Description Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days Bid validity periods In days |
Description Legal Status of Bidder. |
Description Place of Registration. |
Description Principal place of Business |
Description Power of attorney of signatory Bid Attached or Not |
Description Total value of civil engineering construction work performed in last five years. 2019-20 Escalation Factor= 1.47 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). Rs. 145.59 Lakhs Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2020-21 Escalation Factor= 1.36 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). Rs. 145.59 Lakhs Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2021-22 Escalation Factor= 1.26 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). Rs. 145.59 Lakhs Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2022-23 Escalation Factor= 1.17 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). Rs. 145.59 Lakhs Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2023-24 Escalation Factor= 1.08 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). Rs. 145.59 Lakhs Amount To be entered (Rs in Lakhs) |
Description Work Experience of Similar nature Satisfactorily completed as a prime contractor (or as a nominated sub contractor, where the sub contract involved the executiion of all main items of the work described in the bid document, provided further that all other qualifications criteria are satisdied) at least one similar work of value not less than the amount specified in the Appendix (not less than 10% (Ten Percent) of the estimated value of Contract. Or Satisfactory completed water supply schemes (Piped water supply schemes) at least one work of value not less than 10% (Ten percent) 0f the estimated cost of works for which the bid has beem invited. Rs. 29.12 (Lakhs) OR Work Experience of any Civil work any one year during last five years. Satisfactorily completed any type of Civil Engineering works of value not less than 25% (Twenty Five Percent) of the estimated cost of at least one work for which the bid has been invited during last five years. Rs, 72.79 Lakhs Amount To be entered (Rs in Lakhs) |
Description Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period. Rs. 291.173 Lakhs Amount To be entered (Rs in Lakhs) |
Description Minimum Quantities of work done of similar nature in any one year during last five years. Items Unit Quantity High Yielding Tube well Nos. 4 Pump/ Motor Nos. 4 Distribution Main meter 4525 House Connection Nos. 300 RCC/Steel Staging Nos. 4 Arsenic removal plant Nos. 4 |
Description Existing commitments and ongoing works. Amount To be entered (Rs in Lakhs) |
Description Work for which Bid already submitted. Amount To be entered (Rs in Lakhs) |
Description Availability of key items of Contractor's Equipment. Type of Equipment/Maximum age No. Required Nos. Max Age Concrete Mixer 1 5 Vibrator 2 5 Rotary Drilling/Reverse Rotary/ DTH Rig Machine 1 10 Compressor 1 5 Truck/Tractor with trailer 1 5 Hydraulic Excavator 0 5 |
Description Key Personnel. Name 2-10 Crores Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED. 1 Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2 Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. or retired J.E. & above of PHED 6 Surveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 1 |
Description Evidence of accesses to Financial Resources. Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). Rs. 29.12 Lakhs Amount To be entered (Rs in Lakhs) |
Description Proposed methodology and programme of construction.Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) |
Description Litigation History. Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) |
Description Affidavit Regarding statements made in the required attachments are true and correct. |
Description Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.25 % of B.O.Q. Amount Rs. 72.59 Lakhs |
|
|
Description Character Certificate |
Description Time of Completion - 06 Months To be entered in months |