createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1706075148256
version12
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee4240.00
emd254340.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-02-2024 16:30:00
tenderQueryClose08-02-2024 16:30:00
technicalBidOpen12-02-2024 11:30:00
publishedDate02-02-2024 11:52:02
publishedByPostPWD_EE_DIV_CKM
publishedByUserKPE11164 - D N SRIDHAR
bidValidityPeriod90
noOfCalls2
preBidMeetingDate01-02-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonD N Sridhar
splitEmdRequiredYnTrue
emdBankGuarantee154340.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08262234028
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1706075148259
version16
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT5734/CALL-2
titleRepair works to Workshop and other development works at DACG Polytechnic College Building in Chikmagalur Taluk and District.
descriptionRepair works to Workshop and other development works at DACG Polytechnic College Building in Chikmagalur Taluk and District.
categoryWORKS
categoryTextWorks
ecv16955890.64
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1699
locationNamePWD Division Office Chikkamagaluru
provisionalAmount21000000.0
groupOverheadTotalNone
fileNumberKPWD/CKM/DACG/College/CKM/Repair/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17060751480001NoneNoneBuildingsGround floor works of Repair works to Workshop and other development works at DACG Polytechnic College Building12478284.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
228060367003Nonep-165 item no-19.27.2 vol-2Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material to the appropriate disposal area as per direction of Engineer-in-charge Asbestos cement sheet (p-165/item no-19.27.2 vol-2 Corrigendum 2 Item Sl no 24) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm40.1740.172228.75FalseNoneNoneFalseNoneFalse89528.88750
228060467003Nonep-163 item no-19.7.1 vol-2Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. (p-163/item no-19.7.1 vol-2 ) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm380.07380.0791.4FalseNoneNoneFalseNoneFalse34738.3980
228060567003Nonep-8 item no-1.14.1 vol-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m. (p-8/item no-1.14.1 vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum75.1975.1936.0FalseNoneNoneFalseNoneFalse2706.840
228060667003Nonep-8 item no-1.12 vol-1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including Cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (p-8/item no-1.12 vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum66.9566.95955.53FalseNoneNoneFalseNoneFalse63972.73350
228060767003NoneP.No. 24, I.No.4.27 vol-3Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density (P.No. 24, I.No.4.27 vol-3 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum2465.822465.82121.41FalseNoneNoneFalseNoneFalse299375.20620
228060867003NoneP.No. 64, I.No. 9.31 vol-2Providing and laying heavy duty cobble stones 60mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per m2 over 50mm thick sand bed ( average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level , including cost of materials, labour and Usage charges of machinery complete as per specifications. (P.No. 64, I.No. 9.31 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1119.611119.61809.4FalseNoneNoneFalseNoneFalse906212.3340
228060967003Nonep-12 item no-2.1.2 vol-1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (p-12/item no-2.1.2 vol-1) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum5362.185362.1857.77FalseNoneNoneFalseNoneFalse309773.13860
228061067003Nonep-15 item no-2.1.4 vol-1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (p-15/item no-2.1.4 vol-1) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum5899.845899.8460.12FalseNoneNoneFalseNoneFalse354698.38080
228061167003Nonep-9 item no-5.4 vol-2Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (p-9/item no-5.4 vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum5512.565512.5619.44FalseNoneNoneFalseNoneFalse107164.16640
228061267003Nonep-17 item no-2.5.2 vol-1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Plinth Beam (p-17/item no-2.5.2 vol-1) Including formwork charges of 50 percent ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum9557.379557.377.96FalseNoneNoneFalseNoneFalse76076.66520
228061367003Nonep-84 item no-11.32 vol-2Providing Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary omplete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (p-84/item no-11.32 vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg94.7694.76955.8FalseNoneNoneFalseNoneFalse90571.6080
228061467003NoneP.No. 13, I.No. 6.2 vol-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work (P.No. 13, I.No. 6.2 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum6896.886896.8855.1FalseNoneNoneFalseNoneFalse380018.0880
