createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1706792145369
version8
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd1000000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose16-02-2024 17:00:00
tenderQueryClose08-02-2024 11:00:00
technicalBidOpen17-02-2024 17:00:00
publishedDate02-02-2024 19:00:59
publishedByPostKREIS_EE3_EEOFF_BNG
publishedByUserKPE16513 - T V RAVINDRA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate08-02-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonT V RAVINDRA
splitEmdRequiredYnTrue
emdBankGuarantee900000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022283366
mobileNumber9449712847
tenderSupplierListNone
tenderSchedule
createdTs1706792145390
version9
createdDateNone
modifiedDateNone
tenderNumberKREIS/2023-24/BD/WORK_INDENT150
titleCONSTRUCTION OF (BC) MORARJI DESAI RESIDENTIAL PU COLLEGE AT NAVANAGRA BAGALKOT DISTRICT (Phase-1)
descriptionCONSTRUCTION OF (BC) MORARJI DESAI RESIDENTIAL PU COLLEGE AT NAVANAGRA BAGALKOT DISTRICT (Phase-1
categoryWORKS
categoryTextWorks
ecv66627679.66
deptNameKarnataka Residential Educational Institutions Society
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2893
locationNameKREIS Executive Engineer Section Bengaluru
provisionalAmount88000000.0
groupOverheadTotalNone
fileNumberNAVANAGARA
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17067921450000NoneNoneBuildingsUp to Plinth level14897148.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238523570947None2.5.AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer. In area of light jungle. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3.933.939900.0FalseNoneNoneFalseNoneFalse38907.00
238523670947None1.13Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In Ordinary/Soft rock upto 300 mm depth ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum326.0326.0780.0FalseNoneNoneFalseNoneFalse254280.00
238523770947None4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface ofconsolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm118.0118.01716.0FalseNoneNoneFalseNoneFalse202488.00
238523870947None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum102.0102.01652.0FalseNoneNoneFalseNoneFalse168504.00
238523970947None1.15.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum363.0363.0413.0FalseNoneNoneFalseNoneFalse149919.00
238524070947None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6201.06201.0358.0FalseNoneNoneFalseNoneFalse2219958.00
238524170947None5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum5989.05989.013.0FalseNoneNoneFalseNoneFalse77857.00
238524270947None1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum266.0266.01159.4FalseNoneNoneFalseNoneFalse308400.40
238524370947None1.8Construction of Embankment by excavating the available approved Gravel Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials, usage & all other appurtenances required to complete the work. Deduct 5%/cub per if rollers are not used and tamping is done manually. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum450.3450.31284.0FalseNoneNoneFalseNoneFalse578185.20
238524470947None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (Footings) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6842.886842.88491.0FalseNoneNoneFalseNoneFalse3359854.080
238524570947None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery,curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (COLUMN) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10771.210771.247.0FalseNoneNoneFalseNoneFalse506246.40
238524670947None2.3.2Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PLINGTH BEAM). (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9720.09720.0169.0FalseNoneNoneFalseNoneFalse1642680.00
238524770947None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates. FLAGGING CONCRETE ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6217.06217.018.0FalseNoneNoneFalseNoneFalse111906.00
238524870947None2.11.aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.MT89457.089457.059.0FalseNoneNoneFalseNoneFalse5277963.00
17067921450000NoneNoneBuildingsGROUND FLOOR21720321.62
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238524970948None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. COLULMNS (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum11633.111633.168.21FalseNoneNoneFalseNoneFalse793493.7510
238525070948None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.LINTEL & ROOF BEAM (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10948.810948.845.39FalseNoneNoneFalseNoneFalse496966.0320
238525170948None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ROOF SLAB (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10264.510264.5260.47FalseNoneNoneFalseNoneFalse2673594.3150
238525270948None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. STAIRCASE (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10264.510264.520.0FalseNoneNoneFalseNoneFalse205290.00
238525370948None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. CHEJJA (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9613.59613.59.44FalseNoneNoneFalseNoneFalse90751.440
238525470948None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. WALL SHELVES (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9613.59613.53.1FalseNoneNoneFalseNoneFalse29801.850
238525570948None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. LOFT (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9613.59613.53.0FalseNoneNoneFalseNoneFalse28840.50
238525670948None2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (CILL CONCRETE) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6217.06217.04.0FalseNoneNoneFalseNoneFalse24868.00
238525770948None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1310.01310.02110.48FalseNoneNoneFalseNoneFalse2764728.80
238525870948None2.11.aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.MT89457.089457.049.97FalseNoneNoneFalseNoneFalse4470166.290
238525970948None6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1033.01033.0173.46FalseNoneNoneFalseNoneFalse179184.180
238526070948None12.15Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm9334.09334.013.77FalseNoneNoneFalseNoneFalse128529.180
238526170948None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum98815.098815.03.0FalseNoneNoneFalseNoneFalse296445.00
238526270948None12.57.2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 35 mm thick one side teak and one side commercial. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3493.03493.069.84FalseNoneNoneFalseNoneFalse243951.120
238526370948None12.93.1Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately). Size 62 x 100mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr702.0702.0143.1FalseNoneNoneFalseNoneFalse100456.20
238526470948None12.94.1Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately). 30 mm thickness ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3485.03485.045.68FalseNoneNoneFalseNoneFalse159194.80
238526570948None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5719.05719.016.56FalseNoneNoneFalseNoneFalse94706.640
238526670948None12.9Providing & fixing of 3 track x 2 panel sliding windows made out of multi chambered UPVC(Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm6734.06734.054.0FalseNoneNoneFalseNoneFalse363636.00
238526770948None12.86Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5390.05390.0152.0FalseNoneNoneFalseNoneFalse819280.00
238526870948None11.34.AProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs168.0168.04787.0FalseNoneNoneFalseNoneFalse804216.00
238526970948None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Internal Plastering) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm295.0295.03420.27FalseNoneNoneFalseNoneFalse1008979.650
238527070948None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm371.0371.01841.21FalseNoneNoneFalseNoneFalse683088.910
238527170948None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm100.0100.04945.77FalseNoneNoneFalseNoneFalse494577.00
238527270948None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm110.0110.04945.77FalseNoneNoneFalseNoneFalse544034.70
238527370948None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre as per specifications and as per directions of Engineer in charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.053.04945.77FalseNoneNoneFalseNoneFalse262125.810
238527470948None8.3Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm174.0174.01842.0FalseNoneNoneFalseNoneFalse320508.00
238527570948None8.41Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm167.0167.0394.8FalseNoneNoneFalseNoneFalse65931.60
238527670948None8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm115.0115.0178.0FalseNoneNoneFalseNoneFalse20470.00
238527770948None8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm115.0115.0456.0FalseNoneNoneFalseNoneFalse52440.00
238527870948None9.21.2Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). Size of Tile 600x600 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1238.01238.01648.9FalseNoneNoneFalseNoneFalse2041338.20
238527970948None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm889.0889.0113.55FalseNoneNoneFalseNoneFalse100945.950
238528070948None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1449.01449.0492.3FalseNoneNoneFalseNoneFalse713342.70
238528170948None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment. Plaster mesh 150mm wide ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.038.0988.0FalseNoneNoneFalseNoneFalse37544.00
238528270948None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs565.0565.0693.0FalseNoneNoneFalseNoneFalse391545.00
238528370948None9.25Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm800.0800.0147.0FalseNoneNoneFalseNoneFalse117600.00
238528470948None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Handles 200mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each86.186.1100.0FalseNoneNoneFalseNoneFalse8610.00
238528570948None22.15.3Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Aldrop 16mm dia, 200mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each353.85353.85100.0FalseNoneNoneFalseNoneFalse35385.00
238528670948None22.15.5Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 150x10mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each193.2193.2100.0FalseNoneNoneFalseNoneFalse19320.00
238528770948None22.15.8Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each114.45114.45200.0FalseNoneNoneFalseNoneFalse22890.00
238528870948None22.15.10Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Door stopper 75mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each115.45115.45100.0FalseNoneNoneFalseNoneFalse11545.00
17067921450000NoneNoneBuildingsFIRST FLOOR13861466.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238528970949None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. COLULMNS (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum11749.4311749.4349.73FalseNoneNoneFalseNoneFalse584299.15390
238529070949None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.LINTEL & ROOF BEAM (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum11058.2911058.2958.13FalseNoneNoneFalseNoneFalse642818.39770
238529170949None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ROOF SLAB (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10367.1510367.15148.35FalseNoneNoneFalseNoneFalse1537966.70250
238529270949None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. STAIRCASE (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10367.1510367.1515.56FalseNoneNoneFalseNoneFalse161312.8540
238529370949None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. CHEJJA (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9709.649709.644.9FalseNoneNoneFalseNoneFalse47577.2360
238529470949None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. WALL SHELVES (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9709.649709.643.15FalseNoneNoneFalseNoneFalse30585.3660
238529570949None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. LOFT (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9709.649709.641.01FalseNoneNoneFalseNoneFalse9806.73640
238529670949None2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (CILL CONCRETE) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6279.176279.172.35FalseNoneNoneFalseNoneFalse14756.04950
238529770949None2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.MT90351.5790351.5722.07FalseNoneNoneFalseNoneFalse1994059.14990
238529870949None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1323.11323.11730.57FalseNoneNoneFalseNoneFalse2289717.1670
238529970949None6.15Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1043.331043.33167.38FalseNoneNoneFalseNoneFalse174632.57540
238530070949None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr99803.1599803.150.95FalseNoneNoneFalseNoneFalse94812.99250
238530170949None12.57.2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 35 mm thick one side teak and one side commercial. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3527.933527.9337.44FalseNoneNoneFalseNoneFalse132085.69920
238530270949None12.93.1Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately). Size 62 x 100mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr709.02709.02127.2FalseNoneNoneFalseNoneFalse90187.3440
238530370949None12.94.1Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately). 30 mm thickness ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3519.853519.8537.8FalseNoneNoneFalseNoneFalse133050.330
238530470949None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5776.195776.1911.48FalseNoneNoneFalseNoneFalse66310.66120
238530570949None12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm6801.346801.3458.74FalseNoneNoneFalseNoneFalse399510.71160
238530670949None12.86Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5443.95443.9113.52FalseNoneNoneFalseNoneFalse617991.5280
238530770949None11.34AProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs169.68169.683049.2FalseNoneNoneFalseNoneFalse517388.2560
238530870949None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm297.95297.951956.92FalseNoneNoneFalseNoneFalse583064.3140
238530970949None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm374.71374.711331.02FalseNoneNoneFalseNoneFalse498746.50420
238531070949None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm101.0101.02810.76FalseNoneNoneFalseNoneFalse283886.760
238531170949None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm111.0111.02810.76FalseNoneNoneFalseNoneFalse311994.360
238531270949None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre as per specifications and as per directions of Engineer in charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.5353.532810.76FalseNoneNoneFalseNoneFalse150459.98280
238531370949None8.30Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm175.74175.741331.02FalseNoneNoneFalseNoneFalse233913.45480
238531470949None8.41Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm168.67168.67330.0FalseNoneNoneFalseNoneFalse55661.10
238531570949None8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm116.15116.1589.86FalseNoneNoneFalseNoneFalse10437.2390
238531670949None8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm116.15116.15348.48FalseNoneNoneFalseNoneFalse40475.9520
238531770949None9.21.2Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). Size of Tile 600x600 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1339.291339.29834.81FalseNoneNoneFalseNoneFalse1118052.68490
238531870949None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm897.89897.89146.76FalseNoneNoneFalseNoneFalse131774.33640
238531970949None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1463.491463.49218.82FalseNoneNoneFalseNoneFalse320240.88180
238532070949None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment. Plaster mesh 150mm wide ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.3838.381500.0FalseNoneNoneFalseNoneFalse57570.00
238532170949None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs570.65570.65216.0FalseNoneNoneFalseNoneFalse123260.40
238532270949None8.83Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixing chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work HOM of machineries, curing, complete as per specifications. Specification. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1250.381250.3829.4FalseNoneNoneFalseNoneFalse36761.1720
238532370949None7.18Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs,laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum2037.172037.1744.03FalseNoneNoneFalseNoneFalse89696.59510
238532470949None15.11Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (5 Liquid :7 Powder) to the RCC surface like Roof,bathroom, toilet, balcony & utility area applied @ 2.2kg/m2 in 2 coats to achieve 1.2mm DFT, having Elongation at break 120% as per ASTM D 412, Tensile strength 1N/mm2 as per ASTM D 412, Adhesion strength: 0.80N/mm2 as per ASTM D 4541, crack bridging upto 2mm as per ASTM C 836. The finished cost to include surface preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per specification. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm621.15621.15243.68FalseNoneNoneFalseNoneFalse151361.8320
238532570949None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Handles 200mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each454.5454.5100.0FalseNoneNoneFalseNoneFalse45450.00
238532670949None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Aldrop 16mm dia, 200mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each303.0303.0100.0FalseNoneNoneFalseNoneFalse30300.00
238532770949None22.15.3Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 150x10mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each121.2121.2200.0FalseNoneNoneFalseNoneFalse24240.00
238532870949None22.15.8Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each50.550.5300.0FalseNoneNoneFalseNoneFalse15150.00
238532970949None22.15.10Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Door stopper 75mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each101.0101.0100.0FalseNoneNoneFalseNoneFalse10100.00
17067921450000NoneNoneBuildingsTERRACE FLOOR4297476.41
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238533070950None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. COLULMNS (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum11865.7611865.766.48FalseNoneNoneFalseNoneFalse76890.12480
238533170950None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. COLULMNS (The cost of Formwork is included) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum11496.4211496.4210.53FalseNoneNoneFalseNoneFalse121057.30260
238533270950None2.5.2Providing and laying in position Reinforced cement concrete for all Superstructures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (LINTEL& ROOF BEAM) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum11167.7811167.789.46FalseNoneNoneFalseNoneFalse105647.19880
238533370950None2.5.2Providing and laying in position Reinforced cement concrete for all Superstructures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (ROOF SLAB) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10469.7910469.7915.15FalseNoneNoneFalseNoneFalse158617.31850
238533470950None2.5.1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CHEJJA) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9805.779805.770.18FalseNoneNoneFalseNoneFalse1765.03860
238533570950None2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (CILL CONCRETE) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6341.316341.313.97FalseNoneNoneFalseNoneFalse25175.00070
238533670950None2.11.aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.MT91246.1491246.144.32FalseNoneNoneFalseNoneFalse394183.32480
238533770950None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1336.21336.2463.86FalseNoneNoneFalseNoneFalse619809.7320
238533870950None12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm6868.686868.685.94FalseNoneNoneFalseNoneFalse40799.95920
238533970950None11.34.AProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs171.36171.36190.26FalseNoneNoneFalseNoneFalse32602.95360
238534070950None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm300.9300.9206.4FalseNoneNoneFalseNoneFalse62105.760
238534170950None8.6.2Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm378.42378.42839.43FalseNoneNoneFalseNoneFalse317657.10060
238534270950None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm102.0102.0278.4FalseNoneNoneFalseNoneFalse28396.80
238534370950None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm112.2112.2278.4FalseNoneNoneFalseNoneFalse31236.480
238534470950None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre as per specifications and as per directions of Engineer in charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm54.0654.06278.4FalseNoneNoneFalseNoneFalse15050.3040
238534570950None8.30Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm177.48177.48839.43FalseNoneNoneFalseNoneFalse148982.03640
238534670950None8.4Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm117.3117.321.74FalseNoneNoneFalseNoneFalse2550.1020
238534770950None15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas /Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm833.34833.341838.45FalseNoneNoneFalseNoneFalse1532053.9230
238534870950None2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates. FLAGGING CONCRETE ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6341.346341.3491.92FalseNoneNoneFalseNoneFalse582895.97280
17067921450000NoneNoneBuildingsWATER SUPPLY AND SANITATION WORKS2355742.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238534970951None9.1.2Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE Grade PE80-PN6.0, 75mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m245.0245.0250.0FalseNoneNoneFalseNoneFalse61250.00
238535070951None13.33.6Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes conforming to IS 15778 having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings, this includes jointing of pipes and fittings with one step solvent cement, trenching, refilling & testing of joints complete. (external work). - 50mm nominal OD pipes ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m721.0721.0225.0FalseNoneNoneFalseNoneFalse162225.00
