tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1706874459000 | 0 | None | None | Modernization of tanks | Improvements to Feeder Channel | 70068.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2408232 | 71915 | None | PWD Common SR Vol-3 2023-24 P.No.9 I.No-2.5.ii.a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness-By Mechanical Means using Dozer- In area of light jungle etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | 100 Sqm | 393.0 | 393.0 | 20.0 | False | None | None | False | None | False | 7860.0 | 0 | 2408233 | 71915 | None | Common SR Vol-4 2023-24 P.No.140 I.No-3.12 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour & all necessary works as directed and complete as per specification etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 54.0 | 54.0 | 1152.0 | False | None | None | False | None | False | 62208.0 | 0 |
| 1706874459000 | 0 | None | None | Modernization of tanks | Improvements of Tank Bund | 370866.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2408234 | 71916 | None | PWD Common SR Vol-3 2023-24 P.No.9 I.No-2.5.ii.a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness-By Mechanical Means using Dozer- In area of light jungle etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | 100 Sqm | 393.0 | 393.0 | 65.0 | False | None | None | False | None | False | 25545.0 | 0 | 2408235 | 71916 | None | Common SR Vol-4 2023-24 P.No.111 I.No-8.2.1 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Each | 25.5 | 25.5 | 220.0 | False | None | None | False | None | False | 5610.0 | 0 | 2408236 | 71916 | None | Common SR Vol-4 2023-24 P.No.139 I.No-3.7 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 454.0 | 454.0 | 728.44 | False | None | None | False | None | False | 330711.76 | 0 | 2408237 | 71916 | None | PWD Common SR Vol-3 2023-24 P.No.78 I.No-8.54 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | No | 9000.0 | 9000.0 | 1.0 | False | None | None | False | None | False | 9000.0 | 0 |
| 1706874459000 | 0 | None | None | Modernization of tanks | Improvements to Waste weir | 525368.44 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2408238 | 71917 | None | PWD Common SR Vol-1 - P.No.8 I.No-1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work - In all kinds of soils Depth upto 3 m etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 102.0 | 102.0 | 109.65 | False | None | None | False | None | False | 11184.3 | 0 | 2408239 | 71917 | None | Common SR Vol-4 P.No.39 I.No-2.13 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 6067.0 | 6067.0 | 21.93 | False | None | None | False | None | False | 133049.31 | 0 | 2408240 | 71917 | None | Common SR Vol-4 2023-24 P.No.130 I.No-1.12 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/ sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 6955.0 | 6955.0 | 40.8 | False | None | None | False | None | False | 283764.0 | 0 | 2408241 | 71917 | None | PWD Common SR Vol-1 2023-24 P.No.18 I.No-2.11(e) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. - Dam & Allied Works ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | t | 88842.0 | 88842.0 | 1.096 | False | None | None | False | None | False | 97370.832 | 0 |
| 1706874459000 | 0 | None | None | Modernization of tanks | Construction of Box Drain | 259332.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2408242 | 71918 | None | PWD Common SR Vol-1 2023-24 P.No.8 I.No-1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work - In all kinds of soils Depth upto 3 m etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 102.0 | 102.0 | 103.04 | False | None | None | False | None | False | 10510.08 | 0 | 2408243 | 71918 | None | Common SR Vol-4 2023-24 P.No.39 I.No-2.13 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 6067.0 | 6067.0 | 9.2 | False | None | None | False | None | False | 55816.4 | 0 | 2408244 | 71918 | None | Common SR Vol-4 2023-24 P.No.130 I.No-1.12 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/ sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 6955.0 | 6955.0 | 19.32 | False | None | None | False | None | False | 134370.6 | 0 | 2408245 | 71918 | None | PWD Common SR Vol-1 2023-24 P.No.18 I.No-2.11(e) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. - Dam & Allied Works ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | t | 88842.0 | 88842.0 | 0.66 | False | None | None | False | None | False | 58635.72 | 0 |
| 1706874459000 | 0 | None | None | Modernization of tanks | Construction of Head sluice | 769800.61 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2408246 | 71919 | None | PWD Common SR Vol-3 2023-24 P.No.10 I.No-2.8.ii.a | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work-By Mechanical Means-Cement Concrete Grade M-15 & M-20 ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 719.0 | 719.0 | 84.8 | False | None | None | False | None | False | 60971.2 | 0 | 2408247 | 71919 | None | Common SR Vol-4 2023-24 P.No.139 I.No-3.4 | Cutting open existing bund by manual means and forming temperary diversion channel including placing the excavated soil in specified dump area & all necessary works as directed and etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 394.0 | 394.0 | 285.14 | False | None | None | False | None | False | 112345.16 | 0 | 2408248 | 71919 | None | PWD Common SR Vol-1 -2023-24 P.No.8 I.No-1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work - In all kinds of soils Depth upto 3 m etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 102.0 | 102.0 | 54.73 | False | None | None | False | None | False | 5582.46 | 0 | 2408249 | 71919 | None | Common SR Vol-4 2023-24 P.No.39 I.No-2.13 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 6067.0 | 6067.0 | 5.47 | False | None | None | False | None | False | 33186.49 | 0 | 2408250 | 71919 | None | Common SR Vol-4 2023-24 P.No.130 I.No-1.12 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/ sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 6955.0 | 6955.0 | 61.16 | False | None | None | False | None | False | 425367.8 | 0 | 2408251 | 71919 | None | PWD Common SR Vol-1 2023-24 P.No.18 I.No-2.11(e) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. - Dam & Allied Works ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | t | 88842.0 | 88842.0 | 0.788 | False | None | None | False | None | False | 70007.496 | 0 | 2408252 | 71919 | None | Common SR Vol-4 2023-24 P.No.133 I.No-2.3 | Fabrication, supply, erection, testing and commissioning of plug and rod type hoist assembly consisting of truncated upright cone type cast iron plug fixed to alloy steel screw hoist with supporting structure for operating circular sluice openings including cost of all materials, labour, machinery, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat zinc chromate red oxide primer and three coats anti corrosive bitumineous black paint & all necessary works as directed and etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Kg | 238.0 | 238.0 | 150.0 | False | None | None | False | None | False | 35700.0 | 0 | 2408253 | 71919 | None | Common SR Vol-4 2023-24 P.No.188 I.No-16.32 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey-RCC NP3 Class pipe of 300 mm dia etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | m | 1332.0 | 1332.0 | 20.0 | False | None | None | False | None | False | 26640.0 | 0 |
| 1706874459000 | 0 | None | None | Modernization of tanks | Construction of Bridge | 2235558.92 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2408254 | 71920 | None | PWD Common SR Vol-3 2023-24 P.No.9 I.No-2.5.ii.a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness-By Mechanical Means using Dozer- In area of light jungle etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | 100 Sqm | 393.0 | 393.0 | 20.0 | False | None | None | False | None | False | 7860.0 | 0 | 2408255 | 71920 | None | PWD Common SR Vol-1 2023-24 P.No.8 I.No-1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. - In all kinds of soils Depth upto 3 m ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 102.0 | 102.0 | 178.58 | False | None | None | False | None | False | 18215.16 | 0 | 2408256 | 71920 | None | Common SR Vol-4 2023-24 P.No.39 I.No-2.13 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 6067.0 | 6067.0 | 69.53 | False | None | None | False | None | False | 421838.51 | 0 | 2408257 | 71920 | None | Common SR Vol-4 2023-24 P.No.130 I.No-1.12 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/ sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 6955.0 | 6955.0 | 118.63 | False | None | None | False | None | False | 825071.65 | 0 | 2408258 | 71920 | None | PWD Common SR Vol-1 2023-24 P.No.16 I.No-2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work.-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 7185.15 | 7185.15 | 29.44 | False | None | None | False | None | False | 211530.816 | 0 | 2408259 | 71920 | None | PWD Common SR Vol-1 2023-24 P.No.18 I.No-2.11(e) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. - Dam & Allied Works ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | t | 88842.0 | 88842.0 | 7.461 | False | None | None | False | None | False | 662850.162 | 0 | 2408260 | 71920 | None | Common SR Vol-4 2023-24 P.No.40 I.No-2.18 | Providing and forming expansion joint for spillway bridge consisting of 75 x 75 x 6 mm angles 2 numbers provided with 250 mm long 12 mm dia. anchors fixed to both flanges at 150 mm c / c and 140 x 6 mm plate welded on top of one of the angle including cost of all materials, labour, machinery, providing and fixing 38 mm thick joint filler board matching the thickness of wearing coat, painting and all other ancillary operations etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | m | 2525.0 | 2525.0 | 8.0 | False | None | None | False | None | False | 20200.0 | 0 | 2408261 | 71920 | None | PWD Common SR Vol-1 2023-24 P.No.7 I.No-1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Cum | 474.0 | 474.0 | 74.03 | False | None | None | False | None | False | 35090.22 | 0 | 2408262 | 71920 | None | Common SR Vol-4 2023-24 P.No.54 I.No-3.44.1 | Providing and constructing dry size stone pitching using 200 to 250 mm size stones with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete- 300 mm thick etc., complete with all leads and lifts as per standard specifications and directions of Engineer In-Charge of the work. ---- etc., complete with all leads and lifts as per standard specifcations and directions of Engineer In-charge of the work | Sqm | 388.0 | 388.0 | 84.8 | False | None | None | False | None | False | 32902.4 | 0 |
|
|
---|