228061567003NoneP No 182 20.89 vol-2Repairs to plaster in patches of 2.5 m 2 and less in walls, ceilings 10 to 20mm thick in cement mortar 1:4 including cutting the patches in proper shape and replastering the surface of the wall including disposal of rubbish with a lead of 50m including curing cost of materials, labour, complete as per specification.(P No 182/20.89 vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm325.48325.481416.25FalseNoneNoneFalseNoneFalse460961.050
228061667003NoneP.No.42 I.No. 8.8 Vol-2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P.No.42 I.No. 8.8 Vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm316.21316.21262.5FalseNoneNoneFalseNoneFalse83005.1250
228061767003NoneP No 41 8.4.2 vol-2Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(P No 41/8.4.2 vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm269.86269.86335.43FalseNoneNoneFalseNoneFalse90519.13980
228061867003NoneP.No. 183 I.No. 20.103 vol-2Repairing door and window frames with available wood to the required size. (P.No. 183 I.No. 20.103 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm778.68778.68148.5FalseNoneNoneFalseNoneFalse115633.980
228061967003NoneP.No. 183 I.No. 20.104 vol-2Repairing and fixing shutters (panelled or glazed) to doors, windows, ventilators and cupboards. (P.No. 183 I.No. 20.104 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm778.68778.68148.5FalseNoneNoneFalseNoneFalse115633.980
228062067003NoneP.No. 81, I.No. 11.16.2 vol-2Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat f approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge (P.No. 81, I.No. 11.16.2 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg140.08140.0811739.25FalseNoneNoneFalseNoneFalse1644434.140
228062167003NoneP.No.85 , I.No. 11.34A vol-2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (P.No.85 , I.No. 11.34A vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg149.35149.351113.74FalseNoneNoneFalseNoneFalse166337.0690
228062267003NoneP.No.52 I.No. 8.72.1 Vol-2Finishing walls with water proofing cement paint of required shade :Old work (one coats applied @ 2.20 kg/10 m²) over priming coat of primer applied @ 0.80 litrs/10 m² complete including cost of Priming coat including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (P.No.52 I.No. 8.72.1 Vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm65.9265.923430.58FalseNoneNoneFalseNoneFalse226143.83360
228062367003NoneP.No.53 I.No. 8.74.1 Vol-2Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two coat applied @ 1.67 ltr/ 10 m²) on existing cement paint surface including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer- in-charge. (P.No.53 I.No. 8.74.1 Vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm84.4684.464718.86FalseNoneNoneFalseNoneFalse398554.91560
228062467003NoneP.No. 48, I.No. 8.40 vol-2Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (P.No. 48, I.No. 8.40 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm92.792.7349.15FalseNoneNoneFalseNoneFalse32366.2050
228062567003NoneP.No. 47, I.No. 8.33.3 vol-2Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P.No. 47, I.No. 8.33.3 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm109.18109.182050.1FalseNoneNoneFalseNoneFalse223829.9180
228062667003NoneP.No. 83, I.No. 11.28 vol-2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with ecessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, (P.No. 83, I.No. 11.28 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg515.0515.02640.0FalseNoneNoneFalseNoneFalse1359600.00
228062767003NoneP.No.178 I.No. 20.46 Vol-2Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. (P.No.178 I.No. 20.46 Vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm2.062.06270.06FalseNoneNoneFalseNoneFalse556.32360
228062867003NoneP.No.62 I.No. 9.19 Vol-2Providing and laying Vitrified tiles in different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser, treads of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints as per direction of Engineer in charge. (P.No.62 I.No. 9.19 Vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1269.991269.99270.06FalseNoneNoneFalseNoneFalse342973.49940
228062967003NoneP.No. 63, I.No. 9.24 vol-2Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent (P.No. 63, I.No. 9.24 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm2956.12956.1782.07FalseNoneNoneFalseNoneFalse2311877.1270
228063067003NoneP.No. 106, I.No. 12.57.9 vol-2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification -do- 40 mm thick both side commercial (P.No. 106, I.No. 12.57.9 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm2969.492969.495.04FalseNoneNoneFalseNoneFalse14966.22960
228063167003NoneP.No. 100 I.No. 12.13.1 vol-2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum63451.0963451.090.22FalseNoneNoneFalseNoneFalse13959.23980
228063267003NoneP.No. 110, I.No. 12.84 vol-2Providing & fixing of 2 track x 2panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm4237.424237.4263.0FalseNoneNoneFalseNoneFalse266957.460
228063367003NoneP.No. 26, I.No. 7.38 vol-2Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns poxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation nd should be supplied in single length upto 12 m or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm572.68572.682654.75FalseNoneNoneFalseNoneFalse1520322.230
228063467003NoneP.No. 27, I.No. 7.39.1 vol-2Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete Ridges plain (500 - 600mm) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m371.83371.83168.9FalseNoneNoneFalseNoneFalse62802.0870
228063567003NoneP.No. 27, I.No. 7.39.6 vol-2Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete Gutter (600 mm over all girth) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m880.65880.65354.3FalseNoneNoneFalseNoneFalse312014.2950
17060751480001NoneNoneBuildingsFirst floor works of Repair works to Workshop and other development works at DACG Polytechnic College Building352694.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
228063667004NoneP.No. 110, I.No. 12.84 vol-2PProviding & fixing of 2 track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made). (P.No. 110, I.No. 12.84 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm4279.794279.7959.4FalseNoneNoneFalseNoneFalse254219.5260
228063767004NoneP.No.52 I.No. 8.72.1 Vol-2Finishing walls with water proofing cement paint of required shade :Old work (one coats applied @ 2.20 kg/10 m²) over priming coat of primer applied @ 0.80 litrs/10 m² complete including cost of Priming coat including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (P.No.52 I.No. 8.72.1 Vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm66.5866.58544.55FalseNoneNoneFalseNoneFalse36256.1390
228063867004NoneP.No.53 I.No. 8.74.1 Vol-2Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two coat applied @ 1.67 ltr/ 10 m²) on existing cement paint surface including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer- in-charge. (P.No.53 I.No. 8.74.1 Vol-2) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm85.385.3392.84FalseNoneNoneFalseNoneFalse33509.2520
228063967004NoneP.No. 47, I.No. 8.33.3 vol-2Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P.No. 47, I.No. 8.33.3 vol-2 ). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm110.27110.27260.36FalseNoneNoneFalseNoneFalse28709.89720
17060751480000NoneNoneBuildingsConstruction of CC Road1221063.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
228064067005NoneP No 8, I. No 1.12 Vol-1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum66.9566.95101.4FalseNoneNoneFalseNoneFalse6788.730
228064167005NoneItem no:4.2V p-15,V-3By Mix in Place Method, Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -V Material ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum2301.022301.02101.4FalseNoneNoneFalseNoneFalse233323.4280
228064267005NoneItem no:20.29 p-138,V-3Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work (Item no:20.29/p-138,V-3) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum6707.366707.36146.25FalseNoneNoneFalseNoneFalse980951.40
17060751480000NoneNoneBuildingsConstruction of CC Drain2141092.93
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
228064367006NoneVOL-1, p.no.8.i.no.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work .(VOL-1, p.no.8.i.no.1.14.1) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum75.1975.19405.3FalseNoneNoneFalseNoneFalse30474.5070
228064467006NoneP.NO. 15 ITM.NO.2.1.3 VOL-1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ( P.NO. 15/ITM.NO.2.1.3 VOL-1) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum5720.625720.6247.92FalseNoneNoneFalseNoneFalse274132.11040
228064567006NoneVol 1 P. No.17 I.No. 2.4.3Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement to be paid separately) M25 Design Mix Using 20mm nominal size graded crushed coarse aggregates(Vol 1/ P. No.17/ I.No. 2.4.3 ). Including formwork charges of 35 percent ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum8331.888331.88114.38FalseNoneNoneFalseNoneFalse953000.43440
228064667006NoneP.NO. 71 ITM.NO. 9.3 VOL -3Supplying, Fitting and Placing TMT Fe 500 Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications. (.P.NO. 71 /ITM.NO. 9.3 VOL -3) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.MT82705.9182705.916.24FalseNoneNoneFalseNoneFalse516084.87840
228064767006NoneVol 2 P. No.151 I.No. 17.5Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineer-in-charge.(Vol 2/ P. No.151/ I.No. 17.5). ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each1224.671224.67300.0FalseNoneNoneFalseNoneFalse367401.00
17060751480000NoneNoneBuildingsElectrical works in DACG Polytechnic College Building762755.05
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
228064867007None1.1.1Supplying heavy gauge PVC conduit pipe . dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc, and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 19/20 mm dia 2 mm thick ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m68.068.0250.0FalseNoneNoneFalseNoneFalse17000.00
228064967007None1.1.225 mm dia 2 mm thick ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m80.080.0186.0FalseNoneNoneFalseNoneFalse14880.00
228065067007None1.12Supplying And Fixing Metal Fan Box with Round Hook. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos163.0163.020.0FalseNoneNoneFalseNoneFalse3260.00
228065167007None3.4.1Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in brick/Stone/C.C wall 1-3 Way ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each123.0123.018.0FalseNoneNoneFalseNoneFalse2214.00
228065267007None3.4.24-5 Way ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each138.0138.012.0FalseNoneNoneFalseNoneFalse1656.00
228065367007None3.4.36 Way ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each212.0212.06.0FalseNoneNoneFalseNoneFalse1272.00
228065467007None3.4.48 Way ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each250.0250.016.0FalseNoneNoneFalseNoneFalse4000.00
228065567007None3.4.510-12 Way ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each325.0325.018.0FalseNoneNoneFalseNoneFalse5850.00
228065667007None3.5.1Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 1 to 3 Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each152.0152.018.0FalseNoneNoneFalseNoneFalse2736.00
228065767007None3.5.24 Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each175.0175.012.0FalseNoneNoneFalseNoneFalse2100.00
228065867007None3.5.36 Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each244.0244.06.0FalseNoneNoneFalseNoneFalse1464.00
228065967007None3.5.48 Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each302.0302.016.0FalseNoneNoneFalseNoneFalse4832.00
228066067007None3.5.510-12 Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each363.0363.018.0FalseNoneNoneFalseNoneFalse6534.00
228066167007None2.2.1Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch box ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Point251.0251.056.0FalseNoneNoneFalseNoneFalse14056.00
228066267007None2.2.2Medium point above 3m upto 6m from tapping point to out let via switch box ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Point361.0361.075.0FalseNoneNoneFalseNoneFalse27075.00
228066367007None2.2.3Long point above 6m upto 10m from tapping point to out let via switch box ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Point542.0542.090.0FalseNoneNoneFalseNoneFalse48780.00
228066467007None3.6.1Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each88.088.0180.0FalseNoneNoneFalseNoneFalse15840.00
228066567007None3.6.36A Three Way socket ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each162.0162.030.0FalseNoneNoneFalseNoneFalse4860.00
228066667007None3.6.4Stepped Fan Regulator Two Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each313.0313.030.0FalseNoneNoneFalseNoneFalse9390.00
228066767007None3.6.816A One Way Switch ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each249.0249.010.0FalseNoneNoneFalseNoneFalse2490.00
228066867007None3.6.96A Bell Push ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each159.0159.02.0FalseNoneNoneFalseNoneFalse318.00
228066967007None3.6.1032A DP Switch ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each375.0375.030.0FalseNoneNoneFalseNoneFalse11250.00
228067067007None3.6.116/16A Universal Socket ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each249.0249.030.0FalseNoneNoneFalseNoneFalse7470.00
228067167007None2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mm2 ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m26.026.0950.0FalseNoneNoneFalseNoneFalse24700.00
228067267007None2.3.32.5 mm2 ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m40.040.01650.0FalseNoneNoneFalseNoneFalse66000.00
228067367007None2.3.44 mm2 ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m59.059.01200.0FalseNoneNoneFalseNoneFalse70800.00
228067467007None2.3.56 mm2 ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m87.087.0250.0FalseNoneNoneFalseNoneFalse21750.00
228067567007None3.10.1Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size . mm conduit using necessary machine screws. 80 mm ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos10.010.035.0FalseNoneNoneFalseNoneFalse350.00
228067667007None3.10.2110 mm ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos12.012.060.0FalseNoneNoneFalseNoneFalse720.00
228067767007None13.2.1Supplying and Fixing.mm dia class A GI pipe bracket upto 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole, using suitable clA, bolts, nuts and wiring using suitable capacity wires. Using 25mm dia G.I.Pipe ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each1050.01050.06.0FalseNoneNoneFalseNoneFalse6300.00
228067867007None12.3.2Supplying and fixing/replacing condenser for ceiling fan/MV/SV/MH and other luminaries. 8mfd ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each158.0158.0120.0FalseNoneNoneFalseNoneFalse18960.00
228067967007None5.18.7Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. II - Double Door 6 Way SP & N ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each1552.01552.02.0FalseNoneNoneFalseNoneFalse3104.00
228068067007None5.18.11III - Double Door 4 Way TP & N ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each3053.03053.02.0FalseNoneNoneFalseNoneFalse6106.00
228068167007None5.17.1Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SP ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each523.0523.06.0FalseNoneNoneFalseNoneFalse3138.00
