Physical doc Submission End Date as allowed in the tender document
03-09-2024 04:00 PM
Pre-bid Discussion
31468
101
100
1522
2483
3919
prebiddiscussion
Pre Bid Discussion
Pre Bid Discussion
538
538
A
3724
1582283435000
3724
1582284150000
1
1
19246
Y
2
N
Pre-bid Discussion
1071781
0
0
0
0
false
false
Y
false
Pre-Bid Discussion Type
OFFLINE
Pre-Bid Meeting Start Date
27-08-2024 11:30 AM
Pre-Bid Meeting End Date
27-08-2024 02:00 PM
Venue Details
OFFICE OF EXECUTIVE ENGINEER P. H ,DIVISION SAHARSA
Remarks
REFER TO THE NIT
Payment
Payment Type
Amount
Payment Mode
Payment Currency
Exemption Allowed/Disallowed
Exemption Reason
EMD
609600
Internet Payment Gateway(IPG),Challan|Bank Guarantee
INR
N
Tender Fee
10000
Internet Payment Gateway(IPG),Challan|
INR
N
Tender Processing Fee
5900
Internet Payment Gateway(IPG),Challan|
INR
N
Payment Type
EMD
Amount
609600
Payment Mode
Internet Payment Gateway(IPG),Challan|Bank Guarantee
Payment Currency
INR
Exemption Allowed/Disallowed
N
Exemption Reason
Payment Type
Tender Fee
Amount
10000
Payment Mode
Internet Payment Gateway(IPG),Challan|
Payment Currency
INR
Exemption Allowed/Disallowed
N
Exemption Reason
Payment Type
Tender Processing Fee
Amount
5900
Payment Mode
Internet Payment Gateway(IPG),Challan|
Payment Currency
INR
Exemption Allowed/Disallowed
N
Exemption Reason
GENERAL PARTICULARS
Description
Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days Bid validity periods In days
(i) Legal Status of Bidder.
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not
(a) Existing commitments and ongoing works
(b) Work for which Bid already submitted
Key Personnel Personnel/Qualification/Contract Package Size (work > Rs. 50 Crore) Project Manager/ B.E. Civil + 10 Years Experience (5 years of PHE Works) 1 no. Site Engineer / B.E. Civil + 7 Years Experience (3 years of PHE works) 2 no. Site superviser / B.E. Civil or Mech. + 05 yrs experiance or Diploma in Civil + 07 Years Experience 6 no. Surveyor / B.E. Civil + 03 Years Exp. Or Dip. Civil + 05 years Exp. 1no.
Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not)
Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
Affidavit Regarding statements made in the required attachments are true and correct.
Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.
PAN No.
GST No.
Character Certificate
Time of Completion 6 Months To be entered in months
Description
Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days Bid validity periods In days
Description
(i) Legal Status of Bidder.
Description
(ii) Place of Registration.
Description
(iii) Principal place of Business
Description
(iv) Power of attorney of signatory Bid Attached or Not
Description
(a) Existing commitments and ongoing works
Description
(b) Work for which Bid already submitted
Description
Key Personnel Personnel/Qualification/Contract Package Size (work > Rs. 50 Crore) Project Manager/ B.E. Civil + 10 Years Experience (5 years of PHE Works) 1 no. Site Engineer / B.E. Civil + 7 Years Experience (3 years of PHE works) 2 no. Site superviser / B.E. Civil or Mech. + 05 yrs experiance or Diploma in Civil + 07 Years Experience 6 no. Surveyor / B.E. Civil + 03 Years Exp. Or Dip. Civil + 05 years Exp. 1no.
Description
Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not)
Description
Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
Description
Affidavit Regarding statements made in the required attachments are true and correct.
Description
Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.
Description
PAN No.
Description
GST No.
Description
Character Certificate
Description
Time of Completion 6 Months To be entered in months
Terms and Conditions
Clause No.
Specification
Attachment
1
All Terms and Conditions are as Per NIT and Bidding Document
2
Bidders should quote the rate in uploaded Financial Excel sheet and upload the sheet in price breakup section of BOQ Tab. (Evaluation will be done on the basis of Uploaded Excel sheet.)
3
Bidder should fill the required information in uploaded technical bid sheet and upload the filled sheet
Clause No.
1
Specification
All Terms and Conditions are as Per NIT and Bidding Document
Attachment
Clause No.
2
Specification
Bidders should quote the rate in uploaded Financial Excel sheet and upload the sheet in price breakup section of BOQ Tab. (Evaluation will be done on the basis of Uploaded Excel sheet.)
Attachment
Clause No.
