createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1706619956942
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd43625.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose08-02-2024 17:00:00
tenderQueryClose07-02-2024 17:00:00
technicalBidOpenNone
publishedDate30-01-2024 19:31:30
publishedByPostCMC_MCOM_UDP
publishedByUserKPE15327 - RAYAPPA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonYashwanth prabhu
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9743412642
tenderSupplierListNone
tenderSchedule
createdTs1706619956973
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/OW/WORK_INDENT13564
titleConstruction of road and drain thottam SC colony sudeer sankri house in Vadabhandeshwara ward
descriptionConstruction of road and drain thottam SC colony sudeer house to sankri house road in Vadabhandeshwara ward
categoryWORKS
categoryTextWorks
ecv1744973.27
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2411
locationNameDMA City Municipal Council Udupi
provisionalAmount1745000.0
groupOverheadTotal266182.36
fileNumberUCMC/CR/B2/CR/156/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17066199570000NoneNoneOther WorksConstruction of road and drain thottam SC colony sudeer sankri house in Vadabhandeshwara ward1478790.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
234105269277Nonecode01Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.If the height of embankment construction is more than if rollers are not used and tamping is done manually Add for works under foul & sullage situation PWD SR 2021-22 Vol:1 P.NO.6.No:1.8 vol-1.Cum530.88530.88408.0FalseNoneNoneFalseNoneFalse216599.040
234105369277Nonecode02Earth work excavation by manual means for drains,canals, waste weir draft,approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, including setting out, shoring,strutting, barricading, caution lights, excavated surface leveled and sides neatlydressed disposing off or leveling the excavated stuff or sorting & stacking theselected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth Sl. No.1.5.1 P.No. 6/CSR 2023-2024 Vol-1Cum334.88334.8872.0FalseNoneNoneFalseNoneFalse24111.360
234105469277Nonecode03Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Depth upto 3.00m)(Pg 8, Item No. 1.14.1 Vol I PWDSR 2023-24)Cum114.24114.2472.0FalseNoneNoneFalseNoneFalse8225.280
234105569277Nonecode04Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Pg 15, Item No. 2.1.3 Vol I PWDSR 2023-24)Cum6707.686707.6810.5FalseNoneNoneFalseNoneFalse70430.640
234105669277Nonecode05Loosening, leveling and Compacting original ground supportingembankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. Sl. No.3.7, 406 P.No. 16/CSR 2023-24 VOL-3Cum117.6117.640.8FalseNoneNoneFalseNoneFalse4798.080
234105769277Nonecode06Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcementincluding cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Sl. No.3.7, 406 P.No. 16/CSR 2021-22 VOL-3Tonne96804.9696804.962.575FalseNoneNoneFalseNoneFalse249272.7720
234105869277Nonecode07Providing and laying in Cement Concrete for all Basement & surface levelworks, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevantIS Codes machine mixed with super plasticisers, laid in layers, well compactedusing needle vibrators, providing weep holes wherever necessary, including alllead & lifts, cost of all materials of quality, labour, Usage charges of machinery,curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Page no 16, item no2.3.1 , UNI SR 2023-24)Cum9560.389560.3852.2FalseNoneNoneFalseNoneFalse499051.8360
234105969277Nonecode08Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC in mechanical mix plant carriageof mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density Sl. No.4.17, 406 P.No. 31/CSR 2023-24 VOL-3Cum2866.082866.0841.65FalseNoneNoneFalseNoneFalse119372.2320
234106069277Nonecode09Construction of un-reinforced plain cement concrete pavementusing RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. Thesuperplastisiser confirming to IS 9103-1999 Reaffirmed-2008,Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. (Groove cutting shall be paid seperately) Sl. No.6.6 P.No. 51/CSR 2023-24 VOL-3Cum7586.887586.8835.7FalseNoneNoneFalseNoneFalse270851.6160
234106169277Nonecode10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications (Pg 7, Item No. 1.10 Vol I PWDSR 2023-24)Cum179.2179.212.24FalseNoneNoneFalseNoneFalse2193.4080
234106269277Nonecode11Cutting of Trees, excluding removal of stumps and roots of trees Girth from 900 mm to 1800 mm (page no. 9 Si no.1.3 code no.2.1(201)( KUWS&DB 2021-22)Each1983.521983.527.0FalseNoneNoneFalseNoneFalse13884.640
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17066199580000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17066199580000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17066199580000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17066199580000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17066199580000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17066199580000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17066199580000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17066199580000NoneNoneELIGIBILITYBanker DetailsNone
17066199750000NoneNoneELIGIBILITYGST shall be paid SeparatelyNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Contractor Registration CertificateTrueTechnical Bid
Similar work done CertificateTrueTechnical Bid
ESI &EPF registration certificateTrueTechnical Bid
Payment more towards workers ESI &EPF challan up to till monthTrueTechnical Bid
GST registration certificateTrueTechnical Bid
Unbalanced tender difference amount in the form of FDR-100 percentage- excluding 10 percentageTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone