Description Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days Bid validity periods In days |
Description (i) Legal Status of Bidder. |
Description (ii) Place of Registration. |
Description (iii) Principal place of Business |
Description (iv) Power of attorney of signatory Bid Attached or Not |
Description Total value of civil engineering construction work performed in last five years. 2018-19 Escalation Factor= 1.47 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). RS. 127.86 LAKHS Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2019-20 Escalation Factor= 1.36 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). RS. 127.86 LAKHS Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2020-21 Escalation Factor= 1.26 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). RS. 127.86 LAKHS Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2021-22 Escalation Factor= 1.17 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). RS. 127.86 LAKHS Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2022-23 Escalation Factor= 1.08 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). RS. 127.86 LAKHS Amount To be entered (Rs in Lakhs) |
Description Work Experience of Similar Nature Satisfactorily completed design-build part of water supply schemes (piped water supply or lift irrigation) of at least one work of value not less than 10% (Ten percent) of the design-build part of the estimated cost of works for which the bid has been invited during last five years. The main components of the piped water supply or lift irrigation works shall include all or any two of the components viz. TW, pipeline, motor pump installation, construction of elevated water storage structure, house connection, Water treatment Units for communities etc. RS. 25.57 LAKHS OR Work Experience of any Civil work any one year during last five years Satisfactorily completed any type of Civil Engineering works of value not less than 25% (Twenty Five Percent) of the estimated cost of at least one work for which the bid has been invited during last five years. RS. 63.93 LAKHS Amount To be entered (Rs in Lakhs) |
Description Minimum Quantities of work done of similar nature during last five years. Items Unit Quantity Construction of TUBEWELL Nos. 3 Supply & installation of Motor pumps Nos. 3 Supply, Laying of Distribution mains meter 3225 House connections Nos. 142 RCC/ Steel Staging Nos. 3 Arsenic Removal Plant Nos. 3 Value to be entered in unit Nos |
Description Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works for which bids are invited. (For contracts involving operation and maintenance; the period of completion shall be the sum of entire DB duration and half the duration of the O&M period), B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months. RS. 255.73 LAKHS |
Description (a) Existing commitments and ongoing works |
Description (b) Work for which Bid already submitted |
Description Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age Concrete Mixer 2 5 Vibrator 4 5 Rotary Drilling / Reverse Rotary / DTH Rig Machine 1 5 Compressor 1 5 Truck / Tractor with trailer 1 5 Hydraulic Excavator - 5 |
Description Key Personnel Personnel/Qualification/Contract Package Size (work > Rs. 50 Crore) Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1 no Site Engineer B.E. Civil + 07 Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2no. Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or retired J.E. & above of PHED 6 no. Surveyor .B E. Civil + 03 Years Exp. or Dip. Civil + 05 years Exp 1 no. |
Description Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). RS. 25.57 LAKHS |
Description Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) |
Description Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) |
Description Affidavit Regarding statements made in the required attachments are true and correct. |
Description Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 25 % of B.O.Q.Amount 63.93 LAKHS |
|
Description GST No. and Place of Registration |
Description Time of Completion 6 Months To be entered in months |
Description CHARACTER CERTIFICATE |