3
Specification
Bidder should fill the required information in uploaded technical bid sheet and upload the filled sheet
Attachment
Attachments
Label
File Name
Attach File
NIT PDF
nit.pdf
nit.pdf
PAPER CUTTING
paper cutting.pdf
paper cutting.pdf
TECHNICAL SHEET (VIEW ONLY)
TECHNICAL Bid Gr-23NEW.xls
TECHNICAL Bid Gr-23NEW.xls
TENDER DOCUMENT
Bid Document Group 23NEW.doc
Bid Document Group 23NEW.doc
Label
NIT PDF
File Name
nit.pdf
Attach File
nit.pdf
Label
PAPER CUTTING
File Name
paper cutting.pdf
Attach File
paper cutting.pdf
Label
TECHNICAL SHEET (VIEW ONLY)
File Name
TECHNICAL Bid Gr-23NEW.xls
Attach File
TECHNICAL Bid Gr-23NEW.xls
Label
TENDER DOCUMENT
File Name
Bid Document Group 23NEW.doc
Attach File
Bid Document Group 23NEW.doc
Required Attachment
Supporting Document
Mandatory
Allow Exemption
Attachement Group
Evaluation Type
BIDSECURITY PHOTO COPY
Y
N
Others
BidPart1
LAST 5 YEARS ANNUAL TURN OVER
Y
N
Others
BidPart1
EXPERIENCE Of SIMILAR NATURE Of W0RKS
Y
N
Others
BidPart1
QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
Y
N
Others
BidPart1
BALANCE VALUE OF ON GOING WORKS
Y
N
Others
BidPart1
BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
Y
N
Others
BidPart1
AFFIDAVIT
Y
N
Others
BidPart1
UNDERTAKING
Y
N
Others
BidPart1
LITIGATION HISTORY
Y
N
Others
BidPart1
PLANT and MACHINARIES
Y
N
Others
BidPart1
KEY PERSONNEL
Y
N
Others
BidPart1
Power of Attoney
Y
N
Others
BidPart1
Legal Status Of Bidder
Y
N
Others
BidPart1
PROGRAMME Of CONSTRUCTION
Y
N
Others
BidPart1
NOC FOR DEBAR
Y
N
Others
BidPart1
LABOUR LICENCE
Y
N
Others
BidPart1
PAN CARD
Y
N
Others
BidPart1
GST CERTIFICATE
Y
N
Others
BidPart1
Character Certificate
Y
N
Others
BidPart1
Any other Documens required as per NIT/ Standard Bidding Documents Required
Y
N
Others
BidPart1
DEPARTMENTAL REGISTRATION CERTIFICATE
Y
N
Others
BidPart1
Supporting Document
BIDSECURITY PHOTO COPY
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
LAST 5 YEARS ANNUAL TURN OVER
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
EXPERIENCE Of SIMILAR NATURE Of W0RKS
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
BALANCE VALUE OF ON GOING WORKS
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
AFFIDAVIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
UNDERTAKING
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
LITIGATION HISTORY
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
PLANT and MACHINARIES
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
KEY PERSONNEL
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Power of Attoney
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Legal Status Of Bidder
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
PROGRAMME Of CONSTRUCTION
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
NOC FOR DEBAR
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
LABOUR LICENCE
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
PAN CARD
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
GST CERTIFICATE
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Character Certificate
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Any other Documens required as per NIT/ Standard Bidding Documents Required
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
DEPARTMENTAL REGISTRATION CERTIFICATE
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
BOQ
ITEM CODE
ITEM NAME
UOM
Quantity
Estimated Cost
BOQ Attachment
Mandatory Item
Gr. No.-23
Design, construction, supply, Testing, Commissioning of water supply schemes with electric driven motor pump and Iron removal treatment plant having technology (Adsorption/Ion exchange/membrane/Nano Technology etc.) of CSIR or certified by CSIR or any other technology endorsed/approved by GoI in the Iron Affected Panchayat:- AJGAIBA (5C), SOURBAZAR (14B, 14C, 15B), BAIJNATHPUR (1B, 7B, 8B) Total-07 Schemes, Block- Sour Bazar, District - Saharsa on turn-key basis with 06 months trial run after commissioning and comprehensive Operation and Maintenance of 60 Months after Successful completion of Trial Run Period Under Mukhyamantri Nishchay (Quality Affected) Yojna on Turn-key basis under P.H. Division, Saharsa.
Work
1
30480000
Gr-23 FB.xlsx
Yes
ITEM CODE
Gr. No.-23
ITEM NAME
Design, construction, supply, Testing, Commissioning of water supply schemes with electric driven motor pump and Iron removal treatment plant having technology (Adsorption/Ion exchange/membrane/Nano Technology etc.) of CSIR or certified by CSIR or any other technology endorsed/approved by GoI in the Iron Affected Panchayat:- AJGAIBA (5C), SOURBAZAR (14B, 14C, 15B), BAIJNATHPUR (1B, 7B, 8B) Total-07 Schemes, Block- Sour Bazar, District - Saharsa on turn-key basis with 06 months trial run after commissioning and comprehensive Operation and Maintenance of 60 Months after Successful completion of Trial Run Period Under Mukhyamantri Nishchay (Quality Affected) Yojna on Turn-key basis under P.H. Division, Saharsa.