238535170951None13.32.2Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete as per direction of engineer incharge . Concealed work including cutting chases and good the walls etc. 20 mm nominal OD pipes ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m379.0379.0230.0FalseNoneNoneFalseNoneFalse87170.00
238535270951None13.32.4Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete as per direction of engineer incharge . Concealed work including cutting chases and good the walls etc. 32 mm nominal OD pipes ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m556.0556.0175.0FalseNoneNoneFalseNoneFalse97300.00
238535370951NoneN180FSupply and delivery at site GM (copper alloy) gate valves confirming to Class-I as per IS 778 with latest amendments, 1 No. screwed in bonnet inside screw, rising spring spindle integral seat screwed females ends confirming to IS 554/ 1990 body hydraulically tested 1.5HP seat standard tested 1 HP with IS mark For 50 mm dia GM (Copper alloy) Gate valves ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1688.01688.06.0FalseNoneNoneFalseNoneFalse10128.00
238535470951NoneN190FProviding GM (copper alloy) reflex valves/ globe valves confirming to Class-I and as per IS 778/1990 with latest amendments, 1 No. and with ISI mark screwed female ends confirming to IS 554/ 1990 horizontal body hydraulically tested for 1.50 HP and seat hydraulically tested 1 HP. For 50 mm dia GM (Copper alloy) Globe valves ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos794.0794.03.0FalseNoneNoneFalseNoneFalse2382.00
238535570951None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum194.0194.0270.0FalseNoneNoneFalseNoneFalse52380.00
238535670951None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum122.0122.0270.0FalseNoneNoneFalseNoneFalse32940.00
238535770951NoneT130BConstructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4977.04977.025.0FalseNoneNoneFalseNoneFalse124425.00
238535870951NoneT130CConstructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos3864.03864.06.0FalseNoneNoneFalseNoneFalse23184.00
238535970951None13.34Providing and placing on terrace (at all floor levels), polyethylene water storage tanks IS:12701 marked, with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes, But without Fittings and the base support ofr tank. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos9.09.018000.0FalseNoneNoneFalseNoneFalse162000.00
238536070951None13.17.4Providing and fixing PTMT bib cock of approved quality and colour. 15 mm nominal bore, 90 mm long, weighing not less than 93 g ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each242.0242.070.0FalseNoneNoneFalseNoneFalse16940.00
238536170951None13.8.2.2Providing and fixing unplasticised PVC connection pipe with brass unions : 45 cm length, 20 mm nominal bore ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos110.0110.0100.0FalseNoneNoneFalseNoneFalse11000.00
238536270951None14.2.1Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fix tures complete, including cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4828.04828.07.0FalseNoneNoneFalseNoneFalse33796.00
238536370951None14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4884.04884.031.0FalseNoneNoneFalseNoneFalse151404.00
238536470951None14.5.1Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm with white PVC automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS : 2556, C.I. trap with outlet grating and other couplings in C.P. brass, including painting of fittings and cutting and making good the walls and floors wherever required : Single half stall urinal with 5 litre P.V.C. automatic flushing cistern ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8642.08642.012.0FalseNoneNoneFalseNoneFalse103704.00
238536570951None14.7.3Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 550x400 mm with a pair of 15 mm C.P. brass pillar taps ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Unit2866.02866.018.0FalseNoneNoneFalseNoneFalse51588.00
238536670951None14.31Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Unit1220.01220.018.0FalseNoneNoneFalseNoneFalse21960.00
238536770951None14.40.2Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Unit496.0496.031.0FalseNoneNoneFalseNoneFalse15376.00
238536870951None601Providing & fixing in position 75x75 mm PVC 'P' traps of self cleansing design with outlet size of 75 mm diameter of approved make, including making connection with PVC soil / waste pipes using rubber gaskets, embedding the trap in 150 mm thick PCC 1:2:4 and fixing of top tile & strainer of approved make on top of the trap etc., complete all as specified & directed. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos50.8550.8549.0FalseNoneNoneFalseNoneFalse2491.650
238536970951None516S.C.I. gully or nahani grating 100 mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos25.025.074.0FalseNoneNoneFalseNoneFalse1850.00
238537070951None13.22.1.2Providing and fixing PTMT grating of approved quality and colour 125 mm nominal dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos99.099.074.0FalseNoneNoneFalseNoneFalse7326.00
238537170951None16.15.10Providing and constructing "WIRE CUT BRICK MACHINEHOLE CHAMBERS" using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm and down size. Providing and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Providing and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos48447.048447.09.0FalseNoneNoneFalseNoneFalse436023.00
238537270951None30.50.9Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work. 100 mm nominal dia Pipes ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m930.0930.0225.0FalseNoneNoneFalseNoneFalse209250.00
238537370951None30.50.9Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work. 150 mm nominal dia Pipes ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m1593.01593.0240.0FalseNoneNoneFalseNoneFalse382320.00
238537470951None13.48Providing and fixing on wall face unplasticized Rigid PVC Rain water pipes confirming to IS : 13592 Type A Including jointing with seal ring confirming to IS : 5382, Leaving 10mm gap for Thermal expansion, (i) Single Socked pipes 100mm daimeter. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m253.0253.0210.0FalseNoneNoneFalseNoneFalse53130.00
238537570951NoneXXXXV3provding and fixing 2HP monoblock Motor with all accessories. For single phase…Make : ATALATA / SUGUNA / CRI/ KIRILOSAKAR ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos21100.021100.02.0FalseNoneNoneFalseNoneFalse42200.00
17067921450000NoneNoneBuildingsUG SUMP1157038.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238537670952None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum102.0102.0160.27FalseNoneNoneFalseNoneFalse16347.540
238537770952None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. Deduct 5% per cum if rollers are not used and tamping is done manually. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum474.0474.048.6FalseNoneNoneFalseNoneFalse23036.40
238537870952None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6201.06201.08.9FalseNoneNoneFalseNoneFalse55188.90
238537970952None2.2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (FOOTING) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6969.66969.652.0FalseNoneNoneFalseNoneFalse362419.20
238538070952None11.32Providing Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.MT89457.089457.06.24FalseNoneNoneFalseNoneFalse558211.680
238538170952None8.6.2Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm368.0368.0199.72FalseNoneNoneFalseNoneFalse73496.960
238538270952None15.2Providing and Applying PU based Elastomeric Liquid Applied PU Waterproofing Membrane single component, cold applied, water based acrylic PU dispersion with highly elastic and UV resistant water proofing treatment to the Existing Roof surface/Chajjas/Sunken portion of WC:Bathroom applied @ 1.2L/per m2,having tensile strength greater than 1.5N/mm2, elongation greater than 300% with solid content not less than 60% in 2coats including surface preparation, priming the surface with water based acrylic primer @0.1 L/m2, and spreading 60 gsm geotextile between two top coats completely as per specification. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm575.0575.0114.56FalseNoneNoneFalseNoneFalse65872.00
238538370952None16.61.2Supply and fixing of SFRC machinhole cover (Medium Duty) made as per IS to suit existing damaged machinhole cover after removing the debries from inside and outside the existing machinhole etc.with all lead and lifts. HEAVY DUTY ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1233.01233.02.0FalseNoneNoneFalseNoneFalse2466.00
17067921450000NoneNoneBuildingsBOREWELL1266106.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238538470953None12.4Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depthof drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1)       Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2)   A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each5552.45552.42.0FalseNoneNoneFalseNoneFalse11104.80
238538570953None12.1.1Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 0 to 50 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr388.5388.5100.0FalseNoneNoneFalseNoneFalse38850.00
238538670953None12.1.2Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 50 to 100 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr487.2487.2100.0FalseNoneNoneFalseNoneFalse48720.00
238538770953None12.1.3Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 100 to 150 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr517.65517.65100.0FalseNoneNoneFalseNoneFalse51765.00
238538870953None12.1.4Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 150 to 200 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr600.6600.6100.0FalseNoneNoneFalseNoneFalse60060.00
238538970953None12.1.5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 200 to 250 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr704.55704.55100.0FalseNoneNoneFalseNoneFalse70455.00
238539070953None12.1.6Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 250 to 300 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr777.0777.0100.0FalseNoneNoneFalseNoneFalse77700.00
238539170953None9.1.2Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE Grade PE80-PN6.0, 75mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr257.25257.251000.0FalseNoneNoneFalseNoneFalse257250.00
238539270953None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum275.1275.1450.0FalseNoneNoneFalseNoneFalse123795.00
238539370953None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum168.0168.0450.0FalseNoneNoneFalseNoneFalse75600.00
238539470953None13.28Supply and delivery at site 50mm(2”) dia heavy duty unplasticized PVC Column pipes with heavy duty collars,rubber profile ring,vibration control profile ring,freezing and turbulence free leak proof EPDM ring with ISI mark with its latest amendments ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr577.5577.5350.0FalseNoneNoneFalseNoneFalse202125.00
238539570953None13.22.4Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x6 m2 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr194.25194.25400.0FalseNoneNoneFalseNoneFalse77700.00
238539670953None13.16.7Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications,as per necessary ammendments and instructions of engineer incharge of work. For 10.00 HP - 90 LPM @ 220 m = 20 STG Outlet Dia - 2.00" ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos57342.657342.61.0FalseNoneNoneFalseNoneFalse57342.60
238539770953None13.25.1Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1312.51312.51.0FalseNoneNoneFalseNoneFalse1312.50
238539870953None12.32Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr2029.652029.6535.0FalseNoneNoneFalseNoneFalse71037.750
238539970953None11.15.6Supply and delivery at site GM (copper alloy) gate valves confirming to Class-I as per IS 778 with latest amendments, 1 No. screwed in bonnet inside screw, rising spring spindle integral seat screwed females ends confirming to IS 554/ 1990 body hydraulically tested 1.5HP seat standard tested 1 HP with IS mark. For 50 mm dia GM (Copper alloy) Gate valves ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1772.051772.052.0FalseNoneNoneFalseNoneFalse3544.10
238540070953None10.60RCC hume pipe Circular pump house: Providing precast RCC Circular Hume pipe pump house with M.S door and RCC conical roof as per specification and drawings - Internal dia Mtr. 1200 mm & height of 2.5 Mtr. With Wall thickness 65mm etc. complete. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each17221.0517221.051.0FalseNoneNoneFalseNoneFalse17221.050
238540170953None10.70Erection and positioning of RCC Hume pipe pump house/Cistern on size stone masory platform including transportation charges and handling,finishing with all necessary tools ,plants and materials etc.,complete as directed by the Engineer in charge of the work ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1976.11976.11.0FalseNoneNoneFalseNoneFalse1976.10
238540270953None13.24.3Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter etc. complete. 6 to 15 HP pumps ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set18375.018375.01.0FalseNoneNoneFalseNoneFalse18375.00
238540370953None12.34Providing and laying at site of work MS casing caps as per IS 1239 (part x005fII) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos172.2172.21.0FalseNoneNoneFalseNoneFalse172.20
17067921450000NoneNoneBuildingsSTP CIVIL2159368.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238540470954None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum102.0102.0341.0FalseNoneNoneFalseNoneFalse34782.00
238540570954None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. Deduct 5% cum per if rollers are not used and tamping is done manually. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm474.0474.034.1FalseNoneNoneFalseNoneFalse16163.40
238540670954None4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface ofconsolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm118.0118.080.0FalseNoneNoneFalseNoneFalse9440.00
238540770954None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6201.06201.010.0FalseNoneNoneFalseNoneFalse62010.00
238540870954None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1310.01310.0109.0FalseNoneNoneFalseNoneFalse142790.00
238540970954None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (Footings) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6969.66969.691.0FalseNoneNoneFalseNoneFalse634233.60
238541070954None2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.MT89457.089457.010.92FalseNoneNoneFalseNoneFalse976870.440
238541170954None11.34.AProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs168.0168.0399.0FalseNoneNoneFalseNoneFalse67032.00
238541270954None12.86Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5930.05930.03.0FalseNoneNoneFalseNoneFalse17790.00
238541370954None11.2.1Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm4478.04478.02.0FalseNoneNoneFalseNoneFalse8956.00
238541470954None9.1Providing and laying Cement concrete flooring 40 mm thick with 20 mm nominal size stone aggregate using 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry complete. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm451.0451.040.0FalseNoneNoneFalseNoneFalse18040.00
238541570954None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm371.0371.099.0FalseNoneNoneFalseNoneFalse36729.00
238541670954None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm295.0295.094.0FalseNoneNoneFalseNoneFalse27730.00
238541770954None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm110.0110.083.0FalseNoneNoneFalseNoneFalse9130.00
238541870954None15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm817.0817.040.0FalseNoneNoneFalseNoneFalse32680.00
238541970954None8.34.3Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.053.019.0FalseNoneNoneFalseNoneFalse1007.00
238542070954None8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, Vol. 02 Item Code: 8.40) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm115.0115.019.0FalseNoneNoneFalseNoneFalse2185.00
238542170954None10.1.8Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For. PVC pipes 140mm dia., 6 kg/sqcm & class 3 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m618.0618.0100.0FalseNoneNoneFalseNoneFalse61800.00
17067921450000NoneNoneBuildingsINTERNAL ELECTRICAL WORK2789319.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238542270955NoneITEMCODE-1.13Supplyin and Fixing Metal Fan Box with Round Hook.(3/1.12) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos.117.0117.0100.0FalseNoneNoneFalseNoneFalse11700.00
238542370955NoneITEMCODE-5.1Supplying push button operated direct online starter with an antiweld silver cadmium oxide contactor with replaceable fixed and moving contacts and bimetallic thermal overload relay help in anticorrosion treated sheet steel or iron clad enclosure and fixing the same to suitable capacity wires for 400/440 volts 3 phase motor/single phase motor upto 5 HP. (44/6.1) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1927.01927.02.0FalseNoneNoneFalseNoneFalse3854.00
238542470955NoneITEMCODE-5.37Supplying, fixing and wiring heavy duty low voltage capacitors conforming to IS 2834. 3 phase, 400/440 volts grade, for power factor improvement of rotating machineries like induction motor. (29/5.37) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kvar480.0480.020.0FalseNoneNoneFalseNoneFalse9600.00
238542570955NoneITEMCODE-5.38Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 220v A.C. 50 Hz 12/24v D.C. (29/5.38) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each515.0515.012.0FalseNoneNoneFalseNoneFalse6180.00
238542670955NoneITEMCODE-12.56Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia (40/6.1) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3510.03510.0200.0FalseNoneNoneFalseNoneFalse702000.00
238542770955NoneITEMCODE-8.1Supplying and drawing UTP-CAT 6E LAN cable.(9.1/54) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr38.038.0115.0FalseNoneNoneFalseNoneFalse4370.00
238542870955NoneITEMCODE-8.3Supplying and drawing PVC insulated gas injected physical foam jelly flooded co-axial TV cable.RG-6. (9.3/54). ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr44.044.0150.0FalseNoneNoneFalseNoneFalse6600.00
238542970955NoneITEMCODE-13.14Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps. ceiling rose with sufficient length of 23 / 0.0076 inch PVC insulated twin core wire. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each492.0492.030.0FalseNoneNoneFalseNoneFalse14760.00
238543070955NoneITEMCODE-13.10Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. (80/14.8) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each171.0171.0100.0FalseNoneNoneFalseNoneFalse17100.00
238543170955NoneITEMCODE-1.2.1Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia ......mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary(2/1.2) 19/20mm dia 2mm thick ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr66.066.01250.0FalseNoneNoneFalseNoneFalse82500.00
238543270955NoneITEMCODE-1.2.2Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia ......mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary(2/1.2) 25mm dia 2mm thick ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr78.078.01000.0FalseNoneNoneFalseNoneFalse78000.00
238543370955NoneITEMCODE-1.3.1Concealed Conduit System Supplying heavy gauge PVC Conduit Pipe ….dia …..mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary.(2/1.3) 19/20mm dia 2mm thick ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr68.068.01500.0FalseNoneNoneFalseNoneFalse102000.00
238543470955NoneITEMCODE-1.3.2Concealed Conduit System Supplying heavy gauge PVC Conduit Pipe ….dia …..mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary.(2/1.3) 25mm dia 2mm thick ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr79.079.0500.0FalseNoneNoneFalseNoneFalse39500.00
238543570955NoneITEMCODE-11.11.4Supplying & fixing of retrofit type - LED bulb.......W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per watt, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp wattage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 volts. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. (68/12.11) 9W, 6500K ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each154.0154.060.0FalseNoneNoneFalseNoneFalse9240.00
238543670955NoneITEMCODE-11.3.2Supplying of ......feet - PVC Batten with integrated LED tube .....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. (64/12.3) LED light fighting 1 x4'- 20/22 w ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each690.0690.0150.0FalseNoneNoneFalseNoneFalse103500.00
238543770955NoneITEMCODE-11.6.2Supplying of recess mounting non integral type ........LED ...... W luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded fase ceiling clamps, Power LEDs with CCT 6500 degree K, CRI 70%. efficacy 100 lumen per watt, 120degree beam spread, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level. LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF 0.95, power loss should 5% of lamp wattage., short circuit & open circuit protection to be integrated in the circuit, , THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 volts. BIS Approved and Tested by NABL/ CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.(12.6/65) LED modular down light 2'x2' / 1' x 4' 34 -36watt ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3692.03692.03.0FalseNoneNoneFalseNoneFalse11076.00
238543870955NoneITEMCODE-11.8.1LED Street light. Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output. Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mouting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency130lm/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008 . Housing with supplier word mark name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds Osram make LED Source. (67/12.8) LED Streetlight 25watts ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2425.02425.03.0FalseNoneNoneFalseNoneFalse7275.00
238543970955NoneITEMCODE-12.2.1Supplying and fixing one of 230 volts Ding dong bell and a flush type bell push with gang box fixed on necessary wooden or rawl plugs using NF screws with Remote. (13.2/71) Ding Dong Bell ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each246.0246.04.0FalseNoneNoneFalseNoneFalse984.00
