tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1705389104000 | 0 | None | None | Buildings | Ground Floor - CONSTRUCTION OF GOVERNMENT PRE UNIVERSITY COLLEGE BUILDING AT KADUR | 6773401.07 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2159191 | 63372 | None | Item no- 1.12,Page No-8, Vol 1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 95.0 | 95.0 | 38.99 | False | None | None | False | None | False | 3704.05 | 0 | 2159192 | 63372 | None | Item no- 1.14.1,Page No-8, Vol 1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 102.0 | 102.0 | 240.43 | False | None | None | False | None | False | 24523.86 | 0 | 2159193 | 63372 | None | Item no- 1.15.2,Page No-9, Vol 1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 1.5m, but not exceeding 3 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 425.0 | 425.0 | 60.11 | False | None | None | False | None | False | 25546.75 | 0 | 2159194 | 63372 | None | Item no- 4.1,Page No-5, Vol 2 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 ltr/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 118.0 | 118.0 | 302.57 | False | None | None | False | None | False | 35703.26 | 0 | 2159195 | 63372 | None | Item no- 1.9,Page No-7, Vol 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 266.0 | 266.0 | 240.44 | False | None | None | False | None | False | 63957.04 | 0 | 2159196 | 63372 | None | Item no- 1.11,Page No-7, Vol 1 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 433.0 | 433.0 | 128.21 | False | None | None | False | None | False | 55514.93 | 0 | 2159197 | 63372 | None | Item no- 2.1.3,Page No-15, Vol 1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 5989.0 | 5989.0 | 50.81 | False | None | None | False | None | False | 304301.09 | 0 | 2159198 | 63372 | None | Item no- 2.2.3,Page No-15, Vol 1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Isolated Footing - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 6842.88 | 6842.88 | 71.16 | False | None | None | False | None | False | 486939.3408 | 0 | 2159199 | 63372 | None | Item no- 2.4.3,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 10771.2 | 10771.2 | 5.03 | False | None | None | False | None | False | 54179.136 | 0 | 2159200 | 63372 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Column - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 11633.1 | 11633.1 | 12.06 | False | None | None | False | None | False | 140295.186 | 0 | 2159201 | 63372 | None | Item no- 2.4.3,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Plinth Beam - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 9504.0 | 9504.0 | 24.67 | False | None | None | False | None | False | 234463.68 | 0 | 2159202 | 63372 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams and Lintels - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 10948.8 | 10948.8 | 20.66 | False | None | None | False | None | False | 226202.208 | 0 | 2159203 | 63372 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Slab and Staircase - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 10264.5 | 10264.5 | 41.49 | False | None | None | False | None | False | 425874.105 | 0 | 2159204 | 63372 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 7048.29 | 7048.29 | 2.57 | False | None | None | False | None | False | 18114.1053 | 0 | 2159205 | 63372 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Chejja - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 9922.35 | 9922.35 | 5.13 | False | None | None | False | None | False | 50901.6555 | 0 | 2159206 | 63372 | None | Item no- 2.11 (a),Page No-18, Vol 1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | t | 89457.0 | 89457.0 | 16.24 | False | None | None | False | None | False | 1452781.68 | 0 | 2159207 | 63372 | None | Item no- 5.4,Page No-9, Vol 2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 6389.0 | 6389.0 | 12.94 | False | None | None | False | None | False | 82673.66 | 0 | 2159208 | 63372 | None | Item no- 6.32,Page No-17, Vol 2 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1310.0 | 1310.0 | 320.65 | False | None | None | False | None | False | 420051.5 | 0 | 2159209 | 63372 | None | Item no- 6.34,Page No-17, Vol 2 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1104.0 | 1104.0 | 39.89 | False | None | None | False | None | False | 44038.56 | 0 | 2159210 | 63372 | None | Item no- 12.13.1,Page No-100, Vol 2 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 98815.0 | 98815.0 | 0.38 | False | None | None | False | None | False | 37549.7 | 0 | 2159211 | 63372 | None | Item no- 12.51,Page No-105, Vol 2 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 1016.0 | 1016.0 | 4.0 | False | None | None | False | None | False | 4064.0 | 0 | 2159212 | 63372 | None | Item no- 10.6.3,Page No-69, Vol 2 | Providing and fixing expansion hold fasteners on C.C./R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.Fastener with threaded dia 12 mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 60.0 | 60.0 | 16.0 | False | None | None | False | None | False | 960.0 | 0 | 2159213 | 63372 | None | Item no- 12.20,Page No-100, Vol 2 | Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 6150.0 | 6150.0 | 9.0 | False | None | None | False | None | False | 55350.0 | 0 | 2159214 | 63372 | None | Item no- 12.57.5,Page No-105, Vol 2 | Providing and fixing 35 mm thick one side teak and one side commercial flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 3897.0 | 3897.0 | 8.75 | False | None | None | False | None | False | 34098.75 | 0 | 2159215 | 63372 | None | Item no- 12.54,Page No-104, Vol 2 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 318.0 | 318.0 | 20.0 | False | None | None | False | None | False | 6360.0 | 0 | 2159216 | 63372 | None | Item no- 12.55.1,Page No-104, Vol 2 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges with both side prelam ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 2366.0 | 2366.0 | 6.72 | False | None | None | False | None | False | 15899.52 | 0 | 2159217 | 63372 | None | Item no- 12.88,Page No-110, Vol 2 | Providing & fixing of 2-track x 2-panel sliding window made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour havingisolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P s shall not be made) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 5390.0 | 5390.0 | 1.89 | False | None | None | False | None | False | 10187.1 | 0 | 2159218 | 63372 | None | Item no- 12.90,Page No-110, Vol 2 | Providing & fixing of 3 track x 2 panel sliding windows made out of multi chambered UPVC(Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 6734.0 | 6734.0 | 47.7 | False | None | None | False | None | False | 321211.8 | 0 | 2159219 | 63372 | None | Item no- 12.85,Page No-109, Vol 2 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 5719.0 | 5719.0 | 4.5 | False | None | None | False | None | False | 25735.5 | 0 | 2159220 | 63372 | None | Item no- 11.34B,Page No-86, Vol 2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Kg | 183.0 | 183.0 | 1201.2 | False | None | None | False | None | False | 219819.6 | 0 | 2159221 | 63372 | None | Item no- 8.1.2,Page No-41, Vol 2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 241.0 | 241.0 | 692.33 | False | None | None | False | None | False | 166851.53 | 0 | 2159222 | 63372 | None | Item no- 8.51,Page No-50, Vol 2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 100.0 | 100.0 | 1087.78 | False | None | None | False | None | False | 108778.0 | 0 | 2159223 | 63372 | None | Item no- 8.2.2,Page No-41, Vol 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 279.0 | 279.0 | 397.16 | False | None | None | False | None | False | 110807.64 | 0 | 2159224 | 63372 | None | Item no- 9.2,Page No-59, Vol 2 | Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed at 2 litre per 50 kg of cement or as per direction of Engineer incharge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 800.0 | 800.0 | 75.72 | False | None | None | False | None | False | 60576.0 | 0 | 2159225 | 63372 | None | Item no- 9.17.2,Page No-61, VOL 2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1175.0 | 1175.0 | 159.75 | False | None | None | False | None | False | 187706.25 | 0 | 2159226 | 63372 | None | Item no- 9.24,Page No-63, Vol 2 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.
** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 2852.0 | 2852.0 | 152.75 | False | None | None | False | None | False | 435643.0 | 0 | 2159227 | 63372 | None | Item no- 10.1.1,Page No-69, Vol 2 | Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Area of the slab upto 0.50 m2 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 4006.0 | 4006.0 | 53.0 | False | None | None | False | None | False | 212318.0 | 0 | 2159228 | 63372 | None | Item no- 9.11,Page No-60, Vol 2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 889.0 | 889.0 | 18.58 | False | None | None | False | None | False | 16517.62 | 0 | 2159229 | 63372 | None | Item no- 10.14,Page No-71, Vol 2 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados,over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1106.0 | 1106.0 | 76.27 | False | None | None | False | None | False | 84354.62 | 0 | 2159230 | 63372 | None | Item no- 11.28,Page No-85, Vol 2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Kg | 565.0 | 565.0 | 272.25 | False | None | None | False | None | False | 153821.25 | 0 | 2159231 | 63372 | None | Item no- 8.33.1,Page No-46, Vol 2 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree
angle with 10 years life ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 158.0 | 158.0 | 1087.78 | False | None | None | False | None | False | 171869.24 | 0 | 2159232 | 63372 | None | Item no- 8.30,Page No-46, Vol 2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 174.0 | 174.0 | 397.16 | False | None | None | False | None | False | 69105.84 | 0 | 2159233 | 63372 | None | Item no- 8.33.3,Page No-47, Vol 2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 139.0 | 139.0 | 52.2 | False | None | None | False | None | False | 7255.8 | 0 | 2159234 | 63372 | None | Item no- 8.16.2,Page No-43, Vol 2 | Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment. Plaster mesh 150mm wide ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 38.0 | 38.0 | 247.75 | False | None | None | False | None | False | 9414.5 | 0 | 2159235 | 63372 | None | Item no- 8.49,Page No-49, Vol 2 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Per cm Height Per Letter | 4.0 | 4.0 | 1790.0 | False | None | None | False | None | False | 7160.0 | 0 | 2159236 | 63372 | None | Item no- 8.84,Page No-55, Vol 2 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 475.0 | 475.0 | 7.2 | False | None | None | False | None | False | 3420.0 | 0 | 2159237 | 63372 | None | Item no- 22.4,Page No-217, Vol 2 | Providing and supplying Kitchen cabinet with 19mm thick one side Architect recommended decorative Acrylic Glossy or Matt finished laminate (1.5mm thick) and other side balancing lamination(preferably white) on factory pressed BWP grade marine ply as per IS 710 of approved brand . complete as per direction of engineer in-charge. (Payment of providing and fixing auto closing hinges shall be paid separately) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 3100.0 | 3100.0 | 28.0 | False | None | None | False | None | False | 86800.0 | 0 |
| 1705389104000 | 0 | None | None | Buildings | First Floor - CONSTRUCTION OF GOVERNMENT PRE UNIVERSITY COLLEGE BUILDING AT KADUR | 3758682.88 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2159238 | 63373 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 11749.43 | 11749.43 | 11.42 | False | None | None | False | None | False | 134178.4906 | 0 | 2159239 | 63373 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams & Lintels - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 11058.29 | 11058.29 | 17.93 | False | None | None | False | None | False | 198275.1397 | 0 | 2159240 | 63373 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Roof Slab and Staircase - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 10367.15 | 10367.15 | 41.14 | False | None | None | False | None | False | 426504.551 | 0 | 2159241 | 63373 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 7118.77 | 7118.77 | 2.41 | False | None | None | False | None | False | 17156.2357 | 0 | 2159242 | 63373 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Chejja - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 10021.57 | 10021.57 | 1.89 | False | None | None | False | None | False | 18940.7673 | 0 | 2159243 | 63373 | None | Item no- 2.11 (a),Page No-18, Vol 1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | t | 90351.57 | 90351.57 | 9.04 | False | None | None | False | None | False | 816778.1928 | 0 | 2159244 | 63373 | None | Item no- 8.16a,Page No-44, Vol 2 | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1250.38 | 1250.38 | 24.07 | False | None | None | False | None | False | 30096.6466 | 0 | 2159245 | 63373 | None | Item no- 6.32,Page No-17, Vol 2 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1323.1 | 1323.1 | 273.55 | False | None | None | False | None | False | 361934.005 | 0 | 2159246 | 63373 | None | Item no- 6.34,Page No-17, Vol 2 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1115.4 | 1115.4 | 26.94 | False | None | None | False | None | False | 30048.876 | 0 | 2159247 | 63373 | None | Item no- 12.13.1,Page No-100, Vol 2 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 99803.15 | 99803.15 | 0.29 | False | None | None | False | None | False | 28942.9135 | 0 | 2159248 | 63373 | None | Item no- 12.51,Page No-105, Vol 2 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos. | 1026.16 | 1026.16 | 3.0 | False | None | None | False | None | False | 3078.48 | 0 | 2159249 | 63373 | None | Item no- 10.6.3,Page No-69, Vol 2 | Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.Fastener with threaded dia 12 mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 60.6 | 60.6 | 18.0 | False | None | None | False | None | False | 1090.8 | 0 | 2159250 | 63373 | None | Item no- 12.57.5,Page No-105, Vol 2 | Providing and fixing 35 mm thick one side teak and one side commercial flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 3935.97 | 3935.97 | 8.75 | False | None | None | False | None | False | 34439.7375 | 0 | 2159251 | 63373 | None | Item no- 12.54,Page No-104, Vol 2 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 321.18 | 321.18 | 20.0 | False | None | None | False | None | False | 6423.6 | 0 | 2159252 | 63373 | None | Item no- 12.55.1,Page No-104, Vol 2 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges with both side prelam ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 2389.66 | 2389.66 | 6.72 | False | None | None | False | None | False | 16058.5152 | 0 | 2159253 | 63373 | None | Item no- 12.90,Page No-110, Vol 2 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 6801.34 | 6801.34 | 26.1 | False | None | None | False | None | False | 177514.974 | 0 | 2159254 | 63373 | None | Item no- 12.85,Page No-109, Vol 2 | Providing & fixing of louvered ventilator made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) and lead free with gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 5776.19 | 5776.19 | 4.86 | False | None | None | False | None | False | 28072.2834 | 0 | 2159255 | 63373 | None | Item no- 11.34B,Page No-86, Vol 2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Kg | 184.83 | 184.83 | 650.16 | False | None | None | False | None | False | 120169.0728 | 0 | 2159256 | 63373 | None | Item no- 8.1.2,Page No-41, Vol 2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 243.41 | 243.41 | 430.12 | False | None | None | False | None | False | 104695.5092 | 0 | 2159257 | 63373 | None | Item no- 8.51,Page No-50, Vol 2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 101.0 | 101.0 | 737.73 | False | None | None | False | None | False | 74510.73 | 0 | 2159258 | 63373 | None | Item no- 8.2.2,Page No-41, Vol 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 281.79 | 281.79 | 394.39 | False | None | None | False | None | False | 111135.1581 | 0 | 2159259 | 63373 | None | Item no- 9.17.2,Page No-61, Vol 2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1186.75 | 1186.75 | 159.75 | False | None | None | False | None | False | 189583.3125 | 0 | 2159260 | 63373 | None | Item no- 9.24,Page No-63, Vol 2 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.
** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 2880.52 | 2880.52 | 103.93 | False | None | None | False | None | False | 299372.4436 | 0 | 2159261 | 63373 | None | Item no- 10.1.1,Page No-69, Vol 2 | Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 4046.06 | 4046.06 | 9.0 | False | None | None | False | None | False | 36414.54 | 0 | 2159262 | 63373 | None | Item no- 15.10,Page No-151, Vol 2 | Newly Constructed Bathroom/toilet/balcony/utility with
Cementatius Waterproof coating - Below 300 m2
Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (1 Liquid: 2 Powder), to the RCC surface like bathroom, toilet, balcony & utility area applied @ 1.7kg/m2 in 2 coats to achieve 1mm DFT, having Elongation at break 50% as per ASTM D 412, Tensile strength 1N/mm2 as per ASTM D 412, Adhesion strength: 0.80 N/mm2 as per ASTM D 4541, crack bridging upto 1mm as per ASTM C 836, Water penetration (5 bar pressure) as per BS EN 12390.The finished cost to include surface
preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per specification. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 370.67 | 370.67 | 30.39 | False | None | None | False | None | False | 11264.6613 | 0 | 2159263 | 63373 | None | Item no- 7.18,Page No-23, Vol 2 | Providing and laying cinder concrete in cement 1:15 (1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 2037.17 | 2037.17 | 7.05 | False | None | None | False | None | False | 14362.0485 | 0 | 2159264 | 63373 | None | Item no- 9.11,Page No-60, Vol 2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 897.89 | 897.89 | 23.49 | False | None | None | False | None | False | 21091.4361 | 0 | 2159265 | 63373 | None | Item no- 10.14,Page No-71, Vol 2 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados,over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1117.06 | 1117.06 | 79.0 | False | None | None | False | None | False | 88247.74 | 0 | 2159266 | 63373 | None | Item no- 11.28,Page No-85, Vol 2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Kg | 570.65 | 570.65 | 269.79 | False | None | None | False | None | False | 153955.6635 | 0 | 2159267 | 63373 | None | Item no- 8.33.1,Page No-46, Vol 2 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 159.58 | 159.58 | 737.73 | False | None | None | False | None | False | 117726.9534 | 0 | 2159268 | 63373 | None | Item no- 8.30,Page No-46, Vol 2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 175.74 | 175.74 | 394.39 | False | None | None | False | None | False | 69310.0986 | 0 | 2159269 | 63373 | None | Item no- 8.33.3,Page No-47, Vol 2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 140.39 | 140.39 | 30.96 | False | None | None | False | None | False | 4346.4744 | 0 | 2159270 | 63373 | None | Item no- 8.16.2,Page No-43, Vol 2 | Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment. Plaster mesh 150mm wide ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 38.38 | 38.38 | 247.75 | False | None | None | False | None | False | 9508.645 | 0 | 2159271 | 63373 | None | Item no- 8.84,Page No-55, Vol 2 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 479.75 | 479.75 | 7.2 | False | None | None | False | None | False | 3454.2 | 0 |
| 1705389104000 | 0 | None | None | Buildings | Terrece floor - CONSTRUCTION OF GOVERNMENT PRE UNIVERSITY COLLEGE BUILDING AT KADUR | 874661.05 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2159272 | 63374 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Column - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 11865.76 | 11865.76 | 4.28 | False | None | None | False | None | False | 50785.4528 | 0 | 2159273 | 63374 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams and Lintels - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 11167.78 | 11167.78 | 2.74 | False | None | None | False | None | False | 30599.7172 | 0 | 2159274 | 63374 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Slab and Staircase - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 10469.79 | 10469.79 | 3.59 | False | None | None | False | None | False | 37586.5461 | 0 | 2159275 | 63374 | None | Item no- 2.5.2,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill - The cost of formwork is included ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 7189.26 | 7189.26 | 0.4 | False | None | None | False | None | False | 2875.704 | 0 | 2159276 | 63374 | None | Item no- 2.11,Page No-18, Vol 1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | t | 91246.14 | 91246.14 | 1.54 | False | None | None | False | None | False | 140519.0556 | 0 | 2159277 | 63374 | None | tem no- 6.32,Page No-17, Vol 2 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1336.2 | 1336.2 | 144.05 | False | None | None | False | None | False | 192479.61 | 0 | 2159278 | 63374 | None | Item no- 11.5.2,Page No-77, Vol 2 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 4326.84 | 4326.84 | 2.25 | False | None | None | False | None | False | 9735.39 | 0 | 2159279 | 63374 | None | Item no- 12.9,Page No-110, Vol 2 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 6868.68 | 6868.68 | 1.8 | False | None | None | False | None | False | 12363.624 | 0 | 2159280 | 63374 | None | Item no- 11.34B,Page No-86, Vol 2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Kg | 186.66 | 186.66 | 37.8 | False | None | None | False | None | False | 7055.748 | 0 | 2159281 | 63374 | None | Item no- 8.1.2,Page No-41, Vol 2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 245.82 | 245.82 | 57.43 | False | None | None | False | None | False | 14117.4426 | 0 | 2159282 | 63374 | None | Item no- 8.51,Page No-50, Vol 2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 102.0 | 102.0 | 100.41 | False | None | None | False | None | False | 10241.82 | 0 | 2159283 | 63374 | None | Item no- 8.2.2,Page No-41, Vol 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 284.58 | 284.58 | 285.06 | False | None | None | False | None | False | 81122.3748 | 0 | 2159284 | 63374 | None | Item no- 15.1,Page No-149, Vol 2 | Polyurethane based Single Component for New Surface Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing embrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 833.34 | 833.34 | 258.93 | False | None | None | False | None | False | 215776.7262 | 0 | 2159285 | 63374 | None | Item no- 8.33.1,Page No-46, Vol 2 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 161.16 | 161.16 | 100.41 | False | None | None | False | None | False | 16182.0756 | 0 | 2159286 | 63374 | None | Item no- 8.3,Page No-46, Vol 2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 177.48 | 177.48 | 285.06 | False | None | None | False | None | False | 50592.4488 | 0 | 2159287 | 63374 | None | Item no- 8.33.3,Page No-47, Vol 2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 141.78 | 141.78 | 1.8 | False | None | None | False | None | False | 255.204 | 0 | 2159288 | 63374 | None | Item no- 8.16.2,Page No-43, Vol 2 | Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment. Plaster mesh 150mm wide ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 38.76 | 38.76 | 61.2 | False | None | None | False | None | False | 2372.112 | 0 |
| 1705389104000 | 0 | None | None | Buildings | Water Supply and Sanitary works | 682733.96 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2159289 | 63375 | None | Item no- 13.3.1,Page No-117, Vol 2 | Providing and fixing brass stop cock of approved quality :15 mm nominal bore ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 299.0 | 299.0 | 30.0 | False | None | None | False | None | False | 8970.0 | 0 | 2159290 | 63375 | None | Item no- 13.20.2,Page No-120, Vol 2 | Providing and fixing PTMT pillar cock of approved quality and colour. 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 gms ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 314.0 | 314.0 | 12.0 | False | None | None | False | None | False | 3768.0 | 0 | 2159291 | 63375 | None | Item no- 14.1.1,Page No-131, Vol 2 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 4884.0 | 4884.0 | 8.0 | False | None | None | False | None | False | 39072.0 | 0 | 2159292 | 63375 | None | Item no- 14.2.1,Page No-131, Vol 2 | Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlleddevice (handle lever), conforming to IS : 7231, with all fittings andfixtures complete, including cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 4838.0 | 4838.0 | 1.0 | False | None | None | False | None | False | 4838.0 | 0 | 2159293 | 63375 | None | Item no- 14.4.1,Page No-131, Vol 2 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 4454.0 | 4454.0 | 12.0 | False | None | None | False | None | False | 53448.0 | 0 | 2159294 | 63375 | None | Item no- 14.7.8,Page No-133, Vol 2 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar
taps, 32 mm C.P. brass waste of standard pattern, including painting of
fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Surgeon type wash basin of size 660x460 mm with a pair of 15 mm C.P. brass pillar taps with elbow including operated levers ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 4113.0 | 4113.0 | 4.0 | False | None | None | False | None | False | 16452.0 | 0 | 2159295 | 63375 | None | Item no- 14.8,Page No-133, Vol 2 | Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 1423.0 | 1423.0 | 4.0 | False | None | None | False | None | False | 5692.0 | 0 | 2159296 | 63375 | None | Item no- 14.32.2,Page No-136, Vol 2 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 453x357 mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 1018.0 | 1018.0 | 4.0 | False | None | None | False | None | False | 4072.0 | 0 | 2159297 | 63375 | None | Item no- 14.40.2,Page No-137, Vol 2 | Providing and fixing PTMT towel rail complete with brackets fixed to
wooden cleats with CP brass screws with concealed fittings arrangement
of approved quality and colour, 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 496.0 | 496.0 | 4.0 | False | None | None | False | None | False | 1984.0 | 0 | 2159298 | 63375 | None | Item no- 13.31.2,Page No-122, Vol 2 | Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 20mm nominal dia pipes ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 242.0 | 242.0 | 70.0 | False | None | None | False | None | False | 16940.0 | 0 | 2159299 | 63375 | None | Item no- 13.31.3,Page No-122, Vol 2 | Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 25mm nominal dia pipes ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 318.0 | 318.0 | 60.0 | False | None | None | False | None | False | 19080.0 | 0 | 2159300 | 63375 | None | Item no- 13.31.4,Page No-122, Vol 2 | Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 32mm nominal dia pipes ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 400.0 | 400.0 | 60.0 | False | None | None | False | None | False | 24000.0 | 0 | 2159301 | 63375 | None | Item no- 13.31.6,Page No-122, Vol 2 | Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 50mm nominal dia pipes ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 781.0 | 781.0 | 90.0 | False | None | None | False | None | False | 70290.0 | 0 | 2159302 | 63375 | None | Item no- 13.4.4,Page No-117, Vol 2 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) :50 mm nominal bore ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 855.0 | 855.0 | 30.0 | False | None | None | False | None | False | 25650.0 | 0 | 2159303 | 63375 | None | Item no- 13.8.2.2,Page No-118, Vol 2 | Providing and fixing unplasticised PVC connection pipe with brass unions :20 mm nominal bore ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 110.0 | 110.0 | 30.0 | False | None | None | False | None | False | 3300.0 | 0 | 2159304 | 63375 | None | Item no- 13.34,Page No-123, Vol 2 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Ltr | 9.0 | 9.0 | 3000.0 | False | None | None | False | None | False | 27000.0 | 0 | 2159305 | 63375 | None | Item no- 686,Page No-45, Vol 5 | PVC pipes of10 Kg/cm2 for 110mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 335.0 | 335.0 | 80.0 | False | None | None | False | None | False | 26800.0 | 0 | 2159306 | 63375 | None | Item no- 664,Page No-44, Vol 5 | PVC pipes of 10 Kg/cm2 for 200mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 1155.0 | 1155.0 | 50.0 | False | None | None | False | None | False | 57750.0 | 0 | 2159307 | 63375 | None | Item no- 672,Page No-44, Vol 5 | PVC pipes of 4 Kg/cm2 for 200mm(4.256) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 488.0 | 488.0 | 51.2 | False | None | None | False | None | False | 24985.6 | 0 | 2159308 | 63375 | None | Item no- 1.4.1,Page No-5, Vol 1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 242.0 | 242.0 | 19.2 | False | None | None | False | None | False | 4646.4 | 0 | 2159309 | 63375 | None | Item no- 13.33.10,Page No-123, Vol 2 | Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge. External work - 150mm nominal dia pipes ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 5306.0 | 5306.0 | 30.0 | False | None | None | False | None | False | 159180.0 | 0 | 2159310 | 63375 | None | Item no- 16.9,Page No-191, Vol 5 | Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 5454.0 | 5454.0 | 6.0 | False | None | None | False | None | False | 32724.0 | 0 | 2159311 | 63375 | None | Item no- 14.11.2,Page No-134, Vol 2 | Providing and fixing white vitreous china laboratory sink with C.I. brackets, C.P. brass chain with rubber plug, 40 mm C.P brass waste and 40mm C.P. brass trap with necessary C.P. brass unions complete, including painting of fittings and brackets, cutting and making good the wall wherever required Size 600x450x200 mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 5082.0 | 5082.0 | 4.0 | False | None | None | False | None | False | 20328.0 | 0 | 2159312 | 63375 | None | Item no- 14.29,Page No-136, Vol 2 | Providing and fixing 100 mm sand cast Iron grating for gully trap. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 47.0 | 47.0 | 15.0 | False | None | None | False | None | False | 705.0 | 0 | 2159313 | 63375 | None | Item no- 13.22.1.2,Page No-120, Vol 2 | Providing and fixing PTMT grating of approved quality and colour 125 mm nominal dia ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 44.0 | 44.0 | 15.0 | False | None | None | False | None | False | 660.0 | 0 | 2159314 | 63375 | None | Item no- 14.17.1,Page No-134, Vol 2 | Providing and fixing a pair of white vitreous china foot rests of standard pattern for squatting pan water closet : 250x130x30 mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 200.0 | 200.0 | 15.0 | False | None | None | False | None | False | 3000.0 | 0 | 2159315 | 63375 | None | Item no- 2.1.3,Page No-15, Vol 1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 5989.0 | 5989.0 | 0.15 | False | None | None | False | None | False | 898.35 | 0 | 2159316 | 63375 | None | Item no- 2.4.3,Page No-17, Vol 1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 6336.0 | 6336.0 | 0.52 | False | None | None | False | None | False | 3294.72 | 0 | 2159317 | 63375 | None | Item no- 2.11 (a),Page No-18, Vol 1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | t | 89457.0 | 89457.0 | 0.06 | False | None | None | False | None | False | 5367.42 | 0 | 2159318 | 63375 | None | Item no- 5.4,Page No-9, Vol 2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 6389.0 | 6389.0 | 2.23 | False | None | None | False | None | False | 14247.47 | 0 | 2159319 | 63375 | None | Item no- 1.9,Page No-7, Vol 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 266.0 | 266.0 | 13.5 | False | None | None | False | None | False | 3591.0 | 0 |
| 1705389104000 | 0 | None | None | Buildings | Electrical estimate | 541066.2 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2159320 | 63376 | None | 1.2.1, Pg No 2 , Vol 6 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 66.0 | 66.0 | 480.0 | False | None | None | False | None | False | 31680.0 | 0 | 2159321 | 63376 | None | 1.2.2, Pg No 2 , Vol 6 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thick ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 78.0 | 78.0 | 80.0 | False | None | None | False | None | False | 6240.0 | 0 | 2159322 | 63376 | None | 1.3.1, Pg No 2 , Vol 6 | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.19/20 mm dia 2 mm thick ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 68.0 | 68.0 | 148.0 | False | None | None | False | None | False | 10064.0 | 0 | 2159323 | 63376 | None | 1.3.2, Pg No 2 , Vol 6 | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 79.0 | 79.0 | 40.0 | False | None | None | False | None | False | 3160.0 | 0 | 2159324 | 63376 | None | 1.5.1, Pg No 2 , Vol 6 | Supplying and fixing PVC/metal conduit Deep junction box 19/20 mm deep Junction box ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 49.0 | 49.0 | 80.0 | False | None | None | False | None | False | 3920.0 | 0 | 2159325 | 63376 | None | 1.5.2, Pg No 3 , Vol 6 | Supplying and fixing PVC/metal conduit Deep junction box 25 mm deep Junction box ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 56.0 | 56.0 | 20.0 | False | None | None | False | None | False | 1120.0 | 0 | 2159326 | 63376 | None | 1.13, Pg no 4, Vol 6 | Supplying And Fixing Metal Fan Box with Round Hook. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 117.0 | 117.0 | 24.0 | False | None | None | False | None | False | 2808.0 | 0 | 2159327 | 63376 | None | 2.3.2, Pg no 5, Vol 6 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 1.5 mm2 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 26.0 | 26.0 | 1140.0 | False | None | None | False | None | False | 29640.0 | 0 | 2159328 | 63376 | None | 2.3.3, Pg no 5, Vol 6 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 2.5 mm2 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 42.0 | 42.0 | 1830.0 | False | None | None | False | None | False | 76860.0 | 0 | 2159329 | 63376 | None | 2.3.4, Pg no 5, Vol 6 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 4 mm2 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 63.0 | 63.0 | 540.0 | False | None | None | False | None | False | 34020.0 | 0 | 2159330 | 63376 | None | 2.2.1, Pg no 5, Vol 6 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Short point upto 3Mtr from tapping point to out let via switch box ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Point | 269.0 | 269.0 | 24.0 | False | None | None | False | None | False | 6456.0 | 0 | 2159331 | 63376 | None | 2.2.2, Pg no 5, Vol 6 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch box ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Point | 379.0 | 379.0 | 33.0 | False | None | None | False | None | False | 12507.0 | 0 | 2159332 | 63376 | None | 2.2.3, Pg no 5, Vol 6 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Point | 555.0 | 555.0 | 40.0 | False | None | None | False | None | False | 22200.0 | 0 | 2159333 | 63376 | None | 2.2.4, Pg no 5, Vol 6 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Two outlet in a row, above 3Mtr upto 6Mtr from tapping point to out let via switches ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Point | 677.0 | 677.0 | 2.0 | False | None | None | False | None | False | 1354.0 | 0 | 2159334 | 63376 | None | 3.4.1, Pg no 8, Vol 6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall1-2 Way
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 138.0 | 138.0 | 4.0 | False | None | None | False | None | False | 552.0 | 0 | 2159335 | 63376 | None | 3.4.2, Pg no 8, Vol 6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall3 Way ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 159.0 | 159.0 | 4.0 | False | None | None | False | None | False | 636.0 | 0 | 2159336 | 63376 | None | 3.4.3, Pg no 8, Vol 6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall4-5 Way ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 177.0 | 177.0 | 10.0 | False | None | None | False | None | False | 1770.0 | 0 | 2159337 | 63376 | None | 3.4.4, Pg no 8, Vol 6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall6 Way ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 220.0 | 220.0 | 4.0 | False | None | None | False | None | False | 880.0 | 0 | 2159338 | 63376 | None | 3.4.5, Pg no 8, Vol 6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall8 Way ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 261.0 | 261.0 | 8.0 | False | None | None | False | None | False | 2088.0 | 0 | 2159339 | 63376 | None | 3.4.6, Pg no 8, Vol 6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall10-12 Way ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 319.0 | 319.0 | 24.0 | False | None | None | False | None | False | 7656.0 | 0 | 2159340 | 63376 | None | 3.4.7, Pg no 8, Vol 6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall16 Way ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 363.0 | 363.0 | 10.0 | False | None | None | False | None | False | 3630.0 | 0 | 2159341 | 63376 | None | 3.5.1, Pg no 8, Vol 6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.1 to 2 Module ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 137.0 | 137.0 | 4.0 | False | None | None | False | None | False | 548.0 | 0 | 2159342 | 63376 | None | 3.5.2, Pg no 8, Vol 6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.3 Module ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 161.0 | 161.0 | 4.0 | False | None | None | False | None | False | 644.0 | 0 | 2159343 | 63376 | None | 3.5.3, Pg no 8, Vol 6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.4 Module ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 175.0 | 175.0 | 10.0 | False | None | None | False | None | False | 1750.0 | 0 | 2159344 | 63376 | None | 3.5.4, Pg no 8, Vol 6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.6 Module ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 234.0 | 234.0 | 4.0 | False | None | None | False | None | False | 936.0 | 0 | 2159345 | 63376 | None | 3.5.5, Pg no 8, Vol 6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.8 Module ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 284.0 | 284.0 | 8.0 | False | None | None | False | None | False | 2272.0 | 0 | 2159346 | 63376 | None | 3.5.6, Pg no 8, Vol 6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.10-12 Module ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 344.0 | 344.0 | 24.0 | False | None | None | False | None | False | 8256.0 | 0 | 2159347 | 63376 | None | 3.5.7, Pg no 8, Vol 6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.16 Module ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 397.0 | 397.0 | 10.0 | False | None | None | False | None | False | 3970.0 | 0 | 2159348 | 63376 | None | 3.6.1, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A One Way Switch ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 102.0 | 102.0 | 150.0 | False | None | None | False | None | False | 15300.0 | 0 | 2159349 | 63376 | None | 3.6.2, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A Two Way Switch ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 166.0 | 166.0 | 4.0 | False | None | None | False | None | False | 664.0 | 0 | 2159350 | 63376 | None | 3.6.3, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A Three Way socket ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 171.0 | 171.0 | 40.0 | False | None | None | False | None | False | 6840.0 | 0 | 2159351 | 63376 | None | 3.6.4, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.Stepped Fan Regulator Two Module ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 357.0 | 357.0 | 24.0 | False | None | None | False | None | False | 8568.0 | 0 | 2159352 | 63376 | None | 3.6.7, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.16A One Way Switch ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 180.0 | 180.0 | 10.0 | False | None | None | False | None | False | 1800.0 | 0 | 2159353 | 63376 | None | 3.6.8, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A Bell Push ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 177.0 | 177.0 | 4.0 | False | None | None | False | None | False | 708.0 | 0 | 2159354 | 63376 | None | 3.6.9, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.32A DP Switch ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 326.0 | 326.0 | 10.0 | False | None | None | False | None | False | 3260.0 | 0 | 2159355 | 63376 | None | 3.6.10, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6/16A Universal Socket ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 236.0 | 236.0 | 10.0 | False | None | None | False | None | False | 2360.0 | 0 | 2159356 | 63376 | None | 3.6.12, Pg no 9, Vol 6 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.RJ45/I.O Outlet Cat-6 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 337.0 | 337.0 | 6.0 | False | None | None | False | None | False | 2022.0 | 0 | 2159357 | 63376 | None | 3.8, Pg no 9, Vol 6 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sq CM | 0.41 | 0.41 | 2500.0 | False | None | None | False | None | False | 1025.0 | 0 | 2159358 | 63376 | None | 3.9, Pg no 9, Vol 6 | Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N. F. screws. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sq CM | 0.35 | 0.35 | 1000.0 | False | None | None | False | None | False | 350.0 | 0 | 2159359 | 63376 | None | 3.10.1, Pg no 9, Vol 6 | Supplying 4 mm thick white plastic plate and covering for junction boxes of size . mm conduit using necessary machine screws. 60mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 8.0 | 8.0 | 35.0 | False | None | None | False | None | False | 280.0 | 0 | 2159360 | 63376 | None | 3.10.2, Pg no 9, Vol 6 | Supplying 4 mm thick white plastic plate and covering for junction boxes of size . mm conduit using necessary machine screws. 80/90mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 15.0 | 15.0 | 42.0 | False | None | None | False | None | False | 630.0 | 0 | 2159361 | 63376 | None | 5.7.3, Pg no 14, Vol 6 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 63A ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 401.0 | 401.0 | 3.0 | False | None | None | False | None | False | 1203.0 | 0 | 2159362 | 63376 | None | 5.18.1, Pg no 17, Vol 6 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.6-32 A SP ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 415.0 | 415.0 | 4.0 | False | None | None | False | None | False | 1660.0 | 0 | 2159363 | 63376 | None | 5.18.5, Pg no 17, Vol 6 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.40 A DP ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 1060.0 | 1060.0 | 2.0 | False | None | None | False | None | False | 2120.0 | 0 | 2159364 | 63376 | None | 5.18.6, Pg no 17, Vol 6 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.50-63 A DP ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 1102.0 | 1102.0 | 2.0 | False | None | None | False | None | False | 2204.0 | 0 | 2159365 | 63376 | None | 5.18.9, Pg no 18, Vol 6 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.50-63 A TPN ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 3088.0 | 3088.0 | 2.0 | False | None | None | False | None | False | 6176.0 | 0 | 2159366 | 63376 | None | 5.19.9, Pg no 18, Vol 6 | Supplying and fixing regular MCB distribution boards on wall/ood board/ flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure.II Double Door 12 Way SP & N ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 2329.0 | 2329.0 | 2.0 | False | None | None | False | None | False | 4658.0 | 0 | 2159367 | 63376 | None | 5.31, Pg no 19, Vol 6 | Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 4390.0 | 4390.0 | 1.0 | False | None | None | False | None | False | 4390.0 | 0 | 2159368 | 63376 | None | 5.44.1, Pg no 21, Vol 6 | Supply and Installation /Fixing /Provision of Outdoor type Thermoplastic Modular Panel enclosure with transparent Polycarbonate Lid, shock proof, IP65 (Weather Proof), rust proof, dust proof, water proof, corrosion proof having internally Embedded gasket on both lid and flap suitable to fix Single Phase /Three Phase Energy Meter in suitable base plate and having a provision for Fuse / MCB cut-out with suitable transparent hinged flap opening for operating MCB along with complete tamper proof SEALING facility.300 mm x 300 mm x 214 mm ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 4512.0 | 4512.0 | 1.0 | False | None | None | False | None | False | 4512.0 | 0 | 2159369 | 63376 | None | 6.4.1, Pg no 30, Vol 6 | Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/19 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power upto 35 W +/- 10 %, Rated current As per IS:374/19, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value 6.2 CMM / W, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification, Motor winding. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 V, Insulation resistance Shall not be less than Two Mega Ohms (2M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, W& current, Air Delivery & Fan Speed as per IS:374/2019 with latest amendment, 2year manufacturer Warranty. (BLDC fans) 48" Sweep 5 Star (1200 mm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 2677.0 | 2677.0 | 22.0 | False | None | None | False | None | False | 58894.0 | 0 | 2159370 | 63376 | None | 11.3.1, Pg no 43, Vol 6 | Supplying of feet -PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours & 70per lumen maintenance with CRI 80. Power Input: 220-240V 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 2 - 9/10 Wa ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 551.0 | 551.0 | 4.0 | False | None | None | False | None | False | 2204.0 | 0 | 2159371 | 63376 | None | 11.3.2, Pg no 43, Vol 6 | Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 20/22 W ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 690.0 | 690.0 | 36.0 | False | None | None | False | None | False | 24840.0 | 0 | 2159372 | 63376 | None | 11.5.2, Pg no 44, Vol 6 | Supply of round/square recess/surface mounted rolling type LED Down light with . W GU 10 LED Lamp Rib Fabricated from diecast aluminium with white powder coated prewired to mains connector & has swivelling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @50/60Hz & Power factor 0.9 along with CE approved. 2years Warranty against any manufacturing defect working under standard electrical condition LED square or round down light 10-12W ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 885.0 | 885.0 | 20.0 | False | None | None | False | None | False | 17700.0 | 0 | 2159373 | 63376 | None | 11.8.3, Pg no 46, Vol 6 | LED Street light.Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr at Lumen Maintenance of 70per, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. LED Streetlight 70W ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 5992.0 | 5992.0 | 2.0 | False | None | None | False | None | False | 11984.0 | 0 | 2159374 | 63376 | None | 11.11.5, Pg no 47, Vol 6 | Supplying & fixing of retrofit type - LED bulb . W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 12W, 6500K ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 269.0 | 269.0 | 20.0 | False | None | None | False | None | False | 5380.0 | 0 | 2159375 | 63376 | None | 3.14.7, Pg no 10, Vol 6 | Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board. 6A Batten Holder ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | No | 74.0 | 74.0 | 20.0 | False | None | None | False | None | False | 1480.0 | 0 | 2159376 | 63376 | None | 6.1, Pg no 30, Vol 6 | Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 1492.0 | 1492.0 | 5.0 | False | None | None | False | None | False | 7460.0 | 0 | 2159377 | 63376 | None | 13.14, Pg no 57, Vol 6 | Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 492.0 | 492.0 | 5.0 | False | None | None | False | None | False | 2460.0 | 0 | 2159378 | 63376 | None | 32.05, Pg no 13, Vol 6 (ESCOMs) | 1.1 kV, XLPE or Heat resistant PVC
insulated, PVC exutruted Inner Seath
Armoured LTUG Cable as per IS-1554 (Part 1) or IS-7098 Part-1, Armouring strip
thickness and resistivity as per IS-39759 (BESCOM) 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Km | 141842.0 | 141842.0 | 0.1 | False | None | None | False | None | False | 14184.2 | 0 | 2159379 | 63376 | None | PWD 23-24 SR VOL -1, PAGE 10, ITEM 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m. PWD SR VOL -1, PAGE 10, ITEM 1.17.1 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 262.0 | 262.0 | 37.5 | False | None | None | False | None | False | 9825.0 | 0 | 2159380 | 63376 | None | 13.1.1, Pg no 56, Vol 6 | Supplying and Fixing of.mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket street light fitting of all capacities to GI or GI or rail or RCC pole / wall using suitable clamps, bolts, and nuts and wiring using suitable capacity wires.Using 25mm dia G.I.Pipe ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 978.0 | 978.0 | 2.0 | False | None | None | False | None | False | 1956.0 | 0 | 2159381 | 63376 | None | 13.7.1, Pg no 56, Vol 6 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps.On wall/ ceiling / Rafter / Girders ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 122.0 | 122.0 | 60.0 | False | None | None | False | None | False | 7320.0 | 0 | 2159382 | 63376 | None | 13.10, Pg no 57, Vol 6 | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 171.0 | 171.0 | 22.0 | False | None | None | False | None | False | 3762.0 | 0 | 2159383 | 63376 | None | 13.11, Pg no 57, Vol 6 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 315.0 | 315.0 | 22.0 | False | None | None | False | None | False | 6930.0 | 0 | 2159384 | 63376 | None | 13.12, Pg no 57, Vol 6 | Extra length of GI pipe of class B 19mm dia for down rod. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 197.0 | 197.0 | 22.0 | False | None | None | False | None | False | 4334.0 | 0 | 2159385 | 63376 | None | 12.56, Pg no 54, Vol 6 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 3510.0 | 3510.0 | 3.0 | False | None | None | False | None | False | 10530.0 | 0 | 2159386 | 63376 | None | 12.58.2, Pg no 54, Vol 6 | GI/Copper strips for grounding connections, using necessary fixing materials as required: 25 x 3 mm GI strip ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | m | 82.0 | 82.0 | 18.0 | False | None | None | False | None | False | 1476.0 | 0 |
|
|
---|