createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1706788256056
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1880.00
emd149800.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose14-02-2024 16:00:00
tenderQueryClose07-02-2024 17:30:00
technicalBidOpen15-02-2024 16:05:00
publishedDate02-02-2024 11:57:07
publishedByPostPWD_EE_DIV_GAD
publishedByUserKPE11642 - V N PATIL
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonEE PWD GADAG
splitEmdRequiredYnTrue
emdBankGuarantee99800.00
emdCash50000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber8372238782
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1706788256058
version20
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT6392/CALL-2
titlepackage 1) Construction of Two Class Rooms for Government High School at Shagyoti Village Gadag Dist/Tq (32.80 Lakhs) 2) Construction of Two Class Rooms for Government Higher Primary School at Chikkahandigol Village Gadag Dist/Tq (27.80 Lakhs) 3) Construction of Two Class Rooms for Government Higher Primary School at Madaganur Village Gadag Dist/Tq (27.80 Lakhs)
descriptionpackage -6 1) Construction of Two Class Rooms for Government High School at Shagyoti Village Gadag Dist/Tq (32.80 Lakhs) 2) Construction of Two Class Rooms for Government Higher Primary School at Chikkahandigol Village Gadag Dist/Tq (27.80 Lakhs) 3) Construction of Two Class Rooms for Government Higher Primary School at Madaganur Village Gadag Dist/Tq (27.80 Lakhs) (88.40 lakh)
categoryWORKS
categoryTextWorks
ecv7488361.05
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1682
locationNamePWD Division Office Gadaga
provisionalAmount8840000.0
groupOverheadTotal0.0
fileNumberkpwd8443Special202324-01
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17067882560000NoneNoneBuildings1 Construction of Two Class Rooms for Government Higher Primary School at Shagyoti Village Gadag Dist Tq (32.80 Lakhs)2727715.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238140370805NoneVol No-1 pg no-08 I No 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurten ances required to complete the work. ---- Work should be carried out as per the direction of engineer incharge of work.Cum95.095.060.0FalseNoneNoneFalseNoneFalse5700.00
238140470805NoneVol No-1 pg no-08 I No 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the In all kinds of soils Depth upto 3 m ---- Work should be carried out as per the direction of engineer incharge of work.Cum102.0102.0218.75FalseNoneNoneFalseNoneFalse22312.50
238140570805NoneVol No-2 pg no-05 I No 4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specific ations. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm118.0118.0128.33FalseNoneNoneFalseNoneFalse15142.940
238140670805NoneVol No-2 pg no 11 I No 1.23Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work.Cum2682.02682.019.13FalseNoneNoneFalseNoneFalse51306.660
238140770805NoneVol No-1 pg no-15 No 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggre gates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum5989.05989.031.82FalseNoneNoneFalseNoneFalse190569.980
238140870805NoneVol No-1 pg no-15I No 2.2.3Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specification s.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6336.06336.031.88FalseNoneNoneFalseNoneFalse201991.680
238140970805NoneVol-1 pg No.-111 (8 Percentage )Additional for formwork, Centering & Scaffolding for Sl No 1 a: Foundation upto plinth Isolated As per Appendix-I in Volume-1 of page No.-111 (@8% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum506.88506.8831.88FalseNoneNoneFalseNoneFalse16159.33440
238141070805NoneVol No-1 pg no-16I No 2.3.2Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6480.06480.012.65FalseNoneNoneFalseNoneFalse81972.00
238141170805NoneVol-1 pg No.-111 Additional for formwork, Centering & Scaffolding for Sl No 9 : RCC Columns / Shaft (Slip Centering) in Volume-1 of page No.-111 (@70% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4536.04536.02.08FalseNoneNoneFalseNoneFalse9434.880
238141270805NoneVol-1 pg No.-112 Additional for formwork, Centering & Scaffolding for Sl No 11 : Earth retaining structures in Volume-1 of page No.-112(@10% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum648.0648.010.57FalseNoneNoneFalseNoneFalse6849.360
238141370805NoneVol No-1 pg no-7I No 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there off ---- Work should be carried out as per the direction of engineer incharge of work.Cum474.0474.0308.3FalseNoneNoneFalseNoneFalse146134.20
238141470805NoneVol No-1 pg no-16I No2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6404.06404.01.67FalseNoneNoneFalseNoneFalse10694.680
238141570805NoneVol No-1 pg no-16 I No 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggrgates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications .M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6843.06843.045.19FalseNoneNoneFalseNoneFalse309235.170
238141670805NoneVol-1 pg No.-111 Additional for formwork, Centering & Scaffolding for Sl No 9 : RCC Columns / Shaft (Slip Centering) in Volume-1 of page No.-111 (@70% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4790.14790.15.4FalseNoneNoneFalseNoneFalse25866.540
238141770805NoneVol-1 pg No.-111 Additional for formwork, Centering & Scaffolding for Sl No 02 : Plinth Beams of Buildings in Volume-1 of page No.-111 (@50% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3421.53421.58.05FalseNoneNoneFalseNoneFalse27543.0750
238141870805NoneVol-1 pg No.-112 Additional for formwork, Centering & Scaffolding for Sl No 14 : RCC Beams, Lintels & Troughs of Aqueducts in Volume-1 of page No.-112 (@60% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4105.84105.89.87FalseNoneNoneFalseNoneFalse40524.2460
238141970805NoneVol-1 pg No.-112 Additional for formwork, Centering & Scaffolding for Sl No 19 : Chejjas, Canopy & Other Architectural projections of minor sections in Volume-1 of page No.-112 (@45% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3079.353079.351.08FalseNoneNoneFalseNoneFalse3325.6980
238142070805NoneVol-1 pg No.-112 Additional for formwork, Centering & Scaffolding for Sl No 15 : RCC Roof Slabs in Volume-1 of page No.-112 (@ 50% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3421.53421.518.14FalseNoneNoneFalseNoneFalse62066.010
238142170805NoneVol-1 pg No.-112 50 Additional for formwork, Centering & Scaffolding for Sl No 16 :Staircase and other similar structures in Volume-1 of page No.-112 (@ 50% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3421.53421.52.65FalseNoneNoneFalseNoneFalse9066.9750
238142270805NoneVol No-1 pg no-18 I No 2.11aSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specific ation.a)Buildings ---- Work should be carried out as per the direction of engineer incharge of work.MT89457.089457.05.63FalseNoneNoneFalseNoneFalse503642.910
238142370805NoneVol No-2 pg no-14 I No 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Work should be carried out as per the direction of engineer incharge of work.Cum7969.07969.042.68FalseNoneNoneFalseNoneFalse340116.920
238142470805NoneVol No-2 pg no-14 I No 6.15Providing Half brick masonry with common burnt clay Non Modularbricks of class designation 3.5 in superstructure above plinth level upto floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm1033.01033.07.92FalseNoneNoneFalseNoneFalse8181.360
238142570805NoneVol No-2 pg no-41 I No 8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm295.0295.0168.2FalseNoneNoneFalseNoneFalse49619.00
238142670805NoneVol No-2 pg no-42 I No 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm371.0371.0295.96FalseNoneNoneFalseNoneFalse109801.160
238142770805NoneVol No-2 pg no-64 I No 9.34Flooring with 25mm thick polished tandur blue stone slabs using cementmortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm1545.01545.0136.86FalseNoneNoneFalseNoneFalse211448.70
238142870805NoneVol No-2 pg no-86I No 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat withapproved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Work should be carried out as per the direction of engineer incharge of work.Kg183.0183.0323.19FalseNoneNoneFalseNoneFalse59143.770
238142970805NoneVol No-2 pg no-81 I No 11.14.3.1Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle thre shold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer- in-charge: Profile E Fixing with adjustable lugs with split end tail to each jamb including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of theEngineer-in-Charge. ---- Work should be carried out as per the direction of engineer incharge of work.m531.0531.013.2FalseNoneNoneFalseNoneFalse7009.20
