31467101100152224833916rfqdateFixed_rfqdate_datasetRFQ DATE538538A37241582283435000372415822841500001119242Y1NDate Schedule10826520000falsefalseYfalse
Bid Submission Start Date 20-08-2024 11:45 PM
Bid Submission Due Date 02-09-2024 04:00 PM
Bid Open Date 03-09-2024 05:00 PM
Physical doc Submission End Date as allowed in the tender document   03-09-2024 04:00 PM

Pre-bid Discussion
31468101100152224833919prebiddiscussionPre Bid DiscussionPre Bid Discussion538538A37241582283435000372415822841500001119246Y2NPre-bid Discussion10826510000falsefalseYfalse
Pre-Bid Discussion Type OFFLINE
Pre-Bid Meeting Start Date 27-08-2024 11:30 AM
Pre-Bid Meeting End Date 27-08-2024 01:30 PM
Venue Details Office of executive engineer, P.H.Division Jhanjharpur
Remarks Office of executive engineer, P.H.Division Jhanjharpur

Payment
Payment TypeAmountPayment ModePayment CurrencyExemption Allowed/DisallowedExemption Reason
EMD 469800 Internet Payment Gateway(IPG),Challan|Bank Guarantee INR N
Tender Fee 10000 Internet Payment Gateway(IPG),Challan| INR N
Tender Processing Fee 3540 Internet Payment Gateway(IPG),Challan| INR N
Payment Type
EMD
Amount
469800
Payment Mode
Internet Payment Gateway(IPG),Challan|Bank Guarantee
Payment Currency
INR
Exemption Allowed/Disallowed
N
Exemption Reason
Payment Type
Tender Fee
Amount
10000
Payment Mode
Internet Payment Gateway(IPG),Challan|
Payment Currency
INR
Exemption Allowed/Disallowed
N
Exemption Reason
Payment Type
Tender Processing Fee
Amount
3540
Payment Mode
Internet Payment Gateway(IPG),Challan|
Payment Currency
INR
Exemption Allowed/Disallowed
N
Exemption Reason

GENERAL PARTICULARS
Description
Name of the Bidder
Bid validity (Bid shall remains valid for a period not less than 180 days after the deadline date. A bid valid for a shorter period shall be rejected by the employer as non responsive
Legal status of bidder
Place of registration
Principal place of business
Power of attorney of signatory bid
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2019-20)
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2020-21)
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2021-22)
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2022-23)
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2023-24)
Work experience of similar nature. Satisfactory completed as a prime contractor (or as a nominated sub contractor , where the sub contract involved the execution of all main items of the work described in the bid document provided further that all other qualification criteria are satisfied) at least one similar work of value not less than the amount specified in the Appendix not less than 10% (ten percent) of the estimated value of contract. OR Satisfactory completed water supply scheme (Piped water supply scheme) at least one work of value not less than 10% (ten percent) of the estimated cost of works for which the bid has been invited. OR Satisfactory completed any type of civil engineering works of value not less than 25% (twenty five percent) of the estimated cost of at least one work for which the bid has been invited during last five years.
Availability of key items of contractor equipment.
Key personnel
Evidence of accesses to financial resources.
Proposed methodology and program of construction
Litigation history. Information regarding any litigation, current or during the last five years , in which the bidder is involved, the parties concerned, disputed amount (attached or not)
Affidavit. Regarding statements made in the required attachments are true and correct.
Undertaking. Able to invest a minimum cost up to 25% of contract value of work during implementation of contract
PAN NUMBER
GST NUMBER
CHARACTER CERTIFICATE
Time of completion
Minimum quantities of work done of similar nature during last five years.
Bid capacity : "More than the total bid value of present work= A*N*3-B=Rs__Where A=Maximum value of work executed in any one year during last 5 years. N=Nos of years for completion of work. B= value of existing commitments & ongoing works to be completed in period. (a) Existing commitments and ongoing works (b) work for which Bid already submitted.
Description
Name of the Bidder
Description
Bid validity (Bid shall remains valid for a period not less than 180 days after the deadline date. A bid valid for a shorter period shall be rejected by the employer as non responsive
Description
Legal status of bidder
Description
Place of registration
Description
Principal place of business
Description
Power of attorney of signatory bid
Description
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2019-20)
Description
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2020-21)
Description
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2021-22)
Description
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2022-23)
Description
Annual Financial turn over in any one year during the last five years to be not less than 50% of the estimated cost of works under the contract (Rs in lakh) attached shall have valid Unique Document Identification Number (UDIN) (2023-24)
Description
Work experience of similar nature. Satisfactory completed as a prime contractor (or as a nominated sub contractor , where the sub contract involved the execution of all main items of the work described in the bid document provided further that all other qualification criteria are satisfied) at least one similar work of value not less than the amount specified in the Appendix not less than 10% (ten percent) of the estimated value of contract. OR Satisfactory completed water supply scheme (Piped water supply scheme) at least one work of value not less than 10% (ten percent) of the estimated cost of works for which the bid has been invited. OR Satisfactory completed any type of civil engineering works of value not less than 25% (twenty five percent) of the estimated cost of at least one work for which the bid has been invited during last five years.
Description
Availability of key items of contractor equipment.
Description
Key personnel
Description
Evidence of accesses to financial resources.
Description
Proposed methodology and program of construction
Description
Litigation history. Information regarding any litigation, current or during the last five years , in which the bidder is involved, the parties concerned, disputed amount (attached or not)
Description
Affidavit. Regarding statements made in the required attachments are true and correct.
Description
Undertaking. Able to invest a minimum cost up to 25% of contract value of work during implementation of contract
Description
PAN NUMBER
Description
GST NUMBER
Description
CHARACTER CERTIFICATE
Description
Time of completion
Description
Minimum quantities of work done of similar nature during last five years.
Description
Bid capacity : "More than the total bid value of present work= A*N*3-B=Rs__Where A=Maximum value of work executed in any one year during last 5 years. N=Nos of years for completion of work. B= value of existing commitments & ongoing works to be completed in period. (a) Existing commitments and ongoing works (b) work for which Bid already submitted.

Terms and Conditions
Clause No.SpecificationAttachment
01 accept all terms and conditions as per nit NIT-08.pdf
Clause No.
01
Specification
accept all terms and conditions as per nit
Attachment
NIT-08.pdf

Attachments
LabelFile NameAttach File
SBD_Tender_Document-226.644 (Babubarhi) SBD_Tender_Document-226.644 (Babubarhi).doc SBD_Tender_Document-226.644 (Babubarhi).doc
TECH_Bid_Babubarhi-226.644 TECH_Bid_Babubarhi-226.644.xls TECH_Bid_Babubarhi-226.644.xls
NIT-08 NIT-08.pdf NIT-08.pdf
Label
SBD_Tender_Document-226.644 (Babubarhi)
File Name
SBD_Tender_Document-226.644 (Babubarhi).doc
Attach File
SBD_Tender_Document-226.644 (Babubarhi).doc
Label
TECH_Bid_Babubarhi-226.644
File Name
TECH_Bid_Babubarhi-226.644.xls
Attach File
TECH_Bid_Babubarhi-226.644.xls
Label
NIT-08
File Name
NIT-08.pdf
Attach File
NIT-08.pdf

Required Attachment
Supporting DocumentMandatoryAllow ExemptionAttachement GroupEvaluation Type
Bid Validity as per NIT Y N Others BidPart1
Legal Status of Bidder. as per NIT Y N Others BidPart1
Principal place of Business Y N Others BidPart1
Power of attorney of signatory Bid Y N Others BidPart1
Work Experience of any Civil work any one year during last five years as per NIT Y N Others BidPart1
Litigation History as per NIT Y N Others BidPart1
Affidavit as per NIT Y N Others BidPart1
Undertaking as per NIT Y N Others BidPart1
PAN No. Y N Others BidPart1
GST No. Y N Others BidPart1
Character certificate as per NIT Y N Others BidPart1
Time of Completion as per NIT Y N Others BidPart1
Bid Security (EMD) as per NIT Y N Others BidPart1
Place of Registration. with certificate Y N Others BidPart1
TECHNICAL sheet fill and upload Y N Others BidPart1
Any other Documens required as per NIT/ Standard Bidding Documents Required N N Others BidPart1
Total value of civil engineering construction work performed in last five years. as per NIT Y N Others BidPart1
Bidding capacity (a)Existing commitments and ongoing works (b) work for which Bid already submitted. Y N Others BidPart1
Minimum Quantities of work done of similar nature during last five years. Y N Others BidPart1
Annual financial turn over in any one year during the last five years to be not less than 50% Y N Others BidPart1
Availability of key items of Contractor's Equipment as per NIT(Ref. Technical sheet &SBD) Y N Others BidPart1
Key Personnel(Ref. Technical sheet &SBD) Y N Others BidPart1
Evidence of accesses to Financial Resources as per NIT(Ref. Technical sheet &SBD) Y N Others BidPart1
Proposed methodology and programme of construction Y N Others BidPart1
Supporting Document
Bid Validity as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Legal Status of Bidder. as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Principal place of Business
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Power of attorney of signatory Bid
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Work Experience of any Civil work any one year during last five years as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Litigation History as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Affidavit as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Undertaking as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
PAN No.
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
GST No.
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Character certificate as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Time of Completion as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Bid Security (EMD) as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Place of Registration. with certificate
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
TECHNICAL sheet fill and upload
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Any other Documens required as per NIT/ Standard Bidding Documents Required
Mandatory
N
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Total value of civil engineering construction work performed in last five years. as per NIT
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Bidding capacity (a)Existing commitments and ongoing works (b) work for which Bid already submitted.
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Minimum Quantities of work done of similar nature during last five years.
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Annual financial turn over in any one year during the last five years to be not less than 50%
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Availability of key items of Contractor's Equipment as per NIT(Ref. Technical sheet &SBD)
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Key Personnel(Ref. Technical sheet &SBD)
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Evidence of accesses to Financial Resources as per NIT(Ref. Technical sheet &SBD)
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1
Supporting Document
Proposed methodology and programme of construction
Mandatory
Y
Allow Exemption
N
Attachement Group
Others
Evaluation Type
BidPart1

BOQ
ITEM CODEITEM NAMEUOMQuantityEstimated CostBOQ AttachmentMandatory Item
NIT-8 Group 1 Design, Construction, Supply, Testing & Commissioning of Water supply schemes with Electric Driven Pumps for Left Out Tolas/Habitations of Non-Quality wards on turn-key basis with 6 Months Trial Run after commissioning and comprehensive Operation and Maintanance of 60 months after succesful completion of Trial Run Period. (Block - Babubarhi, Panchayat-Dhamoura & Ghonghour) in the District of Madhubani under P.H. Division, Jhanjharpur for the year 2023-24. WORK 1 23491935 FINANCIAL BID BABUBARHI.xlsx Yes
ITEM CODE
NIT-8 Group 1
ITEM NAME
Design, Construction, Supply, Testing & Commissioning of Water supply schemes with Electric Driven Pumps for Left Out Tolas/Habitations of Non-Quality wards on turn-key basis with 6 Months Trial Run after commissioning and comprehensive Operation and Maintanance of 60 months after succesful completion of Trial Run Period. (Block - Babubarhi, Panchayat-Dhamoura & Ghonghour) in the District of Madhubani under P.H. Division, Jhanjharpur for the year 2023-24.
UOM
WORK
Quantity
1
Estimated Cost
23491935
BOQ Attachment
FINANCIAL BID BABUBARHI.xlsx
Mandatory Item
Yes

Created By : Mr Ranjeet Singh (EXECUTIVE ENGINEER)

Created On : 20-08-2024 08:53 PM