General Information
Bid Part Template Bid Part Number Scheduled Open Date
Date Schedule
31467 101 100 1522 2483 3916 rfqdate Fixed_rfqdate_dataset RFQ DATE 538 538 A 3724 1582283435000 3724 1582284150000 1 1 19242 Y 1 N Date Schedule 1070417 0 0 0 0 false false Y false
Bid Submission Start Date 19-08-2024 10:00 AM Bid Submission Due Date 02-09-2024 05:00 PM Bid Open Date 03-09-2024 04:00 PM Physical doc Submission End Date as allowed in the tender document 03-09-2024 03:00 PM
Pre-bid Discussion
31468 101 100 1522 2483 3919 prebiddiscussion Pre Bid Discussion Pre Bid Discussion 538 538 A 3724 1582283435000 3724 1582284150000 1 1 19246 Y 2 N Pre-bid Discussion 1070416 0 0 0 0 false false Y false
Pre-Bid Discussion Type OFFLINE Pre-Bid Meeting Start Date 27-08-2024 11:30 AM Pre-Bid Meeting End Date 27-08-2024 12:30 PM Venue Details Office of Executive Engineer, P. H. Division, Aurangabad Remarks
Payment
Payment Type Amount Payment Mode Payment Currency Exemption Allowed/Disallowed Exemption Reason EMD 560000 Internet Payment Gateway(IPG),Challan|Bank Guarantee INR N Tender Fee 10000 Internet Payment Gateway(IPG),Challan| INR N Tender Processing Fee 3540 Internet Payment Gateway(IPG),Challan| INR N
GENERAL PARTICULARS
Description Place of Registration. Principal place of Business (i) Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). Work Experience (Refer SBD Section 1 ITB Clause 4.5A (b) and 4.5 A (c) ) Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). undertaking-- Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. Bidding Capacity:------ Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works (Design Build Period) for which bids are invited, B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months Proposed methodology and programme of construction.------ Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Litigation History----- Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
Terms and Conditions
Clause No. Specification Attachment Time of completion in months - 6 4.7 Attach Bid capacity Accept all terms & conditions as per NIT/ Standard Bidding Documents Download the Technical Bid sheet from the attachment tab and fill up all sheets and upload it in the Required attachments. Download the financial Bid sheet from the BOQ tab and Bidders should quote rate in price breakup section of BOQ and upload it in the BOQ tab (Evaluation will be done on the basis of uploaded Financial Bid Sheet only)
Attachments
Label File Name Attach File NIT NIT 09-2024-25.pdf NIT 09-2024-25.pdf Paper Cutting NIT-09(2024-25) PAPERCUTTING DT-14.08.2024 (1).pdf NIT-09(2024-25) PAPERCUTTING DT-14.08.2024 (1).pdf TENDER DOCUMENT Standard Bidding Doc_leftover tolas_non quality affected GR-05.doc Standard Bidding Doc_leftover tolas_non quality affected GR-05.doc TECHNICALBID TECHNICALBID GR-05.xlsx TECHNICALBID GR-05.xlsx
Required Attachment
Supporting Document Mandatory Allow Exemption Attachement Group Evaluation Type BIDSECURITY PHOTO COPY Y Y Others BidPart1 BALANCE VALUE OF ON GOING WORKS Y N Experiences BidPart1 EXISTING COMMITMENTS Y N Experiences BidPart1 AFFIDAVIT Y N Experiences BidPart1 Registration Y N Experiences BidPart1 Power of Attoney Y N Experiences BidPart1 Legal Status Of Bidder Y N Experiences BidPart1 PROGRAMME Of CONSTRUCTION Y N Experiences BidPart1 NOC FOR DEBAR Y N Experiences BidPart1 GST CERTIFICATE Y N Experiences BidPart1 PAN CARD Y N Experiences BidPart1 Valid Character Certificate Y N Experiences BidPart1 Any other Documens required as per NIT/ Standard Bidding Documents Required Y Y Others BidPart1 LABOUR LICENCE Y Y Experiences BidPart1 Technical Bid sheet (Fill and Upload) Y N BidPart1 AUDIT REPORT (with valid Unique Document Identification Number (UDIN)) Y N Experiences BidPart1 Work Experience (Refer SBD Section 1 ITB Clause 4.5A (b) and 4.5 A (c)) Y N Experiences BidPart1 LAST 5 YEARS ANNUAL TURN OVER (Refer SBD Section 1 ITB Clause 4.5 A (a)) Y N Experiences BidPart1 Availability of key items of Contractor's Equipment (Refer SBD CI. 4.5 (B) (a) Annexure I) Y N Experiences BidPart1 KEY PERSONNEL (Refer SBD Cl. 4.5(B) (b) Annexure II) Y N Experiences BidPart1 Bidding Capacity ( Refer SBD Section 1 ITB Clause 4.7) Y N Experiences BidPart1 UNDERTAKING (Refer SBD Section 1 ITB Clause 4.2 (ii) Y N Experiences BidPart1 LITIGATION HISTORY (Refer SBD Clause 4.3) Y N Experiences BidPart1 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES(Refer SBD Section 1 ITBClause 4.2 (i) Y N Experiences BidPart1
BOQ
ITEM CODE ITEM NAME UOM Quantity Estimated Cost BOQ Attachment Mandatory Item GR No-05 DESIGN, CONSTRUCTION, SUPPLYING,TESTING, COMMISSIONING OF MINI RURAL PIPED WATER SUPPLY SCHEME WITH ELECTRIC DRIVEN PUMPS ON TURNKEY BASIS AFTER COMPLETION AND SUCCESSFUL,COMMISSIONING WITH SIX MONTHS TRIAL RUN AND THERE AFTER SIXTY MONTHS COMPREHENSIVE OPERATION AND MAINTAINANCE FOR NON QUALITY TOLA/ HABITATION OF BLOCK -MADANPUR , PANCHAYAT - PIRWA (W.NO.- 4,7) & PANCHAYAT - KHIRIYAWAN ( W.NO.- 4,6,15) WORK 1 27966000 FINANCIALBID GR-05.xls Yes
Created By : Mr Sami Akhter (EXECUTIVE ENGINEER)
Created On : 18-08-2024 05:55 PM