General Information
Bid Part Template Bid Part Number Scheduled Open Date
Date Schedule
31467 101 100 1522 2483 3916 rfqdate Fixed_rfqdate_dataset RFQ DATE 538 538 A 3724 1582283435000 3724 1582284150000 1 1 19242 Y 1 N Date Schedule 927945 0 0 0 0 false false Y false
Bid Submission Start Date 19-03-2024 10:00 AM Bid Submission Due Date 30-03-2024 05:00 PM Bid Open Date 01-04-2024 04:00 PM Physical doc Submission End Date as allowed in the tender document 01-04-2024 03:00 PM
Pre-bid Discussion
31468 101 100 1522 2483 3919 prebiddiscussion Pre Bid Discussion Pre Bid Discussion 538 538 A 3724 1582283435000 3724 1582284150000 1 1 19246 Y 2 N Pre-bid Discussion 927944 0 0 0 0 false false Y false
Pre-Bid Discussion Type OFFLINE Pre-Bid Meeting Start Date 21-03-2024 11:30 AM Pre-Bid Meeting End Date 21-03-2024 12:30 PM Venue Details Office of Executive Engineer, P. H. Division, Aurangabad Remarks
Payment
Payment Type Amount Payment Mode Payment Currency Exemption Allowed/Disallowed Exemption Reason EMD 479000 Internet Payment Gateway(IPG),Challan|Bank Guarantee INR N Tender Fee 10000 Internet Payment Gateway(IPG),Challan| INR N Tender Processing Fee 3540 Internet Payment Gateway(IPG),Challan| INR N
GENERAL PARTICULARS
Description Place of Registration. Principal place of Business (i) Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). (ii) Satisfactorily completed design-build part of water supply schemes (piped water supply or lift irrigation) of at least one work of value not less than 10% (Ten percent) of the design-build part of the estimated cost of works for which the bid has been invited during last five years. The main components of the piped water supply or lift irrigation works shall include all or any two of the components viz. TW, pipeline, motor pump installation, construction of elevated water storage structure, house connection, Water treatment Units for communities etc. Or Satisfactorily completed any type of Civil Engineering works of value not less than 25% (Twenty Five Percent) of the estimated cost of at least one work for which the bid has been invited during last five years. Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). undertaking-- Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. Bidding Capacity:------ Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works (Design Build Period) for which bids are invited, B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months Proposed methodology and programme of construction.------ Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Litigation History----- Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
Terms and Conditions
Clause No. Specification Attachment Time of completion in months - 6 4.7 Attach Bid capacity Accept all terms & conditions as per NIT/ Standard Bidding Documents Download the Technical Bid sheet from the attachment tab and fill up all sheets and upload it in the Required attachments.
Attachments
Label File Name Attach File TENDER DOCUMENT Standard Bidding Doc_leftover tolas_non quality affected_rev2.doc Standard Bidding Doc_leftover tolas_non quality affected_rev2.doc NIT RE-NIT-44 (2023-24) SBD_Non Quality-4.pdf RE-NIT-44 (2023-24) SBD_Non Quality-4.pdf Paper Cutting NIT-44 PAPERCUTTING.pdf NIT-44 PAPERCUTTING.pdf CORRIGENDUM CORRIGENDUM-NIT-44.pdf CORRIGENDUM-NIT-44.pdf TECHNICALBID TECHNICALBID GR-05.xlsx TECHNICALBID GR-05.xlsx
Required Attachment
Supporting Document Mandatory Allow Exemption Attachement Group Evaluation Type BIDSECURITY PHOTO COPY Y Y Others BidPart1 LAST 5 YEARS ANNUAL TURN OVER Y N Experiences BidPart1 EXPERIENCE Of SIMILAR NATURE Of W0RKS Y N Experiences BidPart1 BALANCE VALUE OF ON GOING WORKS Y N Experiences BidPart1 EXISTING COMMITMENTS Y N Experiences BidPart1 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES Y N Experiences BidPart1 AFFIDAVIT Y N Experiences BidPart1 UNDERTAKING Y N Experiences BidPart1 LITIGATION HISTORY Y N Experiences BidPart1 PLANT and MACHINARIES Y N Experiences BidPart1 KEY PERSONNEL Y N Experiences BidPart1 Registration Y N Experiences BidPart1 Power of Attoney Y N Experiences BidPart1 Legal Status Of Bidder Y N Experiences BidPart1 PROGRAMME Of CONSTRUCTION Y N Experiences BidPart1 NOC FOR DEBAR Y N Experiences BidPart1 GST CERTIFICATE Y N Experiences BidPart1 PAN CARD Y N Experiences BidPart1 Valid Character Certificate Y N Experiences BidPart1 Any other Documens required as per NIT/ Standard Bidding Documents Required Y Y Others BidPart1 LABOUR LICENCE Y Y Experiences BidPart1 Minimum Quantities of work done of similar nature during last five years. Y N Experiences BidPart1 Technical Bid sheet (Fill and Upload) Y N BidPart1 Satisfactorily completed any type of Civil Engineering works of value not less than 25% (Twenty Five Y N Experiences BidPart1 Satisfactorily completed design-build part of water supply schemes (piped water supply or lift irrig Y N Experiences BidPart1 AUDIT REPORT (with valid Unique Document Identification Number (UDIN)) Y N Experiences BidPart1
BOQ
ITEM CODE ITEM NAME UOM Quantity Estimated Cost BOQ Attachment Mandatory Item GR No-05 DESIGN, CONSTRUCTION, SUPPLYING,TESTING, COMMISSIONING OF MINI RURAL PIPED WATER SUPPLY SCHEME WITH ELECTRIC DRIVEN PUMPS ON TURNKEY BASIS AFTER COMPLETION AND SUCCESSFUL,COMMISSIONING WITH SIX MONTHS TRIAL RUN AND THERE AFTER SIXTY MONTHS COMPREHENSIVE OPERATION AND MAINTAINANCE FOR NON QUALITY TOLA/ HABITATION OF BLOCK -MADANPUR , PANCHAYAT - BANIA (W.NO.- 1,6,7,8,9) & PANCHAYAT - BERI ( W.NO.-4,10) UNDER P.H.DIVISION AURANGABAD. WORK 1 23950000 FINANCIALBID.xls Yes
Created By : Mr Sami Akhter (EXECUTIVE ENGINEER)
Created On : 18-03-2024 03:26 PM