1706782316000 | 0 | None | None | Other Works | Construction of drain near Abhishekh Shetty house at Vijayanagara of 50th Alape South ward in MCC limits | 412149.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2366655 | 70370 | None | code01 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.All kinds of soils. Depth upto 1.50 m(Page No. 5 Item No.-1.4.1 common SR 2021-22 VOLUME-1 ). | Cum | 208.32 | 208.32 | 46.8 | False | None | None | False | None | False | 9749.376 | 0 | 2366656 | 70370 | None | code02 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (Page No. 15 Item No.-2.1.2 common SR 2021-22 VOLUME-1 ). | Cum | 5736.64 | 5736.64 | 5.2 | False | None | None | False | None | False | 29830.528 | 0 | 2366657 | 70370 | None | code03 | Providing Thermo-Mechanically Treated bars of grade Fe-550D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (Page No.84 Item No.-11.32 Building SR 2021-22 VOLUME-2 ). | Kg | 100.8 | 100.8 | 1637.27 | False | None | None | False | None | False | 165036.816 | 0 | 2366658 | 70370 | None | code04 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Page No. 16 Item No.-2.4.2 common SR 2021-22 VOLUME-1 ). | Cum | 8790.76 | 8790.76 | 20.36 | False | None | None | False | None | False | 178979.8736 | 0 | 2366659 | 70370 | None | code05 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work (Page No. 8 Item No.1.12 COMMON SR 2021-22 VOLUME-1 ). | Cum | 72.8 | 72.8 | 8.34 | False | None | None | False | None | False | 607.152 | 0 | 2366660 | 70370 | None | code06 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ m3, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. Dry Lean Cement Concrete Sub- base (Page No. 43 Item No.-6.1 Road and Bridge SR 2021-22 VOLUME-3 ). | Cum | 4438.56 | 4438.56 | 1.85 | False | None | None | False | None | False | 8211.336 | 0 | 2366661 | 70370 | None | code07 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. (Page No.138 Item No.-20.29 Road and Bridge SR 2021-22 VOLUME-3 ). | Cum | 7098.56 | 7098.56 | 2.78 | False | None | None | False | None | False | 19733.9968 | 0 |
|