228068267007None5.17.46-32 A DP ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each1103.01103.06.0FalseNoneNoneFalseNoneFalse6618.00
228068367007None5.17.950-63 A TPN ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each2399.02399.06.0FalseNoneNoneFalseNoneFalse14394.00
228068467007None5.7.3Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 63 A ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each372.0372.03.0FalseNoneNoneFalseNoneFalse1116.00
228068567007None5.11.2Supplying of on load change over switches 4 poles, AC- 23A Duty, 415V, 50Hz, AC Supply. (Open Execution) 100 A ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each7200.07200.01.0FalseNoneNoneFalseNoneFalse7200.00
228068667007None5.14.7Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. FOUR Pole 100 A 25 kA ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each8265.08265.01.0FalseNoneNoneFalseNoneFalse8265.00
228068767007None6.3.2Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 56" Sweep (1400 mm) Regular model ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each2170.02170.020.0FalseNoneNoneFalseNoneFalse43400.00
228068867007None5.38Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each464.0464.03.0FalseNoneNoneFalseNoneFalse1392.00
228068967007None5.31Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each3942.03942.01.0FalseNoneNoneFalseNoneFalse3942.00
228069067007None5.21Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each8316.08316.01.0FalseNoneNoneFalseNoneFalse8316.00
228069167007None5.29Supplying, fixing and wiring 3 Phase Digital Ammeter / Voltmeter ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each1280.01280.02.0FalseNoneNoneFalseNoneFalse2560.00
228069267007None5.34Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each505.0505.03.0FalseNoneNoneFalseNoneFalse1515.00
228069367007None5.40.1Supplying . A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 100 A 4 x 30 x 6 mm Aluminium Strips ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m2214.02214.01.0FalseNoneNoneFalseNoneFalse2214.00
228069467007None5.42.2Fabricating supplying and mounting MS box made out .SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. 16 SWG ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sq CM0.380.3878000.0FalseNoneNoneFalseNoneFalse29640.00
228069567007None5.41.1Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40 x 40 x 6 mm ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.m275.0275.08.0FalseNoneNoneFalseNoneFalse2200.00
228069667007None11.3.1Supplying of .feet PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220 240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 2' - 9/10 W ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each496.0496.040.0FalseNoneNoneFalseNoneFalse19840.00
228069767007None11.3.2LED light fitting 1 x 4' - 20/22 W ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each740.0740.020.0FalseNoneNoneFalseNoneFalse14800.00
228069867007None11.5.2Supply of round/square recess/surface mounted rolling type LED Down light with . W GU 10 LED Lamp Rib Fabricated from diecast aluminium with white powder coated prewired to mains connector & has swivelling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70 lumen maintenance with CRI 80. Power Input: 220 240V @50/60Hz & Power factor 0.9 along with CE approved. 2years Warranty against any manufacturing defect working under standard electrical condition LED square or round down light 10-12W ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each835.0835.020.0FalseNoneNoneFalseNoneFalse16700.00
228069967007None11.8.4Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection Min 5KV along with Over voltage/ Overload, short circuit/ misswiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect LED Streetlight 90 W ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos7777.07777.06.0FalseNoneNoneFalseNoneFalse46662.00
228070067007None11.11.4Supplying & fixing of retrofit type LED bulb . W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5 of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 9W, 6500K ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each160.0160.020.0FalseNoneNoneFalseNoneFalse3200.00
228070167007None13.7.1Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA. On wall/ ceiling / Rafter / Girders ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each119.0119.080.0FalseNoneNoneFalseNoneFalse9520.00
228070267007None3.14.6Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board. 6A Lamp Holder ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos63.063.020.0FalseNoneNoneFalseNoneFalse1260.00
228070367007None13.10Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each162.0162.020.0FalseNoneNoneFalseNoneFalse3240.00
228070467007None13.1.1Supplying and Fixing of.mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket 1x40/2x40 W fluorescent tube street light fitting of all capacities to GI or GI or rail or RCC pole / wall using suitable clA, bolts, and nuts and wiring using suitable capacity wires. Using 25mm dia G.I.Pipe ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each837.0837.06.0FalseNoneNoneFalseNoneFalse5022.00
228070567007None6.1Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each1542.01542.06.0FalseNoneNoneFalseNoneFalse9252.00
228070667007None13.14Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each432.0432.06.0FalseNoneNoneFalseNoneFalse2592.00
228070767007None32.11.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 25 Sqmm, 3.5 Core, (12 GI Strips - 4 x 0.8 mm) (Page- 9.27, Sl.No: 218) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Km181452.0181452.00.15FalseNoneNoneFalseNoneFalse27217.80
228070867007None29.0UG Cable Work Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed In Hard Soil ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum389.0389.056.25FalseNoneNoneFalseNoneFalse21881.250
228070967007None54.0Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos2253.02253.05.0FalseNoneNoneFalseNoneFalse11265.00
228071067007None54.1Bentonite clay slurry for earthing in 50 Kg Bag ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Bag359.0359.03.0FalseNoneNoneFalseNoneFalse1077.00
228071167007None54.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos770.0770.03.0FalseNoneNoneFalseNoneFalse2310.00
228071267007None54.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos660.0660.03.0FalseNoneNoneFalseNoneFalse1980.00
228071367007None54.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Bag303.0303.03.0FalseNoneNoneFalseNoneFalse909.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17060751480000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17060751480000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17060751480000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17060751480000NoneNoneELIGIBILITYThe tenderer should be a PWD registered Contractor - also Contractors should have Registration of GST, Employers Provident Fund and tenderer should submit Registration Certificate along with technical bid.None
17060751480000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labor welfare fund and Contractors should follow strictly prevailing rules of labor act.None
17060751480000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17060751480000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Government orders. The item rates quoted shall include cost of royalty charges on construction materials & other taxes as per the rates provided in prevailing cost & conveyance of all materials, Curing, Watering, unloading with all leads & lifts labor, hire charges of machinery equipment etc., complete including all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17060751480000NoneNoneELIGIBILITYThe bidder shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. The tender fee is non-refundable and The employer is not responsible for any delay in accessing E- procurement portal.None
17060751480000NoneNoneELIGIBILITYOnly Original documents to be scanned and uploaded, Executive Engineer reserves the right verify the Original Documents before approval, 0riginal documents / Certificates for qualification shall be produced when called for during evaluation of tender.None
17060751480000NoneNoneELIGIBILITYThe Tenderer should maintain the Work during defective liability period as indicated in The Contract DataNone
17060751480000NoneNoneELIGIBILITYThe materials like bitumen, Steel, Cement etc., required for the work shall be procured by the tenderer themselves and should be got tested by the Quality Control Authority before use on the work.None
17060751480000NoneNoneELIGIBILITYTenderer shall obtain the Work done Certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the tender. The Original Certificate shall be produced at the time of opening of Technical Bids for physical verification, if sought.None
17060751480000NoneNoneELIGIBILITYAs per Government order FD 447 EXP-12 2022 dated 30/07/2022, 18% GST will be added to the Contract amount separately. And Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17060751480000NoneNoneELIGIBILITYEstimate rates are excluding GST as per Common SR 2021-22 and prevailing GST (18% of Amount Put to tender) amount is kept in form of Lump sum in sanctioned estimate according to guidelines in Common SR (GO:PWD 51 RDF 2019 Bangaluru Dt:18.03.2022). Therefore, amount put to Tender and ECV amount are excluding GST. KPPP-PORTAL format has No Options to add GST Separately at stage of Draft Tender Schedule Process for Over All amount put to Tender, tender has been inviting through an Option with INCLUSIVE. But the item wise rates do not include GST. Hence, GST will be paid separately for the quoted amount accordingly. Declaration Certificate must be attached mandatorily.None
17060751480000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tenders without assigning any reason.None
17060751480000NoneNoneELIGIBILITYIn case if the death of a contractor, after executing the agreement / commencement of the work, his legal heir, is an eligible registered contractor and is willing, can execute and complete the work, at the accepted tender rates, irrespective of the cost of the work.None
17060751480000NoneNoneELIGIBILITYPERFORMANCE SECURITY - The successful tenderer shall furnish Performance Security Deposit (Achievement Guarantee) at 5% of the amount put to tender with in 20 days after approve of tender as per rule 29.5 of the tender and clause 44 of the agreement in the form of FDR/Bank Guarantee duly pledged in the nature of EXECUTIVE ENGINEER, PWD Chikmagalur Division.None
17060751480000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17060751480000NoneNoneELIGIBILITYItem for which no rates or price has been entered in will not be paid for by the Employer when executed & shall be deemed covered by the other rates & prices in the bill of quantities.None
17060751480000NoneNoneELIGIBILITYThe tender validity period is 90Days from the date of opening of TenderNone
17060751480001NoneNoneELIGIBILITYContractors has to upload the EPF Registration with DECEMBER 2023 Challan Copy. Contractors has to submit their labour EPF details with every Running BillNone
17060751480000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Bid document.None
17060751480000NoneNoneELIGIBILITYThe rates are exclusive of GST. The contractors has to quote the rates without GST. GST will be paid separately as per prevailing Government order.None
17060751480000NoneNoneELIGIBILITYTHE CONTRACTOR SHALL SUBMIT THE DETAILS OF TECHNICAL STAFF EMPLOYED BY HIM.None
17060751480000NoneNoneELIGIBILITYTHE WORK COMPLETION PERIOD IS 6 MONTHS (INCLUDING MONSOON)None
17060751480000NoneNoneELIGIBILITYBIDDER SHOULD ESTABLISH A FIELD LABORATORYNone
17060751480000NoneNoneELIGIBILITYContractor must have 2graduate engineers and also engineers must worked with firm atleast 5years supervision, certificate should be enclosed.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneshould have in the last five years from 2018-2019 to 2022-2023, achieved in at least in TWO financial year a minimum financial contract turnover,in all classes of civil engineering construction works only of Rs. 339.12lakhs, Approved by CA with balance sheets & UDIN No.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneMandating Satisfactory completion as a prime contractor, for at least one Similar nature of work. i.e Building work of value not less than Rs.84.78Lakhs. from 2018-2019 to 2022-2023Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneexecuted in any one financial year(FROM 2018-19 TO 2022-23) the following minimum quantities of work(1) Earthwork Excavation/ Embankment:1244.00Cum (2) PCC/RCC:348.00Cum (3) TMT Steel:5757.00Kg (4)CC/Vitrified/granite/ceramic flooring:1058.00SqmPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneexisting commitments and on-going works to be completed during the next SIX months in the prescribed format from the Competent Authority not below the rank of Executive Engineer/District Level OfficerPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- existing commitments
NoneNoneNoneNoneKPWD Class 2 and above RegistrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneTenderers , will only be qualified, if their available tender capacity is more than the total tender value. i.e. AXNX1.5 - B, i.e Rs.169.56LakhsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- tender capacity
NoneNoneNoneNoneliquid assets and /or availability of credit facilities of not less than Rs 50.87 Lakhs in the prescribed format in KWFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
should have in the last five years from 2018-2019 to 2022-2023, achieved in at least in TWO financial year a minimum financial contract turnover,in all classes of civil engineering construction works only of Rs. 339.12lakhs, Approved by CA with balance sheets & UDIN No.TrueTechnical Bid
KPWD Class 2 and above RegistrationTrueTechnical Bid
Mandating Satisfactory completion as a prime contractor, for at least one Similar nature of work. i.e Building work of value not less than Rs.84.78Lakhs. from 2018-2019 to 2022-2023TrueTechnical Bid
existing commitments and on-going works to be completed during the next Six months in the prescribed format from the Competent Authority not below the rank of Executive Engineer/District Level OfficerTrueTechnical Bid
Name, address, and telephone, telex, and fax numbers of the Tenderers may provide references if contacted by the EmployerTrueTechnical Bid
Contractors has to upload the EPF Registration with Challan DECEMBER 2023TrueTechnical Bid
Contractor has to upload GST Declaration Certificate in the given prescribed format.TrueTechnical Bid
liquid assets and /or availability of credit facilities of not less than Rs 50.87 Lakhs in the prescribed format in KWTrueTechnical Bid
Executed in any one Financial Year, the minimum quantities of work as prescribed in Bid document from 2018-19 to 2022-23TrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1706179611000
version0
createdDateNone
modifiedDateNone
blockNumber1ST FLOOR PWD BUILDING, AZAD PARK CIRCLE
streetNone
cityChikkamagaluru
stateKarnataka
pin577101
tenderRecallDTONone