238544070955NoneITEMCODE-13.1.1Supplying and Fixing of........mm dia class A GI pipe bracket up to 2 Mtrs long bent at suitable angle and fixing to this bracket 1x40/2x40 watts fluorescent tube street light fitting of all capacities to GI or CI or rail or RCC pole / wall using suitable clamps, bolts, and nuts and wiring using suitable capacity wires. (79/14.1) Using 25mm dia G.I.Pipe ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each978.0978.03.0FalseNoneNoneFalseNoneFalse2934.00
238544170955NoneITEMCODE-13.7.1Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps.(79/14.7) On wall / ceiling / Rafter / Girders ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each122.0122.0250.0FalseNoneNoneFalseNoneFalse30500.00
238544270955NoneITEMCODE-2.2.1Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet..(5/2.2) Short point upto 3Mtr from tapping point to out let via switch box ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Point269.0269.0100.0FalseNoneNoneFalseNoneFalse26900.00
238544370955NoneITEMCODE-2.2.2Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.(5/2.2) Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch box ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Point379.0379.0150.0FalseNoneNoneFalseNoneFalse56850.00
238544470955NoneITEMCODE-2.2.3Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.(5/2.2) Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Point555.0555.0300.0FalseNoneNoneFalseNoneFalse166500.00
238544570955NoneITEMCODE-2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. (5/2.3) 1.5 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr26.026.02000.0FalseNoneNoneFalseNoneFalse52000.00
238544670955NoneITEMCODE-2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. (6/2.3) 2.5 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr42.042.01400.0FalseNoneNoneFalseNoneFalse58800.00
238544770955NoneITEMCODE-2.3.4Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. (6/2.3) 4 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr63.063.01400.0FalseNoneNoneFalseNoneFalse88200.00
238544870955NoneITEMCODE-2.3.6Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.(6/2.3) 10 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr167.0167.050.0FalseNoneNoneFalseNoneFalse8350.00
238544970955NoneITEMCODE-3.10.2Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size ……mm conduit using necessary machine screws. (10/3.10)110mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each15.015.0150.0FalseNoneNoneFalseNoneFalse2250.00
238545070955NoneITEMCODE-3.4.1Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (9/3.4) 1-3Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each138.0138.080.0FalseNoneNoneFalseNoneFalse11040.00
238545170955NoneITEMCODE-3.4.2Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (9/3.4) 4-5Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each159.0159.050.0FalseNoneNoneFalseNoneFalse7950.00
238545270955NoneITEMCODE-3.4.3Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (9/3.4) 6Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each177.0177.045.0FalseNoneNoneFalseNoneFalse7965.00
238545370955NoneITEMCODE-3.4.4Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (9/3.4) 8Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each220.0220.040.0FalseNoneNoneFalseNoneFalse8800.00
238545470955NoneITEMCODE-3.4.5Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (9/3.4) 10-12Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each261.0261.050.0FalseNoneNoneFalseNoneFalse13050.00
238545570955NoneITEMCODE-3.4.6Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (9/3.4) 16-18Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each319.0319.03.0FalseNoneNoneFalseNoneFalse957.00
238545670955NoneITEMCODE-3.5.2Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(9/3.5) 1 to 3 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each161.0161.080.0FalseNoneNoneFalseNoneFalse12880.00
238545770955NoneITEMCODE-3.5.3Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(9/3.5) 4 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each175.0175.040.0FalseNoneNoneFalseNoneFalse7000.00
238545870955NoneITEMCODE-3.5.4Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(9/3.5) 6 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each234.0234.040.0FalseNoneNoneFalseNoneFalse9360.00
238545970955NoneITEMCODE-3.5.5Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(9/3.5) 8 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each284.0284.040.0FalseNoneNoneFalseNoneFalse11360.00
238546070955NoneITEMCODE-3.5.6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(9/3.5) 10-12 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each344.0344.050.0FalseNoneNoneFalseNoneFalse17200.00
238546170955NoneITEMCODE-3.5.7Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(9/3.5) 16-18 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each397.0397.03.0FalseNoneNoneFalseNoneFalse1191.00
238546270955NoneITEMCODE-3.6.1Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (10/3.6) 6Amps one way Switch ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each102.0102.0500.0FalseNoneNoneFalseNoneFalse51000.00
238546370955NoneITEMCODE-3.6.9Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (10/3.6) 32Amps DP switch. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos.326.0326.040.0FalseNoneNoneFalseNoneFalse13040.00
238546470955NoneITEMCODE-3.6.10Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (10/3.6) 6/16Amps universal socket. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos.236.0236.040.0FalseNoneNoneFalseNoneFalse9440.00
238546570955NoneITEMCODE-3.6.11Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (10/3.6) TV/Telephone socket. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos.156.0156.015.0FalseNoneNoneFalseNoneFalse2340.00
238546670955NoneITEMCODE-3.6.12Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (10/3.6) RJ45/ I.O.outlet Cat-6 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos.337.0337.010.0FalseNoneNoneFalseNoneFalse3370.00
238546770955NoneITEMCODE-3.6.2Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (10/3.6) 6Amps Two way Switch ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each166.0166.020.0FalseNoneNoneFalseNoneFalse3320.00
238546870955NoneITEMCODE-3.6.3Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (10/3.6) 6Amps 3way socket. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each171.0171.0150.0FalseNoneNoneFalseNoneFalse25650.00
238546970955NoneITEMCODE-3.6.4Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (10/3.6) Stepped Fan Regulator. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos.357.0357.0150.0FalseNoneNoneFalseNoneFalse53550.00
238547070955NoneITEMCODE-5.18.4Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps DP ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each739.0739.0100.0FalseNoneNoneFalseNoneFalse73900.00
238547170955NoneITEMCODE-5.18.7Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (27/5.17) 6-32Amps TPN ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1717.01717.05.0FalseNoneNoneFalseNoneFalse8585.00
238547270955NoneITEMCODE-5.18.9Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (27/5.17) 63Amps TPN ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3088.03088.05.0FalseNoneNoneFalseNoneFalse15440.00
238547370955NoneITEMCODE-5.19.6Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. (28/5.18) II - Double Door 4Way SP &N ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1524.01524.02.0FalseNoneNoneFalseNoneFalse3048.00
238547470955NoneITEMCODE-5.19.9Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. (28/5.18) II - Double Door 12Way SP &N ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2329.02329.05.0FalseNoneNoneFalseNoneFalse11645.00
238547570955NoneITEMCODE-5.20.1Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board. 16-25 Amps 2 pole ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4277.04277.010.0FalseNoneNoneFalseNoneFalse42770.00
238547670955NoneITEMCODE-5.20.3Supplying, fixing and wiring Earth Leakage Miniature Circuit Breaker (ELMCB) 240/450V up to 300mA sensitivity on existing wood/panel board. (28/5.20) 32-40 Amps 4 pole ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2826.02826.04.0FalseNoneNoneFalseNoneFalse11304.00
238547770955NoneITEMCODE-5.30Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20Amps single phase Class-1 Accuracy with Temper Proof Energy Meter.(5.30/29) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1242.01242.010.0FalseNoneNoneFalseNoneFalse12420.00
238547870955NoneITEMCODE-5.40.1Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. (30/5.40) 100Amps 4x30x6mm Alluminium Strips ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr2214.02214.010.0FalseNoneNoneFalseNoneFalse22140.00
238547970955NoneITEMCODE-5.42.2Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. (30/5.42) 16SWG ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm0.380.38100000.0FalseNoneNoneFalseNoneFalse38000.00
238548070955NoneITEMCODE-6.10.1Supplying and fixing L.T. cast Iron pot heads suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc. (6.10/42) 10Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each260.0260.01.0FalseNoneNoneFalseNoneFalse260.00
238548170955NoneITEMCODE-6.10.3Supplying and fixing L.T. cast Iron pot heads suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc. (6.10/42) 25Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each350.0350.014.0FalseNoneNoneFalseNoneFalse4900.00
238548270955NoneITEMCODE-6.17.1Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. (43/6.17) 1.5 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3.03.080.0FalseNoneNoneFalseNoneFalse240.00
238548370955NoneITEMCODE-6.17.2Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. (43/6.17) 2.5 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4.04.0150.0FalseNoneNoneFalseNoneFalse600.00
238548470955NoneITEMCODE-6.17.3Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. (43/6.17) 4 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each7.07.0300.0FalseNoneNoneFalseNoneFalse2100.00
238548570955NoneITEMCODE-6.17.5Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. (43/6.17) 10 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8.08.0150.0FalseNoneNoneFalseNoneFalse1200.00
238548670955NoneITEMCODE-6.17.7Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. (43/6.17) 25 sqmm Long Barrel ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each20.020.0100.0FalseNoneNoneFalseNoneFalse2000.00
238548770955NoneITEMCODE-6.18.3Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. (44/6.18) 8 SWG GI Wire ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr19.019.0750.0FalseNoneNoneFalseNoneFalse14250.00
238548870955NoneITEMCODE-6.4.1Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 (6.4/40) 2 core 10 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr95.095.030.0FalseNoneNoneFalseNoneFalse2850.00
238548970955NoneITEMCODE-6.4.5Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 (40/6.4) 3.5 core 25 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr180.0180.0200.0FalseNoneNoneFalseNoneFalse36000.00
