Description Bid ValidityBids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days Bid validity periods In days |
Description Legal Status of Bidder. |
Description Place of Registration. |
Description Principal place of Business |
Description Power of attorney of signatory Bid Attached or Not |
Description Total value of civil engineering construction work performed in last five years. 2018-19 Escalation Factor= 1.46 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works) volume of construction work of at least the amount equal to 5% (five percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. . Rs. 1.65 Lakhs Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2019-20 Escalation Factor= 1.36 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works) volume of construction work of at least the amount equal to 5% (five percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year). . Rs. 1.65 Lakhs Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2020-21 Escalation Factor= 1.26 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works) volume of construction work of at least the amount equal to 5% (five percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year). . Rs. 1.65 Lakhs Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2021-22 Escalation Factor= 1.16 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works) volume of construction work of at least the amount equal to 5% (five percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year). . Rs. 1.65 Lakhs Amount To be entered (Rs in Lakhs) |
Description Total value of civil engineering construction work performed in last five years. 2022-23 Escalation Factor= 1.08 Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works) volume of construction work of at least the amount equal to 5% (five percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year). . Rs. 1.65 Lakhs Amount To be entered (Rs in Lakhs) |
Description Work Experience of civil engineering construction / Similar nature works "Satisfactorily completed civil engineering construction work of value not less than 5 % (Five percent) of estimated value of work in any one year during last five financial years." Rs. 1.65 Lakhs Amount To be entered (Rs in Lakhs) For new bidders registered New bidders registered / having applied for registration with Govt. Department and having financial capability but no prior turn over but willing to bid, shall be eligible to participate in the tender provided an additional Bank Guarantee to the tune of 2% of estimated cost of the works for which bid has been invited and having validity till the period of work completion duly pledged is submitted with the technical bid of the tender |
Description Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works for which bids are invited. (For contracts involving operation and maintenance; the period of completion shall be the sum of entire DB duration and half the duration of the O&M period), B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months. Rs. 33.05 Lakhs Amount To be entered (Rs in Lakhs) |
Description Existing commitments and ongoing works. Amount To be entered (Rs in Lakhs) |
Description Work for which Bid already submitted. Amount To be entered (Rs in Lakhs) |
Description Availability of key items of Contractor's Equipment. Type of Equipment/Maximum age No. Required Nos. Max Age Concrete Mixer 1 5 Vibrator 2 5 Rotary Drilling/Reverse Rotary/ DTH Rig Machine 1 5 Compressor 0 0 Truck/Tractor with trailer 0 0 Hydraulic Excavator 0 0 |
Description Key Personnel NAME 0-02 Crores Project Manager/ B.E./B.Tech. Civil Engineering 0 Site Engineer / Diploma in Civil Engineering 1 Site supervisor /I.Sc 5 |
Description Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs 3.31 Lakhs). Amount To be entered (Rs in Lakhs) |
Description Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) |
Description Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) |
Description Affidavit Regarding statements made in the required attachments are true and correct. |
Description Undertaking UndertakingAble to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.25 % of B.O.Q. Amount. Rs. 08.26 Lakhs |
|
|
Description Character Certificate |
Description Time of Completion - 04 MonthsTo be entered in months |