noticeInvitingTenderDTO
createdTs1706780429088
version10
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee3400.00
emd204000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-02-2024 17:00:00
tenderQueryClose07-02-2024 17:30:00
technicalBidOpen12-02-2024 16:30:00
publishedDate02-02-2024 14:16:13
publishedByPostPWD_EE_DIV_CKD
publishedByUserKPE15950 - SUNILKUMAR N BALOL
bidValidityPeriod90
noOfCalls2
preBidMeetingDate09-02-2024 15:23:41
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonShri.Sunilkumar N Balol EE PWD Division Chikodi
splitEmdRequiredYnTrue
emdBankGuarantee104000.00
emdCash100000.00
bgValidityPeriod45
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber8338273859
mobileNumber8338273859
tenderSupplierListNone
tenderSchedule
createdTs1706780429090
version30
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT5937/CALL-2
titleCONSTRUCTION OF GOVT. KANNADA HIGHER PRIMARY SCHOOL RMSA HIGH SCHOOL MEERAPURHATTI Tal Chikkodi, Dist Belagavi
descriptionCONSTRUCTION OF GOVT. KANNADA HIGHER PRIMARY SCHOOL RMSA HIGH SCHOOL MEERAPURHATTI Tal Chikkodi, Dist Belagavi
categoryWORKS
categoryTextWorks
ecv13567969.31
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1686
locationNamePWD Division Office Chikkodi
provisionalAmount16059000.0
groupOverheadTotal0.0
fileNumberKPWD/BLD/SHOOL/SKG
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17067804290000NoneNoneBuildingsEstimate for Borewell Drilling200555.25
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236459570275NoneBWSSB SOR 2021-22, SOR code O040A ,Page No-151Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test ---- including cost of all materials, labor ,HOM,lEach5398.055398.051.0FalseNoneNoneFalseNoneFalse5398.050
236459670275NoneBWSSB SOR 2021-22, SOR code O010 ,Page No-151 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 0 to 50 mtr ---- including cost of all materials, labor ,HOM,lRmtr364.35364.3550.0FalseNoneNoneFalseNoneFalse18217.50
236459770275NoneBWSSB SOR 2021-22, SOR code O010 ,Page No-151Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 50 - 100 mtr ---- including cost of all materials, labor ,HOM,lRmtr464.1464.150.0FalseNoneNoneFalseNoneFalse23205.00
236459870275NoneBWSSB SOR 2021-22, SOR code O010 ,Page No-151 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 100 - 150 mtr ---- including cost of all materials, labor ,HOM,lRmtr478.8478.850.0FalseNoneNoneFalseNoneFalse23940.00
236459970275NoneBWSSB SOR 2021-22, SOR code O010 ,Page No-151 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 150 - 200 mtr ---- including cost of all materials, labor ,HOM,lRmtr562.8562.850.0FalseNoneNoneFalseNoneFalse28140.00
236460070275NoneBWSSB SOR 2021-22, SOR code O160A ,Page No-154 Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty. ---- including cost of all materials, labor ,HOM,lRmtr2029.652029.6550.0FalseNoneNoneFalseNoneFalse101482.50
236460170275NoneBWSSB SOR 2021-22, SOR code O180A,Page No-155 Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge ---- including cost of all materials, labor ,HOM,lEach172.2172.21.0FalseNoneNoneFalseNoneFalse172.20
17067804290001NoneNoneBuildingsEstimate for Borewell pump, Pumphouse and Electrification work271647.26
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236460270276NoneBWSSB SOR 2021-22, SOR code P110 ,Page No-160 Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications,as per necessary ammendments and instructions of engineer incharge of work. For 3 HP ---- including cost of all materials, labor ,HOM,lEach37747.537747.51.0FalseNoneNoneFalseNoneFalse37747.50
236460370276NoneBWSSB SOR 2021-22, SOR code N020F ,Page No-142 Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: ---- including cost of all materials, labor ,HOM,lMtr614.8614.8190.0FalseNoneNoneFalseNoneFalse116812.00
236460470276NoneBWSSB SOR 2021-22, SOR code P230C,Page No-161Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. ---- including cost of all materials, labor ,HOM,lMtr173.25173.25250.0FalseNoneNoneFalseNoneFalse43312.50
236460570276NoneBWSSB SOR 2021-22, SOR code P360A,Page No-163 Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. ---- including cost of all materials, labor ,HOM,lJob6457.56457.51.0FalseNoneNoneFalseNoneFalse6457.50
236460670276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Fabricating supplying and mounting MS box made out .SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete." ---- including cost of all materials, labor ,HOM,lSq CM0.380.3819500.0FalseNoneNoneFalseNoneFalse7410.00
236460770276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. ---- including cost of all materials, labor ,HOM,lMtr497.0497.02.0FalseNoneNoneFalseNoneFalse994.00
236460870276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 ---- including cost of all materials, labor ,HOM,lEach143.0143.02.0FalseNoneNoneFalseNoneFalse286.00
236460970276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 ---- including cost of all materials, labor ,HOM,lMtr40.040.020.0FalseNoneNoneFalseNoneFalse800.00
236461070276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 4m2m ---- including cost of all materials, labor ,HOM,lMtr59.059.020.0FalseNoneNoneFalseNoneFalse1180.00
236461170276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. ---- including cost of all materials, labor ,HOM,lEach200.0200.02.0FalseNoneNoneFalseNoneFalse400.00
236461270276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- including cost of all materials, labor ,HOM,lEach2399.02399.02.0FalseNoneNoneFalseNoneFalse4798.00
236461370276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Supplying, fixing and wiring Earth Leakage Miniature Circuit Breaker (ELMCB) 240/450V up to 300mA sensitivity on existing wood/panel board. ---- including cost of all materials, labor ,HOM,lEach2826.02826.01.0FalseNoneNoneFalseNoneFalse2826.00
236461470276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Fixing a shunt capacitor of . KVAR capacity with necessary clamps, bolts, and nuts on existing wooden or metal board including banking of more than one capacitor. ---- including cost of all materials, labor ,HOM,lEach227.0227.03.0FalseNoneNoneFalseNoneFalse681.00
236461570276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. ---- including cost of all materials, labor ,HOM,lEach464.0464.02.0FalseNoneNoneFalseNoneFalse928.00
236461670276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Digging of Pit for providing GI Pipe type Earthing ---- including cost of all materials, labor ,HOM,lEach578.0578.01.0FalseNoneNoneFalseNoneFalse578.00
236461770276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- including cost of all materials, labor ,HOM,lNo770.0770.01.0FalseNoneNoneFalseNoneFalse770.00
236461870276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- including cost of all materials, labor ,HOM,lNo660.0660.01.0FalseNoneNoneFalseNoneFalse660.00
236461970276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- including cost of all materials, labor ,HOM,lBag303.0303.01.0FalseNoneNoneFalseNoneFalse303.00
236462070276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 ---- including cost of all materials, labor ,HOM,lKm148612.0148612.00.015FalseNoneNoneFalseNoneFalse2229.180
236462170276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable ---- including cost of all materials, labor ,HOM,lKm16159.016159.00.01FalseNoneNoneFalseNoneFalse161.590
236462270276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed. ---- including cost of all materials, labor ,HOM,lCum389.0389.03.75FalseNoneNoneFalseNoneFalse1458.750
236462370276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr ---- including cost of all materials, labor ,HOM,lCum58.058.03.75FalseNoneNoneFalseNoneFalse217.50
236462470276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item GI Pipe B - Class as per IS-1239 40mm dia ---- including cost of all materials, labor ,HOM,lMtr330.4330.46.0FalseNoneNoneFalseNoneFalse1982.40
236462570276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Laying the GI Pipe 80 mm to 150 mm dia at Drainage Water Supply Crossing including fixing collars elbows, bends, Tees and other fitting with Cuts and Threads wherever necessary complete. ---- including cost of all materials, labor ,HOM,lMtr58.058.06.0FalseNoneNoneFalseNoneFalse348.00
236462670276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable Up to 4C x 50 Sqmm ---- including cost of all materials, labor ,HOM,lEach316.0316.01.0FalseNoneNoneFalseNoneFalse316.00
236462770276NoneSchedule Of Rates PWD, Electrical SR 2019-20 Item Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. 8 SWG GI Wire ---- including cost of all materials, labor ,HOM,lMtr19.019.010.0FalseNoneNoneFalseNoneFalse190.00
236462870276NoneSchedule Of Rates PWD, Electrical SR 2022-23 Item Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 Amps three phase 4 wire whole current class-1 Accuracy Energy Meter. ---- including cost of all materials, labor ,HOM,lEach5125.05125.02.0FalseNoneNoneFalseNoneFalse10250.00
236462970276NoneCSR 2021-22, Vol- 1, Item No: 1.4,Page No-5 Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- including cost of all materials, labor ,HOM,lCum195.3195.30.77FalseNoneNoneFalseNoneFalse150.3810
236463070276NoneBWSSB SOR 2021-22 SOR Code : H010C, Page noProviding and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, plywood / steel formwork, cost of all materials of quality, labour, Usage charges of machineries, curing and all the other appurtenances required to complete the work as per technical specifications. ( The cost of steel reinforcement shall be paid separately).PCC 1:2:4 using 40 mm aggregate " ---- including cost of all materials, labor ,HOM,lCum6206.556206.550.26FalseNoneNoneFalseNoneFalse1613.7030
236463170276NoneCSR 2021-22, Vol - 2 Item No: 5.4,Page No-9 Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including cost of all materials, labor ,HOM,lCum5619.65619.60.9FalseNoneNoneFalseNoneFalse5057.640
236463270276NoneBWSSB SOR 2021-22 SOR Code : M070A, Page no136RCC hume pipe Circular pump house: Supplying precast RCC Circular Hume pipe pump house with M.S door and RCC conical roof as per specification and drawings - Internal dia Mtr. 1200 mm & height of 2.5 Mtr. With Wall thickness 65mm ---- including cost of all materials, labor ,HOM,lEach17221.0517221.051.0FalseNoneNoneFalseNoneFalse17221.050
236463370276NoneBWSSB&S SR 2021-22 SOR Code : M080A, Page no136Erection and positioning of RCC Hume pipe pump house/Cistern on size stone masory platform including transportation charges and handling,finishing with all necessary tools ,plants and materials etc.,complete as directed by the Engineer in charge of the work. ---- including cost of all materials, labor ,HOM,lEach1976.11976.11.0FalseNoneNoneFalseNoneFalse1976.10
236463470276NoneCSR 2021-22 Item No: 8.40,Page No-48, Vol - 2 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge." ---- including cost of all materials, labor ,HOM,lSqm94.594.510.37FalseNoneNoneFalseNoneFalse979.9650
236463570276NoneCSR 2021-22 Item No: 8.40,Page No-53, Vol - 3 Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman ---- including cost of all materials, labor ,HOM,lcm11.0311.0350.0FalseNoneNoneFalseNoneFalse551.50
17067804290000NoneNoneBuildingsElectrical Work325593.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236463670277None1.8.2Supplying and fixing of PVC casing and capping on the wall or ceiling using necessary materials like bends, junction box, elbows, screws at an interval of 300 mmetcas required 25mm ---- including cost of all materials, labor ,HOM,lMtr28.028.0500.0FalseNoneNoneFalseNoneFalse14000.00
236463770277None1.6.5Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete.4"x4"x3" ( 101x101x76mm) ---- including cost of all materials, labor ,HOM,lEach69.069.060.0FalseNoneNoneFalseNoneFalse4140.00
236463870277None2.1.2I. Point wiring using Copper wire with switch Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Using class A Materials b) Medium point above 3Mtr up to 6Mtr from tapping point to out let via switch ---- including cost of all materials, labor ,HOM,lPoint386.0386.030.0FalseNoneNoneFalseNoneFalse11580.00
236463970277None2.1.3I. Point wiring using Copper wire with switch Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet Using class A Materialsc) Long point above 6Mtr up to 10Mtr from tapping point to out let via switch ---- including cost of all materials, labor ,HOM,lPoint567.0567.035.0FalseNoneNoneFalseNoneFalse19845.00
236464070277None2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments-1.5 sqmm ---- including cost of all materials, labor ,HOM,lMtr26.026.0600.0FalseNoneNoneFalseNoneFalse15600.00
236464170277None2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments-2.5 sqmm ---- including cost of all materials, labor ,HOM,lMtr40.040.0200.0FalseNoneNoneFalseNoneFalse8000.00
236464270277None2.3.4Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments-4 sqmm ---- including cost of all materials, labor ,HOM,lMtr59.059.0600.0FalseNoneNoneFalseNoneFalse35400.00
236464370277None3.4.1Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall-1-3Way ---- including cost of all materials, labor ,HOM,lEach123.0123.030.0FalseNoneNoneFalseNoneFalse3690.00
236464470277None3.4.4Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall- 8Way ---- including cost of all materials, labor ,HOM,lEach250.0250.010.0FalseNoneNoneFalseNoneFalse2500.00
236464570277None3.4.5Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall-10-12Way ---- including cost of all materials, labor ,HOM,lEach325.0325.050.0FalseNoneNoneFalseNoneFalse16250.00
236464670277None3.5.1Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.- Group-A-1 to 3 Module ---- including cost of all materials, labor ,HOM,lEach152.0152.030.0FalseNoneNoneFalseNoneFalse4560.00
236464770277None3.5..4Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.- Group-A-8Moudule ---- including cost of all materials, labor ,HOM,lEach302.0302.010.0FalseNoneNoneFalseNoneFalse3020.00
236464870277None3.5.6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.- Group-A-12Moudule ---- including cost of all materials, labor ,HOM,lEach403.0403.020.0FalseNoneNoneFalseNoneFalse8060.00
236464970277None3.6.1Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.Using Group "A" materials 6Amps one way ---- including cost of all materials, labor ,HOM,lEach88.088.0150.0FalseNoneNoneFalseNoneFalse13200.00
236465070277None3.6.4Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.Using Group "A" materials Stepped Fan Regulator ---- including cost of all materials, labor ,HOM,lEach313.0313.020.0FalseNoneNoneFalseNoneFalse6260.00
236465170277None3.6.8Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.Using Group "A" materials 16Amps one way switch ---- including cost of all materials, labor ,HOM,lEach249.0249.060.0FalseNoneNoneFalseNoneFalse14940.00
236465270277None3.6.10Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.Using Group "A" materials 32Amps DP switch ---- including cost of all materials, labor ,HOM,lEach375.0375.020.0FalseNoneNoneFalseNoneFalse7500.00
236465370277None3.6.11Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.Using Group "A" materials 6/16Amps universal socket ---- including cost of all materials, labor ,HOM,lEach249.0249.040.0FalseNoneNoneFalseNoneFalse9960.00
236465470277None3.6.3Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.Using Group "A" materials 6Amps 3way socket. ---- including cost of all materials, labor ,HOM,lEach162.0162.040.0FalseNoneNoneFalseNoneFalse6480.00
236465570277None11.3.2Supplying of feet PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greterthan 80. Power Input: 220-240V@ 50/60Hz & Power factor greaterthan 0.9 along with CE approved. years Warranty against any manufacturing defect working under standard electrical condition.12.3.2 LED light fitting 1 x 4'- 20/22 w Each LED light fitting 1 x 4'- 20/22 w Each ---- including cost of all materials, labor ,HOM,lEach740.0740.050.0FalseNoneNoneFalseNoneFalse37000.00
236465670277None5.7.2Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32Amps ---- including cost of all materials, labor ,HOM,lEach200.0200.010.0FalseNoneNoneFalseNoneFalse2000.00
236465770277None5.17.1Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. a) 6-32Amps SP Group 'A' ---- including cost of all materials, labor ,HOM,lEach523.0523.01.0FalseNoneNoneFalseNoneFalse523.00
236465870277None5.17.4Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. 6-32 Amps DP Group 'A' ---- including cost of all materials, labor ,HOM,lEach1103.01103.01.0FalseNoneNoneFalseNoneFalse1103.00
236465970277None5.18.6Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. II - Double Door a) 4Way TP &N ---- including cost of all materials, labor ,HOM,lEach1368.01368.01.0FalseNoneNoneFalseNoneFalse1368.00
236466070277NoneHESCOM SRGI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long,3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg HESCOM SR ---- including cost of all materials, labor ,HOM,lNo770.0770.01.0FalseNoneNoneFalseNoneFalse770.00
236466170277NoneHESCOM SRGood Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each HESCOM SR ---- including cost of all materials, labor ,HOM,lNo660.0660.01.0FalseNoneNoneFalseNoneFalse660.00
236466270277NoneHESCOM SRGood Quality Salt for grounding purposes packed in 50 Kg gunny bag HESCOM SR ---- including cost of all materials, labor ,HOM,lBag303.0303.01.0FalseNoneNoneFalseNoneFalse303.00
236466370277NoneHESCOM SRDigging of Pit for providing GI Pipe type Earthing LABOUR RATE HESCOM SR Hard Soil ---- including cost of all materials, labor ,HOM,lPer Pit2267.02267.01.0FalseNoneNoneFalseNoneFalse2267.00
236466470277None7.3.1.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system and as per technical data approved. 48" Sweep (1200mm) Regular model ---- including cost of all materials, labor ,HOM,lEach2085.02085.021.0FalseNoneNoneFalseNoneFalse43785.00
236466570277None5.6.1Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. 8"x6"1.5" ---- including cost of all materials, labor ,HOM,lEach76.076.021.0FalseNoneNoneFalseNoneFalse1596.00
236466670277None5.6.4Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. 12"x12"2" ---- including cost of all materials, labor ,HOM,lEach162.0162.021.0FalseNoneNoneFalseNoneFalse3402.00
236466770277None13.7.1Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA. On wall / ceiling / Rafter / Girders ---- including cost of all materials, labor ,HOM,lEach119.0119.050.0FalseNoneNoneFalseNoneFalse5950.00
236466870277None13.81Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- including cost of all materials, labor ,HOM,lEach281.0281.020.0FalseNoneNoneFalseNoneFalse5620.00
236466970277None1.9.1Supplying PVC/GI flexible conduit pipe…mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely 20mm ---- including cost of all materials, labor ,HOM,lMtr25.025.010.0FalseNoneNoneFalseNoneFalse250.00
236467070277NoneHescom SRRCC Pole - 9 Mtr Long, 145 Kg WL(Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- including cost of all materials, labor ,HOM,lNos7076.07076.01.0FalseNoneNoneFalseNoneFalse7076.00
236467170277None7.02Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- including cost of all materials, labor ,HOM,lKm46234.046234.00.15FalseNoneNoneFalseNoneFalse6935.10
17067804290001NoneNoneBuildingsEstimate-First Floor -Civil4876296.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236467270278NoneVol.1, P.No.17,I.No.2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.17,I.No.2.5.2) ---- including cost of all materials, labor ,HOM,lCum6386.336386.33108.11FalseNoneNoneFalseNoneFalse690426.13630
236467370278NoneA7 Sl No‍Formwork for column @ 70% ---- including cost of all materials, labor ,HOM,lCum4470.434470.4314.25FalseNoneNoneFalseNoneFalse63703.62750
236467470278NoneA7 Sl NoFormwark for Lintels, Beams @ 60% ---- including cost of all materials, labor ,HOM,lCum3831.83831.86.04FalseNoneNoneFalseNoneFalse23144.0720
236467570278NoneA7 Sl NoFormwark for Roof Slab @ 50% ---- including cost of all materials, labor ,HOM,lCum3193.173193.1763.692FalseNoneNoneFalseNoneFalse203379.383640
236467670278NoneA7 Sl NoFormwark for chajja@ 45% ---- including cost of all materials, labor ,HOM,lCum2873.852873.852.89FalseNoneNoneFalseNoneFalse8305.42650
236467770278NoneA7 Sl NoFormwark for staircase @ 45% ---- including cost of all materials, labor ,HOM,lCum2873.852873.853.2976FalseNoneNoneFalseNoneFalse9476.807760
236467870278NoneV-1 2021-22 P.No. 17 I.No.2.4.1Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Thegranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates(PWD CSR V-1 2021-22 / P.No. 17 I.No.2.4.1) ---- including cost of all materials, labor ,HOM,lCum6113.786113.783.0673FalseNoneNoneFalseNoneFalse18752.7973940
236467970278NoneVol.2, P.No.84,I.No.11.32)Providing Thermo-Mechanically Treated bars of grade Fe-550D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (Vol.2, P.No.84,I.No.11.32) ---- including cost of all materials, labor ,HOM,lKg95.4595.4510603.24FalseNoneNoneFalseNoneFalse1012079.2580
236468070278NoneV-2 2021-22 P.No. 14 I.No.6.8)Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(PWD SR V-2 2021-22 / P.No. 14 I.No.6.8) ---- including cost of all materials, labor ,HOM,lCum7061.877061.8788.2FalseNoneNoneFalseNoneFalse622856.9340
236468170278NoneVolume 2 Page No 99 Item No 12.11)Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(Volume 2 Page No 99 Item No 12.11) ---- including cost of all materials, labor ,HOM,lCum95861.7795861.770.6338FalseNoneNoneFalseNoneFalse60757.1898260
236468270278NoneVolume 2 Page No 106 Item No 12.57.8Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 40 mm thick one side teak and one side commercial.(Volume 2 Page No 106 Item No 12.57.8) ---- including cost of all materials, labor ,HOM,lSqm3445.563445.5625.2FalseNoneNoneFalseNoneFalse86828.1120
236468370278NoneVolume 2 Page No 63 Item No. 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent (Volume 2 Page No 63 Item No. 9.24) ---- including cost of all materials, labor ,HOM,lSqm3037.273037.27160.57FalseNoneNoneFalseNoneFalse487694.44390
236468470278NoneVolume 2 Page No 69 Item No. 10.2)Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. (Volume 2 Page No 69 Item No. 10.2) ---- including cost of all materials, labor ,HOM,lSqm285.27285.2734.74FalseNoneNoneFalseNoneFalse9910.27980
236468570278NoneVolume 2 Page No 69 Item No. 10.2)Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made (Volume 2 Page No 110 Item No. 12.84) ---- including cost of all materials, labor ,HOM,lSqm4362.894362.8915.84FalseNoneNoneFalseNoneFalse69108.17760
236468670278NoneVol.2, P.No.112, I.No.12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made)(Vol.2, P.No.112, I.No.12.90) ---- including cost of all materials, labor ,HOM,lSqm7602.07602.025.92FalseNoneNoneFalseNoneFalse197043.840
236468770278NoneVolume 2 Material component S.No.245, P.No. A-19)Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm (Volume 2 Material component S.No.245, P.No. A-19) ---- including cost of all materials, labor ,HOM,lSqm265.12265.1256.07FalseNoneNoneFalseNoneFalse14865.27840
236468870278NoneVolume 2 Page No 84 Item No 11.31)Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In charge including cost of materials, labour, usage charges of machinery complete as per specifications.. (Volume 2 Page No 84 Item No 11.31) ---- including cost of all materials, labor ,HOM,lKg103.92103.92357.75FalseNoneNoneFalseNoneFalse37177.380
236468970278NoneVolume 2 Page No 84 Item No 11.30.1)Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 4.0 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge (Volume 2 Page No 84 Item No 11.30.1) ---- including cost of all materials, labor ,HOM,lSqm756.13756.1314.31FalseNoneNoneFalseNoneFalse10820.22030
236469070278NoneVol.2, P.No.85, I.No.11.34B)Providing and fixing M.S. grills of required pattern in frames of win dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc (Vol.2, P.No.85, I.No.11.34B) ---- including cost of all materials, labor ,HOM,lKg163.32163.32285.12FalseNoneNoneFalseNoneFalse46565.79840
236469170278NoneVol.2, P.No.61, I.No.9.17.2)Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete Size of Tile 600x600 m (Vol.2, P.No.61, I.No.9.17.2) ---- including cost of all materials, labor ,HOM,lSqm1163.371163.37285.04FalseNoneNoneFalseNoneFalse331606.98480
236469270278NonePWD SR V-2 2021-22 P.No. 41 I.No.8.1.1)Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 41 I.No.8.1.1) ---- including cost of all materials, labor ,HOM,lSqm222.71222.71521.01FalseNoneNoneFalseNoneFalse116034.13710
236469370278NonePWD SR V-2 2021-22 P.No. 50 I.No.8.51)Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.(PWD SR V-2 2021-22 / P.No. 50 I.No.8.51) ---- including cost of all materials, labor ,HOM,lSqm88.0288.02910.35FalseNoneNoneFalseNoneFalse80129.0070
236469470278NonePWD SR V-2 2021-22 P.No. 42 I.No.8.8)Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge (PWD SR V-2 2021-22 / P.No. 42 I.No.8.8) ---- including cost of all materials, labor ,HOM,lSqm322.39322.39488.53FalseNoneNoneFalseNoneFalse157497.18670
236469570278NoneVol.2, P.No.65, I.No.9.36)Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. (Vol.2, P.No.65, I.No.9.36) ---- including cost of all materials, labor ,HOM,lSqm1302.291302.2917.82FalseNoneNoneFalseNoneFalse23206.80780
236469670278NonePWD SR V-2 2021-22 P.No. 47 I.No.8.33.3)Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 47 I.No.8.33.3) ---- including cost of all materials, labor ,HOM,lSqm112.41112.4115.84FalseNoneNoneFalseNoneFalse1780.57440
236469770278NonePWD SR V-2 2021-22 P.No. 46 I.No.8.33.2)Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 46 I.No.8.33.2) ---- including cost of all materials, labor ,HOM,lSqm111.35111.3512.6FalseNoneNoneFalseNoneFalse1403.010
236469870278NoneVol.2, P.No.46, I.No.8.30)Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.30) ---- including cost of all materials, labor ,HOM,lSqm144.22144.22593.38FalseNoneNoneFalseNoneFalse85577.26360
236469970278NoneVol.2, P.No.46, I.No.8.33.1)Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.33.1) ---- including cost of all materials, labor ,HOM,lSqm125.13125.13910.35FalseNoneNoneFalseNoneFalse113912.09550
236470070278NoneVolume 2 Page No 105 Item No 12.51)Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.(Volume 2 Page No 105 Item No 12.51) ---- including cost of all materials, labor ,HOM,lNos1566.361566.3610.0FalseNoneNoneFalseNoneFalse15663.60
236470170278NonePWD SR V-2 2021-22 P.No. 82 I.No.11.26.1)Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in-Charge.(PWD SR V-2 2021-22 / P.No. 82 I.No.11.26.1) ---- including cost of all materials, labor ,HOM,lKg117.71117.71218.0FalseNoneNoneFalseNoneFalse25660.780
236470270278NoneVol.2, P.No.133, I.No.15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. (Vol.2, P.No.133, I.No.15.1) ---- including cost of all materials, labor ,HOM,lSqm797.9797.9314.488FalseNoneNoneFalseNoneFalse250929.97520
17067804290001NoneNoneBuildingsEstimate-Ground Floor -Civil7260426.19
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236470370279NoneVol.1, P.No.8,I.No.1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter includingdressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage ofmachinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ( Vol.1, P.No.8,I.No.1.12) ---- including cost of all materials, labor ,HOM,lCum68.2568.2565.42FalseNoneNoneFalseNoneFalse4464.9150
236470470279NoneVol.1, P.No.8,I.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( Vol.1, P.No.8,I.No.1.14.1) ---- including cost of all materials, labor ,HOM,lCum76.6576.65320.34FalseNoneNoneFalseNoneFalse24554.0610
236470570279NoneVol.1, P.No.15,I.No.2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Formwork included and (The cost of steel reinforcement shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.15,I.No.2.1.3) ---- including cost of all materials, labor ,HOM,lCum5720.45720.462.87FalseNoneNoneFalseNoneFalse359641.5480
236470670279NonePWD SR V-2 2021-22 P.No. 9I.No.5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)(PWD SR V-2 2021-22 / P.No. 9I.No.5.3) ---- including cost of all materials, labor ,HOM,lCum5420.15420.133.63FalseNoneNoneFalseNoneFalse182277.9630
236470770279NonePWD SR V-2 2021-22 P.No. 9 I.No.5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)(PWD SR V-2 2021-22 / P.No. 9 I.No.5.4) ---- including cost of all materials, labor ,HOM,lCum5580.755580.7525.3FalseNoneNoneFalseNoneFalse141192.9750
236470870279NoneVolume 1 Page No 15-Item No 2.2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (The cost of steel reinforcement & formwork to be paid separately) (Volume 1 Page No 15-Item No 2.2.2.1) ---- including cost of all materials, labor ,HOM,lCum6105.756105.7584.01FalseNoneNoneFalseNoneFalse512944.05750
236470970279NoneA7s.no22‍Formwork for footings Isloted @8%(A7/s.no22(2) ---- including cost of all materials, labor ,HOM,lCum488.46488.4684.01FalseNoneNoneFalseNoneFalse41035.52460
236471070279NoneVol.1, P.No.17, I.No.2.4.3Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.17, I.No.2.4.3) ---- including cost of all materials, labor ,HOM,lCum6120.456120.4523.81FalseNoneNoneFalseNoneFalse145727.91450
236471170279NoneA7 s.no22(2)‍Formwork for column @ 70%(A7/s.no22(2) ---- including cost of all materials, labor ,HOM,lCum4284.324284.325.41FalseNoneNoneFalseNoneFalse23178.17120
236471270279NoneA7 s.no22(2)‍Formwork for plinth beams@ 50%(A7/s.no22(2) ---- including cost of all materials, labor ,HOM,lCum3060.233060.2318.4FalseNoneNoneFalseNoneFalse56308.2320
236471370279NonePWD CSR V-1 2021-22 P.No. 7 I.No.1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.(PWD CSR V-1 2021-22 / P.No. 7 I.No.1.9) ---- including cost of all materials, labor ,HOM,lCum214.2214.2379.15FalseNoneNoneFalseNoneFalse81213.930
236471470279NoneVol.1, P.No.17,I.No.2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.17,I.No.2.5.2) ---- including cost of all materials, labor ,HOM,lCum6323.16323.1109.2FalseNoneNoneFalseNoneFalse690482.520
236471570279NoneA7 s.no22(2)‍Formwork for Column @ 70%(A7/s.no22(2) ---- including cost of all materials, labor ,HOM,lCum4426.174426.1714.25FalseNoneNoneFalseNoneFalse63072.92250
236471670279NoneA7s.no22(2)Formwark for Lintels, Beams @ 60% ---- including cost of all materials, labor ,HOM,lCum2655.72655.724.59FalseNoneNoneFalseNoneFalse65303.6630
236471770279NoneA7s.no22(2)Formwark for Roof Slab @ 50% ---- including cost of all materials, labor ,HOM,lCum3161.553161.5563.69FalseNoneNoneFalseNoneFalse201359.11950
236471870279NoneA7s.no22(2)Formwark for chajja@ 45% ---- including cost of all materials, labor ,HOM,lCum2845.392845.393.37FalseNoneNoneFalseNoneFalse9588.96430
236471970279NoneA7s.no22(2)Formwark for staircase @ 45% ---- including cost of all materials, labor ,HOM,lCum2845.392845.393.3FalseNoneNoneFalseNoneFalse9389.7870
236472070279NonePWD CSR V-1 2021-22 P.No. 17 I.No.2.4.1Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Thegranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates(PWD CSR V-1 2021-22 / P.No. 17 I.No.2.4.1) ---- including cost of all materials, labor ,HOM,lCum6053.256053.253.01FalseNoneNoneFalseNoneFalse18220.28250
236472170279NoneVol.2, P.No.84,I.No.11.32Providing Thermo-Mechanically Treated bars of grade Fe-550D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (Vol.2, P.No.84,I.No.11.32) ---- including cost of all materials, labor ,HOM,lKg94.594.515631.73FalseNoneNoneFalseNoneFalse1477198.4850
236472270279NonePWD SR V-2 2021-22 P.No. 14 I.No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(PWD SR V-2 2021-22 / P.No. 14 I.No.6.8) ---- including cost of all materials, labor ,HOM,lCum6991.956991.9587.41FalseNoneNoneFalseNoneFalse611166.34950
236472370279NoneVolume 2 Page No 99 Item No 12.11Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(Volume 2 Page No 99 Item No 12.11) ---- including cost of all materials, labor ,HOM,lCum94912.6594912.650.5063FalseNoneNoneFalseNoneFalse48054.2746950
236472470279NoneVolume 2 Page No 106 Item No 12.57.8Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 40 mm thick one side teak and one side commercial.(Volume 2 Page No 106 Item No 12.57.8) ---- including cost of all materials, labor ,HOM,lSqm3411.453411.4525.2FalseNoneNoneFalseNoneFalse85968.540
236472570279NonePWD SR V-2 2021-22 P.No. 105 I.No.12.53Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges(PWD SR V-2 2021-22 / P.No. 105 I.No.12.53) ---- including cost of all materials, labor ,HOM,lSqm2989.352989.357.98FalseNoneNoneFalseNoneFalse23855.0130
236472670279NonePWD SR V-2 2021-22 P.No. 105 I.No.12.54Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 105 I.No.12.54) ---- including cost of all materials, labor ,HOM,lm498.75498.7528.6FalseNoneNoneFalseNoneFalse14264.250
236472770279NoneVolume 2 Page No 63 Item No. 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent (Volume 2 Page No 63 Item No. 9.24) ---- including cost of all materials, labor ,HOM,lSqm3007.23007.2186.88FalseNoneNoneFalseNoneFalse561985.5360
236472870279NoneVolume 2 Page No 69 Item No. 10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. (Volume 2 Page No 69 Item No. 10.2) ---- including cost of all materials, labor ,HOM,lSqm282.45282.4556.1195FalseNoneNoneFalseNoneFalse15850.9527750
236472970279NoneVolume 2 Page No 110 Item No. 12.84Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made (Volume 2 Page No 110 Item No. 12.84) ---- including cost of all materials, labor ,HOM,lSqm4319.74319.714.4FalseNoneNoneFalseNoneFalse62203.680
236473070279NoneVol.2, P.No.112, I.No.12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made)(Vol.2, P.No.112, I.No.12.90) ---- including cost of all materials, labor ,HOM,lSqm7603.057603.0523.76FalseNoneNoneFalseNoneFalse180648.4680
236473170279NoneS.No.245, P.No. A-19Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm (Volume 2 Material component S.No.245, P.No. A-19) ---- including cost of all materials, labor ,HOM,lSqm262.5262.553.82FalseNoneNoneFalseNoneFalse14127.750
236473270279NoneVolume 2 Page No 84 Item No 11.31)Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In charge including cost of materials, labour, usage charges of machinery complete as per specifications.. (Volume 2 Page No 84 Item No 11.31) ---- including cost of all materials, labor ,HOM,lKg102.9102.9391.5FalseNoneNoneFalseNoneFalse40285.350
236473370279NoneVolume 2 Page No 84 Item No 11.30.1Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 4.0 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge (Volume 2 Page No 84 Item No 11.30.1) ---- including cost of all materials, labor ,HOM,lSqm748.65748.6515.66FalseNoneNoneFalseNoneFalse11723.8590
236473470279NoneVol.2, P.No.85, I.No.11.34BProviding and fixing M.S. grills of required pattern in frames of win dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc (Vol.2, P.No.85, I.No.11.34B) ---- including cost of all materials, labor ,HOM,lKg161.7161.7686.88FalseNoneNoneFalseNoneFalse111068.4960
236473570279NoneVol.2, P.No.61, I.No.9.17.2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete Size of Tile 600x600 m (Vol.2, P.No.61, I.No.9.17.2) ---- including cost of all materials, labor ,HOM,lSqm1151.851151.85390.43FalseNoneNoneFalseNoneFalse449716.79550
236473670279NonePWD SR V-2 2021-22 P.No. 41 I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 41 I.No.8.1.1) ---- including cost of all materials, labor ,HOM,lSqm220.5220.5725.16FalseNoneNoneFalseNoneFalse159897.780
236473770279NonePWD SR V-2 2021-22 P.No. 50 I.No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.(PWD SR V-2 2021-22 / P.No. 50 I.No.8.51) ---- including cost of all materials, labor ,HOM,lSqm87.1587.151102.86FalseNoneNoneFalseNoneFalse96114.2490
236473870279NonePWD SR V-2 2021-22 P.No. 42 I.No.8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge(PWD SR V-2 2021-22 / P.No. 42 I.No.8.8) ---- including cost of all materials, labor ,HOM,lSqm322.35322.35412.41FalseNoneNoneFalseNoneFalse132940.36350
236473970279NoneVol.2, P.No.65, I.No.9.36Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. (Vol.2, P.No.65, I.No.9.36) ---- including cost of all materials, labor ,HOM,lSqm1289.41289.413.5FalseNoneNoneFalseNoneFalse17406.90
236474070279NonePWD SR V-2 2021-22 P.No. 47 I.No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 47 I.No.8.33.3) ---- including cost of all materials, labor ,HOM,lSqm111.3111.338.16FalseNoneNoneFalseNoneFalse4247.2080
236474170279NonePWD SR V-2 2021-22 P.No. 46 I.No.8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 46 I.No.8.33.2) ---- including cost of all materials, labor ,HOM,lSqm110.25110.2512.6FalseNoneNoneFalseNoneFalse1389.150
236474270279NoneVol.2, P.No.46, I.No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.30) ---- including cost of all materials, labor ,HOM,lSqm142.8142.8534.44FalseNoneNoneFalseNoneFalse76318.0320
236474370279NoneVol.2, P.No.46, I.No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.33.1) ---- including cost of all materials, labor ,HOM,lSqm123.9123.91107.86FalseNoneNoneFalseNoneFalse137263.8540
236474470279NoneVolume 2 Page No 105 Item No 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.(Volume 2 Page No 105 Item No 12.51) ---- including cost of all materials, labor ,HOM,lNos1550.851550.8515.0FalseNoneNoneFalseNoneFalse23262.750
236474570279NoneVol.2, 1st corrigendum I.No.13.48Providing and fixing on the wall face unplastisized rigid PVC rain water pipes confirmimg to IS:13592 Type A including jointing with seal ring confirmimg to IS:5382, leaving 10mm gap for thermal expansion, single socketed pipes 100mm diameter. ( Vol.2, 1st corrigendum I.No.13.48) ---- including cost of all materials, labor ,HOM,lm265.65265.65113.5FalseNoneNoneFalseNoneFalse30151.2750
236474670279NonePWD SR V-2 2021-22 P.No. 82 I.No.11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in-Charge.(PWD SR V-2 2021-22 / P.No. 82 I.No.11.26.1) ---- including cost of all materials, labor ,HOM,lKg116.55116.55380.5FalseNoneNoneFalseNoneFalse44347.2750
236474770279NoneQuotation rateProviding and fixing Green board for class room (Quotation rate) ---- including cost of all materials, labor ,HOM,lEach8136.08136.010.0FalseNoneNoneFalseNoneFalse81360.00
236474870279NoneVol.2, P.No.176, I.No.20.34.1Providing and fixing chromium plated brass butt hinges with necessary chromium plated brass screws etc. complete.125x70x4 mm (ordinary type) (Vol.2, P.No.176, I.No.20.34.1) ---- including cost of all materials, labor ,HOM,lEach158.55158.55180.0FalseNoneNoneFalseNoneFalse28539.00
236474970279NoneVol.2, P.No.A-27, S.No.285Hold fasts (Vol.2, P.No.A-27, S.No.285) ---- including cost of all materials, labor ,HOM,lEach33.633.6180.0FalseNoneNoneFalseNoneFalse6048.00
236475070279NoneVol.2, P.No.108, I.No.12.73.1Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete 125mm (Vol.2, P.No.108, I.No.12.73.1) ---- including cost of all materials, labor ,HOM,lEach31.531.5120.0FalseNoneNoneFalseNoneFalse3780.00
236475170279NoneVol.2, P.No.107, I.No.12.60Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete.(Vol.2, P.No.107, I.No.12.60) ---- including cost of all materials, labor ,HOM,lEach873.6873.61.0FalseNoneNoneFalseNoneFalse873.60
236475270279NoneVol.2, P.No.107, I.No.12.63Providing and fixing aluminium tower bolts, ISI marked, anodised (an odic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete (Vol.2, P.No.107, I.No.12.63) ---- including cost of all materials, labor ,HOM,lEach116.55116.5530.0FalseNoneNoneFalseNoneFalse3496.50
236475370279NoneVol.2, P.No.107, I.No.12.58Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete (Vol.2, P.No.107, I.No.12.58) ---- including cost of all materials, labor ,HOM,lEach114.45114.4530.0FalseNoneNoneFalseNoneFalse3433.50
236475470279NoneVol.2, P.No.107, I.No.12.58Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications.(Corr. 1 SCBC Bangalore, Dated 21-04-2022) ---- including cost of all materials, labor ,HOM,lSqm1188.61188.660.14FalseNoneNoneFalseNoneFalse71482.4040
17067804290001NoneNoneBuildingsEstimate of SF Head Room Civil482152.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236475570280NoneVol.1, P.No.17,I.No.2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.17,I.No.2.5.2) ---- including cost of all materials, labor ,HOM,lCum6449.566449.567.56FalseNoneNoneFalseNoneFalse48758.67360
236475670280NoneA7 Sl No‍Formwork for column @ 70% ---- including cost of all materials, labor ,HOM,lCum4514.694514.693.58FalseNoneNoneFalseNoneFalse16162.59020
236475770280NoneA7 Sl NoFormwark for Roof Slab @ 50% ---- including cost of all materials, labor ,HOM,lCum3224.783224.782.77FalseNoneNoneFalseNoneFalse8932.64060
236475870280NoneA7 Sl NoFormwark for chajja@ 45% ---- including cost of all materials, labor ,HOM,lCum2579.822579.820.19FalseNoneNoneFalseNoneFalse490.16580
236475970280NoneV-1 2021-22 P.No. 17 I.No.2.4.Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Thegranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates(PWD CSR V-1 2021-22 / P.No. 17 I.No.2.4.1) ---- including cost of all materials, labor ,HOM,lCum6174.326174.321.79FalseNoneNoneFalseNoneFalse11052.03280
236476070280NoneVol.2, P.No.84,I.No.11.32Providing Thermo-Mechanically Treated bars of grade Fe-550D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (Vol.2, P.No.84,I.No.11.32) ---- including cost of all materials, labor ,HOM,lKg96.3996.39979.22FalseNoneNoneFalseNoneFalse94387.01580
236476170280NoneV-2 2021-22 P.No. 14 I.No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(PWD SR V-2 2021-22 / P.No. 14 I.No.6.8) ---- including cost of all materials, labor ,HOM,lCum7131.797131.7924.16FalseNoneNoneFalseNoneFalse172304.04640
236476270280NoneVolume 2 Page No 99 Item No 12.11Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(Volume 2 Page No 99 Item No 12.11) ---- including cost of all materials, labor ,HOM,lCum96810.996810.90.0514FalseNoneNoneFalseNoneFalse4976.080260
236476370280NoneVolume 2 Page No 106 Item No 12.57.8Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 40 mm thick one side teak and one side commercial.(Volume 2 Page No 106 Item No 12.57.8) ---- including cost of all materials, labor ,HOM,lSqm3479.683479.682.52FalseNoneNoneFalseNoneFalse8768.79360
236476470280NonePWD SR V-2 2021-22 P.No. 41 I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 41 I.No.8.1.1) ---- including cost of all materials, labor ,HOM,lSqm224.91224.9137.56FalseNoneNoneFalseNoneFalse8447.61960
236476570280NonePWD SR V-2 2021-22 P.No. 50 I.No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.(PWD SR V-2 2021-22 / P.No. 50 I.No.8.51) ---- including cost of all materials, labor ,HOM,lSqm88.8988.8957.72FalseNoneNoneFalseNoneFalse5130.73080
236476670280NoneV-2 2021-22 P.No. 42 I.No.8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge(PWD SR V-2 2021-22 / P.No. 42 I.No.8.8) ---- including cost of all materials, labor ,HOM,lSqm325.58325.58198.09FalseNoneNoneFalseNoneFalse64494.14220
236476770280NoneV-2 2021-22 P.No. 46 I.No.8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 46 I.No.8.33.2) ---- including cost of all materials, labor ,HOM,lSqm112.46112.461.26FalseNoneNoneFalseNoneFalse141.69960
236476870280NoneVol.2, P.No.46, I.No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.30) ---- including cost of all materials, labor ,HOM,lSqm145.66145.66200.67FalseNoneNoneFalseNoneFalse29229.59220
236476970280NoneVol.2, P.No.46, I.No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.33.1) ---- including cost of all materials, labor ,HOM,lSqm126.38126.3857.72FalseNoneNoneFalseNoneFalse7294.65360
236477070280NoneVolume 2 Page No 105 Item No 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.(Volume 2 Page No 105 Item No 12.51) ---- including cost of all materials, labor ,HOM,lNos1581.871581.871.0FalseNoneNoneFalseNoneFalse1581.870
17067804290001NoneNoneBuildingsEstimate Septic tank46974.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236477170281NonePWD CSR V-1 2021-22 P.No. 8 I.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work- In all kinds of soils Depth upto 3 m(PWD CSR V-1 2021-22 / P.No. 8 I.No.1.14.1) ---- including cost of all materials, labor ,HOM,lCum76.6576.6513.23FalseNoneNoneFalseNoneFalse1014.07950
236477270281NonePWD CSR V-1 2021-22 P.No. 7 I.No.1.11Supplying and filling in plinth with sand under floors, foundation of Bridges including watering, ramming, consolidating and dressing complete.(PWD CSR V-1 2021-22 / P.No. 7 I.No.1.11) ---- including cost of all materials, labor ,HOM,lCum2285.852285.851.1025FalseNoneNoneFalseNoneFalse2520.1496250
236477370281NonePWD CSR V-1 2021-22 P.No. 15 I.No.2.1.1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:5:10 (M5)Using 40 mm nominal size graded crushed coarse aggregates (PWD CSR V-1 2021-22 / P.No. 15 I.No.2.1.1) ---- including cost of all materials, labor ,HOM,lCum5036.855036.850.735FalseNoneNoneFalseNoneFalse3702.084750
236477470281NonePWD SR V-1 2021-22 P.No. 17 I.No.2.4.3Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all otherappurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR V-1 2021-22 / P.No. 17/I.No.2.4.3) ---- including cost of all materials, labor ,HOM,lCum6120.456120.450.81FalseNoneNoneFalseNoneFalse4957.56450
236477570281NoneISSUE RATEFormwark for Roof Slab @ 50% ---- including cost of all materials, labor ,HOM,lCum6120.456120.450.81FalseNoneNoneFalseNoneFalse4957.56450
236477670281NonePWD SR V-2 2021-22 P.No. 84 I.No.11.32Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)(PWD SR V-2 2021-22 / P.No. 84 I.No.11.32) ---- including cost of all materials, labor ,HOM,lTonne94.594.50.0648FalseNoneNoneFalseNoneFalse6.12360
236477770281NonePWD SR V-2 2021-22 P.No. 14 I.No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(PWD SR V-2 2021-22 / P.No. 14 I.No.6.8) ---- including cost of all materials, labor ,HOM,lCum6991.956991.953.53FalseNoneNoneFalseNoneFalse24681.58350
236477870281NonePWD SR V-2 2021-22 P.No. 41 I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(PWD SR V-2 2021-22 / P.No. 41 I.No.8.1.1) ---- including cost of all materials, labor ,HOM,lSqm273.0273.018.81FalseNoneNoneFalseNoneFalse5135.130
17067804290001NoneNoneBuildingsSanitation and Water Supply104324.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236477970282NonePWD SR V-2 2021-22 P.No 116 I No 13.8.1.1Providing and fixing unplasticised PVC connection pipe with brass unions :.15 mm nominal bore (PWD SR V-2 /2021-22/P.No 116/I No 13.8.1.1) ---- including cost of all materials, labor ,HOM,lNos110.25110.2510.0FalseNoneNoneFalseNoneFalse1102.50
236478070282NonePWD SR V-2 2021-22 P.No 116 I No 13.8.1.1Providing and fixing unplasticised PVC connection pipe with brass unions :.25 mm nominal bore (PWD SR V-2 /2021-22/P.No 116/I No 13.8.1.1) ---- including cost of all materials, labor ,HOM,lNos116.55116.5510.0FalseNoneNoneFalseNoneFalse1165.50
236478170282NonePWD SR V-2 2021-22 P.No. 115 I.No.13.5.2Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete :20 mm nominal bore (PWD SR V-2/ 2021-22 / P.No. 115/ I.No.13.5.2) ---- including cost of all materials, labor ,HOM,lNos378.0378.05.0FalseNoneNoneFalseNoneFalse1890.00
236478270282NonePWD SR V-2 2021-22 P.No. 115 I.No.13.3.1Providing and fixing brass stop cock of approved quality : :15 mm nominal bore (PWD SR V-2/ 2021-22 / P.No. 115/ I.No.13.3.1) ---- including cost of all materials, labor ,HOM,lNos342.3342.35.0FalseNoneNoneFalseNoneFalse1711.50
236478370282NonePWD SR V-2 2021-22 P.No. 115 I.No.13.2.1Providing and fixing brass bib cock of approved quality- 15 mm nominal bore:(PWD SR V-2 2021-22 / P.No. 115/I.No.13.2.1) ---- including cost of all materials, labor ,HOM,lNos342.3342.35.0FalseNoneNoneFalseNoneFalse1711.50
236478470282NonePWD SR V-2 2021-22 P.No. 125 I.No.14.7.5White Vitreous China Angle back wash basin size 600 x 480 mm with single 15mm C.P. brass pillar tap(PWD SR V-2 2021-22 / P.No. 125/I.No.14.7.5) ---- including cost of all materials, labor ,HOM,lEach2263.82263.83.0FalseNoneNoneFalseNoneFalse6791.40
236478570282NoneP.No. 130 I.No.14.44Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flushpipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- including cost of all materials, labor ,HOM,lEach3712.83712.84.0FalseNoneNoneFalseNoneFalse14851.20
236478670282NonePWD SR V-2 2021-22 P.No. 123 I.No.14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required-White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests(PWD SR V-2 2021-22 / P.No. 123/I.No.14.1.1) ---- including cost of all materials, labor ,HOM,lEach4458.34458.32.0FalseNoneNoneFalseNoneFalse8916.60
236478770282NonePWD SR V-2 2021-22 P.No. 129 I.No.14.35.1White vitreous china dual purpose WC pan with white solid plastic seat and lid with white vitreous china flushing cistern and C.P. flush bend.(PWD SR V-2 2021-22 / P.No. 129 I.No.14.35.1) ---- including cost of all materials, labor ,HOM,lEach7113.757113.751.0FalseNoneNoneFalseNoneFalse7113.750
236478870282NonePWD SR V-2 2021-22 P.No. 128 I.No.14.32.2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing .(PWD SR V-2 2021-22 / P.No. 128/ I.No.14.32.2) ---- including cost of all materials, labor ,HOM,lEach912.45912.453.0FalseNoneNoneFalseNoneFalse2737.350
236478970282NonePWD SR V-2 2021-22 P.No. 130 I.No.14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g.(PWD SR V-2 2021-22 / P.No. 130/ I.No.14.40.2) ---- including cost of all materials, labor ,HOM,lEach399.0399.01.0FalseNoneNoneFalseNoneFalse399.00
236479070282NonePWD Circle BGM SR 2018-19 P.No 96 I No 13.78KSRB 13-11.1 : Providing and placing on terrace, polyethylene water storage tanks with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes, including cost of all materials, labour, transport charges, HOM of equipments and testing complete as per specifications.(For 1000 litre capacity) Specification No.KBS 13.22 (PWD Circle BGM SR /2018-19/P.No 96/I No 13.78) ---- including cost of all materials, labor ,HOM,lNos7169.47169.43.0FalseNoneNoneFalseNoneFalse21508.20
236479170282NoneWS &UGDW CSR V-5 2021-22 P.No. 187 I.No.11-T130DConstructing brick masonry chamber of internal dimension 450x300mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame andcover..(WS &UGDW CSR V-5 2021-22 / P.No. 187/ I.No.11-T130D) ---- including cost of all materials, labor ,HOM,lEach3402.03402.03.0FalseNoneNoneFalseNoneFalse10206.00
236479270282NonePWD CSR V-1 2021-22 P.No. 8 I.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work- In all kinds of soils Depth upto 3 m(PWD CSR V-1 2021-22 / P.No. 8 I.No.1.14.1) ---- including cost of all materials, labor ,HOM,lCum76.6576.6511.25FalseNoneNoneFalseNoneFalse862.31250
236479370282NonePWD CSR V-5 2021-22 P.No134 I No 1.1Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to therequired pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for (PWD CSR V-5 /2021-22/P.No134 /I No 1.1)PVC pipes 25 mm dia 10kg/sqm ---- including cost of all materials, labor ,HOM,lm49.3549.3530.0FalseNoneNoneFalseNoneFalse1480.50
236479470282NonePWD CSR V-5 2021-22 P.No134 I No 1.1Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to therequired pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for (PWD CSR V-5 /2021-22/P.No134 /I No 1.1)PVC pipes 32 mm dia 10kg/sqm ---- including cost of all materials, labor ,HOM,lm135.3135.330.0FalseNoneNoneFalseNoneFalse4059.00
236479570282NonePWD CSR V-1 2021-22 P.No. 7 I.No.1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications (PWD CSR V-1 2021-22 / P.No. 7 I.No.1.10) ---- including cost of all materials, labor ,HOM,lCum128.1128.111.25FalseNoneNoneFalseNoneFalse1441.1250
236479670282NonePWD CSR V-2 2021-22 P.No. 124.No.14.5.2Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm with white PVC automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS : 2556, C.I. trap with outlet grating and other couplings in C.P. brass, including painting of fittings and cutting and making good the walls andfloors wherever required :Range of two half stall urinals with 5 litre P.V.C. automatic flushing cistern (PWD CSR V-2 2021-22 / P.No. 124.No.14.5.2) ---- including cost of all materials, labor ,HOM,lEach5458.955458.953.0FalseNoneNoneFalseNoneFalse16376.850
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17067804290000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17067804290000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17067804290000NoneNoneELIGIBILITYThe tenderer should be a KPWD registered Class-1 and above contractorsNone
17067804290000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17067804290000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of on KPPP Portal or before the last date and time of bid submission.None
17067804290000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17067804290000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in MultipleTransaction are liable for rejection.None
17067804290000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17067804290000NoneNoneELIGIBILITYTender invited only for eligible contractors registered under Karnataka Public Works DeptNone
17067804290000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government OrdersNone
17067804290000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17067804290000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer(District Level Officer)and scan the Original Certificate and attach the scanned file to the Bid.None
17067804290000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thiry first day of March of succeeding year(both days inclusive)None
17067804290000NoneNoneELIGIBILITYThe Tenderer shall scan the Original Ownership Documents/ Lease/ Hire committement Agreement for the Machinery and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17067804290000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the BidderNone
17067804290000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reasonNone
17067804290000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing KP-procurement portalNone
17067804290000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17067804290000NoneNoneELIGIBILITYAll materials required for the work shall be procured by the tenderer himself and should be got tested by the quality control authorities at his own cost before use on work.None
17067804290000NoneNoneELIGIBILITYThe items quoted shall include cost of Royalty charges on constructive materials and other taxes as per the rates prevailing Govt Orders at the time of execution and including all the cost and conveyance of all materials, curing, loading and unloading with all lead and lifts, labour, hire charges of machinary and equipments, etc., complete and all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17067804290000NoneNoneELIGIBILITYPhysical quantities requirement to qualify the Tenderer is 80% of the estimated quantity as per Govt Order No. .PW/630/CRM/2014 Bangalore Dated: 17-11-2014None
17067804290000NoneNoneELIGIBILITYDepartment will not supply any materials.None
17067804290000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17067804290000NoneNoneELIGIBILITYEpayment Challan should be ScannedNone
17067804290000NoneNoneELIGIBILITYThe Tenderer must be present during opening of tender and submit uploaded documents duly attested by Gazzeted Officer not below the rank of Executive Engineer and also produce original documents for confirmation at the time of opening.None
17067804290000NoneNoneELIGIBILITYAs per Karnataka State Govt Order No:LD/300/LET/2006/Bangalore Dt: 1-1-2007 and Govt Ltr No:PW/134/BMS/2007, Dt: 27-7-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17067804290000NoneNoneELIGIBILITYTHE CONTRACTORS ARE INSTRUCTED TO SUBMIT ONLY RELEVENT INFORMATION WITH RECORDS AS REQUIRED AND SPECIFIED IN QUALIFICATION CRITERIA.ANY JUNK ,SUPERFLUOS AND UNNECESARY DOCUMENTS IF UPLOADED WILL TREATED AS MISLEADING AND SUCH TENDERS ARE LIABLE TO BE REJECTEDNone
17067804290000NoneNoneELIGIBILITYStar Rates are applicable for this work as per Govt Circular No. PWD/159/CRM/2009 Dated: 30-09-2010None
17067804290000NoneNoneELIGIBILITYThe Project Completion period is 9 months and the Tenderer should maintain work during the defect liability period, which is (1) One year after successful completion of the work.None
17067804290000NoneNoneELIGIBILITYWork Completion/Execution Period : 9 Months Including MansoonNone
17067804290000NoneNoneELIGIBILITYFinancial turover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next sectionNone
17067804290000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWD Division Chikkodi during office hours on all working days. It may be noted that if any of the dates mentioned above happened next working day will holds good in lieu of the dates mentioned.None
17067804290000NoneNoneELIGIBILITYThe EMD of Rs. 2,04,000.00 shall be paid in full through e payment or in two parts i.e. part (1) Rs, 1,00,000.00 br e payment Part (2) Rs. 1,04,000.00 EMD shall be in the form Bank Guarantee in the prescribed format obtained from any Nationalised / Scheduled Bank in favour of Executive Engineer, PWD Division, Chikodi payable at Chikodi.None
17067804290000NoneNoneELIGIBILITYThe Tenderer should submit proposed methodology and program of construction, backed with equipment and materials duly supported with broad calculations and quality management, plan, proposed to be adopted, justifying of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17067804290000NoneNoneELIGIBILITYThe contractor should employ only registered labours Govt Circular No PWD198BMS2009 Dated 24 06 2009 As per EPF and MP act 1952 in respect of of the employees angaged by or through contractors agencies and contractors shall have provident fund code number all the contract employees deployed by them are enrolled as members of provident fundNone
17067804290000NoneNoneELIGIBILITYUnique Document Identification Number (UDIN) form practicing Chartered Account is preferredNone
17067804290000NoneNoneELIGIBILITYAppeal as per the Government Ltr No. 572/CRM/2020/PWD-COMM-1-PWD-SEC, Dtated: 09-10-2020 the appeal received in e-proc as per KTTP act/rules within the stipulated time will only the considered. Any written appeal received shall not be considered.None
17067804290000NoneNoneELIGIBILITYThe items quoted shall include cost of Royalty charges on constructive materials and other taxes (excluding GST)as per the rates prevailing Govt Orders at the time of execution and including all the cost and conveyance of all materials, curing, loading and unloading with all lead and lifts, labour, hire charges of machinary and equipments, etc., complete and all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17067804290000NoneNoneELIGIBILITYSince this work is approved under 8443- Deposit Contribution head, Quoted Amount Should be restricted to Amount Put to tender. If Quoted amount is more than Amount put to tender, then such tenders will be Rejected.None
17067804290000NoneNoneELIGIBILITYAll formats prescribed in the bid documents shall be filled in completed manner (Section 3 & 4 of the bid document) and shall be uploaded properly signed by the tenderer. Necessary certificates shall be uploaded along with the formats wherever required. General documents section can be used for this purpose.None
17067804290000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Government ordersNone
17067804290000NoneNoneELIGIBILITYIf no bid received auto extension will be done by KPPP Portal itself for 2 daysNone
17067804290000NoneNoneELIGIBILITYContractor should prepare Quality Assurance Plan and get approved from Quality Assurance Executive Engineer before starting the work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work of value not less than Rs.67.83 Lakhs, in previous five years.Past ExperienceBankers Details
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19,2019-20,2020-21,2021-22,2022-23 (c) executed in any one year, the following minimum quantities of work: 1)Excavation-309.00 CUM, 2)BBM/SSM-188.00 CUM, 3)Plastering-1766.00 SQM, 4)Concrete(PCC/RCC)-315.00 CUM, 5)Steel-22,244.00 KGS, 6)Flooring-843.00 SQMPast ExperienceNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneEach tenderer should demonstrate availability of few key equipments/machinery for execution of the work.However as per Govt circular No.GO FD/AE 263/EXP12-2022 dt 11-05-2022,this clause for owning key equipments for works costing upto Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the following machineries for various activities involved in construction as per MORTH specification.Capabilities of VendorTendered Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire commitment Agreement ownership documents Lease Commitments Agreement Information in format-8
NoneNoneNoneNoneReport on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Auditors Report
NoneNoneNoneNoneMaximum of Civil Engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. (Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24)Financial StatusCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on the Letter Head of the tenderer
NoneNoneNoneNoneLatest Income Tax Clearance CertificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Scanned Copy of ITC Certificate
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity (AxNx1.5-B)Where A is Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress.N -Number of years prescribed for completion of the works for which tenders are invited-0.75 Year.B-Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 0.75 year (Period of completion of the works for which tenders are invited)Financial StatusWork list should upload
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Calculation sheet on lettar head
NoneNoneNoneNoneValue at 2023-24 price level, of existing commitments and on-going works to be executed during the next 12 months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24), (Monthwise commitment shall be furnished).Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Statement on the Letter head of the tenderer
NoneNoneNoneNoneLiquid Assets and or availability of credit facilities of no less than Rs.45.22 Lakhs (Credit Lines or letter of credit or certificates from the banks for meeting the fund requirement etc.,Financial Statuslegal status
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22&2022-23 (a) achieved in at least two financial years a minimum financial turnover of Rs.271.35 Lakhs (in all classes of civil engineering construction works only)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNonePrincipal Place of BusinessOthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation on works which are yet to be completed.OthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 5 and Certificates in Format 3
NoneNoneNoneNoneAssessed Tender Capacity shall be more than the Tendered AmountOthersTender Capacity
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Assessment on the Letter Head of the Tenderer
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involved:OthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 10
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.Othersnew work
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 6 and Letter of Acceptance
NoneNoneNoneNoneConstitutional or Legal Status of the TendererOthersLegal
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneName, Address, telephone No., Fax No., and email ID of the Tenderers BankersOthersBankers Details
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on the Letter Head of the tenderer
NoneNoneNoneNoneThe EMD of Rs. 2,04,000.00 shall be paid in full through e payment or in two parts i.e. part (1) Rs, 1,00,000.00 br e payment Part (2) Rs. 1,04,000.00 EMD shall be in the form Bank Guarantee in the prescribed format obtained from any Nationalised / Scheduled Bank in favour of Executive Engineer, PWD Division, Chikodi payable at Chikodi.OthersEMD
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Epayment Challan and Part-II Scanned copy of EMD
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 7
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors KPWD Civil Registration CertificateTrueTechnical Bid
Annual Turn Over Certificate from 2018-19 to 2022-23TrueTechnical Bid
Financial work done certificateTrueTechnical Bid
Qtywise work done certificate.TrueTechnical Bid
Line of credit in prescribed formatTrueTechnical Bid
Machineries documents.TrueTechnical Bid
GST RegistratationTrueTechnical Bid
Ongoing work detailsTrueTechnical Bid
Any other related documentsTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1706781221000
version0
createdDateNone
modifiedDateNone
blockNumberEE pwd chikodi opposite to court
streetNone
citychikodi
stateKarnataka
pin591201
tenderRecallDTONone