tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1706615726000 | 1 | None | None | Buildings | Highschool Building | 1604917.42 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2340251 | 69230 | Volume -1-Common SR- Chapter - I- Earth Work | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 65.0 | 72.8 | 67.5 | False | None | None | False | None | False | 4914.0 | 0 | 2340252 | 69230 | Volume -1-Common SR- Chapter - I- Earth Work | 1.14.1 | In all kinds of soils Depth upto 3 m ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 73.0 | 81.76 | 394.35 | False | None | None | False | None | False | 32242.056 | 0 | 2340255 | 69230 | Volume-2-For Buildings Chapter-4-Anti-Termite Treatment | 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/Sqm including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 95.0 | 106.4 | 90.0 | False | None | None | False | None | False | 9576.0 | 0 | 2340256 | 69230 | Volume -1-Common SR- Chapter - I- Earth Work | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 204.0 | 228.48 | 29.84 | False | None | None | False | None | False | 6817.8432 | 0 | 2340258 | 69230 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.55.1 | with both side prelam ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 3803.0 | 4259.36 | 2.52 | False | None | None | False | None | False | 10733.5872 | 0 | 2340260 | 69230 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.84 | PProviding & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size – 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 4114.0 | 4607.68 | 6.48 | False | None | None | False | None | False | 29857.7664 | 0 | 2340262 | 69230 | Volume-2-For Buildings Chapter-8-Finishing | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 83.0 | 92.96 | 132.52 | False | None | None | False | None | False | 12319.0592 | 0 | 2340265 | 69230 | Volume-2-For Buildings Chapter-8-Finishing | 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 Sqm over and including one coat of Special primer applied @ 0.75 ltr /10 Sqm with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 118.0 | 132.16 | 132.52 | False | None | None | False | None | False | 17513.8432 | 0 | 2340267 | 69230 | Volume-2-For Buildings Chapter-8-Finishing | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two coats applied @ 1.43 ltr/10 Sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 Sqm) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 132.0 | 147.84 | 107.2 | False | None | None | False | None | False | 15848.448 | 0 | 2340268 | 69230 | Volume-2-For Buildings Chapter-8-Finishing | 8.4 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 90.0 | 100.8 | 9.0 | False | None | None | False | None | False | 907.2 | 0 | 2340270 | 69230 | Volume-2-For Buildings Chapter-11-Steel and Aluminium Work | 11.28 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | kg | 500.0 | 560.0 | 122.4 | False | None | None | False | None | False | 68544.0 | 0 | 2340272 | 69230 | Volume-2-For Buildings Chapter-15-Water Proofing | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per Sqm to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per Sqm and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 745.0 | 834.4 | 80.16 | False | None | None | False | None | False | 66885.504 | 0 | 2340274 | 69230 | Volume-2-For Buildings Chapter-9-Flooring | 9.4 | Providing and laying Cement concrete pavement with 1:2:4 for commercial & residential building floors, hardpaths, footpaths using 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size, including finishing complete as per Engineer incharge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6200.0 | 6944.0 | 3.26 | False | None | None | False | None | False | 22637.44 | 0 | 2340250 | 69230 | None | 6.36 VOL 2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Basement in CM 1:6.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6328.0 | 6328.0 | 2.11 | False | None | None | False | None | False | 13352.08 | 0 | 2340253 | 69230 | None | 6.37 VOL 2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Super structure in CM 1:6
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6611.36 | 6611.36 | 20.14 | False | None | None | False | None | False | 133152.7904 | 0 | 2340254 | 69230 | None | 12.98 VOL 2 | Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross- section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Mtr | 706.72 | 706.72 | 5.7 | False | None | None | False | None | False | 4028.304 | 0 | 2340257 | 69230 | None | S.R. Item No. 2.1.3 Page 15 of PWD UNI SR VOL-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6220.48 | 6220.48 | 13.29 | False | None | None | False | None | False | 82670.1792 | 0 | 2340259 | 69230 | None | S.R. Item No. 2.2.2.1 Page 15 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7232.2 | 7232.2 | 9.72 | False | None | None | False | None | False | 70296.984 | 0 | 2340261 | 69230 | None | S.R. Item No. 2.4.3 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7247.92 | 7247.92 | 1.26 | False | None | None | False | None | False | 9132.3792 | 0 | 2340263 | 69230 | None | S.R. Item No. 2.4.3 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10066.56 | 10066.56 | 3.96 | False | None | None | False | None | False | 39863.5776 | 0 | 2340264 | 69230 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 11778.14 | 11778.14 | 2.05 | False | None | None | False | None | False | 24145.187 | 0 | 2340266 | 69230 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 11085.31 | 11085.31 | 0.91 | False | None | None | False | None | False | 10087.6321 | 0 | 2340269 | 69230 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 11085.31 | 11085.31 | 2.75 | False | None | None | False | None | False | 30484.6025 | 0 | 2340271 | 69230 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10392.48 | 10392.48 | 12.02 | False | None | None | False | None | False | 124917.6096 | 0 | 2340273 | 69230 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10046.06 | 10046.06 | 0.32 | False | None | None | False | None | False | 3214.7392 | 0 | 2340275 | 69230 | None | S.R. Item No.11.32 Page 84 of PWD UNI SR VOL-2 | Providing Thermo-Mechanically Treated bars of grade Fe-550 or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 103.04 | 103.04 | 4022.87 | False | None | None | False | None | False | 414516.5248 | 0 | 2340276 | 69230 | None | S.R. Item No.5.4 Page 9 of PWD UNI SR VOL-2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 5994.24 | 5994.24 | 16.71 | False | None | None | False | None | False | 100163.7504 | 0 | 2340277 | 69230 | None | S.R. Item No.9.17.5 Page 61 of PWD UNI SR VOL-2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete.Size of Tile 600x1200 mm
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 2061.92 | 2061.92 | 71.4 | False | None | None | False | None | False | 147221.088 | 0 | 2340278 | 69230 | None | S.R. Item No. 11.34A Page 85 of VOL-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 162.4 | 162.4 | 136.08 | False | None | None | False | None | False | 22099.392 | 0 | 2340279 | 69230 | None | S.R. Item No. 8.3.2 Page 41 of VOL-2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 309.12 | 309.12 | 107.2 | False | None | None | False | None | False | 33137.664 | 0 | 2340280 | 69230 | None | 8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
S.R. Item No. 8.5.2 Page 42 of VOL-2
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 329.28 | 329.28 | 132.52 | False | None | None | False | None | False | 43636.1856 | 0 |
| 1706615726000 | 0 | None | None | Buildings | Toilet for Highschool Building | 655141.81 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2340281 | 69231 | Volume -1-Common SR- Chapter - I- Earth Work | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 65.0 | 72.8 | 9.45 | False | None | None | False | None | False | 687.96 | 0 | 2340283 | 69231 | Volume -1-Common SR- Chapter - I- Earth Work | 1.14.1 | In all kinds of soils Depth upto 3 m ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 73.0 | 81.76 | 59.0 | False | None | None | False | None | False | 4823.84 | 0 | 2340286 | 69231 | Volume-2-For Buildings Chapter-4-Anti-Termite Treatment | 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/Sqm including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 95.0 | 106.4 | 18.28 | False | None | None | False | None | False | 1944.992 | 0 | 2340287 | 69231 | Volume -1-Common SR- Chapter - I- Earth Work | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 204.0 | 228.48 | 8.32 | False | None | None | False | None | False | 1900.9536 | 0 | 2340289 | 69231 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.54 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 475.0 | 532.0 | 26.7 | False | None | None | False | None | False | 14204.4 | 0 | 2340291 | 69231 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.55.1 | with both side prelam ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 3803.0 | 4259.36 | 8.82 | False | None | None | False | None | False | 37567.5552 | 0 | 2340294 | 69231 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size – 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 4870.0 | 5454.4 | 1.35 | False | None | None | False | None | False | 7363.44 | 0 | 2340296 | 69231 | Volume-2-For Buildings Chapter-8-Finishing | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 83.0 | 92.96 | 36.69 | False | None | None | False | None | False | 3410.7024 | 0 | 2340297 | 69231 | Volume-2-For Buildings Chapter-8-Finishing | 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 Sqm over and including one coat of Special primer applied @ 0.75 ltr /10 Sqm with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 118.0 | 132.16 | 36.69 | False | None | None | False | None | False | 4848.9504 | 0 | 2340299 | 69231 | Volume-2-For Buildings Chapter-8-Finishing | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two coats applied @ 1.43 ltr/10 Sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 Sqm) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 132.0 | 147.84 | 62.53 | False | None | None | False | None | False | 9244.4352 | 0 | 2340301 | 69231 | Volume-2-For Buildings Chapter-8-Finishing | 8.4 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 90.0 | 100.8 | 10.17 | False | None | None | False | None | False | 1025.136 | 0 | 2340304 | 69231 | Volume-2-For Buildings Chapter-11-Steel and Aluminium Work | 11.28 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | kg | 500.0 | 560.0 | 56.95 | False | None | None | False | None | False | 31892.0 | 0 | 2340305 | 69231 | Volume-2-For Buildings Chapter-15-Water Proofing | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per Sqm to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per Sqm and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 745.0 | 834.4 | 28.83 | False | None | None | False | None | False | 24055.752 | 0 | 2340308 | 69231 | Volume-2-For Buildings Chapter-14-Sanitary Installations | 14.1.1 | White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | each | 4246.0 | 4755.52 | 2.0 | False | None | None | False | None | False | 9511.04 | 0 | 2340310 | 69231 | Volume-2-For Buildings Chapter-14-Sanitary Installations | 14.4.1 | One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | each | 3536.0 | 3960.32 | 5.0 | False | None | None | False | None | False | 19801.6 | 0 | 2340312 | 69231 | Volume-2-For Buildings Chapter-14-Sanitary Installations | 14.2.1 | W.C. pan with ISI marked white solid plastic seat and lid ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | each | 4026.0 | 4509.12 | 1.0 | False | None | None | False | None | False | 4509.12 | 0 | 2340313 | 69231 | Volume-2-For Buildings Chapter-14-Sanitary Installations | 14.7.7 | White Vitreous China Flat back wash basin size 450x 300 mm with single 15mm C.P. brass pillar tap ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | each | 1606.0 | 1798.72 | 3.0 | False | None | None | False | None | False | 5396.16 | 0 | 2340315 | 69231 | Volume-2-For Buildings Chapter-9-Flooring | 9.4 | Providing and laying Cement concrete pavement with 1:2:4 for commercial & residential building floors, hardpaths, footpaths using 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size, including finishing complete as per Engineer incharge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6200.0 | 6944.0 | 0.65 | False | None | None | False | None | False | 4513.6 | 0 | 2340282 | 69231 | None | S.R. Item No.6.36 Page of PWD UNI SR VOL-2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Basement in CM 1:6.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6328.0 | 6328.0 | 3.55 | False | None | None | False | None | False | 22464.4 | 0 | 2340284 | 69231 | None | S.R. Item No.6.37 Page of PWD UNI SR VOL-2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Super structure in CM 1:6
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6611.36 | 6611.36 | 11.92 | False | None | None | False | None | False | 78807.4112 | 0 | 2340285 | 69231 | None | S.R. Item No. 13.34 Page of VOL-2 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Ltr | 8.96 | 8.96 | 2000.0 | False | None | None | False | None | False | 17920.0 | 0 | 2340288 | 69231 | None | S.R. Item No .1.2 Chapter 12 Page of VOL-6 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC pipes 32mm dia., 10 kg/sqcm & class 5
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Mtr | 66.66 | 66.66 | 60.0 | False | None | None | False | None | False | 3999.6 | 0 | 2340290 | 69231 | None | S.R. Item No .1.2 Chapter 12 Page of VOL-6 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC pipes 75mm dia., 6 kg/sqcm & class 3
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Mtr | 218.74 | 218.74 | 60.0 | False | None | None | False | None | False | 13124.4 | 0 | 2340292 | 69231 | None | S.R. Item No .1.7 Chapter 12 Page of VOL-6 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC pipes 110mm dia., 6 kg/sqcm & class 3
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Mtr | 410.39 | 410.39 | 45.0 | False | None | None | False | None | False | 18467.55 | 0 | 2340293 | 69231 | None | S.R. Item No. 2.1.3 Page 15 of PWD UNI SR VOL-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6220.48 | 6220.48 | 4.54 | False | None | None | False | None | False | 28240.9792 | 0 | 2340295 | 69231 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 11085.31 | 11085.31 | 0.86 | False | None | None | False | None | False | 9533.3666 | 0 | 2340298 | 69231 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10392.48 | 10392.48 | 4.32 | False | None | None | False | None | False | 44895.5136 | 0 | 2340300 | 69231 | None | S.R. Item No.11.32 Page 84 of PWD UNI SR VOL-2 | Providing Thermo-Mechanically Treated bars of grade Fe-550 or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 103.04 | 103.04 | 579.35 | False | None | None | False | None | False | 59696.224 | 0 | 2340302 | 69231 | None | S.R. Item No.5.4 Page 9 of PWD UNI SR VOL-2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 5994.24 | 5994.24 | 10.7 | False | None | None | False | None | False | 64138.368 | 0 | 2340303 | 69231 | None | S.R. Item No.9.11 Page 60 of PWD UNI SR VOL-2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including pointing the joints with white cement and matching pigments etc., complete.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 853.44 | 853.44 | 20.38 | False | None | None | False | None | False | 17393.1072 | 0 | 2340306 | 69231 | None | S.R. Item No. 9.39 Page 65 of VOL-2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 1161.44 | 1161.44 | 40.5 | False | None | None | False | None | False | 47038.32 | 0 | 2340307 | 69231 | None | S.R. Item No. 11.34A Page 85 of VOL-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 162.4 | 162.4 | 28.35 | False | None | None | False | None | False | 4604.04 | 0 | 2340309 | 69231 | None | S.R. Item No. 8.3.2 Page 41 of VOL-2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 309.12 | 309.12 | 62.53 | False | None | None | False | None | False | 19329.2736 | 0 | 2340311 | 69231 | None | S.R. Item No. 8.8 Page42 of VOL-2 | Providing 15 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 329.28 | 329.28 | 36.69 | False | None | None | False | None | False | 12081.2832 | 0 | 2340314 | 69231 | None | S.R. Item No.6.34 Page 17 of PWD UNI SR VOL-2 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 1052.8 | 1052.8 | 6.37 | False | None | None | False | None | False | 6706.336 | 0 |
| 1706615726000 | 1 | None | None | Buildings | Primary School Building | 3875974.48 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2340317 | 69232 | Volume -1-Common SR- Chapter - I- Earth Work | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 65.0 | 72.8 | 112.5 | False | None | None | False | None | False | 8190.0 | 0 | 2340318 | 69232 | Volume -1-Common SR- Chapter - I- Earth Work | 1.14.1 | In all kinds of soils Depth upto 3 m ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 73.0 | 81.76 | 607.97 | False | None | None | False | None | False | 49707.6272 | 0 | 2340321 | 69232 | Volume-2-For Buildings Chapter-4-Anti-Termite Treatment | 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/Sqm including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 95.0 | 106.4 | 220.0 | False | None | None | False | None | False | 23408.0 | 0 | 2340323 | 69232 | Volume -1-Common SR- Chapter - I- Earth Work | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 204.0 | 228.48 | 69.68 | False | None | None | False | None | False | 15920.4864 | 0 | 2340324 | 69232 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.55.1 | with both side prelam ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 3803.0 | 4259.36 | 15.12 | False | None | None | False | None | False | 64401.5232 | 0 | 2340326 | 69232 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.84 | PProviding & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size – 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 4114.0 | 4607.68 | 12.96 | False | None | None | False | None | False | 59715.5328 | 0 | 2340328 | 69232 | Volume-2-For Buildings Chapter-8-Finishing | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 83.0 | 92.96 | 375.88 | False | None | None | False | None | False | 34941.8048 | 0 | 2340330 | 69232 | Volume-2-For Buildings Chapter-8-Finishing | 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 Sqm over and including one coat of Special primer applied @ 0.75 ltr /10 Sqm with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 118.0 | 132.16 | 375.88 | False | None | None | False | None | False | 49676.3008 | 0 | 2340332 | 69232 | Volume-2-For Buildings Chapter-8-Finishing | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two coats applied @ 1.43 ltr/10 Sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 Sqm) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 132.0 | 147.84 | 220.56 | False | None | None | False | None | False | 32607.5904 | 0 | 2340334 | 69232 | Volume-2-For Buildings Chapter-8-Finishing | 8.4 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 90.0 | 100.8 | 28.08 | False | None | None | False | None | False | 2830.464 | 0 | 2340337 | 69232 | Volume-2-For Buildings Chapter-11-Steel and Aluminium Work | 11.28 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | kg | 500.0 | 560.0 | 56.95 | False | None | None | False | None | False | 31892.0 | 0 | 2340339 | 69232 | Volume-2-For Buildings Chapter-15-Water Proofing | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per Sqm to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per Sqm and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 745.0 | 834.4 | 186.25 | False | None | None | False | None | False | 155407.0 | 0 | 2340340 | 69232 | Volume-2-For Buildings Chapter-9-Flooring | 9.4 | Providing and laying Cement concrete pavement with 1:2:4 for commercial & residential building floors, hardpaths, footpaths using 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size, including finishing complete as per Engineer incharge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6200.0 | 6944.0 | 5.93 | False | None | None | False | None | False | 41177.92 | 0 | 2340316 | 69232 | None | S.R. Item No.6.36 Page of PWD UNI SR VOL-2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Basement in CM 1:6.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6328.0 | 6328.0 | 3.95 | False | None | None | False | None | False | 24995.6 | 0 | 2340319 | 69232 | None | S.R. Item No.6.37 Page of PWD UNI SR VOL-2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Super structure in CM 1:6
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6611.36 | 6611.36 | 47.11 | False | None | None | False | None | False | 311461.1696 | 0 | 2340320 | 69232 | None | S.R. Item No. 12.98 Page of VOL-2 | Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross- section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Mtr | 706.72 | 706.72 | 34.2 | False | None | None | False | None | False | 24169.824 | 0 | 2340322 | 69232 | None | S.R. Item No. 2.1.3 Page 15 of PWD UNI SR VOL-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6220.48 | 6220.48 | 33.18 | False | None | None | False | None | False | 206395.5264 | 0 | 2340325 | 69232 | None | S.R. Item No. 2.2.2.1 Page 15 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7232.2 | 7232.2 | 32.13 | False | None | None | False | None | False | 232370.586 | 0 | 2340327 | 69232 | None | S.R. Item No. 2.4.3 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7247.92 | 7247.92 | 3.4 | False | None | None | False | None | False | 24642.928 | 0 | 2340329 | 69232 | None | S.R. Item No. 2.4.3 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10066.56 | 10066.56 | 8.38 | False | None | None | False | None | False | 84357.7728 | 0 | 2340331 | 69232 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 11778.14 | 11778.14 | 6.42 | False | None | None | False | None | False | 75615.6588 | 0 | 2340333 | 69232 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 11085.31 | 11085.31 | 3.54 | False | None | None | False | None | False | 39241.9974 | 0 | 2340335 | 69232 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 11085.31 | 11085.31 | 6.34 | False | None | None | False | None | False | 70280.8654 | 0 | 2340336 | 69232 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10392.48 | 10392.48 | 27.94 | False | None | None | False | None | False | 290365.8912 | 0 | 2340338 | 69232 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10046.06 | 10046.06 | 2.67 | False | None | None | False | None | False | 26822.9802 | 0 | 2340341 | 69232 | None | S.R. Item No.11.32 Page 84 of PWD UNI SR VOL-2 | Providing Thermo-Mechanically Treated bars of grade Fe-550 or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 103.04 | 103.04 | 10776.41 | False | None | None | False | None | False | 1110401.2864 | 0 | 2340342 | 69232 | None | S.R. Item No.5.4 Page 9 of PWD UNI SR VOL-2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 5994.24 | 5994.24 | 35.6 | False | None | None | False | None | False | 213394.944 | 0 | 2340343 | 69232 | None | S.R. Item No.9.17.5 Page 61 of PWD UNI SR VOL-2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete.Size of Tile 600x1200 mm
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 2061.92 | 2061.92 | 162.68 | False | None | None | False | None | False | 335433.1456 | 0 | 2340344 | 69232 | None | S.R. Item No. 8.3.2 Page 41 of VOL-2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 309.12 | 309.12 | 220.56 | False | None | None | False | None | False | 68179.5072 | 0 | 2340345 | 69232 | None | S.R. Item No. 8.5.2 Page42 of VOL-2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 329.28 | 329.28 | 375.88 | False | None | None | False | None | False | 123769.7664 | 0 | 2340346 | 69232 | None | S.R. Item No. 11.34A Page 85 of VOL-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 162.4 | 162.4 | 272.16 | False | None | None | False | None | False | 44198.784 | 0 |
| 1706615726000 | 1 | None | None | Buildings | Toilet for Primary School Building | 566070.53 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2340348 | 69233 | Volume -1-Common SR- Chapter - I- Earth Work | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 65.0 | 72.8 | 8.92 | False | None | None | False | None | False | 649.376 | 0 | 2340349 | 69233 | Volume -1-Common SR- Chapter - I- Earth Work | 1.14.1 | In all kinds of soils Depth upto 3 m ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 73.0 | 81.76 | 51.08 | False | None | None | False | None | False | 4176.3008 | 0 | 2340352 | 69233 | Volume-2-For Buildings Chapter-4-Anti-Termite Treatment | 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/Sqm including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 95.0 | 106.4 | 24.0 | False | None | None | False | None | False | 2553.6 | 0 | 2340354 | 69233 | Volume -1-Common SR- Chapter - I- Earth Work | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 204.0 | 228.48 | 6.14 | False | None | None | False | None | False | 1402.8672 | 0 | 2340355 | 69233 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.54 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 475.0 | 532.0 | 21.0 | False | None | None | False | None | False | 11172.0 | 0 | 2340357 | 69233 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.55.1 | with both side prelam ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 3803.0 | 4259.36 | 6.3 | False | None | None | False | None | False | 26833.968 | 0 | 2340359 | 69233 | Volume-2-For Buildings Chapter-12-Wood & PVC Works | 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size – 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 4870.0 | 5454.4 | 1.08 | False | None | None | False | None | False | 5890.752 | 0 | 2340361 | 69233 | Volume-2-For Buildings Chapter-8-Finishing | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 83.0 | 92.96 | 32.68 | False | None | None | False | None | False | 3037.9328 | 0 | 2340363 | 69233 | Volume-2-For Buildings Chapter-8-Finishing | 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 Sqm over and including one coat of Special primer applied @ 0.75 ltr /10 Sqm with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 118.0 | 132.16 | 32.68 | False | None | None | False | None | False | 4318.9888 | 0 | 2340365 | 69233 | Volume-2-For Buildings Chapter-8-Finishing | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two coats applied @ 1.43 ltr/10 Sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 Sqm) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 132.0 | 147.84 | 60.29 | False | None | None | False | None | False | 8913.2736 | 0 | 2340367 | 69233 | Volume-2-For Buildings Chapter-8-Finishing | 8.4 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 90.0 | 100.8 | 7.38 | False | None | None | False | None | False | 743.904 | 0 | 2340370 | 69233 | Volume-2-For Buildings Chapter-15-Water Proofing | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per Sqm to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per Sqm and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 745.0 | 834.4 | 26.22 | False | None | None | False | None | False | 21877.968 | 0 | 2340372 | 69233 | Volume-2-For Buildings Chapter-14-Sanitary Installations | 14.1.1 | White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | each | 4246.0 | 4755.52 | 2.0 | False | None | None | False | None | False | 9511.04 | 0 | 2340374 | 69233 | Volume-2-For Buildings Chapter-14-Sanitary Installations | 14.4.1 | One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | each | 3536.0 | 3960.32 | 6.0 | False | None | None | False | None | False | 23761.92 | 0 | 2340376 | 69233 | Volume-2-For Buildings Chapter-14-Sanitary Installations | 14.7.7 | White Vitreous China Flat back wash basin size 450x 300 mm with single 15mm C.P. brass pillar tap ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | each | 1606.0 | 1798.72 | 2.0 | False | None | None | False | None | False | 3597.44 | 0 | 2340378 | 69233 | Volume-2-For Buildings Chapter-9-Flooring | 9.4 | Providing and laying Cement concrete pavement with 1:2:4 for commercial & residential building floors, hardpaths, footpaths using 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size, including finishing complete as per Engineer incharge. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6200.0 | 6944.0 | 1.32 | False | None | None | False | None | False | 9166.08 | 0 | 2340347 | 69233 | None | S.R. Item No.6.36 Page of PWD UNI SR VOL-2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Basement in CM 1:6.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6328.0 | 6328.0 | 2.63 | False | None | None | False | None | False | 16642.64 | 0 | 2340350 | 69233 | None | S.R. Item No.6.37 Page of PWD UNI SR VOL-2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Super structure in CM 1:6
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6611.36 | 6611.36 | 11.31 | False | None | None | False | None | False | 74774.4816 | 0 | 2340351 | 69233 | None | S.R. Item No. 13.34 Page of VOL-2 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Ltr | 8.96 | 8.96 | 2000.0 | False | None | None | False | None | False | 17920.0 | 0 | 2340353 | 69233 | None | S.R. Item No .1.2 Chapter 12 Page of VOL-6 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC pipes 32mm dia., 10 kg/sqcm & class 5
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Mtr | 66.66 | 66.66 | 65.0 | False | None | None | False | None | False | 4332.9 | 0 | 2340356 | 69233 | None | S.R. Item No .1.2 Chapter 12 Page of VOL-6 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC pipes 75mm dia., 6 kg/sqcm & class 3
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Mtr | 218.74 | 218.74 | 60.0 | False | None | None | False | None | False | 13124.4 | 0 | 2340358 | 69233 | None | S.R. Item No .1.7 Chapter 12 Page of VOL-6 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC pipes 110mm dia., 6 kg/sqcm & class 3
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Mtr | 410.39 | 410.39 | 60.0 | False | None | None | False | None | False | 24623.4 | 0 | 2340360 | 69233 | None | S.R. Item No. 2.1.3 Page 15 of PWD UNI SR VOL-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6220.48 | 6220.48 | 3.77 | False | None | None | False | None | False | 23451.2096 | 0 | 2340362 | 69233 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 11085.31 | 11085.31 | 0.75 | False | None | None | False | None | False | 8313.9825 | 0 | 2340364 | 69233 | None | S.R. Item No. 2.5.2 Page 17 of PWD UNI SR VOL-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10392.48 | 10392.48 | 3.93 | False | None | None | False | None | False | 40842.4464 | 0 | 2340366 | 69233 | None | S.R. Item No.11.32 Page 84 of PWD UNI SR VOL-2 | Providing Thermo-Mechanically Treated bars of grade Fe-550 or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 103.04 | 103.04 | 520.96 | False | None | None | False | None | False | 53679.7184 | 0 | 2340368 | 69233 | None | S.R. Item No.5.4 Page 9 of PWD UNI SR VOL-2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 5994.24 | 5994.24 | 9.37 | False | None | None | False | None | False | 56166.0288 | 0 | 2340369 | 69233 | None | S.R. Item No.6.34 Page 17 of PWD UNI SR VOL-2 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 1052.8 | 1052.8 | 6.88 | False | None | None | False | None | False | 7243.264 | 0 | 2340371 | 69233 | None | S.R. Item No.9.11 Page 60 of PWD UNI SR VOL-2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including pointing the joints with white cement and matching pigments etc., complete.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 853.44 | 853.44 | 13.86 | False | None | None | False | None | False | 11828.6784 | 0 | 2340373 | 69233 | None | S.R. Item No. 9.39 Page 65 of VOL-2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 1161.44 | 1161.44 | 36.54 | False | None | None | False | None | False | 42439.0176 | 0 | 2340375 | 69233 | None | S.R. Item No. 11.34A Page 85 of VOL-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 162.4 | 162.4 | 22.68 | False | None | None | False | None | False | 3683.232 | 0 | 2340377 | 69233 | None | S.R. Item No. 8.3.2 Page 41 of VOL-2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 309.12 | 309.12 | 60.29 | False | None | None | False | None | False | 18636.8448 | 0 | 2340379 | 69233 | None | S.R. Item No. 8.5.2 Page 42 of VOL-2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
S.R. Item No. 8.5.2 Page 42 of VOL-2
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 329.28 | 329.28 | 32.68 | False | None | None | False | None | False | 10760.8704 | 0 |
| 1706615726000 | 0 | None | None | Buildings | Electrical Works | 389971.16 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2340380 | 69234 | None | 1.2.2 | Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. ( COMMON Electrical SR 2022-23 )
25mm dia 2mm thick
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | m | 70.0 | 70.0 | 330.0 | False | None | None | False | None | False | 23100.0 | 0 | 2340381 | 69234 | None | 1.3.2 | Supplying heavy gauge PVC Conduit Pipe ….dia .mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.( COMMON Electrical SR 2022-23 )
25mm dia 2mm thick
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | m | 80.0 | 80.0 | 230.0 | False | None | None | False | None | False | 18400.0 | 0 | 2340382 | 69234 | None | 1.5.2 | Supplying and fixing PVC/metal conduit Deep junction box
25 mm deep Junction box
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 51.0 | 51.0 | 30.0 | False | None | None | False | None | False | 1530.0 | 0 | 2340383 | 69234 | None | 1.12 | Supplying And Fixing Metal Fan Box with Round Hook
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | No | 163.0 | 163.0 | 16.0 | False | None | None | False | None | False | 2608.0 | 0 | 2340384 | 69234 | None | 3.4.1 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ,( COMMON Electrical SR 2022-23 )
1-3Way
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 123.0 | 123.0 | 3.0 | False | None | None | False | None | False | 369.0 | 0 | 2340385 | 69234 | None | 3.4.2 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ,( COMMON Electrical SR 2022-23 )
4-5Way
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 138.0 | 138.0 | 3.0 | False | None | None | False | None | False | 414.0 | 0 | 2340386 | 69234 | None | 3.4.4 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ,( COMMON Electrical SR 2022-23 )
8Way
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 250.0 | 250.0 | 4.0 | False | None | None | False | None | False | 1000.0 | 0 | 2340387 | 69234 | None | 3.4.5 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ,( COMMON Electrical SR 2022-23 )
10-12Way
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 325.0 | 325.0 | 10.0 | False | None | None | False | None | False | 3250.0 | 0 | 2340388 | 69234 | None | 3.5.1 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.( COMMON Electrical SR 2022-23 )
1-3 Module
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 152.0 | 152.0 | 3.0 | False | None | None | False | None | False | 456.0 | 0 | 2340389 | 69234 | None | 3.5.2 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.( COMMON Electrical SR 2022-23 )
4 Module
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 175.0 | 175.0 | 3.0 | False | None | None | False | None | False | 525.0 | 0 | 2340390 | 69234 | None | 3.5.4 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.( COMMON Electrical SR 2022-23 )
8 Module
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 302.0 | 302.0 | 4.0 | False | None | None | False | None | False | 1208.0 | 0 | 2340391 | 69234 | None | 3.5.5 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.( COMMON Electrical SR 2022-23 )
10-12 Module
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 363.0 | 363.0 | 10.0 | False | None | None | False | None | False | 3630.0 | 0 | 2340392 | 69234 | None | 3.6.1 | Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate. Is 3854 and IS 1293. ( COMMON Electrical SR 2022-23 )
6Amps one way Switch
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 88.0 | 88.0 | 82.0 | False | None | None | False | None | False | 7216.0 | 0 | 2340393 | 69234 | None | 3.6.3 | Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate. Is 3854 and IS 1293. ( COMMON Electrical SR 2022-23 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 162.0 | 162.0 | 20.0 | False | None | None | False | None | False | 3240.0 | 0 | 2340394 | 69234 | None | 3.6.4 | Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate. Is 3854 and IS 1293. ( COMMON Electrical SR 2022-23 )
Stepped Fan Regulator Two Module
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 313.0 | 313.0 | 16.0 | False | None | None | False | None | False | 5008.0 | 0 | 2340395 | 69234 | None | 3.6.10 | Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate. Is 3854 and IS 1293. ( COMMON Electrical SR 2022-23 )
32Amps DP switch
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 375.0 | 375.0 | 4.0 | False | None | None | False | None | False | 1500.0 | 0 | 2340396 | 69234 | None | 2.2.1 | Wires and Cables-Point wiring using Copper wire without switch.
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block.complete for each outlet. ( COMMON Electrical SR 2022-23 )
Short point upto 3Mtr from tapping point to out let via switch box
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Point | 251.0 | 251.0 | 20.0 | False | None | None | False | None | False | 5020.0 | 0 | 2340397 | 69234 | None | 2.2.2 | Wires and Cables-Point wiring using Copper wire without switch.
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block.complete for each outlet. ( COMMON Electrical SR 2022-23 )
Wires and Cables-Point wiring using Copper wire without switch.
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block.complete for each outlet. ( COMMON Electrical SR 2022-23 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Point | 361.0 | 361.0 | 21.0 | False | None | None | False | None | False | 7581.0 | 0 | 2340398 | 69234 | None | 2.2.3 | Wires and Cables-Point wiring using Copper wire without switch.
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block.complete for each outlet. ( COMMON Electrical SR 2022-23 )
Long point above 6Mtr upto 10Mtr from tapping point to outlet via switch box
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Point | 542.0 | 542.0 | 20.0 | False | None | None | False | None | False | 10840.0 | 0 | 2340399 | 69234 | None | 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.( COMMON Electrical SR 2022-23 )
1.5 sqmm
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | m | 26.0 | 26.0 | 580.0 | False | None | None | False | None | False | 15080.0 | 0 | 2340400 | 69234 | None | 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.( COMMON Electrical SR 2022-23 )
2.5 sqmm
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | m | 40.0 | 40.0 | 710.0 | False | None | None | False | None | False | 28400.0 | 0 | 2340401 | 69234 | None | 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.( COMMON Electrical SR 2022-23 )
4 sqmm
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | m | 59.0 | 59.0 | 300.0 | False | None | None | False | None | False | 17700.0 | 0 | 2340402 | 69234 | None | 5.18.14 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.-111-Double Door,( COMMON Electrical SR 2022-23 )
Double Door , 6 Way SP & N ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 1552.0 | 1552.0 | 4.0 | False | None | None | False | None | False | 6208.0 | 0 | 2340403 | 69234 | None | 5.17.4 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898,( COMMON Electrical SR 2022-23 )
6-32 Amps DP
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 1103.0 | 1103.0 | 12.0 | False | None | None | False | None | False | 13236.0 | 0 | 2340404 | 69234 | None | 5.30 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 20 Amps Single phase class-1 Accuracy Energy Meter.( COMMON Electrical SR 2022-22 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 1242.0 | 1242.0 | 2.0 | False | None | None | False | None | False | 2484.0 | 0 | 2340405 | 69234 | None | 5.42 | Fabricating supplying and mounting MS box made out .SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete.( COMMON Electrical SR 2022-23 )
16SWG
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sq CM | 0.38 | 0.38 | 8000.0 | False | None | None | False | None | False | 3040.0 | 0 | 2340406 | 69234 | None | 11.3.2 | Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.( P.No. 34 of COMMON PWD SR 2022-23 )LED light fighting 1 x4'- 20/22 w
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 740.0 | 740.0 | 28.0 | False | None | None | False | None | False | 20720.0 | 0 | 2340407 | 69234 | None | 11.8.4 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation.Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, deliveringsuperior light output Rated life Burning Hrs 50000 hr @Lumen Maintenance of 70%, maximum light intensity shouldbe between 60 degrees to 70 degrees. CCT 5500K, IP66optical and electrical compartment & impact resistance ofcomplete luminaire greater than IK08. Power Factor greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/Overload, short circuit/ miss-wiring protection. Compatiblefor pole mounting with outer dia of 40mm to 50mm. UniversalVoltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598,LM 79 & LM 80 Adherence with RoHS.
UL approved MCPCB.Top access street light with single screw to ensure ease ofmaintenance at the sight site location with minimized minimaltools. LED Light fixture with .W System Powerconsumption. LED Efficiency greater than 1301m/w, nominal CRI greater than 75.Luminaire manufacturer should have in-house facilityaccredited by NABL/CPRI & any Government certifiedagency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shallbe Engraved / Embossing on the die cast housing/ Bodypart. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned,( P.No. 36 of COMMON PWD SR 2022-23 )
LED Streetlight 90 W
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 7777.0 | 7777.0 | 4.0 | False | None | None | False | None | False | 31108.0 | 0 | 2340408 | 69234 | None | 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 6.3.1 48" Sweep (1200 mm) Regular model( P.No. 22 of COMMON PWD SR 2022-23 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 2085.0 | 2085.0 | 16.0 | False | None | None | False | None | False | 33360.0 | 0 | 2340409 | 69234 | None | 6.1 | Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply. ( P.No. 22 of COMMON PWD SR 2022-23 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 1542.0 | 1542.0 | 4.0 | False | None | None | False | None | False | 6168.0 | 0 | 2340410 | 69234 | None | 13.2.2 | Supplying and Fixing.mm dia class A GI pipe bracket upto 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole, using suitable clA, bolts, nuts and wiring using suitable capacity wires.( COMMON Electrical SR 2022-23 )
Using 32mm dia G.I.Pipe
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 1136.0 | 1136.0 | 4.0 | False | None | None | False | None | False | 4544.0 | 0 | 2340411 | 69234 | None | 13.7.1 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps.( COMMON Electrical SR 2022-23 )
On wall / ceiling / Rafter / Girders
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 119.0 | 119.0 | 28.0 | False | None | None | False | None | False | 3332.0 | 0 | 2340412 | 69234 | None | 13.11 | Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ( COMMON Electrical SR 2022-23 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 281.0 | 281.0 | 16.0 | False | None | None | False | None | False | 4496.0 | 0 | 2340413 | 69234 | None | 13.12 | Extra length of GI pipe of class B 19mm dia for down rod.
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 173.0 | 173.0 | 16.0 | False | None | None | False | None | False | 2768.0 | 0 | 2340414 | 69234 | None | 13.13 | Fixing one exhaust fan after making a suitable nitch in the wall and finishing with cement mortar and colouring to match the existing wall or brackets, with bolts and nuts and a 5 amps, ceiling rose with sufficient length of 23 / 0.0076 inch PVC insulated twin core wire of approved make with wire mesh and wooden frame.( COMMON Electrical SR 2022-23 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Each | 702.0 | 702.0 | 4.0 | False | None | None | False | None | False | 2808.0 | 0 | 2340415 | 69234 | None | MESCOM SR- 7 | Providing Earthing materials pipe type for grounding (Single Electrode with accessories)( Cost data sheet-25)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | No | 1733.0 | 1733.0 | 4.0 | False | None | None | False | None | False | 6932.0 | 0 | 2340416 | 69234 | None | MESCOM SR-7 | Providing Earthing materials pipe type for grounding (Single Electrode with accessories)( Cost data sheet-25)
Labour charges ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | No | 1051.25 | 1051.25 | 4.0 | False | None | None | False | None | False | 4205.0 | 0 | 2340417 | 69234 | None | MESCOM SR 11 | Supplying of GI Wire -8 SWG
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Kg | 77.85 | 77.85 | 2.0 | False | None | None | False | None | False | 155.7 | 0 | 2340418 | 69234 | None | 32.03 | Supplying of 1.1 KV ,XLPE or Heat reisistant PVC insulated , PVC extrusted inner seath Armored , LTUG Cable as per IS-1554 ( Part-1) or IS-7098 Part-1 , Armouring strip thickness and resistively as per IS-3975,.( COMMON Electrical SR 2022-23 )
10 Sqmm, 4 Core, (13 GI Strips - 4 x 0.8 mm)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Km | 148612.0 | 148612.0 | 0.15 | False | None | None | False | None | False | 22291.8 | 0 | 2340419 | 69234 | None | 29.03 | Earth work excavation of cable trench of .5 to o.75 Mtr Width and Depth upto 1 Mtr including trial pits, depositing on pto a lead of 50 Mtr Supporting and Displaying on bank upto a lead 50 Mtrs, Supplying , and Displaying necessary Dangerr Board and Lighting , Using sight Rails and Sign Boards at every 100 mtr wherever neccessary as directed.( COMMON Electrical SR 2022-23 )
In Hard Soil. Ic,120 x 0.60 x 0.60 = 43.20 cmt
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 564.05 | 564.05 | 43.2 | False | None | None | False | None | False | 24366.96 | 0 | 2340420 | 69234 | None | 29.07 | Refilling the cable trenches with selected available earth from trench excavation including watering , consolidation in layers of 15cm . Thickness including dispositing of the surplus earth with a lead of 200 Mtr ,.( COMMON Electrical SR 2022-23 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 84.1 | 84.1 | 43.2 | False | None | None | False | None | False | 3633.12 | 0 | 2340421 | 69234 | None | 31.05 | Laying of cable in existing Trench / GI Pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminium Rollers as directed by the departmental staff,.( COMMON Electrical SR 2022-23 )
LT Cable -2.5to 25 Sqmm
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Km | 23430.55 | 23430.55 | 0.15 | False | None | None | False | None | False | 3514.5825 | 0 | 2340422 | 69234 | None | XXXIV a | Transformer Grounding
GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ( COMMON Electrical SR 2022-23 ) Materials cost
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Per Electrode | 1733.0 | 1733.0 | 4.0 | False | None | None | False | None | False | 6932.0 | 0 | 2340423 | 69234 | None | XXXIV a | Transformer Grounding
GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ( COMMON Electrical SR 2022-23 )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Per Electrode | 1051.25 | 1051.25 | 4.0 | False | None | None | False | None | False | 4205.0 | 0 | 2340424 | 69234 | None | 49.04 | GI Pipe B-Class as per IS 1239
GI Pipe -40 mm Dia
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | m | 295.0 | 295.0 | 14.0 | False | None | None | False | None | False | 4130.0 | 0 | 2340425 | 69234 | None | 70.01 | Supplying of Cable gland
25 mm
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | No | 77.0 | 77.0 | 8.0 | False | None | None | False | None | False | 616.0 | 0 | 2340426 | 69234 | None | 63.04 | Supplying of Haevy Duty Copper Terminal Long Barrel
25 Sqmm Copper Terminal Apprx Wt: 38Gm
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | No | 29.0 | 29.0 | 32.0 | False | None | None | False | None | False | 928.0 | 0 | 2340427 | 69234 | None | 42.08 | Supplying and fixing of 1.1 kv, LT Aerial Bunched Cable, XLPE insulation Confirmin to IS- 14255 :1995.
3x16 + 1x25 Sqmm Street Light ( Insulated Messenger Cum Neutral )
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Km | 130950.0 | 130950.0 | 0.12 | False | None | None | False | None | False | 15714.0 | 0 |
|
|
---|