238549070955NoneITEMCODE-6.5.1Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required. (41/6.5) In exixting trench/duct. 6 sqmm to 16 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr11.8811.8830.0FalseNoneNoneFalseNoneFalse356.40
238549170955NoneITEMCODE-6.5.2Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required. (41/6.5) In exixting trench/duct. 25 sqmm to 75 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr15.515.5350.0FalseNoneNoneFalseNoneFalse5425.00
238549270955NoneITEMCODE-6.6.2Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc., complete.(As per Civil SR KSRB I-2, P-7). (41/6.6) In soil (hard) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr102.0102.0300.0FalseNoneNoneFalseNoneFalse30600.00
238549370955NoneITEMCODE-6.7Providing and filling sand in excavated trench to cover already laid UG cable to a depth of 150mm all-round the cable. (41/6.7) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr100.0100.0300.0FalseNoneNoneFalseNoneFalse30000.00
238549470955NoneITEMCODE-6.9.2Supplying and fixing of class A (medium duty) GI pipe of wall thickness not less than 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV. (42/6.9) 50mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr380.0380.060.0FalseNoneNoneFalseNoneFalse22800.00
238549570955NoneITEMCODE-6.2.1Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. (7.2/46) 12" Sweep (300mm) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2969.02969.030.0FalseNoneNoneFalseNoneFalse89070.00
238549670955NoneITEMCODE-6.4.1Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS:1709/1984 with latest amendment, Rated voltage 220 V/ 50 Hz, Rated power input 48 W +/- 10 %, Rated current As per IS:374/79, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value 4.2 CMM / Watt, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201 , as per IS specification, Motor wdg. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 Volts, Insulation resistance Shall not be less than Two Mega Ohms (2 M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, watt& current , Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturer Warranty. (46/7.4) 48 Sweep 5 Star (1200mm) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2677.02677.0100.0FalseNoneNoneFalseNoneFalse267700.00
238549770955NoneITEMCODE-8.2.2Supplying and drawing PVC flexible one pair telephone unarmoured tinned copper cable. (9.2/54) 2 Pair ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr19.019.0150.0FalseNoneNoneFalseNoneFalse2850.00
238549870955NoneITEMCODE-ESCOM 44.01Pole Mounted Fibre Glass Reinforced Aerial Fuse Board 60 Amps - 3 Way(Dwg No. BESCOM/GM/QS&S/24 Dtd 24.11.2018) (44.01/148) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr936.0936.010.0FalseNoneNoneFalseNoneFalse9360.00
238549970955NoneITEMCODE-14-154.2Supplying and fixing PBBC/bakelite straight or slant batten holder and wiring, within 60w/230 Volts lamps. (20/4.2) SR 14-15 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each88.088.0500.0FalseNoneNoneFalseNoneFalse44000.00
238550070955NoneITEMCODE-14-154.4Supplying and fixing cast Aluminium round or oblong type bulk head fitting with GI wire guard, glass cover with 15Watts 230V CFL lamp as required. (20/4.4) SR 14-15 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each952.0952.010.0FalseNoneNoneFalseNoneFalse9520.00
17067921450000NoneNoneBuildings11KV LINE251587.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238550170956NoneITEMCODE-21.03Double Pole Transformer Structure complete with cross arms, braces, clamps, bolts & nuts and washers including 2 No of Poles For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL - MS ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each17402.017402.01.0FalseNoneNoneFalseNoneFalse17402.00
238550270956NoneITEMCODE-ESCOMH-Frame for mounting GOS ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3934.03934.01.0FalseNoneNoneFalseNoneFalse3934.00
238550370956NoneITEMCODE-ESCOM11 kV, 200 Amps, Single Break GOS ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8499.08499.01.0FalseNoneNoneFalseNoneFalse8499.00
238550470956NoneITEMCODE-ESCOM11 kV, Solid Core Type HG Fuse Unit ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1037.01037.03.0FalseNoneNoneFalseNoneFalse3111.00
238550570956NoneITEMCODE-ESCOM11 kV Lightning Arrester, Metal oxide, 9 kV, 5 kA Polymeric Type with ground disconnector ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set1413.01413.01.0FalseNoneNoneFalseNoneFalse1413.00
238550670956NoneITEMCODE-ESCOMRCC Pole - 9 Mtr Long, 145 Kg WL ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each7424.07424.010.0FalseNoneNoneFalseNoneFalse74240.00
238550770956NoneITEMCODE-ESCOMPSCC Pole - 9 Mtr Long, 200 Kg WL ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4855.04855.03.0FalseNoneNoneFalseNoneFalse14565.00
238550870956NoneITEMCODE-ESCOMGuy Set: Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1220.01220.03.0FalseNoneNoneFalseNoneFalse3660.00
238550970956NoneITEMCODE-ESCOM11 kV, Horizontal Cross Arm with clamps, HTST supports, bolts, nuts and washers for RCC Pole - 9 Mtr Long, 145 Kg WL ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each550.0550.030.0FalseNoneNoneFalseNoneFalse16500.00
238551070956NoneITEMCODE-ESCOM11 kV, 5 KN Polymeric Pin Insulator ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each180.0180.060.0FalseNoneNoneFalseNoneFalse10800.00
238551170956NoneITEMCODE-ESCOM11 kV, 45 KN Polymeric Insulator ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos164.0164.018.0FalseNoneNoneFalseNoneFalse2952.00
238551270956NoneITEMCODE-ESCOMPG Clamp: Rabbit to Rabbit ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each79.079.030.0FalseNoneNoneFalseNoneFalse2370.00
238551370956NoneITEMCODE-7.02Rabbit ACSR (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Km46234.046234.01.0FalseNoneNoneFalseNoneFalse46234.00
238551470956NoneITEMCODE-15.13Supplying and fixing of Spiral Earth Electrodes as per standard technical specification as per ESCOM. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each490.6490.610.0FalseNoneNoneFalseNoneFalse4906.00
238551570956NoneITEMCODE-ESCOMConcrete works: Providing cement concrete to Poles and Guy sets with material and labour including necessary curing etc., complete (cost does not include excavation) - A) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos237.0237.010.0FalseNoneNoneFalseNoneFalse2370.00
238551670956NoneITEMCODE-ESCOMConcrete works: Providing cement concrete to Poles and Guy sets with material and labour including necessary curing etc., complete (cost does not include excavation) - B) Pole Concreting with CC 1:2:4 (without coping) a) 9 Mtr support (650x500x1700mm) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No2746.02746.010.0FalseNoneNoneFalseNoneFalse27460.00
238551770956NoneITEMCODE-ESCOMConcrete works: Providing cement concrete to Poles and Guy sets with material and labour including necessary curing etc., complete (cost does not include excavation) - C) Providing Coping for Pole with CC 1:2:4 (As per actuals) a) 150 mm all around the Pole for an height of 300 mm for RCC, PSCC Pole ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each471.0471.010.0FalseNoneNoneFalseNoneFalse4710.00
238551870956NoneITEMCODE-ESCOMConcrete works: Providing cement concrete to Poles and Guy sets with material and labour including necessary curing etc., complete (cost does not include excavation) - D) Guy concreting in Marshy area a) Providing cement concrete 1:2:4 for Anchor Rod in Marshy/Black Cotton Soil 600x600x450 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No881.0881.03.0FalseNoneNoneFalseNoneFalse2643.00
238551970956NoneITEMCODE-ESCOMProviding guarding between HT & LT line above 40 Mtr span (Including labour for fixing of necessary cross arms) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Span1165.01165.02.0FalseNoneNoneFalseNoneFalse2330.00
238552070956NoneITEMCODE-ESCOMLT 4 Pin Cross Arm with clamps, bolts, nuts and washers ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each372.0372.04.0FalseNoneNoneFalseNoneFalse1488.00
17067921460000NoneNoneBuildingsSUBSTATION1592160.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238552170957NoneITEMCODE-48.08GI Pipe B - Class as per IS-1239 - GI Pipe - 100 mm Dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr1359.751359.7550.0FalseNoneNoneFalseNoneFalse67987.50
238552270957NoneITEMCODE-1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum203.7203.751.12FalseNoneNoneFalseNoneFalse10413.1440
238552370957NoneITEMCODE-45.0411 kV, Jointing & Cable Termination Kit as per IS-13573 - Heat Shrinkable Indoor Type Cable Termination Kit for XLPE Cable - 3x95 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kit3931.23931.22.0FalseNoneNoneFalseNoneFalse7862.40
238552470957NoneITEMCODE-45.0711 kV, Jointing & Cable Termination Kit as per IS-13573 - Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable - 3x95 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kit4270.354270.352.0FalseNoneNoneFalseNoneFalse8540.70
238552570957NoneITEMCODE-52.01Transparent Alkathine tube 19 mm dia, 2 mm thick in coils of 30 Mtr ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Coil542.85542.851.0FalseNoneNoneFalseNoneFalse542.850
238552670957NoneITEMCODE-18.01LT Distribution Box for 100 kVA DTC with MCCB's (Sheet Metal)(Dwg No. BESCOM/GM/QS&S/58 Dtd 24.11.2018) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set23820.323820.32.0FalseNoneNoneFalseNoneFalse47640.60
238552770957NoneITEMCODE-9.07Fixing LT Distribution box for 100/250/500 kVA DTC ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each404.25404.251.0FalseNoneNoneFalseNoneFalse404.250
238552870957NoneITEMCODE-36.0111 kV, 3 Core, XPLE HTUG Cable with pressure extruded inner sheeth, ROUND WIRE ARMOURED as per IS-7098 (Part-2) Armouring wires dia and Resistivity as per IS-3975 - 95 Sqmm, (54 GI Wires - 2.5 mm Dia) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Km934149.3934149.30.14FalseNoneNoneFalseNoneFalse130780.9020
238552970957NoneITEMCODE-21.01Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff - HT Cable - 3x95 to 150 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Km64388.164388.10.14FalseNoneNoneFalseNoneFalse9014.3340
238553070957NoneITEMCODE-45.0411 kV, Jointing & Cable Termination Kit as per IS-13573 - Heat Shrinkable Indoor Type Cable Termination Kit for XLPE Cable - 3x95 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kit3931.23931.26.0FalseNoneNoneFalseNoneFalse23587.20
238553170957NoneITEMCODE-21.2.3Disc Insulator 90 kN ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each622.65622.656.0FalseNoneNoneFalseNoneFalse3735.90
238553270957NoneITEMCODE-12.57Supplyingfixingandwiringearthelectrodeforgroundingoflifts,transformers,DGsetsetc.using40mmdia2.9mmthick2.5mlongGIpipewithGIfunnelwithmeshandsuitablesizereducerfixedonthetopoftheearthelectrode.ThefunnelshouldbeenclosedinaCCchamberof400x400x400mmwithacastironcover.Theearthelectrodeshallhavestaggeredholesof12mmdiaandtheelectrodeshouldbecovered150mmall-roundwithalternatelayersofsaltandcharcoalfromthebottomoftheCCchamber.Theconnectionfromtheelectrode is to be established through GI strip using GI bolts and nuts. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No4468.84468.818.0FalseNoneNoneFalseNoneFalse80438.40
238553370957NoneITEMCODE-12.06Distribution Transformer - 3 Phase, 11kV/433V - Stacked CRGO Core with Oil as per IS-1180 (Part-1): 2014 - 100 kVA, Aluminium Wdg, Star 2 (5 Star) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each233049.6233049.61.0FalseNoneNoneFalseNoneFalse233049.60
238553470957NoneITEMCODE-59.05Heavy Duty Copper Terminal Long Barrel - 95 Sqmm Copper Terminal, Apprx Wt: 58 Gm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each135.45135.4544.0FalseNoneNoneFalseNoneFalse5959.80
238553570957NoneITEMCODE-21.07Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff - LT Cable - 120 to 240 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Km33891.933891.90.31FalseNoneNoneFalseNoneFalse10506.4890
238553670957NoneITEMCODE-32.151.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 - 120 Sqmm, 3.5 Core, (23 GI Strips - 4 x 0.8 mm) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Km479733.45479733.450.18FalseNoneNoneFalseNoneFalse86352.0210
238553770957NoneITEMCODE-12.58.2GI/Copperstripsforgroundingconnections,usingnecessaryfixingmaterials as required.- 25 x 3 mm GI strip ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr86.186.1192.5FalseNoneNoneFalseNoneFalse16574.250
238553870957NoneITEMCODE-22.09Prefabricated Platform for erection of 250 kVA Transformer on 11 Mtr Spun Pole Structure involving Rectangular hollow Sections 96x48x4.87 Thk and 66x3x4.5 Thk, Circular hollow section of 165.6 OD x 10 Thk , MS Stiffner plate 12 mm Thk, MS plate Base Plate 16 mm Thk, J Blots 12 mm dia, Gusset Plates, Clamps,15 mm rods 2.5 Mtr length as per drawing details. Tor Steel Rods cut of Dia 8 mm,10 mm,12 mm,16 mm and 20 mm bent as per drawing & tied inclusive of labour for Reinforced foundation(Dwg No. BESCOM/GM/QS&S/70 Dtd 24.11.2018) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No55773.955773.95.0FalseNoneNoneFalseNoneFalse278869.50
238553970957NoneITEMCODE-11.58Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin-charge. (Made of G.I. wire of dia 4 mm) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm843.15843.1580.0FalseNoneNoneFalseNoneFalse67452.00
238554070957NoneITEMCODE-11.16.1Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs142.8142.8300.0FalseNoneNoneFalseNoneFalse42840.00
238554170957NoneITEMCODE-15.3Supply, installation of 4kg Fire Extinguisher Mono Ammonium Phosphate Powder 50, Stored Pressure Type, Pressure Gauge, Gross Weight 6.9 Kg, empty weight 2.9 Kg, Can Height 440MM, Diameter 140MM, Discharge Time less than 13 Sees, Controllable discharge mechanism (Squeeze grip with easy snap safety seal), Range minimum 4 meters, applicable on Class A,8, C and electrically started Fire, A Rating 2A, 8 Rating 218, Can construction : Deep drawn & Co., Mig welded, valve Construciton : Forging and Mechining, Internal Coating of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster power coating, Sheet metal thickness: 1.60MM, 5 years Warranty with installation system with Superior quality EPDM Rubber Hosepipe etc., including cost of supporting materials like MS stand & accessaries if it is fixing n floor / MS brackets & accessories if it is fixing on wall, , labour, usage charges of machinery complete as per specifications. complete IS 15683, CE Approved. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2782.52782.51.0FalseNoneNoneFalseNoneFalse2782.50
238554270957NoneITEMCODE-15.111Supplying of four bucket stand alongwith buckets. Complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1942.51942.51.0FalseNoneNoneFalseNoneFalse1942.50
238554370957NoneITEMCODE-15.113Supplying of Hand gloves. Complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Pair1023.751023.751.0FalseNoneNoneFalseNoneFalse1023.750
238554470957NoneITEMCODE-15.116Supplying of First Aid Chart with Lamination. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each420.0420.01.0FalseNoneNoneFalseNoneFalse420.00
238554570957NoneITEMCODE-35.5Hickery rods ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos5668.955668.953.0FalseNoneNoneFalseNoneFalse17006.850
238554670957NoneITEMCODE-35.51Grounding sticks extendable upto 18 ft : 3 nos. of each 6 ft Sticks of 3 phase R, Y, B (3 nos. of 1 set) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set1842.751842.751.0FalseNoneNoneFalseNoneFalse1842.750
238554770957NoneITEMCODE-15.114Supplying of first aid box. Complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each630.0630.01.0FalseNoneNoneFalseNoneFalse630.00
238554870957NoneITEMCODE-68.17Supplying and fixing of DANGER/NO ADMISSION/NO SMOKING board made out of MS sheet metal with two coats of non corrosive enameled paint. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each157.5157.56.0FalseNoneNoneFalseNoneFalse945.00
238554970957NoneITEMCODE-68.17Caution/Danger Board ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each157.5157.51.0FalseNoneNoneFalseNoneFalse157.50
238555070957NoneITEMCODE-5.15Fixing Danger Board ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each84.084.07.0FalseNoneNoneFalseNoneFalse588.00
238555170957NoneITEMCODE-5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6708.456708.453.14FalseNoneNoneFalseNoneFalse21064.5330
238555270957NoneITEMCODE-5.6Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Basement in CM 1:6 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6770.46770.42.51FalseNoneNoneFalseNoneFalse16993.7040
238555370957NoneITEMCODE-1.23Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum2816.12816.18.0FalseNoneNoneFalseNoneFalse22528.80
238555470957NoneITEMCODE-49.071.1 KV Class HR (Heat Resistant) PVC Insulated & UnSheathed Aluminium Wires Multistrand Single Core Lead wires as per IS-694: 2010 PVC Wire - 120 SqmmAl Wt: 32 Kg, Total Wt: 45.5Kg/100 Mtr Coil ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Coil15034.9515034.950.5FalseNoneNoneFalseNoneFalse7517.4750
238555570957NoneITEMCODE-43.2.9Quad Rigid Spacer ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1943.551943.558.0FalseNoneNoneFalseNoneFalse15548.40
238555670957NoneITEMCODE-5.15GI Fish Plate ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos93.4593.452.0FalseNoneNoneFalseNoneFalse186.90
238555770957NoneITEMCODE-58.02LT Metering Cubicle at Low Tension for 50 KW to 150 KW having specification & design as per the prototype approval (Excluding Meter Cost & Modem Cost) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos83876.183876.11.0FalseNoneNoneFalseNoneFalse83876.10
238555870957NoneITEMCODE-9.02Erection of LT metering Cubicle on Platform. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1741.951741.951.0FalseNoneNoneFalseNoneFalse1741.950
238555970957NoneITEMCODE-53.01CT PT Operated ETV Meter 0.2s Accuracy Class with ABT feature and DLMS protocal with ToD with RS 232 Port UNIDIRACTIONAL (Used for HT Installation, LT Metering Cubicle 50-150 KW ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos20595.7520595.751.0FalseNoneNoneFalseNoneFalse20595.750
238556070957NoneITEMCODE-11.02Fixing Metering Box for housing the ETV Meter 3 Phase 4 Wire along with CT's, Meter & wiring for DTC - 100 kVA TC ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set2043.32043.31.0FalseNoneNoneFalseNoneFalse2043.30
238556170957NoneITEMCODE-41.01Load Break Switch with Panel ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each76900.9576900.951.0FalseNoneNoneFalseNoneFalse76900.950
238556270957NoneITEMCODE-68.08Route & Joint indicating slab with MS Anchor rod ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No139.65139.655.0FalseNoneNoneFalseNoneFalse698.250
238556370957NoneITEMCODE-68.07Cable Covering Tile 125x125x40 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each5383.355383.350.5FalseNoneNoneFalseNoneFalse2691.6750
238556470957NoneITEMCODE-59.06Heavy Duty Copper Terminal Long Barrel 120 Sqmm Copper Terminal, Apprx Wt: 64 Gm. Copper Lugs - 120sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No147.0147.012.0FalseNoneNoneFalseNoneFalse1764.00
238556570957NoneITEMCODE-9.02PG Clamp - Rabbit to 120 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No107.1107.14.0FalseNoneNoneFalseNoneFalse428.40
238556670957NoneITEMCODE-59.05Heavy Duty Copper Terminal Long Barrel 95 Sqmm Copper Terminal, Apprx Wt: 58 Gm Copper Lugs - 95sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No135.45135.4512.0FalseNoneNoneFalseNoneFalse1625.40
238556770957NoneITEMCODE-30.02LT Feeder Pillar - 12 Way with Poreclain Rewireable Cutout and & 1 No of 630 Amps Load Break Switch with Copper Busbar asper IS-13947 Part-1&2(Dwg No. BESCOM/GM/QS&S/41 Dtd 24.11.2018) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each65670.1565670.151.0FalseNoneNoneFalseNoneFalse65670.150
238556870957NoneITEMCODE-21.08Supply and erection of Double Pole TC structural set including all hardwares suitable for 100/300 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each32228.732228.71.0FalseNoneNoneFalseNoneFalse32228.70
238556970957NoneITEMCODE-24.07Supplying and Fixing H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each6374.556374.551.0FalseNoneNoneFalseNoneFalse6374.550
238557070957NoneITEMCODE-2.12Supplying and Fixing ….. including all Hardwares etc complete as per the standard technical specification BESCOM - HT ST Support 50x8 mm Flat - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each127.05127.054.0FalseNoneNoneFalseNoneFalse508.20
238557170957NoneITEMCODE-2.02Supply and fixing of …….cross arm including all Hardwares complete as per the standard technical specification BESCOM - 11 kV, Horizontal Cross Arm - Galvanised Iron (GI) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each511.35511.352.0FalseNoneNoneFalseNoneFalse1022.70
238557270957NoneITEMCODE-24.01Supplying and Fixing ….. including all Hardwares etc complete as per the standard technical specification.of BESCOM - 11 kV, 200 Amps Single Break GOS ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each9922.59922.51.0FalseNoneNoneFalseNoneFalse9922.50
238557370957NoneITEMCODE-20.01Supplying and Fixing ….. including all Hardwares etc complete as per the standard technical specification.of BESCOM - 11 kV, HG Fuse Unit with Solid Core Insulator ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1122.451122.451.0FalseNoneNoneFalseNoneFalse1122.450
238557470957NoneITEMCODE-19.02Supplying and Fixing ….. including all Hardwares etc complete as per the standard technical specification of BESCOM. - 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1663.21663.21.0FalseNoneNoneFalseNoneFalse1663.20
238557570957NoneITEMCODE-1.02Supply and erection of 9 Mtr RCC Pole including earth work etc,. complete as per the standard technical specification of BESCOM.. RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8731.88731.82.0FalseNoneNoneFalseNoneFalse17463.60
238557670957NoneITEMCODE-5.10,5.11,5.13,5.15, 5.16 & 8.02Supplying and Fixing ….. including all Hardwares etc complete as per the standard technical specification BESCOM - GUY Set ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1709.871709.872.0FalseNoneNoneFalseNoneFalse3419.740
238557770957NoneITEMCODE-25.02Supplying and fixing of 11 kV, DOLO Cutout REC Specification(Dwg No. BESCOM/GM/QS&S/20 Dtd 24.11.2018) on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV class ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set4453.054453.053.0FalseNoneNoneFalseNoneFalse13359.150
238557870957NoneITEMCODE-63.04Supplying and fixing Brass Cable Gland suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 45mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each206.85206.8516.0FalseNoneNoneFalseNoneFalse3309.60
17067921460000NoneNoneBuildingsSOLAR WATER HEATER279944.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
238557970958None7.3.3Supplying, installation ,testing and commissioning of solar hot water heater comprising of solar flat plate collector of size 2120x1040x100mm and stainless steel hot water storage tank with stainless steel heat exchanger absorber made of copper sheet and copper tube of following capacity aluminium box collector with approximate capacity electrical back up arrangement excluding inlet and out let pipes. As per the directions SS Model with 100mm thick of 48kg/Meter cube density Rock wool insulation with 22SWG Aluminium cladding for 300 liter capacity. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each69986.069986.04.0FalseNoneNoneFalseNoneFalse279944.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17067921470000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17067921470000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17067921470002NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submissionrequired for successful completion of work etc., complete. The work shall be executed as per standard technical specification and as per the directions of Engineer in charge of the work.None
17068112180000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17068112480000NoneNoneELIGIBILITYThe tenderer has to furnish the details of the Head Office including Telephone No.s, E-mail address, the fax and the mobile numbers of the person whom to be contacted.None
17068113210000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17068113460000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17068113700000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17068113930000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17068114080000NoneNoneELIGIBILITYMaterials like bitumen,steel,cement etc.,required for the work shell be procured by the tenderer themselves and should got tested by the quality Assurance authority before use on the work.None
17068114220000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17068114380000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original, Submit the original document at the time of technical bid opening or next day and the Executive Director reserves the right to verify the original documents before approval.None
17068114830000NoneNoneELIGIBILITYIf any, additional information required, the same may be obtained from the office of the Executive Director, 8, M S B-1, 6th & 7th Floor, Cunningham Road, Bangalore-52 during office hours on all working days. It may be noted that if any of the dates mentioned above happened to be a General Holiday , the next working day will be consideredNone
17068115040000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasonsNone
17068115220000NoneNoneELIGIBILITYThe contractors assessed available tender capacity shall be more than the tender value, it will be calculated as per the STD tender document Attached.None
17068115350000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17068115490000NoneNoneELIGIBILITYTenderer who qualifying in the technical bid such tenderer financial bid will be opened.None
17068116270000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at no extra cost in order to carry out all the required tests for the materials being used in the project.None
17068116490000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost. Contractor should carryout additional test required to test the suitability of materials before using the same to the work.None
17068116950000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.Contractor should execute the project with least impact to the environment.None
17068117140000NoneNoneELIGIBILITYWhen Structure constructed disputes arising on account of damages to the existing bunds, Structure and other private properties, if any, has to be resolved by the contractor. All precautions should be taken by the contractor so that there are no damages to such public /private properties.None
17068117450000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17068117710000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17068118000000NoneNoneELIGIBILITYThe Bidder shall not furnish any fake/fabricated/false information or withhold facts etc., if the bidder is found to have violated any of these above (found either during evaluation or after awarding the tender), the tender shall be rejected and action as per rules and regulations shall be taken against the Bidder.None
17068118300000NoneNoneELIGIBILITYIf the Successful Bidder has quoted lesser rates than the estimated rates then he should without fail remit the Unbalanced Tender Amount along with the Security Deposit within the stipulated time as that shall be specified in the Letter of Acceptance, failing which the tender of the Successful Bidder shall be rejectedNone
17068118510000NoneNoneELIGIBILITYThe bidders should submit the Bid capacity compulsorily. The details of balance work B value (works on hand & works for which tender submitted). Should be submitted in the prescribed format & should be signed by the concerned Executive Engineer / District level officer. In case the bidder does not furnish the above details/suppresses the actual facts/ produces false facts, along with the Technical bid, the technical bid of such bidder shall be considered for rejection.None
17068119020000NoneNoneELIGIBILITYWith regard to tenders where lesser rates are quoted by the tenderer as per Standard Tender Document the contractor along with his financial bid shall furnish a detailed rate analysis for such of the items where has quoted lesser rates than the estimated rates. The rate analysis must indicated break up of rates for various components such as materials, labour, machinery and other relevant components. He shall also explain & substantiate how such lesser quoted rates would work out for him from the point of view of doing quality work. He shall also give undertaking that the rates quoted by me are workable to execute quality wok as per specifications and to the full satisfaction of the department Any failure on the part of the contractor in not submitting the above said information along with his financial bid in E-proc will be viewed seriously during evaluation of his financial bidNone
17068119470000NoneNoneELIGIBILITYAll the items of work as Mentioned in the Bill of Quantity (BOQ) are including lead and lift charges loading and unloading charges labour charges, curing all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and as per the directions of Engineer in charge of the work.None
17068119650000NoneNoneELIGIBILITYThe Defect liability period of the work is 24 Months from the date of submision of final bill.None
17068120090000NoneNoneELIGIBILITYTerms and condition of Contract as per Approved STD KW-4.None
17068120300000NoneNoneELIGIBILITYQAP & PERT chart should be submitted by the successful bidder within 3 Days From date of Agreement.None
17068120610000NoneNoneELIGIBILITYDesign mix For Concrete shall be obtained from the approved NABL acredated laboratories and same shall be got approved from the department before incorporating in the work.None
17068121120000NoneNoneELIGIBILITYIf a bidder participates in more than two packages, only two packages will be considered.None
17068121400000NoneNoneELIGIBILITYThe intended bidders shall visit the site and quote his offer accordingly and for having visited the site, they should upload the Geo-tag Photos and Document for having visited the site duly certified by concerned Assistant Executive Engineer KREIS, while submitting the tenders.None
17068630910000NoneNoneELIGIBILITYThe rates are exclusive of GST. GST will be paid separatelyNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneThe Tenderer or his identified sub-contractor should possess valid license for executing water supply/sanitary engineering works and should have executed similar water supply/sanitary engineering works totaling Rs 24.0 Lakhs in any one year during 2018-19 to 2022-23.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing building electrification works and should have executed similar electrical works totaling Rs 23.00 Lakhs in any one year during 2018-19 to 2022-23Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year, the following minimum quantities of work:(2017-18 to 2021-22) RCC 1594.00 Cum,Steel 156.00 MT,BBM/Laterite Stone/Solid Block 2830.00 Cum,Flooring 3622.00 Sqm Tenderer Shall submit Work done Certificate stating the above quantities executed issued by not below the rank of executive Engineer.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderer should Satisfactorily completed as prime contractor, atleast one similar work such as Building work of value not less than Rs 333.00 Lakhs. The workdone certificate duly signed not below the Rank of Executive Engineer.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe tenderer shall produce Critical Machineries (50% to be owned & 50% to be hired with supporting documents): Trucks/Tipper/Dumpers - 2 Nos Excavators/Dozers - 2 Nos,Mechanical Concrete Mixer with Hopper - 2 No,Centering Sheet - 2700 Sqm,Water Tanker of minimum Capacity 6000 Liters - 2 Nos,Laboratory Equipments - 1 Unit.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- RELAVENT DOCUMENT
NoneNoneNoneNoneThe Tenderer shall give details of the works on hand. (Present contract commitment).Duely signed by bidder.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- RELAVENT DETAILS
NoneNoneNoneNoneThe tenderer has to furnish liquid assets and /or availability of credit facilities of no less than Rs: 167.00 Lakhs Credit lines/ letter of credit/ certificates from Nationalized/ Scheduled banks.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAchieved in at least two financial years a minimum financial turnover of Rs 1333.00Lakhs. Duly certified by CA with UDIN.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTenderer has to furnish Annual turnover for the last 5 years i.e. 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Duly certified by CA with UDIN.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneThe Tenderer shall have valid class-I KPWD/CPWD/MES/Railways/Public sectors licence.OthersREGISTRATION LICENCE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneThe tenderer has to furnish Company Profile and details of Technical Personnel working/Associated with him the qualification and experience of individual are to be mentionedOthersCOMPANY PROFILE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- RELAVENT DETAILS
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1706863243000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the SE 1st Floor (KREIS) Cunningham Road, Bengaluru
streetNone
cityBENGALURU
stateKarnataka
pin560052
tenderRecallDTONone