238143070805NoneVol No-2 pg no-77 I No 11.5.1Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge ---- Work should be carried out as per the direction of engineer incharge of work.Sqm4478.04478.05.04FalseNoneNoneFalseNoneFalse22569.120
238143170805NoneVol No-2 pg no-109 I No 12.84Providing & fixing of 2-track 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVCirections of the Engineer-in-Charge.honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm .Maximum possible size 1219mm 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Work should be carried out as per the direction of engineer incharge of work.Sqm5023.05023.08.64FalseNoneNoneFalseNoneFalse43398.720
238143270805NoneVol No-2 pg no-50 I No 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm100.0100.0297.36FalseNoneNoneFalseNoneFalse29736.00
238143370805NoneVol No-2 pg no-45 I No8.25Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm137.0137.0297.36FalseNoneNoneFalseNoneFalse40738.320
238143470805NoneVol No-2 pg no-45 I No8.27Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as perspecifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm53.053.0295.95FalseNoneNoneFalseNoneFalse15685.350
238143570805NoneVol No-2 pg no-45 I No8.28Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoro ughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm89.089.0295.95FalseNoneNoneFalseNoneFalse26339.550
238143670805NoneVol No-2 pg no-48 No8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm115.0115.028.11FalseNoneNoneFalseNoneFalse3232.650
238143770805NoneVol No-2 pg no-49 I No8.49Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Work should be carried out as per the direction of engineer incharge of work.cm4.04.04000.0FalseNoneNoneFalseNoneFalse16000.00
238143870805NoneVol No-2 pg no-49 I No8.43Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :Two coats on new work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Work should be carried out as per the direction of engineer incharge of work.Sqm94.094.011.52FalseNoneNoneFalseNoneFalse1082.880
238143970805NoneVol No-2 pg no-125 I no -13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Work should be carried out as per the direction of engineer incharge of work.m291.0291.014.0FalseNoneNoneFalseNoneFalse4074.00
17067882560000NoneNoneBuildings1 Construction of Two Class Rooms for Government Higher Primary School at Shagyoti Village Gadag Dist Tq (32.80 Lakhs) (Electrificaiton)49858.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238144070806NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.1.1)Open Conduit System Concealed Conduit System :Supplying heavy gauge PVC conduit pipe mm dia mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary19/20mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr69.069.030.0FalseNoneNoneFalseNoneFalse2070.00
238144170806NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.1.2)Concealed Conduit System :Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary25mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr81.081.016.0FalseNoneNoneFalseNoneFalse1296.00
238144270806NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.3.1)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.19/20mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr68.068.012.0FalseNoneNoneFalseNoneFalse816.00
238144370806NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.3.2)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.25mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr79.079.012.0FalseNoneNoneFalseNoneFalse948.00
238144470806NoneVolume-6 PWD Part-1 (Page No.3Item No.1.9.2)Supplying PVC/GI flexible conduit pipe .... mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely25mm ---- Work should be carried out as per the direction of engineer incharge of work.Mtr22.022.04.0FalseNoneNoneFalseNoneFalse88.00
238144570806NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.1)PSupplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box,the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Short point upto 3Mtr from tapping point to out let via switch box ---- Work should be carried out as per the direction of engineer incharge of work.Point269.0269.012.0FalseNoneNoneFalseNoneFalse3228.00
238144670806NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.2)Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch ---- Work should be carried out as per the direction of engineer incharge of work.Point379.0379.02.0FalseNoneNoneFalseNoneFalse758.00
238144770806NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.3)Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box ---- Work should be carried out as per the direction of engineer incharge of work.Point555.0555.02.0FalseNoneNoneFalseNoneFalse1110.00
238144870806None2.3.2Volume6 PWD Part-1 (Page No.5 Item No.2.3.2)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,1.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr26.026.060.0FalseNoneNoneFalseNoneFalse1560.00
238144970806NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.3.3)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,2.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr42.042.070.0FalseNoneNoneFalseNoneFalse2940.00
238145070806NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.3.4)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,4 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr63.063.040.0FalseNoneNoneFalseNoneFalse2520.00
238145170806NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.1)Supplying and flush mounting powder coated / galvanized metal box size 1-2 way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each138.0138.04.0FalseNoneNoneFalseNoneFalse552.00
238145270806NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.3)Supplying and flush mounting powder coated / galvanized metal box size 4-5way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each177.0177.02.0FalseNoneNoneFalseNoneFalse354.00
238145370806NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.5)Supplying and flush mounting powder coated / galvanized metal box size 8way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each261.0261.02.0FalseNoneNoneFalseNoneFalse522.00
238145470806NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.6)Supplying and flush mounting powder coated / galvanized metal box size10-12way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each319.0319.02.0FalseNoneNoneFalseNoneFalse638.00
238145570806NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.2)Supplying and fixing superior quality 3Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box. ---- Work should be carried out as per the direction of engineer incharge of work.Each161.0161.02.0FalseNoneNoneFalseNoneFalse322.00
238145670806NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.3)Supplying and fixing superior quality 4Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box. ---- Work should be carried out as per the direction of engineer incharge of work.Each175.0175.02.0FalseNoneNoneFalseNoneFalse350.00
238145770806NoneVolume-6 PWD Part-1 (Page No.5 Item No.3.5.5)Supplying and fixing superior quality 8 modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox. ---- Work should be carried out as per the direction of engineer incharge of work.Each284.0284.02.0FalseNoneNoneFalseNoneFalse568.00
238145870806NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.6)Supplying and fixing superior quality 10-12Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox. ---- Work should be carried out as per the direction of engineer incharge of work.Each344.0344.02.0FalseNoneNoneFalseNoneFalse688.00
238145970806NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.1)Supplying and fixing of 6Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each102.0102.018.0FalseNoneNoneFalseNoneFalse1836.00
238146070806NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.3)Supplying and fixing of 6Amps 3way modular Socketc on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each171.0171.08.0FalseNoneNoneFalseNoneFalse1368.00
238146170806NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.4)Supplying and fixing of modular stepped electronic fan regulator on existing modular switch plate as per and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each357.0357.04.0FalseNoneNoneFalseNoneFalse1428.00
238146270806NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.7)Supplying and fixing of 16Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each180.0180.02.0FalseNoneNoneFalseNoneFalse360.00
238146370806NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.9)Supplying and fixing of32Amps modular DP Switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each326.0326.02.0FalseNoneNoneFalseNoneFalse652.00
238146470806NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.10)Supplying and fixing of6/16amps modular Universal Socket on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each236.0236.02.0FalseNoneNoneFalseNoneFalse472.00
238146570806NoneVolume-6 PWD Part-1 (Page No.10 Item No.3.14.6)Supplying and fixing of 6Amps pendent holder on existing board. ---- Work should be carried out as per the direction of engineer incharge of work.Each71.071.04.0FalseNoneNoneFalseNoneFalse284.00
238146670806NoneVolume-6 PWD Part-1 (Page No.14 Item No.5.7.3)Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.63amps ---- Work should be carried out as per the direction of engineer incharge of work.Each401.0401.02.0FalseNoneNoneFalseNoneFalse802.00
238146770806NoneVolume-6 PWD Part-1 (Page No.30 Item No.6.3.1)Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) Economy model ---- Work should be carried out as per the direction of engineer incharge of work.Each2984.02984.04.0FalseNoneNoneFalseNoneFalse11936.00
238146870806NoneVolume-6 PWD Part-1 (Page No.43 Item No.11.3.2)LED Indoor Supplying of 1x4' feet - LED PVC Square Batten 20/22W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50Hz & Power factor 0.9 along with CE approved drivers. 2 years Warranty against any manufacturing defect working under standard electrical condition ---- Work should be carried out as per the direction of engineer incharge of work.Each690.0690.04.0FalseNoneNoneFalseNoneFalse2760.00
238146970806NoneVolume-6 PWD Part-1 (Page No.47 Item No.11.11.4)Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. ---- Work should be carried out as per the direction of engineer incharge of work.Each154.0154.04.0FalseNoneNoneFalseNoneFalse616.00
238147070806NoneVolume-6 PWD Part-1 (Page No.56 Item No.13.7.1)Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- Work should be carried out as per the direction of engineer incharge of work.Each122.0122.08.0FalseNoneNoneFalseNoneFalse976.00
238147170806NoneVolume-6 PWD Part-1 (Page No.57 Item No.13.10)Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- Work should be carried out as per the direction of engineer incharge of work.Each171.0171.04.0FalseNoneNoneFalseNoneFalse684.00
238147270806NoneESCOM SR 2023-24 Item No.51.01 Page No.22)Grounding Material GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg (ESCOM SR 2023-24 Item No.51.01 Page No.22) ---- Work should be carried out as per the direction of engineer incharge of work.Each743.0743.02.0FalseNoneNoneFalseNoneFalse1486.00
238147370806NoneESCOM SR 2023-24 Item No.51.02 Page No.22)Grounding Material Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each (BESCOM Part-III 11 KV Materials Item No.54.02 Page No.17) ---- Work should be carried out as per the direction of engineer incharge of work.Each676.0676.02.0FalseNoneNoneFalseNoneFalse1352.00
238147470806None23-24 Item No.1.6.1 ordinary soil Page No.43)Digging of Pit for providing GI Pipe type Earthing Ordinary Soil (ESCOM SR 2023-24 Item No.1.6.1 ordinary soil Page No.43) ---- Work should be carried out as per the direction of engineer incharge of work.Per Pit759.0759.02.0FalseNoneNoneFalseNoneFalse1518.00
17067882560000NoneNoneBuildings2 Construction of Two Class Rooms for Government Higher Primary School at Chikkahandigol Village Gadag Dist/Tq (Rs.27.80) Lakhs2305535.75
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238147570807NoneVol No-1 pg no-08I No 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurten ances required to complete the work. ---- Work should be carried out as per the direction of engineer incharge of work.Cum95.095.048.6FalseNoneNoneFalseNoneFalse4617.00
238147670807NoneVol No-1 pg no-08 I No 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the In all kinds of soils Depth upto 3 m ---- Work should be carried out as per the direction of engineer incharge of work.Cum102.0102.0182.92FalseNoneNoneFalseNoneFalse18657.840
238147770807NoneVol No-2 pg no-05I No 4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specific ations. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm118.0118.0112.78FalseNoneNoneFalseNoneFalse13308.040
238147870807NoneVol No-2 pg no 11 I No 1.23Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work.Cum2682.02682.021.3FalseNoneNoneFalseNoneFalse57126.60
238147970807NoneVol No-1 pg no-15 I No 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggre gates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum5989.05989.030.58FalseNoneNoneFalseNoneFalse183143.620
238148070807NoneVol No-1 pg no-15I No 2.2.3Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specification s.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6336.06336.026.9FalseNoneNoneFalseNoneFalse170438.40
238148170807NoneVol-1 pg No.-111 (8 Percentage )Additional for formwork, Centering & Scaffolding for Sl No 1 a: Foundation upto plinth Isolated As per Appendix-I in Volume-1 of page No.-111 (@8% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum506.88506.8826.9FalseNoneNoneFalseNoneFalse13635.0720
238148270807NoneVol No-1 pg no-16I No 2.3.2Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6480.06480.011.45FalseNoneNoneFalseNoneFalse74196.00
238148370807NoneVol-1 pg No.-111 70Additional for formwork, Centering & Scaffolding for Sl No 8: Columns & Piers As per Appendix-I in Volume-1 of page No.-111 (@70% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4536.04536.02.08FalseNoneNoneFalseNoneFalse9434.880
238148470807NoneVol-1 pg No.-112 Additional for formwork, Centering & Scaffolding for Sl No 2: Earth retaining structure drainages As per Appendix-I in Volume-1 of page No.-112(@10% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum648.0648.09.37FalseNoneNoneFalseNoneFalse6071.760
238148570807NoneVol No-1 pg no-7I No 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there off ---- Work should be carried out as per the direction of engineer incharge of work.Cum474.0474.0247.65FalseNoneNoneFalseNoneFalse117386.10
238148670807NoneVol No-1 pg no-16I No2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6404.06404.03.09FalseNoneNoneFalseNoneFalse19788.360
238148770807NoneVol No-1 pg no-16 I No 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggrgates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications .M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6843.06843.035.76FalseNoneNoneFalseNoneFalse244705.680
238148870807NoneVol-1 pg No.-111 Additional for formwork, Centering & Scaffolding for Sl No 8: Columns & Piers As per Appendix-I in Volume-1 of page No.-111 (@70% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4790.14790.15.0FalseNoneNoneFalseNoneFalse23950.50
238148970807NoneVol-1 pg No.-111 Additional for formwork, Centering & Scaffolding for Sl No 12 : plinth beam As per corrigendam 3 Appendix-I in Volume-1 of page No.-111 (@50% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3421.53421.57.02FalseNoneNoneFalseNoneFalse24018.930
238149070807NoneVol-1 pg No.-112 Additional for formwork, Centering & Scaffolding for Sl No 12 : beam & lintels As per Appendix-I in Volume-1 of page No.-112 (@60% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4105.84105.88.56FalseNoneNoneFalseNoneFalse35145.6480
238149170807NoneVol-1 pg No.-112 Additional for formwork, Centering & Scaffolding for Sl No 20 : Chejjas, Canopy & Other Architectural projections of minor sections As per Appendix-I in Volume-1 of page No.-112 (@45% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3079.353079.351.08FalseNoneNoneFalseNoneFalse3325.6980
238149270807NoneVol-1 pg No.-112 Additional for formwork, Centering & Scaffolding for Sl No 13 : Roof straight As per corrigendum Appendix-I in Volume-1 of page No.-112 (@ 50% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3421.53421.514.1FalseNoneNoneFalseNoneFalse48243.150
238149370807NoneVol No-1 pg no-18 I No 2.11aSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specific ation.a)Buildings ---- Work should be carried out as per the direction of engineer incharge of work.MT89457.089457.04.87FalseNoneNoneFalseNoneFalse435655.590
238149470807NoneVol No-2 pg no-14 I No 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Work should be carried out as per the direction of engineer incharge of work.Cum7969.07969.031.04FalseNoneNoneFalseNoneFalse247357.760
238149570807NoneVol No-2 pg no-14 I No 6.15Providing Half brick masonry with common burnt clay Non Modularbricks of class designation 3.5 in superstructure above plinth level upto floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm1033.01033.09.36FalseNoneNoneFalseNoneFalse9668.880
238149670807NoneVol No-2 pg no-41 I No 8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm295.0295.0137.26FalseNoneNoneFalseNoneFalse40491.70
238149770807NoneVol No-2 pg no-42 I No 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm371.0371.0229.06FalseNoneNoneFalseNoneFalse84981.260
238149870807NoneVol No-2 pg no-64 No 9.34Flooring with 25mm thick polished tandur blue stone slabs using cementmortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm1545.01545.0109.2FalseNoneNoneFalseNoneFalse168714.00
238149970807NoneVol No-2 pg no-86I No 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat withapproved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Work should be carried out as per the direction of engineer incharge of work.Kg183.0183.0338.94FalseNoneNoneFalseNoneFalse62026.020
238150070807NoneVol No-2 pg no-81 I No 11.14.3.1Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle thre shold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer- in-charge: Profile E Fixing with adjustable lugs with split end tail to each jamb including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of theEngineer-in-Charge. ---- Work should be carried out as per the direction of engineer incharge of work.m531.0531.013.2FalseNoneNoneFalseNoneFalse7009.20
238150170807NoneVol No-2 pg no-77 I No 11.5.1Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge ---- Work should be carried out as per the direction of engineer incharge of work.Sqm4478.04478.05.04FalseNoneNoneFalseNoneFalse22569.120
238150270807NoneVol No-2 pg no-79 I No 11.11.1Providing & fixing of 2-track 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVCirections of the Engineer-in-Charge.honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm .Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Work should be carried out as per the direction of engineer incharge of work.Sqm5023.05023.08.64FalseNoneNoneFalseNoneFalse43398.720
238150370807NoneVol No-2 pg no-50 I No 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm100.0100.0240.04FalseNoneNoneFalseNoneFalse24004.00
238150470807NoneVol No-2 pg no-45 I No8.25Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm137.0137.0240.04FalseNoneNoneFalseNoneFalse32885.480
238150570807NoneVol No-2 pg no-45 I No8.27Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as perspecifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm53.053.0229.06FalseNoneNoneFalseNoneFalse12140.180
238150670807NoneVol No-2 pg no-45 No8.28Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoro ughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm89.089.0229.06FalseNoneNoneFalseNoneFalse20386.340
238150770807NoneVol No-2 pg no-48 No8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm115.0115.028.86FalseNoneNoneFalseNoneFalse3318.90
238150870807NoneVol No-2 pg no-49 No8.49Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Work should be carried out as per the direction of engineer incharge of work.cm4.04.04000.0FalseNoneNoneFalseNoneFalse16000.00
238150970807NoneVol No-2 pg no-49 I No8.43Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :Two coats on new work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Work should be carried out as per the direction of engineer incharge of work.Sqm94.094.017.28FalseNoneNoneFalseNoneFalse1624.320
238151070807NoneVol No-2 pg no-125 I no -13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Work should be carried out as per the direction of engineer incharge of work.m291.0291.021.0FalseNoneNoneFalseNoneFalse6111.00
17067882560000NoneNoneBuildingsConstruction of Two Class Rooms for Government Higher Primary School at Chikkahandigol Village Gadag DistTq (ELECTRIFICATION49858.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238151170808NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.1.1)Open Conduit System Concealed Conduit System :Supplying heavy gauge PVC conduit pipe mm dia mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary19/20mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr69.069.030.0FalseNoneNoneFalseNoneFalse2070.00
238151270808NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.1.2)Concealed Conduit System :Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary25mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr81.081.016.0FalseNoneNoneFalseNoneFalse1296.00
238151370808NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.3.1)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.19/20mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr68.068.012.0FalseNoneNoneFalseNoneFalse816.00
238151470808NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.3.2)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.25mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr79.079.012.0FalseNoneNoneFalseNoneFalse948.00
238151570808NoneVolume-6 PWD Part-1 (Page No.3Item No.1.9.2)Supplying PVC/GI flexible conduit pipe .... mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely25mm ---- Work should be carried out as per the direction of engineer incharge of work.Mtr22.022.04.0FalseNoneNoneFalseNoneFalse88.00
238151670808NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.1)Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box,the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Short point upto 3Mtr from tapping point to out let via switch box ---- Work should be carried out as per the direction of engineer incharge of work.Point269.0269.012.0FalseNoneNoneFalseNoneFalse3228.00
238151770808NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.2)Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch ---- Work should be carried out as per the direction of engineer incharge of work.Point379.0379.02.0FalseNoneNoneFalseNoneFalse758.00
238151870808NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.3)Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box ---- Work should be carried out as per the direction of engineer incharge of work.Point555.0555.02.0FalseNoneNoneFalseNoneFalse1110.00
238151970808None2.3.2Volume-6 PWD Part-1 (Page No.5 Item No.2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,1.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr26.026.060.0FalseNoneNoneFalseNoneFalse1560.00
238152070808NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.3.3)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,2.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr42.042.070.0FalseNoneNoneFalseNoneFalse2940.00
238152170808NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.3.4)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,4 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr63.063.040.0FalseNoneNoneFalseNoneFalse2520.00
238152270808NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.1)Supplying and flush mounting powder coated / galvanized metal box size 1-2 way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each138.0138.04.0FalseNoneNoneFalseNoneFalse552.00
238152370808NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.3)Supplying and flush mounting powder coated / galvanized metal box size 4-5way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each177.0177.02.0FalseNoneNoneFalseNoneFalse354.00
238152470808NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.5)Supplying and flush mounting powder coated / galvanized metal box size 8way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each261.0261.02.0FalseNoneNoneFalseNoneFalse522.00
238152570808NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.6)Supplying and flush mounting powder coated / galvanized metal box size10-12way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each319.0319.02.0FalseNoneNoneFalseNoneFalse638.00
238152670808NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.2)Supplying and fixing superior quality 3Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box. ---- Work should be carried out as per the direction of engineer incharge of work.Each161.0161.02.0FalseNoneNoneFalseNoneFalse322.00
238152770808NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.3)Supplying and fixing superior quality 4Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box. ---- Work should be carried out as per the direction of engineer incharge of work.Each175.0175.02.0FalseNoneNoneFalseNoneFalse350.00
238152870808NoneVolume-6 PWD Part-1 (Page No.5 Item No.3.5.5)Supplying and fixing superior quality 8 modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox. ---- Work should be carried out as per the direction of engineer incharge of work.Each284.0284.02.0FalseNoneNoneFalseNoneFalse568.00
238152970808NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.6)Supplying and fixing superior quality 10-12Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox. ---- Work should be carried out as per the direction of engineer incharge of work.Each344.0344.02.0FalseNoneNoneFalseNoneFalse688.00
238153070808NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.1)Supplying and fixing of 6Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each102.0102.018.0FalseNoneNoneFalseNoneFalse1836.00
238153170808NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.3)Supplying and fixing of 6Amps 3way modular Socketc on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each171.0171.08.0FalseNoneNoneFalseNoneFalse1368.00
238153270808NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.4)Supplying and fixing of modular stepped electronic fan regulator on existing modular switch plate as per and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each357.0357.04.0FalseNoneNoneFalseNoneFalse1428.00
238153370808NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.7)Supplying and fixing of 16Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each180.0180.02.0FalseNoneNoneFalseNoneFalse360.00
238153470808NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.9)Supplying and fixing of32Amps modular DP Switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each326.0326.02.0FalseNoneNoneFalseNoneFalse652.00
238153570808NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.10)Supplying and fixing of6/16amps modular Universal Socket on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each236.0236.02.0FalseNoneNoneFalseNoneFalse472.00
238153670808NoneVolume-6 PWD Part-1 (Page No.10 Item No.3.14.6)Supplying and fixing of 6Amps pendent holder on existing board. ---- Work should be carried out as per the direction of engineer incharge of work.Each71.071.04.0FalseNoneNoneFalseNoneFalse284.00
238153770808NoneVolume-6 PWD Part-1 (Page No.14 Item No.5.7.3)Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.63amps ---- Work should be carried out as per the direction of engineer incharge of work.Each401.0401.02.0FalseNoneNoneFalseNoneFalse802.00
238153870808NoneVolume-6 PWD Part-1 (Page No.30 Item No.6.3.1)Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) Economy model ---- Work should be carried out as per the direction of engineer incharge of work.Each2984.02984.04.0FalseNoneNoneFalseNoneFalse11936.00
238153970808NoneVolume-6 PWD Part-1 (Page No.43 Item No.11.3.2)LED Indoor Supplying of 1x4' feet - LED PVC Square Batten 20/22W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50Hz & Power factor 0.9 along with CE approved drivers. 2 years Warranty against any manufacturing defect working under standard electrical condition ---- Work should be carried out as per the direction of engineer incharge of work.Each690.0690.04.0FalseNoneNoneFalseNoneFalse2760.00
238154070808NoneVolume6 PWD Part-1 (Page No.47 Item No.11.11.4)Supplying & fixing of retrofit type LED bulb . W with OPAL acrylicdiffuser comprising of LED source with CCT 6500 degree K, CRI 7. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5 of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABLCPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. ---- Work should be carried out as per the direction of engineer incharge of work.Each154.0154.04.0FalseNoneNoneFalseNoneFalse616.00
238154170808NoneVolume-6 PWD Part-1 (Page No.56 Item No.13.7.1)Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- Work should be carried out as per the direction of engineer incharge of work.Each122.0122.08.0FalseNoneNoneFalseNoneFalse976.00
238154270808NoneVolume-6 PWD Part-1 (Page No.57 Item No.13.10)Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- Work should be carried out as per the direction of engineer incharge of work.Each171.0171.04.0FalseNoneNoneFalseNoneFalse684.00
238154370808NoneESCOM SR 2023-24 Item No.51.01 Page No.22)Grounding Material GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg (ESCOM SR 2023-24 Item No.51.01 Page No.22) ---- Work should be carried out as per the direction of engineer incharge of work.Each743.0743.02.0FalseNoneNoneFalseNoneFalse1486.00
238154470808NoneESCOM SR 2023-24 Item No.51.02 Page No.22)Grounding Material Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each (BESCOM Part-III 11 KV Materials Item No.54.02 Page No.17) ---- Work should be carried out as per the direction of engineer incharge of work.Each676.0676.02.0FalseNoneNoneFalseNoneFalse1352.00
238154570808NoneESCOM SR 202324 Item No.1.6.1 ordinary soil Pg.43Digging of Pit for providing GI Pipe type Earthing Ordinary Soil (ESCOM SR 2023-24 Item No.1.6.1 ordinary soil Page No.43) ---- Work should be carried out as per the direction of engineer incharge of work.Per Pit759.0759.02.0FalseNoneNoneFalseNoneFalse1518.00
17067882560000NoneNoneBuildingsConstruction of Two Class Rooms for Government Higher Primary School at Madaganur Village Gadag Dist/Tq (27.80 Lakhs2305535.75
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238154670809NoneVol No-1 pg no-08I No 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurten ances required to complete the work. ---- Work should be carried out as per the direction of engineer incharge of work.Cum95.095.048.6FalseNoneNoneFalseNoneFalse4617.00
238154770809NoneVol No-1 pg no-08I No 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the In all kinds of soils Depth upto 3 m ---- Work should be carried out as per the direction of engineer incharge of work.Cum102.0102.0182.92FalseNoneNoneFalseNoneFalse18657.840
238154870809NoneVol No-2 pg no-05I No 4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specific ations. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm118.0118.0112.78FalseNoneNoneFalseNoneFalse13308.040
238154970809NoneVol No-2 pg no 11I No 1.23Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work.Cum2682.02682.021.3FalseNoneNoneFalseNoneFalse57126.60
238155070809NoneVol No-1 pg no-15I No 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggre gates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum5989.05989.030.58FalseNoneNoneFalseNoneFalse183143.620
238155170809NoneVol No-1 pg no-15I No 2.2.3Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specification s.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6336.06336.026.9FalseNoneNoneFalseNoneFalse170438.40
238155270809NoneVol-1 pg No.-111 (8 Percentage )Additional for formwork, Centering & Scaffolding for Sl No 1 a: Foundation upto plinth Isolated As per Appendix-I in Volume-1 of page No.-111 (@8% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum506.88506.8826.9FalseNoneNoneFalseNoneFalse13635.0720
238155370809NoneVol No-1 pg no-16I No 2.3.2Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6480.06480.011.45FalseNoneNoneFalseNoneFalse74196.00
238155470809NoneVol-1 pg No.-111 70 percentageAdditional for formwork, Centering & Scaffolding for Sl No 8: Columns & Piers As per Appendix-I in Volume-1 of page No.-111 (@70% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4536.04536.02.08FalseNoneNoneFalseNoneFalse9434.880
238155570809NoneVol-1 pg No.-112 10percentageAdditional for formwork, Centering & Scaffolding for Sl No 2: Earth retaining structure drainages As per Appendix-I in Volume-1 of page No.-112(@10% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum648.0648.09.37FalseNoneNoneFalseNoneFalse6071.760
238155670809NoneVol No-1 pg no-7I No 1.8Construction of Embankment by excavating the available approved Gravel Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling ,water ,all materials ,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 per m for every 1.50 m height or part there of ---- Work should be carried out as per the direction of engineer incharge of work.Cum474.0474.0247.65FalseNoneNoneFalseNoneFalse117386.10
238155770809NoneVol No-1 pg no-16I No2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6404.06404.03.09FalseNoneNoneFalseNoneFalse19788.360
238155870809NoneVol No-1 pg no-16 I No 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggrgates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications .M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Work should be carried out as per the direction of engineer incharge of work.Cum6843.06843.035.76FalseNoneNoneFalseNoneFalse244705.680
238155970809NoneVol-1 pg No.-111 70percentageAdditional for formwork, Centering & Scaffolding for Sl No 8: Columns & Piers As per Appendix-I in Volume-1 of page No.-111 (@70% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4790.14790.15.0FalseNoneNoneFalseNoneFalse23950.50
238156070809NoneVol-1 pg No.-111 (50percentage)Additional for formwork, Centering & Scaffolding for Sl No 12 : plinth beam As per corrigendam 3 Appendix-I in Volume-1 of page No.-111 (@50% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3421.53421.57.02FalseNoneNoneFalseNoneFalse24018.930
238156170809NoneVol-1 pg No.-112 (60percentage )Additional for formwork, Centering & Scaffolding for Sl No 12 : beam & lintels As per Appendix-I in Volume-1 of page No.-112 (@60% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum4105.84105.88.56FalseNoneNoneFalseNoneFalse35145.6480
238156270809NoneVol-1 pg No.-112 (45percentage )Additional for formwork, Centering & Scaffolding for Sl No 20 : Chejjas, Canopy & Other Architectural projections of minor sections As per Appendix-I in Volume-1 of page No.-112 (@45% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3079.353079.351.08FalseNoneNoneFalseNoneFalse3325.6980
238156370809NoneVol-1 pg No.-112 (50percentage )Additional for formwork, Centering & Scaffolding for Sl No 13 : Roof straight As per corrigendum Appendix-I in Volume-1 of page No.-112 (@ 50% of Finished Rate) ---- Work should be carried out as per the direction of engineer incharge of work.Cum3421.53421.514.1FalseNoneNoneFalseNoneFalse48243.150
238156470809NoneVol No-1 pg no-18 I No 2.11aSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specific ation.a)Buildings ---- Work should be carried out as per the direction of engineer incharge of work.MT89457.089457.04.87FalseNoneNoneFalseNoneFalse435655.590
238156570809NoneVol No-2 pg no-14 I No 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Work should be carried out as per the direction of engineer incharge of work.Cum7969.07969.031.04FalseNoneNoneFalseNoneFalse247357.760
238156670809NoneVol No-2 pg no-14 I No 6.15Providing Half brick masonry with common burnt clay Non Modularbricks of class designation 3.5 in superstructure above plinth level upto floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm1033.01033.09.36FalseNoneNoneFalseNoneFalse9668.880
238156770809NoneVol No-2 pg no-41 I No 8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm295.0295.0137.26FalseNoneNoneFalseNoneFalse40491.70
238156870809NoneVol No-2 pg no-42 I No 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm371.0371.0229.06FalseNoneNoneFalseNoneFalse84981.260
238156970809NoneVol No-2 pg no-64 I No 9.34Flooring with 25mm thick polished tandur blue stone slabs using cementmortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm1545.01545.0109.2FalseNoneNoneFalseNoneFalse168714.00
238157070809NoneVol No-2 pg no-86 I No 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat withapproved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Work should be carried out as per the direction of engineer incharge of work.Kg183.0183.0338.94FalseNoneNoneFalseNoneFalse62026.020
238157170809NoneVol No-2 pg no-81 I No 11.14.3.1Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle thre shold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer- in-charge: Profile E Fixing with adjustable lugs with split end tail to each jamb including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of theEngineer-in-Charge. ---- Work should be carried out as per the direction of engineer incharge of work.m531.0531.013.2FalseNoneNoneFalseNoneFalse7009.20
238157270809NoneVol No-2 pg no-77 I No 11.5.1Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge ---- Work should be carried out as per the direction of engineer incharge of work.Sqm4478.04478.05.04FalseNoneNoneFalseNoneFalse22569.120
238157370809NoneVol No-2 pg no-79 I No 11.11.1Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVCirections of the Engineer-in-Charge.honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm .Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Work should be carried out as per the direction of engineer incharge of work.Sqm5023.05023.08.64FalseNoneNoneFalseNoneFalse43398.720
238157470809NoneVol No-2 pg no-50 I No 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm100.0100.0240.04FalseNoneNoneFalseNoneFalse24004.00
238157570809NoneVol No-2 pg no-45 I No8.25Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm137.0137.0240.04FalseNoneNoneFalseNoneFalse32885.480
238157670809NoneVol No-2 pg no-45 I No8.27Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as perspecifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm53.053.0229.06FalseNoneNoneFalseNoneFalse12140.180
238157770809NoneVol No-2 pg no-45 I No8.28Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoro ughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm89.089.0229.06FalseNoneNoneFalseNoneFalse20386.340
238157870809NoneVol No-2 pg no-48 I No8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work.Sqm115.0115.028.86FalseNoneNoneFalseNoneFalse3318.90
238157970809NoneVol No-2 pg no-49 I No8.49Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Work should be carried out as per the direction of engineer incharge of work.cm4.04.04000.0FalseNoneNoneFalseNoneFalse16000.00
238158070809NoneVol No-2 pg no-49 I No8.43Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :Two coats on new work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Work should be carried out as per the direction of engineer incharge of work.Sqm94.094.017.28FalseNoneNoneFalseNoneFalse1624.320
238158170809NoneVol No-2 pg no-125 I no -13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Work should be carried out as per the direction of engineer incharge of work.m291.0291.021.0FalseNoneNoneFalseNoneFalse6111.00
17067882570000NoneNoneBuildingsConstruction of Two Class Rooms for Government Higher Primary School at Madaganur Village Gadag Dist/Tq (27.80 Lakhs) (ELECRIFICATION)49858.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238158270810NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.1.1)Open Conduit System Concealed Conduit System :Supplying heavy gauge PVC conduit pipe mm dia mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary19/20mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr69.069.030.0FalseNoneNoneFalseNoneFalse2070.00
238158370810NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.1.2)Concealed Conduit System :Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary25mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr81.081.016.0FalseNoneNoneFalseNoneFalse1296.00
238158470810NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.3.1)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.19/20mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr68.068.012.0FalseNoneNoneFalseNoneFalse816.00
238158570810NoneVolume-6 PWD Part-1 (Page No.2 Item No.1.3.2)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.25mm dia 2mm thick ---- Work should be carried out as per the direction of engineer incharge of work.Mtr79.079.012.0FalseNoneNoneFalseNoneFalse948.00
238158670810NoneVolume-6 PWD Part-1 (Page No.3Item No.1.9.2)Supplying PVC/GI flexible conduit pipe .... mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely25mm ---- Work should be carried out as per the direction of engineer incharge of work.Mtr22.022.04.0FalseNoneNoneFalseNoneFalse88.00
238158770810NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.1)Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box,the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Short point upto 3Mtr from tapping point to out let via switch box ---- Work should be carried out as per the direction of engineer incharge of work.Point269.0269.012.0FalseNoneNoneFalseNoneFalse3228.00
238158870810NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.2)Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch ---- Work should be carried out as per the direction of engineer incharge of work.Point379.0379.02.0FalseNoneNoneFalseNoneFalse758.00
238158970810NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.2.3)Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box ---- Work should be carried out as per the direction of engineer incharge of work.Point555.0555.02.0FalseNoneNoneFalseNoneFalse1110.00
238159070810None2.3.2Volume-6 PWD Part-1 (Page No.5 I No.2.3.2)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,1.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr26.026.060.0FalseNoneNoneFalseNoneFalse1560.00
238159170810NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.3.3)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,2.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr42.042.070.0FalseNoneNoneFalseNoneFalse2940.00
238159270810NoneVolume-6 PWD Part-1 (Page No.5 Item No.2.3.4)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,4 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP. ---- Work should be carried out as per the direction of engineer incharge of work.Mtr63.063.040.0FalseNoneNoneFalseNoneFalse2520.00
238159370810NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.1)Supplying and flush mounting powder coated / galvanized metal box size 1-2 way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each138.0138.04.0FalseNoneNoneFalseNoneFalse552.00
238159470810NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.3)Supplying and flush mounting powder coated / galvanized metal box size 4-5way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each177.0177.02.0FalseNoneNoneFalseNoneFalse354.00
238159570810NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.5)Supplying and flush mounting powder coated / galvanized metal box size 8way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each261.0261.02.0FalseNoneNoneFalseNoneFalse522.00
238159670810NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.4.6)Supplying and flush mounting powder coated / galvanized metal box size10-12way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Work should be carried out as per the direction of engineer incharge of work.Each319.0319.02.0FalseNoneNoneFalseNoneFalse638.00
238159770810NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.2)Supplying and fixing superior quality 3Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box. ---- Work should be carried out as per the direction of engineer incharge of work.Each161.0161.02.0FalseNoneNoneFalseNoneFalse322.00
238159870810NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.3)Supplying and fixing superior quality 4Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box. ---- Work should be carried out as per the direction of engineer incharge of work.Each175.0175.02.0FalseNoneNoneFalseNoneFalse350.00
238159970810NoneVolume-6 PWD Part-1 (Page No.5 Item No.3.5.5)Supplying and fixing superior quality 8 modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox. ---- Work should be carried out as per the direction of engineer incharge of work.Each284.0284.02.0FalseNoneNoneFalseNoneFalse568.00
238160070810NoneVolume-6 PWD Part-1 (Page No.8 Item No.3.5.6)Supplying and fixing superior quality 10-12Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox. ---- Work should be carried out as per the direction of engineer incharge of work.Each344.0344.02.0FalseNoneNoneFalseNoneFalse688.00
238160170810NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.1)Supplying and fixing of 6Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each102.0102.018.0FalseNoneNoneFalseNoneFalse1836.00
238160270810NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.3)Supplying and fixing of 6Amps 3way modular Socketc on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each171.0171.08.0FalseNoneNoneFalseNoneFalse1368.00
238160370810NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.4)Supplying and fixing of modular stepped electronic fan regulator on existing modular switch plate as per and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each357.0357.04.0FalseNoneNoneFalseNoneFalse1428.00
238160470810NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.7)Supplying and fixing of 16Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each180.0180.02.0FalseNoneNoneFalseNoneFalse360.00
238160570810NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.9)Supplying and fixing of32Amps modular DP Switch on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each326.0326.02.0FalseNoneNoneFalseNoneFalse652.00
238160670810NoneVolume-6 PWD Part-1 (Page No.9 Item No.3.6.10)Supplying and fixing of6/16amps modular Universal Socket on existing modular switch plate as per IS 3854 and IS 1293. ---- Work should be carried out as per the direction of engineer incharge of work.Each236.0236.02.0FalseNoneNoneFalseNoneFalse472.00
238160770810NoneVolume-6 PWD Part-1 (Page No.10 Item No.3.14.6)Supplying and fixing of 6Amps pendent holder on existing board. ---- Work should be carried out as per the direction of engineer incharge of work.Each71.071.04.0FalseNoneNoneFalseNoneFalse284.00
238160870810NoneVolume-6 PWD Part-1 (Page No.14 Item No.5.7.3)Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.63amps ---- Work should be carried out as per the direction of engineer incharge of work.Each401.0401.02.0FalseNoneNoneFalseNoneFalse802.00
238160970810NoneVolume-6 PWD Part-1 (Page No.30 Item No.6.3.1)Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) Economy model ---- Work should be carried out as per the direction of engineer incharge of work.Each2984.02984.04.0FalseNoneNoneFalseNoneFalse11936.00
238161070810NoneVolume-6 PWD Part-1 (Page No.43 I No.11.3.2)LED Indoor Supplying of 1x4' feet - LED PVC Square Batten 20/22W with high quality diffuser with Life of 25000 burning hours & 70 lumen maintenance with CRI 80. Power Input: 220-240V @ 50Hz & Power factor 0.9 along with CE approved drivers. 2 years Warranty against any manufacturing defect working under standard electrical condition ---- Work should be carried out as per the direction of engineer incharge of work.Each690.0690.04.0FalseNoneNoneFalseNoneFalse2760.00
238161170810NoneVolume-6 PWD Part-1 (Page No.47 Item No.11.11.4)Supplying & fixing of retrofit type LED bulb .W with OPAL acrylicdiffuser comprising of LED source with CCT 6500 degree K, CRI 70 efficacy 80 lumen per W, life25000 burning hours and Compliance to IS 10322IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% oflamp Wage., short circuit & open circuit protection to be integrated incircuit, THD less than 20, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested byNABLCPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. ---- Work should be carried out as per the direction of engineer incharge of work.Each154.0154.04.0FalseNoneNoneFalseNoneFalse616.00
238161270810NoneVolume-6 PWD Part-1 (Page No.56 Item No.13.7.1)Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- Work should be carried out as per the direction of engineer incharge of work.Each122.0122.08.0FalseNoneNoneFalseNoneFalse976.00
238161370810NoneVolume-6 PWD Part-1 (Page No.57 Item No.13.10)Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- Work should be carried out as per the direction of engineer incharge of work.Each171.0171.04.0FalseNoneNoneFalseNoneFalse684.00
238161470810NoneESCOM SR 2023-24 Item No.51.01 Page No.22)Grounding Material GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg (ESCOM SR 2023-24 Item No.51.01 Page No.22) ---- Work should be carried out as per the direction of engineer incharge of work.Each743.0743.02.0FalseNoneNoneFalseNoneFalse1486.00
238161570810NoneESCOM SR 2023-24 Item No.51.02 Page No.22)Grounding Material Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each (BESCOM Part-III 11 KV Materials Item No.54.02 Page No.17) ---- Work should be carried out as per the direction of engineer incharge of work.Each676.0676.02.0FalseNoneNoneFalseNoneFalse1352.00
238161670810NoneESCOM SR 2023-24 I No.1.6.1 ordinary soil P No.43Digging of Pit for providing GI Pipe type Earthing Ordinary Soil (ESCOM SR 2023-24 Item No.1.6.1 ordinary soil Page No.43) ---- Work should be carried out as per the direction of engineer incharge of work.Per Pit759.0759.02.0FalseNoneNoneFalseNoneFalse1518.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17067882560000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17067882560000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17067882560000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17067882560000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17067882560000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17067882560000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17067882560000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should give all details and documents as per Technical and Financial bid attached to this tender.None
17067882560000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17067882560000NoneNoneELIGIBILITYAll necessary arrangements shall be made and precaution taken to prevent completely or partially, damage to the structure or labours / employees during construction period. (As per recent Labour Act) Contractor shall be fully responsible for any damage to the structure during the construction and maintainance period.Any damage caused due to any reasons shall be rectified / replaced at his own cost as per the direction of Engineer in charge. Nothing shall be payable by the Department on account of inclusive of all such arrangements/ precautions work needed.None
17067882560000NoneNoneELIGIBILITYThe field Lab shall preferably located, adjacent to the site with the required amenity as per the clause. Failing which 1% of the amount of work done will be penalizedNone
17067882560000NoneNoneELIGIBILITYTenderer shall obtain the Work Done Certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer( District Level Officer), scan the original Certificate and attach the scanned file to the tender. The Original Certificate shall be produced at the time of opening of Technical Bids for physical verificationNone
17067882560000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards labour welfare fund.None
17067882560000NoneNoneELIGIBILITYThe employer reserves the rights to Reject one or all Tenders without assigning any reasons.None
17067882560000NoneNoneELIGIBILITYThe Item Rates quoted shall include cost of Royalty charges on constructive materials & other taxes as per the rates prevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loading and unloading with all leads and lifts, labour, hire charges of machinery & equipment etc., complete and all incidental charges. All the items shall be executed as directed by the Engineer-in-charge of work.None
17067882560000NoneNoneELIGIBILITYThe construction materials (minerals metal ,sand and Murom) shall be bought from the authorized quarries along with the mineral dispatch permit or else 5 times the royalty will be deducted as penalty as per the Directions on the Director, Mines and Geology Department Bangalore proceedings dated 25.03.2013.None
17067882560000NoneNoneELIGIBILITYThe awarded Contractor has to Submit his bills through e-MB for payment.( Billing is through e-Mb ie: Contractor has to produce Soft copy and hard Copy of RA or Final bill for payments)None
17067882560000NoneNoneELIGIBILITYThe Important Original Documents Certificates which are uploaded like Work done Line of Credit Turn over Certificates and Machineries Ownership Documents shall be produced at the time of opening of Tender for physical verification. If fail to Produce documents Certificates on or before the time of opening the Bid is liable for Rejection with out any prior notice.None
17067882560000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/95/LET/2013 Bangalore dated 01.04.2013 the Contractor shall be registered under section 7 of Buildings and other Construction workers (Regulation of Employment and Conditions of Service) Act and the construction labour shall get the registration under section 12 of the act before making payment of running billsNone
17067882560000NoneNoneELIGIBILITYThe Item rates quoted shall include cost of Royalty charges on construction materialsNone
17067882560000NoneNoneELIGIBILITYGST shall be paid to the Tendered Amount SeparatelyNone
17067882560000NoneNoneELIGIBILITYIncrease in GST shall not be paid in the extended period of contract for which contractor is alone responsible for delay as determined by the authority while granting the extension of time.None
17067882560000NoneNoneELIGIBILITYThe tenderer should maintain the Road during the DEFECT LIABILITY PERIOD, which is up to One year after successful completion of the work.None
17067882560000NoneNoneELIGIBILITYTender period for work completion 06 Calendar Months (including monsoon period)None
17067882560000NoneNoneELIGIBILITYContractors registered under class-1 and 2 may tender for works anywhere in the state.Contactors registered under class-3 may tender for works within the districts of the PWD circles where in they are registered. Contactors registered under-4 may tender for works within the districts or within the division whichever is applicableNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work1)Earthwork-1607.12 Cum 2)Concrete work (Including PCC/RCC)-338.77 Cum 3)Steel-15.37 Tonne 4)SSM/BBM/UCR/Solid blocks-104.76 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Quantity wise workdone certificate
NoneNoneNoneNone3.2(b) To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19,2019-20 ,and 2020-21,2021-22,2022-23 Satisfactorily completed as prime contractor, at least one similar work (to an extent of 50% of the contract value), such as Construction of Building Works of value not less than Rs 37.45 lakhsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified,if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity-( AxNx2.5-B )whereA-Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress.N -Number of years prescribed for completion of the works for which tenders are invited -0.50 Year.B-Value at 2023-24price level, of existing commitments and on-going works to be completed during the next 0.50 year (Period of completion of the works for which tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Calculation sheet on lettar head
NoneNoneNoneNoneAssessed Tender Capacity shall be more than the Tendered AmountCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Assessed Tender Capacity shall be more than the Tendered Amount
NoneNoneNoneNoneQualification and experience of the key Technical and Management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this work, if awardedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Biodata of the personnel
NoneNoneNoneNone3.3 a Each Tenderer should further demonstrate :As per this note, each tenderer should demonstrate availability of few key equipments /machinery for execution of the work . However as per Govt circular no GO-FD/AE 263/EXP12-2022 dt-11-05-2022, this clause for owning key equipments for works costing up to Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the following machineries for various activities involved in construction as per Morth specification.Sl No. Name of machinery 1)Excavator JCB / Hitachi 2)Tippers3)Concrete Batching Plant4)Water Tanker5)Shuttering Materials 6)Transit Mixers 7)Selfloading Moblie Concrete Batching Plant of min 2 cum capacity (Like Ajax)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- LIST OF MACHINERIES
NoneNoneNoneNone3.2 (a) To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19 2019-20,and 2020-21,2021-22,2022-23Achieved in at least two financial years an Average Annual financial turnover (in all classes of civil engineering construction works only) of Rs.74.89 lakhs. The Bidder shall submit the Balance sheets and IT Returns of the same period to substantiate the turnover certificate.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs.22.47 Lakhs (estimated cash flow for 3 months of peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneThe EMD of Rs.149800.00 shall be paid in full through e-payment or in two parts i.e,Part(1)Rs. 50,000.00 by e-payment part (2)99800.00 in the form of BG to be upload.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- EMD Details
NoneNoneNoneNoneList of Financial Resources with CertificatesFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of Financial Resources with Certificates
NoneNoneNoneNoneInformation on litigation in which the Tender is involved.OthersInformation on litigation in which the Tender is involved.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on litigation in which the Tender is involved.
NoneNoneNoneNoneContractor PWD registration certificate.OthersPWD Registration Certificate (Class I/II/III/IV)
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- PWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneProposed methodology and Program of construction, backed with equipment, planning and deployment, duly supported with Broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones.OthersBar Chart/ PERT and Report
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bar Chart/ PERT and Report
NoneNoneNoneNoneInformation on the Works for which tenderer has submitted TenderOthersInformation in Format VI
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format VI
NoneNoneNoneNoneBanker DetaList of existing commitments and ongoing worksils for referenceOthersInformation in format IV
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in format IV
NoneNoneNoneNoneBanker DetaList of existing commitments and ongoing worksils for referenceOthersInformation in Format VI
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format VI
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Contractor PWD Registration CertificateTrueTechnical Bid
Satisfactorily completed as prime contractor, at least one similar work done certificate.TrueTechnical Bid
LOC should be preescribed formate-2,if not then the tender will not be acceptedTrueTechnical Bid
Bid capacity on the contractor letter headTrueTechnical Bid
Quantity wise workdone certificate.TrueTechnical Bid
Any other related documents.TrueTechnical Bid
Present Postal address and phone number of the Contractor is Complusory.TrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone