General Information
Bid Part Template Bid Part Number Scheduled Open Date
Date Schedule
29676 101 100 1522 2462 3916 rfqdate Fixed_rfqdate_dataset RFQ DATE 538 538 A 3724 1578380101000 3724 1578380631000 1 1 18867 0 Y 1 N Date Schedule 0 1150644 0 0 0 0 false false Y false
Bid Submission Start Date 26-09-2024 06:00 PM Bid Submission Due Date 18-10-2024 03:00 PM Bid Open Date 21-10-2024 03:30 PM Physical doc Submission End Date as allowed in the tender document 21-10-2024 03:00 PM
Pre-bid Discussion
29684 101 100 1522 2462 3919 prebiddiscussion Pre Bid Discussion Pre Bid Discussion 538 538 A 3724 1578380101000 3724 1578380632000 1 1 18871 0 Y 2 N Pre-bid Discussion 0 1150643 0 0 0 0 false false Y false
Pre-Bid Discussion Type OFFLINE Pre-Bid Meeting Start Date 09-10-2024 03:00 PM Pre-Bid Meeting End Date 09-10-2024 04:00 PM Venue Details 09-10-2024 03:00 pm AT CHIEF ENGINEER (NORTH) BUILDING CONSTRUCTION DEPARTMENT PATNA. Remarks 03-10-2024 03:00 pm AT SUPERINTENDING ENGINEER BUILDING CIRCLE MUZAFFARPUR.
Payment
Payment Type Amount Payment Mode Payment Currency Exemption Allowed/Disallowed Exemption Reason EMD 570300 Internet Payment Gateway(IPG),Challan|Bank Guarantee INR N Tender Fee 10000 Internet Payment Gateway(IPG),Challan| INR N Tender Processing Fee 3540 Internet Payment Gateway(IPG),Challan| INR N
GENERAL PARTICULARS
Description ALL INFORMATION IS TO BE FILLED IN REMARK FIEDLD (a) Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given.16.1 Bid Security Amount in Rupees Total Bid Security Amount in Rupees 5,70,300.00 IFB (i) Legal Status of Bidder 4.3(a) (ii) Place of Registration. (iii) write Principal place of Business (iv) Power of attorney of signatory Bid 4.2(iv) Total value of civil engineering construction work, in Rupees, Performed in last five years. minimum annual financial turnover (in all classes of civil engineering construction works only) amount of construction work of at least the equal to the 50 % of estimated cost of works for which bid has been invited. The turn over will be indexed at the rate of 8% for a year i.e. Rs. 1,42,57,318.00 2019 - 2020 2020 - 2021 2021 - 2022 2022 - 2023 2023 - 2024 Amount in Rupees related to Work Experience of Similar nature Satisfactory completed at least one similar work of value not less than 50% of estimated Cost Rs 1,42,57,318.00 4.5(A) (b) Minimum Quantities of work done as prime contractor in any one year during last five years, units shall be same as in Requirement column Items Qty Unit 4.5A( c) Items Qty Unit EARTH WORK/SAND FILLING WORK 1437.891 M3 BRICK WORK 228.878 M3 RCC/PCC 347.519 M3 STONE AND TILE FLOORING 491.732 M2 ELECTRICAL WORK 818580.00 RUPEES FIRE FIGHTING WORK 29750.000 RUPEES PLUMBING WORK 621455.000 RUPEES Electrical License The contractor or his identified sub-contractor should possess required valid electrical license for executing the building electrification works and should have executed similar electrical works for a minimum amount as indicated in Appendix in any one year 4.5A( d) (a) Amount of Existing commitments and ongoing works in Rupees Sec 2-1.4(A) (b) Amount of Work for which Bid already submitted, in Rupees Sec 2-1.4(B) Numbers and Maximum age of Equipment's with bidder Type of Equipment Maxm. Age Nos. Sec 2-1.5 (Vide Departmental Letter No-8274 (bh) Dated-12-10-2012) 1. Concrete Mixer with Integral weigh Batching facility . 5 1 2. Concrete Batching & Mixing plant Minimum capacity 15m3/hr. 5 0 3. Pump for concreting 5 0 4. Transit Mixture 5 0 5. Vibrator (Plate & Niddle) 5 2 6. Water Tanker 5 1 7. Steel shuttering 5 2000 sft Name of the Personnel and Experience in years and Select from drop down list Personnel / Qualification 4.5(B) (b) (Vide Departmental Letter No-8274 (bh) Dated-12-10-2012) 1. Project Manager B.E. Civil + 10 Years Exp. (5 years as Manager having MBA) or equivalent or retired E.E. 0 No. 2. Site Engineer B.E. (Civil) + 03 Years Exp. (3 years in Building Construction) or Diploma in Civil + 7 year Exp. In Building Construction or retired A.E. 1 No 3. Plant Engineer B.E. Mech./ Civil + 03 Years Exp. or Dip. Mech + 05 Years Exp. or Retired J.E. 0 No. 4. Quantity Surveyor B.E. Civil + 03 Years Exp. or Dip. Civil + 05 Years Exp. 0 No. 5. Site Supervisor Fresh Graduate in Civil or Diploma Civil + 02 Years Exp. or retired I.T.I Holder. 1 Nos Evidence of accesses to Financial Resources in Rupees Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (for work under this bid). 4.2(i) Proposed methodology and programme of construction Select from drop down list the proposed methodology and programme of construction, backed with equipment planning and deployment 4.3(l) Litigation History. Select from drop down list. Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) 4.3(j) Affidavit Select from drop down list. Regarding statements made in the required attachments are true and correct. Sec-2, Affidavit Undertaking Select from drop down list. Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. Sec-2, Undertaking Time of Completion in months 09 Months Registration No. IT.& GST Registration & clearance Certificate Labour License Character Certificate NOC for Debar (If required)
Terms and Conditions
Clause No. Specification Attachment NIT08202425 ACCEPT ALL TERMS AND CONDITIONS AS PER NIT, CORRIGENDUM AND SBD NITPCANDC08202425.pdf
Attachments
Label File Name Attach File NITPCANDC08202425 NITPCANDC08202425.pdf NITPCANDC08202425.pdf BOQ08202425PDF BOQ08202425PDF.pdf BOQ08202425PDF.pdf 50 PERCENT MATERIALS 50 PERCENT MATERIALS.pdf 50 PERCENT MATERIALS.pdf SBD08202425PDF SBD08202425PDF.pdf SBD08202425PDF.pdf 00707_Letter no 7292 E-in- C bcd 00707_Letter no 7292 E-in- C bcd.pdf 00707_Letter no 7292 E-in- C bcd.pdf 06397_Letter No 3183 Dated 3-6-2020 06397_Letter No 3183 Dated 3-6-2020.pdf 06397_Letter No 3183 Dated 3-6-2020.pdf 16471_FORBANKGUARANTEECIRCULARS 16471_FORBANKGUARANTEECIRCULARS.pdf 16471_FORBANKGUARANTEECIRCULARS.pdf 29236_NEWADDITIONALPERFORMA 29236_NEWADDITIONALPERFORMA.pdf 29236_NEWADDITIONALPERFORMA.pdf 96007_Letter no 7291 E-in-C bcd 96007_Letter no 7291 E-in-C bcd.pdf 96007_Letter no 7291 E-in-C bcd.pdf CHECKLISTFORCONTRACTORS CHECKLISTFORCONTRACTORS.pdf CHECKLISTFORCONTRACTORS.pdf E-PROC 2.0 ENC LT NO.7534 E-PROC 2.0 ENC LT NO.7534.pdf E-PROC 2.0 ENC LT NO.7534.pdf LETTER NO-7974 E-in-C bcd LETTER NO-7974 E-in-C bcd.pdf LETTER NO-7974 E-in-C bcd.pdf LETTER-8274 LETTER-8274.pdf LETTER-8274.pdf
Required Attachment from Bidder
Supporting Document Mandatory Allow Exemption Attachement Group Evaluation Type REGISTRATION Y N Others BidPart1 ELECTRICAL REGISTARTION Y N Others BidPart1 LEGAL STATUS OF BIDDER Y N Others BidPart1 POWER OF ATTORNEY Y N Others BidPart1 BID SECURITY (EMD) only Bank Guarantee Y N Others BidPart1 PAN CARD Y N Others BidPart1 GST REGISTRATION Y N Others BidPart1 LAST 05 YEARS ANNUAL TURN OVER Y N Others BidPart1 EXPERIENCE OF SIMILAR NATURE OF WORKS Y N Others BidPart1 (A) QUANTITY OF WORK- EARTH WORK, PILE WORK, (RCC/PCC,B/W,FLOORING,PHE AND ELECTRICAL, ETC Y N Others BidPart1 AMOUNT OF EXISTING COMMITMENTS AND ON GOING WORKS Y N Others BidPart1 AMOUNT OF WORK FOR ALREADY SUBMITTED Y N Others BidPart1 BIDDING CAPACITY (BC-AxNx3-B) Y N Others BidPart1 PLANT AND MACHINARIES Y N Others BidPart1 KEY PERSONNEL Y N Others BidPart1 BANKERS CERTIFICATE FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF CREDIT FACILITIES Y N Others BidPart1 AFFIDAVIT (Affidavit should be in proper stamped paper) Y N Others BidPart1 UNDERTAKING Y N Others BidPart1 LITIGATION HISTORY Y N Others BidPart1 NOC FOR DEBAR Y N Others BidPart1 PROGRAMME OF CONSTRUCTION Y N Others BidPart1 ALL OTHER REQUIRED DOCUMENTS AS PER NIT N N Others BidPart1
BOQ
Work Ref No (If Applicable) Name of the Work UOM QUANTITY Rate Estimated Cost (Inclusive of All Taxes & Other Charges) Attachment Mandatory Item NIT08202425 CONSTRUCTION OF ONE NO. PANCHAYAT SARKAR BHAWAN AT MANIKA HARIKESH PANCHAYAT IN MUSHAHARI BLOCK DISTRICT MUZAFFARPUR. Work 1 28514636 28514636 BOQ08202425.xlsx Yes SUM: 28514636 Two crore eighty-five lakh fourteen thousand six hundred and thirty-six
Created By : Mr RAVI CHAND (EXECUTIVE ENGINEER)
Created On : 26-09-2024 04:16 PM