Description Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days |
Description (i) Legal Status of Bidder. |
Description (ii) Place of Registration. |
Description (iv) Power of attorney of signatory Bid Attached (If any) or Not |
Description Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2019-20 Escalation Factor= 1.47 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 135.10 LAKHS |
Description Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2020-21 Escalation Factor= 1.36 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 135.10 LAKHS |
Description Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2021-22 Escalation Factor= 1.26 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 135.10 LAKHS |
Description Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2022-23 Escalation Factor= 1.17 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 135.10 LAKHS |
Description Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2023-24 Escalation Factor= 1.08 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 135.10 LAKHS |
Description Work Experience of Similar nature Satisfactorily completed design-build part of water supply schemes (piped water supply or lift irrigation) of at least one work of value not less than 10% (Ten percent) of the design-build part of the estimated cost of works for which the bid has been invited during last five years. The main components of the piped water supply or lift irrigation works shall include all or any two of the components viz. TW, pipeline, motor pump installation, construction of elevated water storage structure, house connection, Water treatment Units for communities etc. RS. 27.20 LAKHS OR Work Experience of Similar nature any one year during last five years Satisfactorily completed any type of Civil Engineering works of value not less than 25% (Twenty Five Percent) of the estimated cost of at least one work for which the bid has been invited during last five years. RS. 67.55 LAKHS |
Description Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works for which bids are invited. (For contracts involving operation and maintenance; the period of completion shall be the sum of entire DB duration and half the duration of the O&M period), B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months RS- 270.20LAKHS |
Description (a) Existing commitments and ongoing works Amount To be entered (Rs in Lakhs) |
Description (b) Work for which Bid already submitted Amount To be entered (Rs in Lakhs) |
Description Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required (Up to Rs. 30 Crore) Nos. Max. Age Concrete Mixer 1 5 Vibrator 2 5 Compressor 1 5 Truck/Tractor with trailer 1 5 Nos. Rotary Drilling / Reverse Rotary /DTH Rig Machine 1 10 |
Description Key Personnel Personnel/Qualification/Contract Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1 Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2 Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 6 Burveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 1 |
Description Evidence of accesses to Financial Resources Evidence of access to or availability of creadit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). - 27.02 LAKHS |
Description Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) |
Description Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) |
Description Affidavit Regarding statements made in the required attachments are true and correct. /Not resigned previously allotted work and not blacklisted from any Organization (Attached or not) |
Description Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. RS. 67.55 LAKHS (Attached or not) |
Description Time of Completion in months 6 months Execution Part & After That Min Six monthes of Trail Run and 60 months of Operation and Maintenance After Successfull Trial Run |
Description Registration No. (Attached or not) |
Description Latest Character Certificate Issued by District Police (Attached or not) |
Description I.T. & G.S.T. Registration Last three year return (Attached or not) |
Description Mobile No. & Email ID |
Description NOC for Debar (Attached or not) |
Description Any Document as per Nit |
|
Description Minimum Quantities of work done of similar nature in any one year during last five years. Construction of High Yielding T/Well Nos. 5 Supply & installation of Motor pumps Nos. 5 Supply, Laying of Distribution mains meter 5600 House connections Nos. 545 RCC/ Steel Staging Nos. 5 |