createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1705593276554
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee1750.00
emd70000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-02-2024 16:30:00
tenderQueryClose08-02-2024 17:30:00
technicalBidOpen12-02-2024 16:00:00
publishedDate31-01-2024 18:36:26
publishedByPostPWD_EE_DIV_KLB
publishedByUserKPE14204 - SUBHASH L SHIXNAKAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer PWD Division Kalaburgi
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08472256652
mobileNumber9448652632
tenderSupplierListNone
tenderSchedule
createdTs1705593276591
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT7549
titleCONSTRUCTION OF FOUR CLASS ROOM TO GOVERNMENT HIGHER PRIMARY & HIGH SCHOOL AT BIRAL (B) VILLAGE IN JEWARGI TALUKA DIST KALABURAGI UNDER KKRDB MICRO FOR THE YEAR 2023-24(KLB231023364) (Reserved for SC category)
descriptionCONSTRUCTION OF FOUR CLASS ROOM TO GOVERNMENT HIGHER PRIMARY & HIGH SCHOOL AT BIRAL (B) VILLAGE IN JEWARGI TALUKA DIST KALABURAGI UNDER KKRDB MICRO FOR THE YEAR 2023-24(KLB231023364) (Reserved for SC category)
categoryWORKS
categoryTextWorks
ecv6978034.59
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1689
locationNamePWD Division Office Kalaburagi
provisionalAmount8250000.0
groupOverheadTotal0.0
fileNumberPWD/SD/JEW/2022-23/KKRDB/6
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17055932770000NoneNoneBuildingsCONSTRUCTION OF FOUR CLASS ROOM TO GOVERNMENT HIGHER PRIMARY & HIGH SCHOOL AT BIRAL (B) VILLAGE IN JEWARGI TALUKA DIST KALABURAGI UNDER KKRDB MICRO FOR THE YEAR 2023-243883216.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
222192465038NoneItem No.1.5.1 Page No.6, Vol - I PWD CSR - 2023-24Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depthCum313.95313.95127.3FalseNoneNoneFalseNoneFalse39965.8350
222192565038NoneItem No.1.9, Page No.7, Vol - IFilling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Cum279.3279.3101.83FalseNoneNoneFalseNoneFalse28441.1190
222192665038NoneItem No. 1.8, Page No.7, Vol - IConstruction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.7119.97FalseNoneNoneFalseNoneFalse59709.0690
222192765038NoneItem No.2.1.2, Page No.15, Vol - IProviding and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregatesCum5947.25947.226.47FalseNoneNoneFalseNoneFalse157422.3840
222192865038NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6961.56961.510.57FalseNoneNoneFalseNoneFalse73583.0550
222192965038NoneVol-I S R Sl no. 1 (b) page no. 111Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for Foundation upto Plinth All other types add 8 PercentCum556.92556.9210.57FalseNoneNoneFalseNoneFalse5886.64440
222193065038NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6961.56961.59.56FalseNoneNoneFalseNoneFalse66551.940
222193165038NoneVol-I S R Sl No. 9 page No. 111Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) add 70 percentCum4873.054873.059.56FalseNoneNoneFalseNoneFalse46586.3580
222193265038NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6961.56961.58.18FalseNoneNoneFalseNoneFalse56945.070
222193365038NoneVol-I S R Sl no. 2 Page No. 111Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for Plinth Beams of Buildings add 50 PercentCum3480.753480.758.18FalseNoneNoneFalseNoneFalse28472.5350
222193465038NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6961.56961.519.22FalseNoneNoneFalseNoneFalse133800.030
222193565038NoneVol-I S R Sl no. 14 Page No. 112Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding RCC Beams, Lintels & Troughs of Aqueducts add 60 PercentCum4176.94176.919.22FalseNoneNoneFalseNoneFalse80280.0180
222193665038NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6961.56961.533.79FalseNoneNoneFalseNoneFalse235229.0850
222193765038NoneVol-I S R SL no. 15 Page No. 112Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Roof Slabs add 50 PercentCum / K3480.753480.7533.79FalseNoneNoneFalseNoneFalse117614.54250
222193865038NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6961.56961.50.4FalseNoneNoneFalseNoneFalse2784.60
222193965038NoneVol-I S R SL No. 19 Page No. 112Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding Chejjas, Canopy & Other Architectural projections of minor sections add 45 PerecntCum3132.673132.670.4FalseNoneNoneFalseNoneFalse1253.0680
222194065038NoneItem No.5.1.1, Page No.9, Vol - 2Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5891.555891.5555.13FalseNoneNoneFalseNoneFalse324801.15150
222194165038NoneItem No.5.4, Page No.9, Vol - 2Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6708.456708.4533.94FalseNoneNoneFalseNoneFalse227684.7930
222194265038NoneItem No.6.8, Page No.14, Vol - 2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum8367.458367.4568.64FalseNoneNoneFalseNoneFalse574341.7680
222194365038NoneItem No.8.2.2, Page No.41, Vol - 2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-ChargeSqm292.95292.95530.94FalseNoneNoneFalseNoneFalse155538.8730
222194465038NoneItem No.8.1.2, Page No.41, Vol - 2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm253.05253.05215.45FalseNoneNoneFalseNoneFalse54519.62250
222194565038NoneItem No.12.13.1 Page No.100, Vol - 2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.Cum103755.75103755.750.33FalseNoneNoneFalseNoneFalse34239.39750
222194665038NoneItem No.12.21 Page No.100, Vol - 2Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures)Sqm6029.16029.17.56FalseNoneNoneFalseNoneFalse45579.9960
222194765038NoneItem No.12.51 Page No.104, Vol - 2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.No1066.81066.84.0FalseNoneNoneFalseNoneFalse4267.20
222194865038NoneItem No. 9.35 Page No.64, Vol - 2Flooring with 25mm thick polished shahabad slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications.Sqm1717.81717.8228.22FalseNoneNoneFalseNoneFalse392036.3160
222194965038NoneItem No.11.44 Page No.91, Vol - 2Providing and fixing double glazed hermetically sealed glazing in alu minium windows, ventilators and partition etc. with 6 mm thick clear float glass both side, having 12 mm air gap, including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant) etc. as per specifications, drawings and direction of Engineer-in-charge complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-ChargeSqm4562.254562.2523.76FalseNoneNoneFalseNoneFalse108399.060
222195065038NoneItem No.11.34.B Page No.86, Vol - 2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.Kg192.15192.15498.96FalseNoneNoneFalseNoneFalse95875.1640
222195165038NoneItem No.8.34.1 Page No.47, Vol - 2Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as perspecifications and as per directions of Engineer-in-charge.Sqm55.6555.6519.66FalseNoneNoneFalseNoneFalse1094.0790
222195265038NoneItem No.8.33.2 Page No.46, Vol - 2Painting wood work with Deluxe Multi Surface Paint of requiredshade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm144.9144.919.66FalseNoneNoneFalseNoneFalse2848.7340
222195365038NoneItem No.8.33.3 Page No.47, Vol - 2Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm145.95145.9523.76FalseNoneNoneFalseNoneFalse3467.7720
222195465038NoneItem No.8.51, Page No.50, Vol - 2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.Sqm105.0105.0609.32FalseNoneNoneFalseNoneFalse63978.60
222195565038NoneItem No.8.25, Page No.45, Vol - 2Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm143.85143.85609.32FalseNoneNoneFalseNoneFalse87650.6820
222195665038NoneItem No.8.29, Page No.45, Vol - 2Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm297.15297.15149.47FalseNoneNoneFalseNoneFalse44415.01050
222195765038NoneItem No.2.11 (a) Vol-I 2023-24 S R Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildingst93929.8593929.855.52FalseNoneNoneFalseNoneFalse518492.7720
222195865038NoneI No. 8.7 Vol-III 2023-24 S R Page No. 65Providing and erecting direction and place identification retro reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawingSqm9460.59460.51.0FalseNoneNoneFalseNoneFalse9460.50
17055932770000NoneNoneBuildingsFISRT FLOOR2821135.75
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
222195965039NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7031.117031.119.56FalseNoneNoneFalseNoneFalse67217.41160
222196065039NoneVol-I S R Sl No. 9 page No. 111Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) add 70 percentCum4921.784921.789.56FalseNoneNoneFalseNoneFalse47052.21680
222196165039NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7031.117031.1119.47FalseNoneNoneFalseNoneFalse136895.71170
222196265039NoneVol-I S R Sl no. 14 Page No. 112Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding RCC Beams, Lintels & Troughs of Aqueducts add 60 PercentCum4218.674218.6719.47FalseNoneNoneFalseNoneFalse82137.50490
222196365039NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7031.117031.1133.79FalseNoneNoneFalseNoneFalse237581.20690
222196465039NoneVol-I S R SL no. 15 Page No. 112Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Roof Slabs add 50 PercentCum / K3515.563515.5633.79FalseNoneNoneFalseNoneFalse118790.77240
222196565039NoneItem No.2.5.1, Page No.16, Vol - IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7031.117031.110.4FalseNoneNoneFalseNoneFalse2812.4440
222196665039NoneVol-I S R SL No. 19 Page No. 112Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding Chejjas, Canopy & Other Architectural projections of minor sections add 45 PerecntCum3164.03164.00.4FalseNoneNoneFalseNoneFalse1265.60
222196765039NoneItem No.6.8, Page No.14, Vol - 2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum8451.128451.1268.64FalseNoneNoneFalseNoneFalse580084.87680
222196865039NoneItem No.8.2.2, Page No.41, Vol - 2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-ChargeSqm295.88295.88530.94FalseNoneNoneFalseNoneFalse157094.52720
222196965039NoneItem No.8.1.2, Page No.41, Vol - 2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm255.58255.58226.31FalseNoneNoneFalseNoneFalse57840.30980
222197065039NoneItem No.12.13.1 Page No.100, Vol - 2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.Cum104793.31104793.310.33FalseNoneNoneFalseNoneFalse34581.79230
222197165039NoneItem No.12.21 Page No.100, Vol - 2Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures)Sqm6089.396089.397.56FalseNoneNoneFalseNoneFalse46035.78840
222197265039NoneItem No.12.51 Page No.104, Vol - 2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.No1077.471077.474.0FalseNoneNoneFalseNoneFalse4309.880
222197365039NoneItem No. 9.12.2 Page No.60, Vol - 2Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mmSqm1214.271214.27239.08FalseNoneNoneFalseNoneFalse290307.67160
222197465039NoneItem No.11.44 Page No.91, Vol - 2Providing and fixing double glazed hermetically sealed glazing in alu minium windows, ventilators and partition etc. with 6 mm thick clear float glass both side, having 12 mm air gap, including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant) etc. as per specifications, drawings and direction of Engineer-in-charge complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-ChargeSqm4607.874607.8723.76FalseNoneNoneFalseNoneFalse109482.99120
222197565039NoneItem No.11.34.B Page No.86, Vol - 2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.Kg194.07194.07498.96FalseNoneNoneFalseNoneFalse96833.16720
222197665039NoneItem No.8.34.1 Page No.47, Vol - 2Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as perspecifications and as per directions of Engineer-in-charge.Sqm56.2156.2119.66FalseNoneNoneFalseNoneFalse1105.08860
222197765039NoneItem No.8.33.2 Page No.46, Vol - 2Painting wood work with Deluxe Multi Surface Paint of requiredshade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm146.35146.3519.66FalseNoneNoneFalseNoneFalse2877.2410
222197865039NoneItem No.8.33.3 Page No.47, Vol - 2Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm147.41147.4123.76FalseNoneNoneFalseNoneFalse3502.46160
222197965039NoneItem No.8.51, Page No.50, Vol - 2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.Sqm106.05106.05609.32FalseNoneNoneFalseNoneFalse64618.3860
222198065039NoneItem No.8.25, Page No.45, Vol - 2Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm145.29145.29609.32FalseNoneNoneFalseNoneFalse88528.10280
222198165039NoneItem No.8.29, Page No.45, Vol - 2Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm300.12300.12149.47FalseNoneNoneFalseNoneFalse44858.93640
222198265039NoneItem No.2.11 (a) Vol-I 2023-24 S R Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildingst93859.1593859.155.81FalseNoneNoneFalseNoneFalse545321.66150
17055932770000NoneNoneBuildingsELECTRICAL WORK273682.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
222198365040None1.2.1Concealed Conduit System Supplying heavy gauge PVC conduit pipe mm dia .mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25mm dia 2mm thickMtr66.066.0400.0FalseNoneNoneFalseNoneFalse26400.00
222198465040None1.3.2Supplying heavy gauge PVC Conduit Pipe .dia .mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.25mm dia 2mm thickMtr79.079.0400.0FalseNoneNoneFalseNoneFalse31600.00
222198565040None1.5.2Supplying and fixing PVC/metal conduit Deep junction box 25mm deep junction boxMtr56.056.020.0FalseNoneNoneFalseNoneFalse1120.00
222198665040None1.6.3Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete 10"x7"x3" (254x178x76mm)Mtr112.0112.016.0FalseNoneNoneFalseNoneFalse1792.00
222198765040None1.12Supplying And Fixing Metal Fan Box with Round Hook.No160.0160.016.0FalseNoneNoneFalseNoneFalse2560.00
222198865040None2.1.1Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Short point upto 3Mtr from tapping point to out let via switchPoint285.0285.016.0FalseNoneNoneFalseNoneFalse4560.00
222198965040None2.1.2Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Medium point above 3Mtr upto 6Mtr from tapping point to out let via switchPoint394.0394.016.0FalseNoneNoneFalseNoneFalse6304.00
222199065040None2.1.3Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Long point above 6Mtr upto 10Mtr from tapping point to out let via switchPoint570.0570.016.0FalseNoneNoneFalseNoneFalse9120.00
222199165040None2.5.2Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS:8130-1984 and (Virgin) PVC insulation sheathed suitabl 3C X 1.5Sq.mmMtr72.072.0400.0FalseNoneNoneFalseNoneFalse28800.00
222199265040None2.5.3Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS:8130-1984 and (Virgin) PVC insulation sheathed suitabl 4C X 1.5Sq.mmMtr94.094.0400.0FalseNoneNoneFalseNoneFalse37600.00
222199365040NoneElectrical DSR It.no 3.1.1Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 6Amps 2 WayEach128.0128.016.0FalseNoneNoneFalseNoneFalse2048.00
222199465040None3.14.2Supplying and fixing/replacing of 6/16/32Amps electrical accessories on existing switch board.6Amps 2way SwitchNo70.070.016.0FalseNoneNoneFalseNoneFalse1120.00
222199565040None3.5.1Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.1 to 3 ModuleEach137.0137.076.0FalseNoneNoneFalseNoneFalse10412.00
222199665040None3.5.4Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.6 ModuleEach234.0234.020.0FalseNoneNoneFalseNoneFalse4680.00
222199765040None3.8Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N.F. screws.Sq CM0.410.4180000.0FalseNoneNoneFalseNoneFalse32800.00
222199865040None6.3.2Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system.Each3031.03031.016.0FalseNoneNoneFalseNoneFalse48496.00
222199965040None13.7.1Fixing all types and all capacities of fluorescent / false ceiling/ spot light / CFL / LED fittings indoor on the wall / ceiling /rafters / girders using 23/0.0076 twin twisted PVC insulatedwires, required Nos of round blocks and clamps.Each122.0122.032.0FalseNoneNoneFalseNoneFalse3904.00
222200065040None13.11Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring.Each315.0315.016.0FalseNoneNoneFalseNoneFalse5040.00
222200165040None5.19.12Supplying and fixing regular MCB distribution boards on wall/ wood board / flush mounting using required clamps, bolts,nuts etc., with provision for fixing suitable type capacityMCB's single phase / 3 phase / single door with powdercoated painting. Made out of 14 SWG MS enclosure.Each4940.04940.02.0FalseNoneNoneFalseNoneFalse9880.00
222200265040None5.18.1Supplying and fixing miniature circuit breakers on existingMCB distribution boards using necessary fixing materialsand 'C' Type curve, indicator ON/OFF, energy cross-3 withShort circuit breaking capacity of 10K and complete wiringas required confirming to IEC 60898Each415.0415.06.0FalseNoneNoneFalseNoneFalse2490.00
222200365040None5.18.4Supplying and fixing miniature circuit breakers on existingMCB distribution boards using necessary fixing materialsand 'C' Type curve, indicator ON/OFF, energy cross-3 withShort circuit breaking capacity of 10K and complete wiringas required confirming to IEC 60898.Each739.0739.04.0FalseNoneNoneFalseNoneFalse2956.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17055932790000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17055932790001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17055932790001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of kppp portal on or before the last date and time of bid submission.None
17064937740000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17064937780000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17064937830000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17064937890000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17064937910000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17064937960000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17064938020000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the Bid. The Original Certificate/Certificates shall be produced at the time of opening of technical Bids for physical verification.None
17064938730000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year(both days inclusive).None
17064938860000NoneNoneELIGIBILITYThe Tenderer shall scan the Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machinery and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17064938910000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the BidderNone
17064938960000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reason.None
17064939000000NoneNoneELIGIBILITYThe defect liability period for this work is 365 daysNone
17064939030000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kppp portal.None
17064939090000NoneNoneELIGIBILITYThe rates of all the items appeared in Bill of Quantities are inclusive of all leads and liftsNone
17064939130000NoneNoneELIGIBILITYThe contractor shall bound to comply the prevailing rules and regulations with regard to the EPF rules and any modifications before and after execution of agreementNone
17064939190000NoneNoneELIGIBILITYAfter the award of the contract, the contractor has to furnish the details in respect of labour employed and the EPF details for this work in every RA bill.None
17064939250000NoneNoneELIGIBILITYBidders are advised to note that , 18% GST will be added to the contract amount.None
17064939290000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next section.None
17064939330000NoneNoneELIGIBILITYThe bidder should mention the UDIN No on the turnover certificate, failing which bid is rejected.None
17064940020000NoneNoneELIGIBILITYIf the bidder uploaded the false document while participating in the tender, the bidder will be responsible and action will be initiated as per the tender clause.None
17064940100000NoneNoneELIGIBILITYThe work should be completed in 06 (Six) Months ( including monsoon)None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 a) a) Achieved in at least two financial years an average financial turnover (in all classes of civil engineering construction works only) of Rs. 69.78lakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 b) Satisfactorily completed, as prime contractor, at least one any nature or similar work such as Building Work of value not less than Rs. 17.44LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20 2020-21, 2021-22 & 2022-23 c) Executed in any one year, the following minimum quantities of work: 1) PCC/RCC 137.00Cum, 2) BBM/SSM 136.98Cum 3) Plaster 1050.91Sqm 4) TMT 9.06 TonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAs per the Govt Order No: FD 263 EXP-12/2022 Bangelore Dated: 11.05.2022 as per condition no 3 relaxation of machinery upto Rs. 300.00 Lakhs i.e. KW-3 & KW-4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and scanned copies of the owership Documents & Hire commitment Agreements
NoneNoneNoneNoneQualification and experience of the key technical and Management personnel in permanent employment with the Tenderer and those that are proposed to be deployed on this work, if work is awarded.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Biodata of the personnel
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of no less than Rs. 20.93lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etcFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneReport on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five years.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneLatest Income Tax Clearance CertificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneAssessed Tender Capacity shall be more than the Tendered AmountOthersAssessed Tender Capacity
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Assessement on the Letter Head of the Tenderer
NoneNoneNoneNoneConstitutional or Legal Status of the TendererOthersLegal Status
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation on works which are yet to be completedOthersPending work
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5 and Certificates in Format-3
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted Tender.OthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.OthersCPM/PERT
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- CPM/PERT Chart
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate having UDINTrueTechnical Bid
PWD Contractor Registration certificateTrueTechnical Bid
Any nature of Work done or one similar work done certificate 25percent of APT to qualify QuanitiyTrueTechnical Bid
SC Reserved Category certificate and domicile certificateTrueTechnical Bid
Line of creditTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone