createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1703918585993
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2500.00
emd169000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose16-02-2024 16:00:00
tenderQueryClose16-02-2024 11:00:00
technicalBidOpen17-02-2024 16:30:00
publishedDate02-02-2024 18:05:28
publishedByPostCNNL_EE_DIV_MP_RMG
publishedByUserKPE15057 - MOHANA M N
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonMohan M N
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08027271259
mobileNumber9036100038
tenderSupplierListNone
tenderSchedule
createdTs1703918586016
version6
createdDateNone
modifiedDateNone
tenderNumberCNNL/2023-24/IW/WORK_INDENT700
titleConstruction of protective wall under 22nd km of RBC and distributory near Adekehalla of Uyyamballi Hobli in Kanakapura Taluk.
descriptionConstruction of protective wall under 22nd km of RBC and distributory near Adekehalla of Uyyamballi Hobli in Kanakapura Taluk.
categoryWORKS
categoryTextWorks
ecv9981681.37
deptNameCauvery Neeravari Nigam Limited
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location5704
locationNameCNNL MP Div Ramanagar
provisionalAmount9999000.0
groupOverheadTotal1522629.36
fileNumberCNNL/2023-24/AdikehallaPW
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17039185860000NoneNoneIrrigation and Other WorksConstruction of protective wall under 22nd km of RBC and distributory near Adekehalla of Uyyamballi Hobli in Kanakapura Taluk.8459052.01
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
201037157573NoneSL.NO.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ,etc and as directed by the engineer incharge.Cum75.1975.191264.05FalseNoneNoneFalseNoneFalse95043.91950
201037257573NoneSL.NO.2Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite /trap /basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ,etc and as directed by the engineer incharge.Cum5611.445611.44164.86FalseNoneNoneFalseNoneFalse925101.99840
201037357573NoneSL.NO.3Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for RCC troughs resting on ground including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and lifts. ,etc and as directed by the engineer incharge.Cum9217.079217.07256.5FalseNoneNoneFalseNoneFalse2364178.4550
201037457573NoneSL.NO.4Supplying, Fitting and Placing TMT Fe 550 Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications. ,etc and as directed by the engineer incharge.Tonne80489.3580489.3522.64FalseNoneNoneFalseNoneFalse1822278.8840
201037557573NoneSL.NO.5Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. & MoRTH specification 804 ,etc and as directed by the engineer incharge.Nos9270.09270.01.0FalseNoneNoneFalseNoneFalse9270.00
201037657573NoneSL.NO.6Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area ,etc and as directed by the engineer incharge.Cum625.21625.214.05FalseNoneNoneFalseNoneFalse2532.10050
201037757573NoneSL.NO.7Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ,etc and as directed by the engineer incharge.Cum5988.425988.42476.07FalseNoneNoneFalseNoneFalse2850907.10940
201037857573NoneSL.NO.8Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc... complete the work shall carried out as per technical detailed specfications Head Wall ,etc and as directed by the engineer incharge.Cum598.84598.84476.07FalseNoneNoneFalseNoneFalse285089.75880
201037957573NoneSL.NO.9Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes including cost of all materials, labour, spreading soil in layers of 100 to 150 mm, breaking clods, watering, compaction by earth masters to achieve density control of not less than 90 percent etc., complete with all lead and lifts ,etc and as directed by the engineer incharge.Cum723.06723.065.11FalseNoneNoneFalseNoneFalse3694.83660
201038057573NoneSL.NO.10Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 300mm dia ,etc and as directed by the engineer incharge.m1148.451148.457.5FalseNoneNoneFalseNoneFalse8613.3750
201038157573NoneSL.NO.11Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting brackets, guide rollers, ballast blocks, teflon claded rubber seals etc., with all accessories for river sluice /canal sluice vent including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats cold applied coal tar epoxy paint, seal fixing etc., complete as per specifications and approved drawings with lead upto 1 km and all lifts for structural steel components and all leads and lifts including packing / forwarding charges for other materials. ,etc and as directed by the engineer incharge.Tonne148938.0148938.00.62FalseNoneNoneFalseNoneFalse92341.560
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17039185880000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17039185880000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17039185880000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17039186220000NoneNoneELIGIBILITYThe Intending bidder are advised to visit the site of work and also access the tender documents well in advanceNone
17039186330000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17039186430000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and Submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17039186530000NoneNoneELIGIBILITYThe TENDER PROCEESING FEE will not be refunded.None
17039186610000NoneNoneELIGIBILITYThe CNNL reserves the right of rejecting all or any of the tenders without assigning any reasons,None
17039186690000NoneNoneELIGIBILITYIf the quoted rates for the items fall below the estimated rates, the successful bidder should produce an additional performance Guarantee in the form of Bank Guarantee for the difference amount of quoted rates and estimated rates before executing agreement with CNNL. In case of contractor quoting rate above 125% of the estimated rates, then the amount over and above 125% will be withheld during the progress of work..None
17039187060000NoneNoneELIGIBILITYThe contractor should be registered in respective class Category of KPWD / Any State / Central Government / Public sector organizationsNone
17039187580000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17039187690000NoneNoneELIGIBILITYThe rates quoted by the contractor must be inclusive of sales Tax and any other duties, taxes, etc., except GST The contractor is also required to pay quarry Fees, Royalties, Octroi Dues levied by the state Government or any Local body or an authority and ground rent, if any, charged by the Executive Engineer for stacking materials. No Extra Payment on this account will be made to the contractor.None
17039187800000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the Contractor themselves and should get the same tested by the quality control authority of CNNL before use in this work.None
17039187970000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the bidders in a complete manner. Incomplete formats may constitute sufficient reason at the discretion of CNNL for rejection of the bidNone
17039188080000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer will verify the original documents at any stage before recommending for approval.None
17039188200000NoneNoneELIGIBILITYFurther particulars, if any, required by the bidders can be had from the office of the Executive Engineer, Manchanabele Project Division, Ramanagara during office hours on all working days. It may be noted that if any of the calendar of any event mentioned above happen to be General Holiday / Declared holiday, the next working day will hold good for the respective eventsNone
17039188320000NoneNoneELIGIBILITYThe work includes all lead and lift / de-lift and work shall be carried out as per instruction of engineer-in-charge of the work. And all the specification as per Indian road congress and all relevant Indian codes. The rate for the specifications in the Schedule-B includes all lead and lift, irrespective of distance and heightNone
17039188460000NoneNoneELIGIBILITYThe intending bidders should note that if any of the land either in part / parts or in whole required for the work is not yet acquired by the Nigama, it shall be the responsibility of the bidder to take possession of such land and start the work by obtaining necessary consent of the land owners before commencement of work at no extra cost to the Nigama and no claim what so ever relating to non-availability of land will be entertained. Any delay in obtaining consent of the land owners shall not be considered for any additional compensation.None
17039188540000NoneNoneELIGIBILITYThe undersigned reserves the right to either postpone or to cancel the entire process of tenderNone
17039188630000NoneNoneELIGIBILITYIf CNNL wishes to engage third party consultants for quality control assessment, apart from the CNNL quality control and field tests, the contractor should co-operate with both Quality control authorities and the third partyNone
17039188860000NoneNoneELIGIBILITYDefect liability period will be 3 Years from the date of completion and satisfactory commissioningNone
17039188960000NoneNoneELIGIBILITYPerformance guarantee:- For all works an amount equal to 5.00% of the contract value will be withheld as Performance Guarantee Amount till the expiry of the defect liability periodNone
17039189050000NoneNoneELIGIBILITYBuilding and other construction workers welfare cess The contractor shall subscribe 1.00% of gross amount of each bill payable to him in respect of contract to the building and other construction workers welfare cess as per GO No: LD 300 LET 2006, Bangalore, dated: 18-01-2007. The amount of subscription will be recovered out of payable amount to him in each bill. This component is deemed to have been included in the quoted rate / percentage.None
17039189130000NoneNoneELIGIBILITYThe Tenderer should furnish the Name of the individual / firm/ Company with address and telephone number with place of registration, year of incorporation etc.,None
17039189210000NoneNoneELIGIBILITYThe scanned signature of the bidders / authorized representatives of the bidders shall be attached while uploading the Bid documentNone
17039189290000NoneNoneELIGIBILITYThe Tenderer should furnish the requisite Earnest Money Deposit, Earnest money deposit will have to be in any one of the forms as specified in the Tender document and shall have to be valid for 45 days beyond the validity of the tenderNone
17039189390000NoneNoneELIGIBILITYThe Tenderer should furnish a copy of the Income Tax Return for the latest financial yearNone
17039189470000NoneNoneELIGIBILITYA copy of GST Certificate of the latest financial YearNone
17039189550000NoneNoneELIGIBILITYEmployees Provident fund Registration Certificate In respect of Contractors who are not registered with the EPF (Employees Provident Fund) authorities, the contractors should produce an undertaking that he shall within 7 days of the close of every month submit to the Executive Engineer, a statement showing the recoveries of contributions in respect of employees employed are through in and shall also furnish under the provision of the scheme to the commissioner, EPF However, having given an undertaking to this effect if the contractor does not furnish the information, the Nigama will deduct the necessary amount from the amount due to the contractor. Notwithstanding the above, the contractor will be liable for any consequential penalty /damages levied by the EPF authoritiesNone
17039189620000NoneNoneELIGIBILITYThe necessary certificates / documents in support fulfilling qualification criteria stipulated separately shall be scanned and attached to e-procurement document. The original document shall be produced at the time of opening of tender containing the Technical Bid for verificationNone
17039189700000NoneNoneELIGIBILITYThe Bidder should also furnish the list of work on hand with all details. Such as bid cost, date of entrustment, stipulated date of completion, actual date of completion, completed cost of work, etcNone
17039189790000NoneNoneELIGIBILITYNecessary certificates should be signed by an officer not below the rank of the Executive EngineerNone
17039189870000NoneNoneELIGIBILITYThe intending Bidder/firm/company/ should have man power and machineries available with him for taking up above workNone
17039189940000NoneNoneELIGIBILITYThe intending Bidder/firm/company/ shall provide evidence that the bidder has been actively engaged in the similar nature of work for at least for a period of 5 years prior to the date of submission of applicationNone
17039190070000NoneNoneELIGIBILITYThe intending Bidder/firm/company/ shall provide accurate information on the related application form about any litigation or Arbitration resulting from contracts completed or on going under its execution over the last five years. The consisting history of awards against the tenderer or any partner of a may result in failure of the applicationNone
17039190150000NoneNoneELIGIBILITYThe intending Bidder/firm/company shall provide the audited balance sheets or other financial statements acceptable to the employer for the last five years and must demonstrate the current soundness of the applicants financial position and indicate its prospective long term profitability. If deemed necessary, the employer shall have the authority to make enquiries with the applicants bankersNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneThe bidder/Firm/company should have satisfactorily completed as a prime contractor, at least two similar work such as Construction / Improvements of Canal / Distributaries works of value not less than Rs. 42.32 Lakhs at 2023-24 price level in the preceding last five years. (i.e. 2018-19 to 2022-23), NOTE-1. The financial figures mentioned above is at 2023-24 price levels. Financial turnover and cost of completed works of previous years will be given a weightage of 10% per year based on the rupee value to bring them to current price levels.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe intending bidder / firm / company should have in the last five years satisfactorily executed in any two year the following minimum quantities of the work. Component No. , Nature of Work, minimum component of work, (a) Cement Concrete (Cum)-570 (b) Steel (Tonne) - 14.80, NOTE :- Work done Certificates with year wise break up of quantities duly signed by an officer not below the rank of the Executive Engineer should be submitted along with the technical bid Certificates issued by the Private Individuals/Private Companies/Private Firms, etc., will not be consideredPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under, Assessed available tender capacity (AxNx2.5-B) Where, A-Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. N-Three months prescribed for completion of the works for which tenders are invited. B-Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the tender period daysCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Tender Capacity Calculation with Existing Commitments details
NoneNoneNoneNoneThe intending bidder/firm/ company / should have achieved in at least two out of last Five financial years (i.e. 2018-19 to 2022-23) (In all classes of civil Engineering construction works only) a minimum annual financial turnover of Rs. 84.59 lakhs, NOTE - Audited balance sheets and Turnover certificate duly certified by Chartered accountant should be uploaded. Financial turnover of previous years will be given a weightage of 10% per year based on the rupee value to bring them to current price valueFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneThe bidder / firm/company should furnish details of liquid assets and or availability of credit facilities of Rs 25.38 Lakhs for the work mentioned above for meeting the required funds in the form of credit lines / line of credit / certificate from scheduled /Nationalized BankFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Registration Certificate of class III and aboveTrueTechnical Bid
Annual Turnover Certificate issued by CATrueTechnical Bid
Work done Certificates with year wise executed quantity breakup duly certified by The Executive EngineerTrueTechnical Bid
Line of credit certificate in prescribed formatTrueTechnical Bid
Tender capacity calculation with existing commitments detailsTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone