tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1706786065000 | 0 | None | None | Buildings | Construction of Rooms to Pre metric Boys Hostel at Tekkalakote Town (ST Welfare department) in siruguppa taluk, Ballari District. | 1011980.5 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2367754 | 70440 | None | PWD SR 2023-24 Volume-I Iteam Code-2.5.2 | M 25 concrete Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 18.49 | False | None | None | False | None | False | 134181.93 | 0 | 2367755 | 70440 | None | PWD SR 2023-24 Addendum I P no 111 | Additionalities for Formwork, Centering & Scaffolding 70% for Column - , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of wor ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 5079.9 | 5079.9 | 1.89 | False | None | None | False | None | False | 9601.011 | 0 | 2367756 | 70440 | None | PWD SR 2023-24 Addendum I P no 111 | Additionalities for Formwork, Centering & Scaffolding 60% for Beams and Lintel- , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4354.2 | 4354.2 | 3.32 | False | None | None | False | None | False | 14455.944 | 0 | 2367757 | 70440 | None | PWD SR 2023-24 Addendum I P no 111 | Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas- , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3265.65 | 3265.65 | 0.32 | False | None | None | False | None | False | 1045.008 | 0 | 2367758 | 70440 | None | PWD SR 2023-24 Addendum I P no 111 | Additionalities for Formwork, Centering & Scaffolding 50% for Roof Slab- , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3628.5 | 3628.5 | 12.96 | False | None | None | False | None | False | 47025.36 | 0 | 2367759 | 70440 | None | PWD SR 2023-24 Page No.18 Item No. 2.11 V-1 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C.work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (Building Schedule rate 2023-24 Volume-1 Iteam Code-2.11) - , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries,incidental and equipment charges, and implementation of Environmental and Social Safeguards etc.,complete and as per the directions of engineer-in-charge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Tonne | 94869.15 | 94869.15 | 1.93 | False | None | None | False | None | False | 183097.4595 | 0 | 2367760 | 70440 | None | PWD SR 2023-24 Page No. 14 Item No. 6.8 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour,scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 8451.12 | 8451.12 | 18.44 | False | None | None | False | None | False | 155838.6528 | 0 | 2367761 | 70440 | None | PWD SR 2023-24 P.N. 41, Item No. 8.1.2 Vol-2 | INSIDE PLASTERING:Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:
6 fine sand) including rounding off corners wherever required smooth
rendering, providing and removing scaffolding, including cost of materials,
labour, curing complete as per specifications and as per directions of
Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 253.05 | 253.05 | 125.81 | False | None | None | False | None | False | 31836.2205 | 0 | 2367762 | 70440 | None | PWD SR 2023-24 P.N. 42, Item No. 8.7 Vol-2 | EXTERNAL PLASTERING:Providing 15 mm cement plaster with cement mortar 1:3 (1 cement:
3 coarse sand) finished with a floating coat of neat cement on the rough
side of single or half brick wall including rounding off corners wherever
required smooth rendering, providing and removing scaffolding, including
cost of materials, labour, curing complete as per specifications and as per
directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 384.3 | 384.3 | 105.59 | False | None | None | False | None | False | 40578.237 | 0 | 2367763 | 70440 | None | PWD SR 2023-24 P.N. 50 Item No. 8.51 Vol-2 | wall putty to inside plasatered walls : Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 106.05 | 106.05 | 125.81 | False | None | None | False | None | False | 13342.1505 | 0 | 2367764 | 70440 | None | PWD SR 2023-24 P.N. 48, Item No. 8.39 Vol-2 | Providing and applying painting in two coats with acrylic emulsion paint :Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 134.68 | 134.68 | 257.79 | False | None | None | False | None | False | 34719.1572 | 0 | 2367765 | 70440 | None | PWD SR 2023-24 Page No. 63 Item No. 9.23 Vol-2 | Flooring and Dadoing:Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge :
** Flamed finish granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 2589.3 | 2589.3 | 52.2 | False | None | None | False | None | False | 135161.46 | 0 | 2367766 | 70440 | None | PWD SR 2023-24 Page No. 99 Item No. 12.12 Vol-2 | Doors :Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 131716.22 | 131716.22 | 0.02 | False | None | None | False | None | False | 2634.3244 | 0 | 2367767 | 70440 | None | PWD SR 2023-24 Page No. 100 Item No. 12.15 Vol-2 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 7894.36 | 7894.36 | 2.05 | False | None | None | False | None | False | 16183.438 | 0 | 2367768 | 70440 | None | PWD SR 2023-24 Page No. 47 Item No. 8.34.1 Vol-2 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 56.21 | 56.21 | 5.67 | False | None | None | False | None | False | 318.7107 | 0 | 2367769 | 70440 | None | PWD SR 2023-24 Page No. 47 Item No. 8.41 Vol-2 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 177.1 | 177.1 | 5.67 | False | None | None | False | None | False | 1004.157 | 0 | 2367770 | 70440 | None | PWD SR 2023-24 Page No. 85 Item No. 11.34A Vol-2 | M.S. grill work for windows and ventilators :Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding14.3. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kgs | 178.16 | 178.16 | 207.9 | False | None | None | False | None | False | 37039.464 | 0 | 2367771 | 70440 | None | PWD SR 2023-24 Page No. 109 Item No. 12.86 Vol-2 | Providing & fixing UPVC Window:Providing & fixing of 2-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame.The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mmX 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 5716.1 | 5716.1 | 7.2 | False | None | None | False | None | False | 41155.92 | 0 | 2367772 | 70440 | None | PWD SR 2023-24 Page No. 109 Item No. 12.85 Vol-2 | Providing fixing upvc Ventilator:Providing fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(TitaniumDioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm .Maximum possible size 1000mm x1000mm.The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6065.0 | 6065.0 | 2.7 | False | None | None | False | None | False | 16375.5 | 0 | 2367773 | 70440 | None | PWD SR 2023-24 Page No.151 Item No.15.11 Vol-2 | Newly Constructed Roof-bathroom Toilet-balcony-utility with Cementatius waterproof coating-below 500 m:Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (5 Liquid :7 Powder) to the RCC surface like Roof bathroom-toilet-balcony utility area applied at 2.2kg per m 2 in 2 coats to achieve 1.2mm DFT having Elongation at break greater 120 percent as per ASTM D 412 Tensile strength greater 1N mm 2 as per ASTM D 412 Adhesion strength: 0.80N/mm2 as per ASTM D4541 crack bridging upto 2mm as per ASTM C 836. The finished costtoincludesurface preparation making coving of 50 mm X 50mm at all rightangles of wall Junction with Polymer Repair Mortar and lay 45 gsm glassfibre mesh over the angle fillet when the first coat in still wet treatmentof cracks completely as per specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 556.76 | 556.76 | 57.16 | False | None | None | False | None | False | 31824.4016 | 0 | 2367774 | 70440 | None | PWD SR 2023-24 Vol 2 Page No.125 Item No.13.48 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 308.61 | 308.61 | 5.0 | False | None | None | False | None | False | 1543.05 | 0 | 2367775 | 70440 | None | PWD SR 2023-2024 Vol 3 Sl No.8.54 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 9544.5 | 9544.5 | 1.0 | False | None | None | False | None | False | 9544.5 | 0 | 2367776 | 70440 | None | CSR 2023-2024 Vol-2 Sl No.9.24 P.No.63 | Staircase Granite Flooring :Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 3024.55 | 3024.55 | 14.92 | False | None | None | False | None | False | 45126.286 | 0 | 2367777 | 70440 | None | PWD SR 2023-2024 Vol-2 Sl No.10.2 P.No.69 | Granite Nosing:Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 347.84 | 347.84 | 24.0 | False | None | None | False | None | False | 8348.16 | 0 |
| 1706786065000 | 0 | None | None | Buildings | Electrical work | 44386.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2367778 | 70441 | None | SR 2023-24 Vol 6 item code 1.2.1 | Concealed Conduit System:Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 66.0 | 66.0 | 60.0 | False | None | None | False | None | False | 3960.0 | 0 | 2367779 | 70441 | None | SR 2023-24 Vol 6 item code 1.2.2 | Concealed Conduit System:Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessar ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 78.0 | 78.0 | 30.0 | False | None | None | False | None | False | 2340.0 | 0 | 2367780 | 70441 | None | SR 2023-24 Vol 6 item code 1.4.1 | Supplying and fixing sheet metal box made out of 18 SWG sheet :Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 106.0 | 106.0 | 2.0 | False | None | None | False | None | False | 212.0 | 0 | 2367781 | 70441 | None | SR 2023-24 Vol 6 item code 1.4.3 | Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 139.0 | 139.0 | 4.0 | False | None | None | False | None | False | 556.0 | 0 | 2367782 | 70441 | None | SR 2023-24 Vol 6 item code 1.4.5 | Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 179.0 | 179.0 | 4.0 | False | None | None | False | None | False | 716.0 | 0 | 2367783 | 70441 | None | SR 2023-24 Vol 6 item code 1.5.1 | Supplying and fixing PVC/metal conduit Deep junction box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 49.0 | 49.0 | 6.0 | False | None | None | False | None | False | 294.0 | 0 | 2367784 | 70441 | None | SR 2023-24 Vol 6 item code 1.5.2 | Supplying and fixing PVC/metal conduit Deep junction box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 56.0 | 56.0 | 4.0 | False | None | None | False | None | False | 224.0 | 0 | 2367785 | 70441 | None | SR 2023-24 Vol 6 item code 1.7.1 | Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 29.0 | 29.0 | 60.0 | False | None | None | False | None | False | 1740.0 | 0 | 2367786 | 70441 | None | SR 2023-24 Vol 6 item code 1.12 | Supplying And Fixing Metal Fan Box with Round Hook. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 117.0 | 117.0 | 2.0 | False | None | None | False | None | False | 234.0 | 0 | 2367787 | 70441 | None | SR 2023-24 Vol 6 item code 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 26.0 | 26.0 | 125.0 | False | None | None | False | None | False | 3250.0 | 0 | 2367788 | 70441 | None | SR 2023-24 Vol 6 item code 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 42.0 | 42.0 | 100.0 | False | None | None | False | None | False | 4200.0 | 0 | 2367789 | 70441 | None | SR 2023-24 Vol 6 item code 3.5.1 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 161.0 | 161.0 | 2.0 | False | None | None | False | None | False | 322.0 | 0 | 2367790 | 70441 | None | SR 2023-24 Vol 6 item code 3.5.2 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 175.0 | 175.0 | 4.0 | False | None | None | False | None | False | 700.0 | 0 | 2367791 | 70441 | None | SR 2023-24 Vol 6 item code 3.5.4 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 284.0 | 284.0 | 4.0 | False | None | None | False | None | False | 1136.0 | 0 | 2367792 | 70441 | None | SR 2023-24 Vol 6 item code 3.6.1 | Modular Switches/Sockets/Regulators etc:Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 102.0 | 102.0 | 20.0 | False | None | None | False | None | False | 2040.0 | 0 | 2367793 | 70441 | None | SR 2023-24 Vol 6 item code 3.6.8 | Modular Switches/Sockets/Regulators etc:Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 180.0 | 180.0 | 4.0 | False | None | None | False | None | False | 720.0 | 0 | 2367794 | 70441 | None | SR 2023-24 Vol 6 item code 3.6.11 | Modular Switches/Sockets/Regulators etc:Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 236.0 | 236.0 | 8.0 | False | None | None | False | None | False | 1888.0 | 0 | 2367795 | 70441 | None | SR 2023-24 Vol 6 item code 3.7 | Supplying and fixing 32A security and energy saving DPswitch with key tag suitable to operate on 230 V, 50Hz AC supply & completely wired on existing box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 646.0 | 646.0 | 1.0 | False | None | None | False | None | False | 646.0 | 0 | 2367796 | 70441 | None | SR 2023-24 Vol 6 item code 5.17.1 | Miniature Circuit Breakers:Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 415.0 | 415.0 | 1.0 | False | None | None | False | None | False | 415.0 | 0 | 2367797 | 70441 | None | SR 2023-24 Vol 6 item code 5.17.4 | Miniature Circuit Breakers:Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 739.0 | 739.0 | 1.0 | False | None | None | False | None | False | 739.0 | 0 | 2367798 | 70441 | None | SR 2023-24 Vol 6 item code 11.3.2 | Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours and 70 Percent lumen maintenance with CRI greater than 80. Power Input: 220-240V at 50/60Hz and Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 690.0 | 690.0 | 6.0 | False | None | None | False | None | False | 4140.0 | 0 | 2367799 | 70441 | None | SR 2023-24 Vol 6 item code 12.46 | Supplying and Fixing of 70-150 Watts lamp holder 2 Pin ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 118.0 | 118.0 | 6.0 | False | None | None | False | None | False | 708.0 | 0 | 2367800 | 70441 | None | SR 2023-24 Vol 6 item code 13.19 | Fixing all types and all capacities of 1'x4' / 2'x2' LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 490.0 | 490.0 | 6.0 | False | None | None | False | None | False | 2940.0 | 0 | 2367801 | 70441 | None | SR 2023-24 Vol 6 item code 6.3 | Ceiling Fans:Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-3741979 and with double ball bearing system. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2984.0 | 2984.0 | 2.0 | False | None | None | False | None | False | 5968.0 | 0 | 2367802 | 70441 | None | SR 2023-24 Vol 6 item code 13.11 | Fixing of Fan:Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 315.0 | 315.0 | 2.0 | False | None | None | False | None | False | 630.0 | 0 | 2367803 | 70441 | None | SR 2023-24 Vol 6 item code 2.2.1 | Point wiring:Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 269.0 | 269.0 | 8.0 | False | None | None | False | None | False | 2152.0 | 0 | 2367804 | 70441 | None | SR 2023-24 Vol 6 item code 2.2.2 | Point wiring:Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 379.0 | 379.0 | 4.0 | False | None | None | False | None | False | 1516.0 | 0 |
|
|
---|