createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1706786064775
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd27000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose12-02-2024 16:00:00
tenderQueryClose05-02-2024 12:00:00
technicalBidOpenNone
publishedDate02-02-2024 19:02:36
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1706786064811
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT8146
titleConstruction of Rooms to Pre metric Boys Hostel at Tekkalakote Town (ST Welfare department) in Siruguppa taluk, Ballari District under 2515 KKRDB (Micro Projects) for the year 2023-24 (WorkCode BLY232523267) (General Category)
descriptionConstruction of Rooms to Pre metric Boys Hostel at Tekkalakote Town (ST Welfare department) in Siruguppa taluk, Ballari District under 2515 KKRDB (Micro Projects) for the year 2023-24 (WorkCode BLY232523267) (General Category)
categoryWORKS
categoryTextWorks
ecv1056366.50
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount1310000.0
groupOverheadTotalNone
fileNumberAEE/PWD/SDN/SGP/2023-24/7
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17067860650000NoneNoneBuildingsConstruction of Rooms to Pre metric Boys Hostel at Tekkalakote Town (ST Welfare department) in siruguppa taluk, Ballari District.1011980.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236775470440NonePWD SR 2023-24 Volume-I Iteam Code-2.5.2M 25 concrete Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7257.07257.018.49FalseNoneNoneFalseNoneFalse134181.930
236775570440NonePWD SR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 70% for Column - , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of wor ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5079.95079.91.89FalseNoneNoneFalseNoneFalse9601.0110
236775670440NonePWD SR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 60% for Beams and Lintel- , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4354.24354.23.32FalseNoneNoneFalseNoneFalse14455.9440
236775770440NonePWD SR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas- , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3265.653265.650.32FalseNoneNoneFalseNoneFalse1045.0080
236775870440NonePWD SR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 50% for Roof Slab- , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3628.53628.512.96FalseNoneNoneFalseNoneFalse47025.360
236775970440NonePWD SR 2023-24 Page No.18 Item No. 2.11 V-1Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C.work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (Building Schedule rate 2023-24 Volume-1 Iteam Code-2.11) - , including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries,incidental and equipment charges, and implementation of Environmental and Social Safeguards etc.,complete and as per the directions of engineer-in-charge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne94869.1594869.151.93FalseNoneNoneFalseNoneFalse183097.45950
236776070440NonePWD SR 2023-24 Page No. 14 Item No. 6.8 Vol-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour,scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8451.128451.1218.44FalseNoneNoneFalseNoneFalse155838.65280
236776170440NonePWD SR 2023-24 P.N. 41, Item No. 8.1.2 Vol-2INSIDE PLASTERING:Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm253.05253.05125.81FalseNoneNoneFalseNoneFalse31836.22050
236776270440NonePWD SR 2023-24 P.N. 42, Item No. 8.7 Vol-2EXTERNAL PLASTERING:Providing 15 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm384.3384.3105.59FalseNoneNoneFalseNoneFalse40578.2370
236776370440NonePWD SR 2023-24 P.N. 50 Item No. 8.51 Vol-2wall putty to inside plasatered walls : Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm106.05106.05125.81FalseNoneNoneFalseNoneFalse13342.15050
236776470440NonePWD SR 2023-24 P.N. 48, Item No. 8.39 Vol-2Providing and applying painting in two coats with acrylic emulsion paint :Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm134.68134.68257.79FalseNoneNoneFalseNoneFalse34719.15720
236776570440NonePWD SR 2023-24 Page No. 63 Item No. 9.23 Vol-2Flooring and Dadoing:Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : ** Flamed finish granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2589.32589.352.2FalseNoneNoneFalseNoneFalse135161.460
236776670440NonePWD SR 2023-24 Page No. 99 Item No. 12.12 Vol-2Doors :Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum131716.22131716.220.02FalseNoneNoneFalseNoneFalse2634.32440
236776770440NonePWD SR 2023-24 Page No. 100 Item No. 12.15 Vol-2Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm7894.367894.362.05FalseNoneNoneFalseNoneFalse16183.4380
236776870440NonePWD SR 2023-24 Page No. 47 Item No. 8.34.1 Vol-2Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm56.2156.215.67FalseNoneNoneFalseNoneFalse318.71070
236776970440NonePWD SR 2023-24 Page No. 47 Item No. 8.41 Vol-2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm177.1177.15.67FalseNoneNoneFalseNoneFalse1004.1570
236777070440NonePWD SR 2023-24 Page No. 85 Item No. 11.34A Vol-2M.S. grill work for windows and ventilators :Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding14.3. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs178.16178.16207.9FalseNoneNoneFalseNoneFalse37039.4640
236777170440NonePWD SR 2023-24 Page No. 109 Item No. 12.86 Vol-2Providing & fixing UPVC Window:Providing & fixing of 2-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame.The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mmX 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm5716.15716.17.2FalseNoneNoneFalseNoneFalse41155.920
236777270440NonePWD SR 2023-24 Page No. 109 Item No. 12.85 Vol-2Providing fixing upvc Ventilator:Providing fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(TitaniumDioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm .Maximum possible size 1000mm x1000mm.The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm6065.06065.02.7FalseNoneNoneFalseNoneFalse16375.50
236777370440NonePWD SR 2023-24 Page No.151 Item No.15.11 Vol-2Newly Constructed Roof-bathroom Toilet-balcony-utility with Cementatius waterproof coating-below 500 m:Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (5 Liquid :7 Powder) to the RCC surface like Roof bathroom-toilet-balcony utility area applied at 2.2kg per m 2 in 2 coats to achieve 1.2mm DFT having Elongation at break greater 120 percent as per ASTM D 412 Tensile strength greater 1N mm 2 as per ASTM D 412 Adhesion strength: 0.80N/mm2 as per ASTM D4541 crack bridging upto 2mm as per ASTM C 836. The finished costtoincludesurface preparation making coving of 50 mm X 50mm at all rightangles of wall Junction with Polymer Repair Mortar and lay 45 gsm glassfibre mesh over the angle fillet when the first coat in still wet treatmentof cracks completely as per specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm556.76556.7657.16FalseNoneNoneFalseNoneFalse31824.40160
236777470440NonePWD SR 2023-24 Vol 2 Page No.125 Item No.13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m308.61308.615.0FalseNoneNoneFalseNoneFalse1543.050
236777570440NonePWD SR 2023-2024 Vol 3 Sl No.8.54 Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos9544.59544.51.0FalseNoneNoneFalseNoneFalse9544.50
236777670440NoneCSR 2023-2024 Vol-2 Sl No.9.24 P.No.63 Staircase Granite Flooring :Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm3024.553024.5514.92FalseNoneNoneFalseNoneFalse45126.2860
236777770440NonePWD SR 2023-2024 Vol-2 Sl No.10.2 P.No.69Granite Nosing:Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m347.84347.8424.0FalseNoneNoneFalseNoneFalse8348.160
17067860650000NoneNoneBuildingsElectrical work44386.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
236777870441NoneSR 2023-24 Vol 6 item code 1.2.1Concealed Conduit System:Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m66.066.060.0FalseNoneNoneFalseNoneFalse3960.00
236777970441NoneSR 2023-24 Vol 6 item code 1.2.2Concealed Conduit System:Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessar ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m78.078.030.0FalseNoneNoneFalseNoneFalse2340.00
236778070441NoneSR 2023-24 Vol 6 item code 1.4.1Supplying and fixing sheet metal box made out of 18 SWG sheet :Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each106.0106.02.0FalseNoneNoneFalseNoneFalse212.00
236778170441NoneSR 2023-24 Vol 6 item code 1.4.3Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each139.0139.04.0FalseNoneNoneFalseNoneFalse556.00
236778270441NoneSR 2023-24 Vol 6 item code 1.4.5Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each179.0179.04.0FalseNoneNoneFalseNoneFalse716.00
236778370441NoneSR 2023-24 Vol 6 item code 1.5.1Supplying and fixing PVC/metal conduit Deep junction box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each49.049.06.0FalseNoneNoneFalseNoneFalse294.00
236778470441NoneSR 2023-24 Vol 6 item code 1.5.2Supplying and fixing PVC/metal conduit Deep junction box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each56.056.04.0FalseNoneNoneFalseNoneFalse224.00
236778570441NoneSR 2023-24 Vol 6 item code 1.7.1Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m29.029.060.0FalseNoneNoneFalseNoneFalse1740.00
236778670441NoneSR 2023-24 Vol 6 item code 1.12Supplying And Fixing Metal Fan Box with Round Hook. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos117.0117.02.0FalseNoneNoneFalseNoneFalse234.00
236778770441NoneSR 2023-24 Vol 6 item code 2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m26.026.0125.0FalseNoneNoneFalseNoneFalse3250.00
236778870441NoneSR 2023-24 Vol 6 item code 2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m42.042.0100.0FalseNoneNoneFalseNoneFalse4200.00
236778970441NoneSR 2023-24 Vol 6 item code 3.5.1Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each161.0161.02.0FalseNoneNoneFalseNoneFalse322.00
236779070441NoneSR 2023-24 Vol 6 item code 3.5.2Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each175.0175.04.0FalseNoneNoneFalseNoneFalse700.00
236779170441NoneSR 2023-24 Vol 6 item code 3.5.4Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each284.0284.04.0FalseNoneNoneFalseNoneFalse1136.00
236779270441NoneSR 2023-24 Vol 6 item code 3.6.1Modular Switches/Sockets/Regulators etc:Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each102.0102.020.0FalseNoneNoneFalseNoneFalse2040.00
236779370441NoneSR 2023-24 Vol 6 item code 3.6.8Modular Switches/Sockets/Regulators etc:Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each180.0180.04.0FalseNoneNoneFalseNoneFalse720.00
236779470441NoneSR 2023-24 Vol 6 item code 3.6.11Modular Switches/Sockets/Regulators etc:Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each236.0236.08.0FalseNoneNoneFalseNoneFalse1888.00
236779570441NoneSR 2023-24 Vol 6 item code 3.7Supplying and fixing 32A security and energy saving DPswitch with key tag suitable to operate on 230 V, 50Hz AC supply & completely wired on existing box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each646.0646.01.0FalseNoneNoneFalseNoneFalse646.00
236779670441NoneSR 2023-24 Vol 6 item code 5.17.1Miniature Circuit Breakers:Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each415.0415.01.0FalseNoneNoneFalseNoneFalse415.00
236779770441NoneSR 2023-24 Vol 6 item code 5.17.4Miniature Circuit Breakers:Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each739.0739.01.0FalseNoneNoneFalseNoneFalse739.00
236779870441NoneSR 2023-24 Vol 6 item code 11.3.2Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours and 70 Percent lumen maintenance with CRI greater than 80. Power Input: 220-240V at 50/60Hz and Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each690.0690.06.0FalseNoneNoneFalseNoneFalse4140.00
236779970441NoneSR 2023-24 Vol 6 item code 12.46Supplying and Fixing of 70-150 Watts lamp holder 2 Pin ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos118.0118.06.0FalseNoneNoneFalseNoneFalse708.00
236780070441NoneSR 2023-24 Vol 6 item code 13.19Fixing all types and all capacities of 1'x4' / 2'x2' LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each490.0490.06.0FalseNoneNoneFalseNoneFalse2940.00
236780170441NoneSR 2023-24 Vol 6 item code 6.3Ceiling Fans:Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-3741979 and with double ball bearing system. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2984.02984.02.0FalseNoneNoneFalseNoneFalse5968.00
236780270441NoneSR 2023-24 Vol 6 item code 13.11Fixing of Fan:Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each315.0315.02.0FalseNoneNoneFalseNoneFalse630.00
236780370441NoneSR 2023-24 Vol 6 item code 2.2.1Point wiring:Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point269.0269.08.0FalseNoneNoneFalseNoneFalse2152.00
236780470441NoneSR 2023-24 Vol 6 item code 2.2.2Point wiring:Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point379.0379.04.0FalseNoneNoneFalseNoneFalse1516.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17068538930000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17068538930000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17068538930000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17068538930000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17068538930000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17068538930000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17068538930000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17068538930000NoneNoneELIGIBILITYBanker DetailsNone
17068540200000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17068540270000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP-Procurement on or before the last date and time of bid submission.None
17068540530000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17068540600000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17068540680000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17068540750000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17068540820000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17068540910000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17068540980000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17068541050000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17068541110000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17068541180000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17068541260000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17068541330000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building during the defect liability period.None
17068541400000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing e-procurement portal.None
17068541500000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24. And Value at 2023-24 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24) in the Technical Qualification Criteria mentioned in the next section.None
17068541580000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17068541640000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17068541710000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the KP procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17068541800000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17068541990000NoneNoneELIGIBILITYThe time stipulated for completion of work is 3 (Three) calendar months including rainy season.None
17068542080000NoneNoneELIGIBILITYThe defect liability period for the work is 12 (Twelve) calendar months.None
17068542160000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17068542430000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 (a) achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.11.00 Lakhs.None
17068542950000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21,2021-22 and 2022-23, (b) satisfactorily completed as prime contractor, at least one similar work such as CONSTRUCTION OF BUILDING WORKS of value not less than Rs.5.50 Lakhs.None
17068543200000NoneNoneELIGIBILITYInformation on Existing commitments and on going works which are yet to be completed.None
17068543270000NoneNoneELIGIBILITYInformation of the works for which Tender acceptance letters are received.None
17068543350000NoneNoneELIGIBILITYInformation of the works for which Tenderer has submitted Tender.None
17068543430000NoneNoneELIGIBILITYInformation on litigation in which the Tenderer is involved.None
17068543510000NoneNoneELIGIBILITYAt the time of opening of Financial Bids, the Bidders shall furnish all the documents uploaded in original to this office for verification.None
17068543590000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17068544010000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17068544110000NoneNoneELIGIBILITYThe tenderers shall note that as per the Government Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17068544180000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17068544270000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17068544330000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17068544410000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
17068781800000NoneNoneELIGIBILITYThe tenderer shall upload Physical and financial schedule format before last date of tender receipt in the kpp portal.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Contractor Registration CertificateTrueTechnical Bid
Annual Turnover Certificate with UDIN for the last five years duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Workdone certificateTrueTechnical Bid
Existing CommitmentsTrueTechnical Bid
Physical and financial schedule formatTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone