createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1706602710515
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee600.00
emd50000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-02-2024 17:00:00
tenderQueryClose05-02-2024 16:00:00
technicalBidOpen07-02-2024 17:01:01
publishedDate30-01-2024 14:37:22
publishedByPostPWD_EE_DIV_MYS
publishedByUserKPE11845 - G RAJU
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonG RAJU
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212420810
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1706602710797
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT7531
titleConstruction of compound wall beerihundi government training centre building in mysuru taluk.(remaining work)
descriptionConstruction of compound wall beerihundi government training centre building in mysuru taluk.(remaining work)
categoryWORKS
categoryTextWorks
ecv2372654.17
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1674
locationNamePWD Division Office Mysuru
provisionalAmount2800000.0
groupOverheadTotal0.0
fileNumberaee/pwd/beerihundi/college/8443/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17066027110000NoneNoneBuildingsConstruction of compound wall beerihundi government training centre building in mysuru taluk. (remaining work)2372654.17
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
233779069102None2.5Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of light jungle( P No-9, I No-2.5 (ii) B VOL-III CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm484.0484.019.2FalseNoneNoneFalseNoneFalse9292.80
233779169102None1.1Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.( P No-5, I No-1.1 VOL-I CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm91.091.0285.0FalseNoneNoneFalseNoneFalse25935.00
233779269102None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (P.No- 17, I.No-2.5.2 PWD SR VOL-1 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9945.09945.012.22FalseNoneNoneFalseNoneFalse121527.90
233779369102None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.(P.No- 17, I.No-6.32 PWD SR VOL-2 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum1231.01231.0757.28FalseNoneNoneFalseNoneFalse932211.680
233779469102None8.5.2Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P.No- 42, I.No-8.5.2 PWD SR VOL-2 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm349.0349.01660.8FalseNoneNoneFalseNoneFalse579619.20
233779569102None8.27Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P.No- 45, I.No-8.27 PWD SR VOL-2 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm53.053.01660.8FalseNoneNoneFalseNoneFalse88022.40
233779669102None8.30Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P.No- 46, I.No-8.30 PWD SR VOL-2 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm174.0174.01999.2FalseNoneNoneFalseNoneFalse347860.80
233779769102None8.41Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P.No- 48, I.No-8.41 PWD SR VOL-2 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm130.0130.0105.16FalseNoneNoneFalseNoneFalse13670.80
233779869102None11.25.1Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge.( P No-83, I No-11.25.1 VOL-II CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kg136.0136.0565.33FalseNoneNoneFalseNoneFalse76884.880
233779969102None11.3Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.( P No-77, I No-11.3 VOL-II CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm8276.08276.06.21FalseNoneNoneFalseNoneFalse51393.960
233780069102None11.56Fencing with G.I. barbed wire R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used.( P No-95, I No-11.56 VOL-II CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr12.012.02050.0FalseNoneNoneFalseNoneFalse24600.00
233780169102None2.11aProviding and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired steel @ 2.00 kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. (P.No- 18, I.No-2.11 a PWD SR VOL-2 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm928.0928.045.0FalseNoneNoneFalseNoneFalse41760.00
233780269102None2.11Providing ruled pointing to coursed stone masonry with lime mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost all materials, labour, usage charges of machinery, curing complete as per specification.(P.No- 18, I.No-2.11 a PWD SR VOL-2 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm299.0299.0200.25FalseNoneNoneFalseNoneFalse59874.750
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17066027120000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17066027120000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17066027120000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17066030910000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP Portal on or before the last date and time of bid submission.None
17066032080000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPP portal due to internet connectivity issues and technical glitches at bidders end.None
17066032250000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17066032540000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17066032850000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17066033200000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17066033390000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17066033970000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17066034160000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17066034270000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17066034370000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17066034480000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17066034620000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the form of NSC/DD/FDR in the name of the Executive Engineer, PWP & IWT Division, Mysore Division, Mysore given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of Contract.None
17066034710000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17066034860000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17066034960000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost.None
17066035120000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer - in charge of this workNone
17066035350000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17066035750000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17066035860000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17066035970000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Mysore Division, Mysore during office hours on all working days.None
17066036090000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17066036210000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17066036360000NoneNoneELIGIBILITYThe contractor who participates in tenders for more than one work for which tenders are invited in this IFT, the tenderer must fulfill all the conditions and criteria cumulatively for the participated works.None
17066036490000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-2None
17066036580000NoneNoneELIGIBILITYcore cutting results shall be submitted at the time of submission of RA bills.None
17066036750000NoneNoneELIGIBILITYContractor shall submit the Turnover certificates alongwith supporting documents of balance sheets, profit & loss statement & IT returns signed by Chartered Accountants.None
17066036870000NoneNoneELIGIBILITYProvision of payment for 18% GST has been included for the work.None
17066036970000NoneNoneELIGIBILITYContractors should be registered as KPWD Class III & above Civil Contractor.None
17066039540000NoneNoneELIGIBILITY3.1a Achieved in at least two financial years 2018-19 2019-20 2020-21 2021-22 2022-23 a average financial turnover in all classes of civil engineering construction works only of Rs.23.73 LakhsNone
17066039650000NoneNoneELIGIBILITY3.1b)Satisfactorily completed, 2018-19,2019-20,2020-21.2021-22 & 2022-23 as prime contractor, at least one similar nature work of value not less than Rs. 11.87 LAKHSNone
17066039800000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as Assessed available tender capacity AxNx2.5-B ) Where, A -Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress taking into account the completed as well as ongoing works. N-Number of years prescribed for completion of the works for which tenders are invited.B-value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 5 months.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNone3.1b)Satisfactorily completed, 2018-19,2019-20,2020-21.2021-22 & 2022-23 as prime contractor, at least one similar nature work of value not less than Rs. 11.87 LAKHSPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.1a)Achieved in at least two financial years 2018-19,2019-20,2020-21.2021-22 & 2022-23 a average financial turnover (in all classes of civil engineering construction works only) of Rs. 23.73 LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersList of existing commitments and ongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN from CA and Profit & loss statementsTrueTechnical Bid
KPWD Registration Certificate-CLASS-IV & ABOVETrueTechnical Bid
SIMILAR NATURE OF WORK EXPERIENCE CERTIFICATETrueTechnical Bid
Existing Commitments work details - B-Value - should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone