noticeInvitingTenderDTO
createdTs1706507526444
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee3780.00
emd226600.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose20-02-2024 16:00:00
tenderQueryClose17-02-2024 17:30:00
technicalBidOpen21-02-2024 16:05:00
publishedDate03-02-2024 13:23:34
publishedByPostPWD_EE_DIV_GAD
publishedByUserKPE11642 - V N PATIL
bidValidityPeriod90
noOfCalls1
preBidMeetingDate08-02-2024 17:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnTrue
emdBankGuarantee126600.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08372238782
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1706507526473
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT6340
titleCONSTRUCTION OF KARNATAKA PUBLIC SCHOOL AT DONI VILLAGE,MUNDARGI TALUK,GADAG DISTRICT.
descriptionCONSTRUCTION OF KARNATAKA PUBLIC SCHOOL AT DONI VILLAGE,MUNDARGI TALUK,GADAG DISTRICT.
categoryWORKS
categoryTextWorks
ecv15104250.69
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1682
locationNamePWD Division Office Gadaga
provisionalAmount18150000.0
groupOverheadTotal0.0
fileNumberKPWD/MDG/BUILD/KPS/DONI-4202/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17065075260001NoneNoneBuildingsPRIMARY SCHOOL GROUND FLOOR4553966.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232120668585NoneVol 1 P-8 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Work Should be carried out in site as per Engineer inchargeCum95.095.081.92FalseNoneNoneFalseNoneFalse7782.40
232120768585NoneVol 1 P-8 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Work Should be carried out in site as per Engineer inchargeCum102.0102.0249.32FalseNoneNoneFalseNoneFalse25430.640
232120868585NoneVol 1 P-8 1.15.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting Depth upto 1.5 m depth ---- Work Should be carried out in site as per Engineer inchargeCum363.0363.062.33FalseNoneNoneFalseNoneFalse22625.790
232120968585NoneVol 1 P-7 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Work Should be carried out in site as per Engineer inchargeCum266.0266.0249.32FalseNoneNoneFalseNoneFalse66319.120
232121068585NoneVol 1 P-7 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Work Should be carried out in site as per Engineer inchargeCum474.0474.0160.37FalseNoneNoneFalseNoneFalse76015.380
232121168585NoneVol 1 P-18 2.10.aProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction ofthe Engineer-in-charge. RMC M10 Grade ---- Work Should be carried out in site as per Engineer inchargeCum5866.05866.036.59FalseNoneNoneFalseNoneFalse214636.940
232121268585NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Isolated Footing ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.035.53FalseNoneNoneFalseNoneFalse220961.070
232121368585NoneVol 1 P-111 1.aFormwork, Centering & Scaffloding 8% For Isolated Footing ---- Work Should be carried out in site as per Engineer inchargeCum497.52497.5235.53FalseNoneNoneFalseNoneFalse17676.88560
232121468585NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Columns up to plinth ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.04.2FalseNoneNoneFalseNoneFalse26119.80
232121568585NoneVol 1 P-111 9Formwork, Centering & Scaffloding 70% For Columns up to plinth ---- Work Should be carried out in site as per Engineer inchargeCum4353.34353.34.2FalseNoneNoneFalseNoneFalse18283.860
232121668585NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Columns ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.09.08FalseNoneNoneFalseNoneFalse56468.520
232121768585NoneVol 1 P-111 9Formwork, Centering & Scaffloding 70% For Columns ---- Work Should be carried out in site as per Engineer inchargeCum4353.34353.39.08FalseNoneNoneFalseNoneFalse39527.9640
232121868585NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Plinth Beams ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.014.17FalseNoneNoneFalseNoneFalse88123.230
232121968585NoneVol 1 P-111 2Formwork, Centering & Scaffloding 50% For Plinth Beams ---- Work Should be carried out in site as per Engineer inchargeCum3109.53109.514.17FalseNoneNoneFalseNoneFalse44061.6150
232122068585NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Beams and Lintel ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.017.5FalseNoneNoneFalseNoneFalse108832.50
232122168585NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% For Beams & Lintels ---- Work Should be carried out in site as per Engineer inchargeCum3731.43731.417.5FalseNoneNoneFalseNoneFalse65299.50
232122268585NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Roof Slab & Staircase ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.036.81FalseNoneNoneFalseNoneFalse228921.390
232122368585NoneVol 1 P-112 15Formwork, Centering & Scaffloding 50% For Roof Slab & Staircase ---- Work Should be carried out in site as per Engineer inchargeCum3109.53109.536.81FalseNoneNoneFalseNoneFalse114460.6950
232122468585NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Sill ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.01.51FalseNoneNoneFalseNoneFalse9390.690
232122568585NoneVol 1 P-111 1b.Formwork, Centering & Scaffloding 3% For Sill ---- Work Should be carried out in site as per Engineer inchargeCum186.57186.571.51FalseNoneNoneFalseNoneFalse281.72070
232122668585NoneVol 2 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Chejja ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.00.81FalseNoneNoneFalseNoneFalse5037.390
232122768585NoneVol 2 P-112 19Formwork, Centering & Scaffloding 45% For Chejja ---- Work Should be carried out in site as per Engineer inchargeCum2798.552798.550.81FalseNoneNoneFalseNoneFalse2266.82550
232122868585NoneVol 2 P-18 2.11.aSteel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Work Should be carried out in site as per Engineer inchargeTonne89457.089457.010.73FalseNoneNoneFalseNoneFalse959873.610
232122968585NoneVol 2 P-9 5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Work Should be carried out in site as per Engineer inchargeCum6389.06389.05.63FalseNoneNoneFalseNoneFalse35970.070
232123068585NoneVol 2 P-9 5.1.1Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Work Should be carried out in site as per Engineer inchargeCum5611.05611.038.58FalseNoneNoneFalseNoneFalse216472.380
232123168585NoneVol 2 P-17 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1310.01310.0237.67FalseNoneNoneFalseNoneFalse311347.70
232123268585NoneVol 2 P-17 6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1104.01104.015.16FalseNoneNoneFalseNoneFalse16736.640
232123368585NoneVol 2 P-77 11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeSqm4242.04242.020.16FalseNoneNoneFalseNoneFalse85518.720
232123468585NoneVol 2 P-86 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Work Should be carried out in site as per Engineer inchargeKg183.0183.0839.16FalseNoneNoneFalseNoneFalse153566.280
232123568585NoneVol 2 P-104 12.54Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeMtr318.0318.029.7FalseNoneNoneFalseNoneFalse9444.60
232123668585NoneVol 2 P-104 12.55.1Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges with both side prelam ---- Work Should be carried out in site as per Engineer inchargeSqm2366.02366.09.45FalseNoneNoneFalseNoneFalse22358.70
232123768585NoneVol 2 P-41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm241.0241.0419.83FalseNoneNoneFalseNoneFalse101179.030
232123868585NoneVol 2 P-50 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work Should be carried out in site as per Engineer inchargeSqm100.0100.0767.02FalseNoneNoneFalseNoneFalse76702.00
232123968585NoneVol 2 P-41 8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm279.0279.0322.08FalseNoneNoneFalseNoneFalse89860.320
232124068585NoneVol 2 P-61 9.17.2Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Work Should be carried out in site as per Engineer inchargeSqm1175.01175.0156.56FalseNoneNoneFalseNoneFalse183958.00
232124168585NoneVol 2 P-59 9.2Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge. ---- Work Should be carried out in site as per Engineer inchargeSqm800.0800.024.42FalseNoneNoneFalseNoneFalse19536.00
232124268585NoneVol 2 P-64 9.31Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeSqm2085.02085.0140.61FalseNoneNoneFalseNoneFalse293171.850
232124368585NoneVol 2 P-60 9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Work Should be carried out in site as per Engineer inchargeSqm889.0889.012.47FalseNoneNoneFalseNoneFalse11085.830
232124468585NoneVol 2 P-71 10.14Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Work Should be carried out in site as per Engineer inchargeSqm1106.01106.025.46FalseNoneNoneFalseNoneFalse28158.760
232124568585NoneVol 2 P-69 10.1.1Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. ---- Work Should be carried out in site as per Engineer inchargeSqm4006.04006.00.72FalseNoneNoneFalseNoneFalse2884.320
232124668585NoneVol 2 P-84 11.25.2Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeKg136.0136.0183.87FalseNoneNoneFalseNoneFalse25006.320
232124768585NoneVol 2 P-46 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm158.0158.0767.02FalseNoneNoneFalseNoneFalse121189.160
232124868585NoneVol 2 P-46 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm174.0174.0341.79FalseNoneNoneFalseNoneFalse59471.460
232124968585NoneVol 2 P-47 8.36.1Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm176.0176.047.52FalseNoneNoneFalseNoneFalse8363.520
232125068585NoneVol 2 P-110 12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2 (Titanium Dioxide) at 6PHR with TPE ( Thermo Plastic Elastomer) and lead free, gaskets grey color having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45 mm height with reinforcement of 1mm thickness and Sash with overall size of 39 mm x 75 mm with GI reinforcement of 2mm and mesh sash of size 37 mm x 58 mm. Coextruded Glazing bead for fixing of glass shall be of size 20 mm x 24 mm. Windows shall be provided with 6 mm plain float glass, standard hardware & Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2 mm-2.5 mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T & P s shall not be made) ---- Work Should be carried out in site as per Engineer inchargeSqm6734.06734.027.36FalseNoneNoneFalseNoneFalse184242.240
232125168585NoneVol 2 P-55 8.84Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. ---- Work Should be carried out in site as per Engineer inchargeSqm475.0475.023.04FalseNoneNoneFalseNoneFalse10944.00
232125268585NoneVol 2 P-44 8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1238.01238.019.71FalseNoneNoneFalseNoneFalse24400.980
232125368585NoneVol 5 P-247 21.1.2Water purification plants: Supplying, Installation and Commissioning of automatic Water purification plant (RO+UF) with all accessories piping, product water tank on single phase power supply as per the enclosed detailed Technical Specifications including cost of material, loading and unloading and as directed by the Engineer in charge. (Ref- detailedspecification enclosed seperatly). Note:- 1. The above rates mentioned are only for the preparation of estimate purpose. 2. All items are to be of BSI/NFS standards, with BSI / NFS mark. 3. Tenders to be invited for procurement. 4. No direct payment Page should be made under any situation or condition or on any account. 5. After commissioning of plant necessary testing to be done for the satisfactory of Engineer Incharge. Note: Refer the ANNEXURE: F for Detailed Specification of Each components For 50 LPH: Cabin Type ---- Work Should be carried out in site as per Engineer inchargeEach44000.044000.01.0FalseNoneNoneFalseNoneFalse44000.00
17065075270000NoneNoneBuildingsPRIMARY SCHOOL TERRACE FLOOR450065.22
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232125468586NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Columns ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.192.91FalseNoneNoneFalseNoneFalse18278.26290
232125568586NoneVol 1 P-111 9Formwork, Centering & Scaffloding 70% For Columns ---- Work Should be carried out in site as per Engineer inchargeCum4396.834396.832.91FalseNoneNoneFalseNoneFalse12794.77530
232125668586NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Beams ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.191.28FalseNoneNoneFalseNoneFalse8039.92320
232125768586NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% For Beams ---- Work Should be carried out in site as per Engineer inchargeCum3768.713768.711.28FalseNoneNoneFalseNoneFalse4823.94880
232125868586NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Roof Slab ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.192.06FalseNoneNoneFalseNoneFalse12939.25140
232125968586NoneVol 1 P-112 15Formwork, Centering & Scaffloding 50% For Roof Slab ---- Work Should be carried out in site as per Engineer inchargeCum3140.63140.62.06FalseNoneNoneFalseNoneFalse6469.6360
232126068586NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Lintel ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.190.5FalseNoneNoneFalseNoneFalse3140.5950
232126168586NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% For Lintel ---- Work Should be carried out in site as per Engineer inchargeCum3768.713768.710.5FalseNoneNoneFalseNoneFalse1884.3550
232126268586NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Sill ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.190.3FalseNoneNoneFalseNoneFalse1884.3570
232126368586NoneVol 1 P-111 1b.Formwork, Centering & Scaffloding 3% For Sill ---- Work Should be carried out in site as per Engineer inchargeCum188.44188.440.3FalseNoneNoneFalseNoneFalse56.5320
232126468586NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Chejja ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.190.12FalseNoneNoneFalseNoneFalse753.74280
232126568586NoneVol 1 P-112 19Formwork, Centering & Scaffloding 45% For Chejja ---- Work Should be carried out in site as per Engineer inchargeCum2826.542826.540.12FalseNoneNoneFalseNoneFalse339.18480
232126668586NoneVol 1 P-18 2.11.aSteel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Work Should be carried out in site as per Engineer inchargeTonne90351.5790351.571.0FalseNoneNoneFalseNoneFalse90351.570
232126768586NoneVol 2 P-17 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1323.11323.132.12FalseNoneNoneFalseNoneFalse42497.9720
232126868586NoneVol 2 P-17 6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1115.041115.0449.44FalseNoneNoneFalseNoneFalse55127.57760
232126968586NoneVol 2 P-86 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Work Should be carried out in site as per Engineer inchargeKg184.83184.8345.36FalseNoneNoneFalseNoneFalse8383.88880
232127068586NoneVol 2 P-77 11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Work Should be carried out in site as per Engineer inchargeSqm4284.424284.422.52FalseNoneNoneFalseNoneFalse10796.73840
232127168586NoneVol 2 P-41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm243.41243.4143.26FalseNoneNoneFalseNoneFalse10529.91660
232127268586NoneVol 2 50 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work Should be carried out in site as per Engineer inchargeSqm101.0101.068.31FalseNoneNoneFalseNoneFalse6899.310
232127368586NoneVol 2 P-41 8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm297.95297.95210.02FalseNoneNoneFalseNoneFalse62575.4590
232127468586NoneVol 2 P-46 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm159.58159.5868.31FalseNoneNoneFalseNoneFalse10900.90980
232127568586NoneVol 2 P-46 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm175.74175.74210.02FalseNoneNoneFalseNoneFalse36908.91480
232127668586NoneVol 2 P-47 8.36.1Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm177.76177.764.68FalseNoneNoneFalseNoneFalse831.91680
232127768586NoneVol 2 P-21 7.1.1Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. ---- Work Should be carried out in site as per Engineer inchargeSqm887.79887.7919.84FalseNoneNoneFalseNoneFalse17613.75360
232127868586NoneVol 2 P-77 11.1Providing and fixing Structural Steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeKg107.06107.0698.56FalseNoneNoneFalseNoneFalse10551.83360
232127968586NoneVol-2 P-110 12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45 mm height with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Work Should be carried out in site as per Engineer inchargeSqm6801.346801.342.16FalseNoneNoneFalseNoneFalse14690.89440
17065075270000NoneNoneBuildingsPRIMARY SCHOOL SANITARY AND WATER SUPPLY363098.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232128068587NoneVol 2 P-117 13.3.1Providing and fixing brass stop cock of approved quality :15 mm nominal bore ---- Work Should be carried out in site as per Engineer inchargeNos299.0299.08.0FalseNoneNoneFalseNoneFalse2392.00
232128168587NoneVol 2 P-120 13.20.2Providing and fixing PTMT pillar cock of approved quality and colour. 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 gms ---- Work Should be carried out in site as per Engineer inchargeNos314.0314.04.0FalseNoneNoneFalseNoneFalse1256.00
232128268587NoneVol 2 P-131 14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- Work Should be carried out in site as per Engineer inchargeNos4884.04884.03.0FalseNoneNoneFalseNoneFalse14652.00
232128368587NoneVol 2 P-131 14.2.1Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlleddevice (handle lever), conforming to IS : 7231, with all fittings andfixtures complete, including cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid ---- Work Should be carried out in site as per Engineer inchargeNos4838.04838.01.0FalseNoneNoneFalseNoneFalse4838.00
232128468587NoneVol 2 P-135 14.23Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively. ---- Work Should be carried out in site as per Engineer inchargeNos1154.01154.01.0FalseNoneNoneFalseNoneFalse1154.00
232128568587NoneVol 2 P-133 14.7.8White Vitreous China Surgeon type wash basin of size 660x460 mm with a pair of 15 mm C.P. brass pillar taps with elbow including operated levers ---- Work Should be carried out in site as per Engineer inchargeNos4113.04113.04.0FalseNoneNoneFalseNoneFalse16452.00
232128668587NoneVol 2 P-133 14.8Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings. ---- Work Should be carried out in site as per Engineer inchargeNos1423.01423.04.0FalseNoneNoneFalseNoneFalse5692.00
232128768587NoneVol 2 P-137 14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g ---- Work Should be carried out in site as per Engineer inchargeNos496.0496.02.0FalseNoneNoneFalseNoneFalse992.00
232128868587NoneVol 2 P-136 14.32.2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 453x357 mm ---- Work Should be carried out in site as per Engineer inchargeNos1018.01018.04.0FalseNoneNoneFalseNoneFalse4072.00
232128968587NoneVol 2 P-122 13.31.2Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 20mm nominal dia pipes ---- Work Should be carried out in site as per Engineer inchargeMtr242.0242.020.0FalseNoneNoneFalseNoneFalse4840.00
232129068587NoneVol 2 P-122 13.31.3Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 25mm nominal dia pipes ---- Work Should be carried out in site as per Engineer inchargeMtr318.0318.020.0FalseNoneNoneFalseNoneFalse6360.00
232129168587NoneVol 2 P-122 13.31.4Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 32mm nominal dia pipes ---- Work Should be carried out in site as per Engineer inchargeMtr400.0400.075.0FalseNoneNoneFalseNoneFalse30000.00
232129268587NoneVol 2 P-122 13.31.6Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 50mm nominal dia pipes ---- Work Should be carried out in site as per Engineer inchargeMtr781.0781.060.0FalseNoneNoneFalseNoneFalse46860.00
232129368587NoneVol 2 P-117 13.4.4Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) :50 mm nominal bore ---- Work Should be carried out in site as per Engineer inchargeNos855.0855.015.0FalseNoneNoneFalseNoneFalse12825.00
232129468587NoneVol 2 P-118 13.8.2.2Providing and fixing unplasticised PVC connection pipe with brass unions :45 cm length 20 mm nominal bore ---- Work Should be carried out in site as per Engineer inchargeNos110.0110.015.0FalseNoneNoneFalseNoneFalse1650.00
232129568587NoneVol 2 P-123 13.34Providing and placing on terrace, polyethylene water storage tanks as per IS 12701 : 1996 with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes but without fittings and the base support for tank ---- Work Should be carried out in site as per Engineer inchargeLtr9.09.04000.0FalseNoneNoneFalseNoneFalse36000.00
232129668587NoneVol 5 P-A-44 660PVC pipes of 8 Kg/cm2 for 140mm(3.097) ---- Work Should be carried out in site as per Engineer inchargeMtr456.0456.0111.5FalseNoneNoneFalseNoneFalse50844.00
232129768587NoneVol 5 P-A-44 664PVC pipes of 10 Kg/cm2 for 200mm ---- Work Should be carried out in site as per Engineer inchargeMtr1155.01155.030.0FalseNoneNoneFalseNoneFalse34650.00
232129868587NoneVol 2 P-125 13.49Providing and fixing on wall face unplasticised Rigid PVC rain water pipes of 150mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes ---- Work Should be carried out in site as per Engineer inchargeMtr568.0568.021.5FalseNoneNoneFalseNoneFalse12212.00
232129968587NoneVol 5 P-208 16.60.1Providing PVC-U INDIVIDUAL U.G.D House service connection (which shall be laid from inside the customer property ) which includes: a) Supply of PVC-U pipe (b) providing and fixing of 315 mm dia the PE Inspection chambres with lid consisting of inlet & outlet arrangements with base, riser of min. 0.42 m depth which includes earth work, fixing in CC-1:2:4 with appurtenances., complete. (c) civil works like Earthwork excavation for the pipeline trenches for laying of PVC-U pipes for the house connections in all types of soils , disintegrated rock,soft rock, hard rock, including cutting of any road using , crossing drains, compound, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, c.c. wood work, steel work, including T & P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable and stacking the serviceable material with all lifts and lead , restoring the damaged portions inside or outside the property premises, refilling the portions of trenches that are dug open including linking to existing sewer network with appurtenances. complete. 110 mm dia ---- Work Should be carried out in site as per Engineer inchargeEach8134.08134.02.0FalseNoneNoneFalseNoneFalse16268.00
232130068587NoneVol 1 5 1.4.1Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- Work Should be carried out in site as per Engineer inchargeCum242.0242.09.0FalseNoneNoneFalseNoneFalse2178.00
232130168587NoneVol 1 7 1.90Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Work Should be carried out in site as per Engineer inchargeCum266.0266.020.0FalseNoneNoneFalseNoneFalse5320.00
232130268587NoneVol 5 191 16.90Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover ---- Work Should be carried out in site as per Engineer inchargeEach5454.05454.04.0FalseNoneNoneFalseNoneFalse21816.00
232130368587NoneVol 5 192 16.15.1Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm and down size. Supplying and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Supplying and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm diaCirc. B M.HConstructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.0 M depth & SFRC cover & frame ---- Work Should be carried out in site as per Engineer inchargeEach29047.029047.01.0FalseNoneNoneFalseNoneFalse29047.00
232130468587NoneVol 2 135 14.29Providing and fixing 100 mm sand cast Iron grating for gully trap. ---- Work Should be carried out in site as per Engineer inchargeEach47.047.08.0FalseNoneNoneFalseNoneFalse376.00
232130568587NoneVol 2 120 13.22.1.2Providing and fixing PTMT grating of approved quality and colour 125 mm nominal dia ---- Work Should be carried out in site as per Engineer inchargeNo44.044.08.0FalseNoneNoneFalseNoneFalse352.00
17065075270000NoneNoneBuildingsPRIMARY SCHOOL Electrification223242.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232130668588None1.2.1 (2 of 105)Concealed Conduit System :Supplying heavy gauge PVC conduit pipe mm dia mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary19/20mm dia 2mm thick (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr66.066.0150.0FalseNoneNoneFalseNoneFalse9900.00
232130768588None1.2.2 (2 of 105)Concealed Conduit System :Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary25mm dia 2mm thick.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr78.078.0150.0FalseNoneNoneFalseNoneFalse11700.00
232130868588None1.3.1 (2 of 105)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.19/20mm dia 2mm thick.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr68.068.025.0FalseNoneNoneFalseNoneFalse1700.00
232130968588None1.3.2 (2 of 105)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.25mm dia 2mm thick.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr79.079.025.0FalseNoneNoneFalseNoneFalse1975.00
232131068588None1.9.2 (3 of 105)Supplying PVC/GI flexible conduit pipe .... mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely25mm.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr22.022.010.0FalseNoneNoneFalseNoneFalse220.00
232131168588None2.1.1 (5 of 105)Point wiring using Copper wire with out switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2 X1.5Sq.mm (Phase&Neutral) &1x1.0 Sqmm(earth Wire)Cable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto3mtr from tapping point to out let via Switch.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargePoint285.0285.08.0FalseNoneNoneFalseNoneFalse2280.00
232131268588None2.1.2 (5 of 105)Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargePoint394.0394.023.0FalseNoneNoneFalseNoneFalse9062.00
232131368588None2.1.3 (5 of 105)Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargePoint570.0570.04.0FalseNoneNoneFalseNoneFalse2280.00
232131468588None2.3.2 (5 of 105)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,1.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr26.026.0150.0FalseNoneNoneFalseNoneFalse3900.00
232131568588None2.3.3 (5 of 105)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,2.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr42.042.0300.0FalseNoneNoneFalseNoneFalse12600.00
232131668588None3.4.2 (8 of 105)Supplying and flush mounting powder coated / galvanized metal box size 1-3way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach159.0159.03.0FalseNoneNoneFalseNoneFalse477.00
232131768588None3.4.3 (8 of 105)Supplying and flush mounting powder coated / galvanized metal box size 4-5way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach177.0177.04.0FalseNoneNoneFalseNoneFalse708.00
232131868588None3.4.5 (8 of 105)Supplying and flush mounting powder coated / galvanized metal box size 8way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach261.0261.04.0FalseNoneNoneFalseNoneFalse1044.00
232131968588None3.4.6 (8 of 105)Supplying and flush mounting powder coated / galvanized metal box size 10-12way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach319.0319.08.0FalseNoneNoneFalseNoneFalse2552.00
232132068588None3.5.2 (8 of 105)Supplying and fixing superior quality 3Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach161.0161.03.0FalseNoneNoneFalseNoneFalse483.00
232132168588None3.5.3 (8 of 105)Supplying and fixing superior quality 4Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach175.0175.04.0FalseNoneNoneFalseNoneFalse700.00
232132268588None3.5.5 (8 of 105)Supplying and fixing superior quality 8 modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach284.0284.04.0FalseNoneNoneFalseNoneFalse1136.00
232132368588None3.5.6 (8 of 105)Supplying and fixing superior quality 10-12Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach344.0344.08.0FalseNoneNoneFalseNoneFalse2752.00
232132468588None3.6.1 (9 of 105)Supplying and fixing of 6Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach102.0102.050.0FalseNoneNoneFalseNoneFalse5100.00
232132568588None3.6.3 (9 of 105)Supplying and fixing of 6Amps 3way modular Socketc on existing modular switch plate as per IS 3854 and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach171.0171.015.0FalseNoneNoneFalseNoneFalse2565.00
232132668588None3.6.4 (9 of 105)Supplying and fixing of modular stepped fan regulator Two Module on existing modular switch plate as per and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach357.0357.08.0FalseNoneNoneFalseNoneFalse2856.00
232132768588None3.14.6 (10 of 105)Supplying and fixing of 6AmpsLamp holder on existing board.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeNo71.071.035.0FalseNoneNoneFalseNoneFalse2485.00
232132868588None5.7.3 (14 of 105)Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.63amps.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach401.0401.03.0FalseNoneNoneFalseNoneFalse1203.00
232132968588None5.18.1 (17 of 105)Supplying and fixingof 6to32 Amps Single pole miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach415.0415.05.0FalseNoneNoneFalseNoneFalse2075.00
232133068588None5.18.4 (17 of 105)Supplying and fixingof 6to32 Amps Double pole miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach739.0739.01.0FalseNoneNoneFalseNoneFalse739.00
232133168588None5.19.9 (18 of 105)Supplying and fixing 12way regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.I - doble Door12way sp&n.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach2329.02329.01.0FalseNoneNoneFalseNoneFalse2329.00
232133268588None6.3.1 (30 of 105)Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) Economy model.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach2984.02984.08.0FalseNoneNoneFalseNoneFalse23872.00
232133368588None11.3.2 (43 of 105)LED Indood supplying of 1x4 feet LED PVC square batten 20/22 W with high quality diffuser with life of 25000 burning hours at 70% lumen maintenance with CRI 80 power input 220-240V@ 50Hz & Power Factor 0.9 along with CE approved drivers. 2 years Warrenty againest any manufacturing defect working under standard electrical condition(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach690.0690.023.0FalseNoneNoneFalseNoneFalse15870.00
232133468588None11..11.4 (47 of 105)Supplying & fixing of retrofi ttype LED bulb...... Wwith OPALacry licdiffuser comprising of LED source with CCT 6500 degreeK, CRI70%. efficacy 80lumenper W, life25000 burning hoursand Compliance to IS10322/IEC60598, LM79&LM80. The LED are driven byHFelectronicdriverintegratedinthesystem,withPF 0.95,powerlossshould 5oflampWage.,shortcircuit&opencircuitprotectiontobeintegratedinthecircuit,THDlessthan20%,LifeasperLM79.Theoperatinginputvoltageshouldbebetween130to275V.BISApprovedandTestedbyNABL/CPRIaccreditedlaboratorywith2yearsWarrantyagains tany manufacturing defect working under standard electrical condition. (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach154.0154.05.0FalseNoneNoneFalseNoneFalse770.00
232133568588None13.7.1 (56 of 105)Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach122.0122.023.0FalseNoneNoneFalseNoneFalse2806.00
232133668588None13.10 (57 of 105)Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach171.0171.08.0FalseNoneNoneFalseNoneFalse1368.00
232133768588None12.56 (54 of 105)Supplying,fixing,wiring,earthelectrodeforgroundingconduits,I.C.cutoutsandotherequipment'sonthemeterboardusing40mmdia2.90mmthickGIpipe2.5mlongburiedinapit.Thepitshouldbefilledwithequalproportionofsaltandcharcoal150mmall-roundthepipetocompletedepth.Theconnectionfromthepipetotheconduitetc.,istobeestablishedthroughGIwireofsizeasperlSIspecification7.3.3.ofIS732using12mmdiabolts,nuts,washersandchecknutsetc., the pipe shall have 16 through holes of 12 mm dia (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeNo3510.03510.01.0FalseNoneNoneFalseNoneFalse3510.00
232133868588None32.07 (13 of 81)1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip25Sqmm, 3.5 Core, (12 GI Strips - 4 x 0.8 mm) (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeKm139549.0139549.00.06FalseNoneNoneFalseNoneFalse8372.940
232133968588None11.1.5 127Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete Light Duty GI pipe of 40mm dia (Volume - 5 SR Water Supply and Sewerage Works) ---- Work Should be carried out in site as per Engineer inchargeMtr412.0412.010.0FalseNoneNoneFalseNoneFalse4120.00
232134068588None1.4.1 5Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.( PWD common SR Vol-I 2023-24) ---- Work Should be carried out in site as per Engineer inchargeCum242.0242.022.0FalseNoneNoneFalseNoneFalse5324.00
232134168588None1.10 7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications ( PWD common SR Vol-I 2023-24) ---- Work Should be carried out in site as per Engineer inchargeCum160.0160.022.0FalseNoneNoneFalseNoneFalse3520.00
232134268588None21.05 (52 of 81)Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 2.5 to 25 Sqmm (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeKm20886.020886.00.06FalseNoneNoneFalseNoneFalse1253.160
232134368588None5.37 (19 of 105)Supplying, fixing and wiring heavy duty low voltage capacitors conforming to IS 2834. 3 phase, 400/440 V grade, for power factor improvement of rotating machineries like induction motor.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeKvar480.0480.050.0FalseNoneNoneFalseNoneFalse24000.00
232134468588None5.38 (19 of 105)Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz12/24V D.C (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach515.0515.03.0FalseNoneNoneFalseNoneFalse1545.00
232134568588None5.40.1 (20 of 105)Supplying ......... A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete.100 A 4 x 30 x 10 mm Aluminium Strips (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr2465.02465.00.5FalseNoneNoneFalseNoneFalse1232.50
232134668588None5.41.2 (20 of 105)Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint.50 x 50 x 6 mm (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr395.0395.06.0FalseNoneNoneFalseNoneFalse2370.00
232134768588None5.42.2 (21 of 105)Fabricating supplying and mounting MS box made out ....SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete.16 SWG ((PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeSq CM0.430.4350000.0FalseNoneNoneFalseNoneFalse21500.00
232134868588None6.1 (30 of 105)Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach1492.01492.01.0FalseNoneNoneFalseNoneFalse1492.00
232134968588None11.8.2 (46 of 105)Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 &LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LEDEfficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part.Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source..LED Streetlight 40 W (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach4024.04024.02.0FalseNoneNoneFalseNoneFalse8048.00
232135068588None13.1.1 (56 of 105)Supplying and Fixing of........mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket 1x40/2x40 W fluorescent tube street light fitting of all capacities to GI or GI or rail or RCC pole / wall using suitable clA, bolts, and nuts and wiring using suitable capacity wires.Using 25mm dia G.I.Pipe(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach978.0978.02.0FalseNoneNoneFalseNoneFalse1956.00
232135168588None13.14 (57 of 105)Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire..(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach492.0492.01.0FalseNoneNoneFalseNoneFalse492.00
232135268588NoneHESCOM approvalProviding TC for power supply arrangement as per HESCOM approval ---- Work Should be carried out in site as per Engineer inchargeEach5000.05000.01.0FalseNoneNoneFalseNoneFalse5000.00
17065075270000NoneNoneBuildingsPRIMARY SCHOOL SEPTIC TANK186307.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232135368589NoneVol 1 P-8 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Work Should be carried out in site as per Engineer inchargeCum95.095.03.29FalseNoneNoneFalseNoneFalse312.550
232135468589NoneVol 1 P-8 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Work Should be carried out in site as per Engineer inchargeCum102.0102.032.92FalseNoneNoneFalseNoneFalse3357.840
232135568589NoneVol 2 P-13 6.1Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Work Should be carried out in site as per Engineer inchargeCum8220.08220.09.09FalseNoneNoneFalseNoneFalse74719.80
232135668589NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Plinth Beam ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.01.92FalseNoneNoneFalseNoneFalse11940.480
232135768589NoneVol 1 P-111 1.aFormwork, Centering & Scaffloding 50% For Plinth Beams ---- Work Should be carried out in site as per Engineer inchargeCum3109.53109.51.92FalseNoneNoneFalseNoneFalse5970.240
232135868589NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. for Slab ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.03.01FalseNoneNoneFalseNoneFalse18719.190
232135968589NoneVol 1 P-111 9Formwork, Centering & Scaffloding 50% For Slab ---- Work Should be carried out in site as per Engineer inchargeCum3109.53109.53.01FalseNoneNoneFalseNoneFalse9359.5950
232136068589NoneVol 2 P-18 2.11.aSteel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Work Should be carried out in site as per Engineer inchargeTonne89457.089457.00.53FalseNoneNoneFalseNoneFalse47412.210
232136168589NoneVol 2 P-41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm241.0241.043.95FalseNoneNoneFalseNoneFalse10591.950
232136268589NoneVol 5 P-221 18.3Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm1962.01962.02.0FalseNoneNoneFalseNoneFalse3924.00
17065075270001NoneNoneBuildingsHigh School Ground Floor4676766.99
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232136368590NoneVol 1 P-8 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Work Should be carried out in site as per Engineer inchargeCum95.095.097.81FalseNoneNoneFalseNoneFalse9291.950
232136468590NoneVol 1 P-8 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Work Should be carried out in site as per Engineer inchargeCum102.0102.0103.01FalseNoneNoneFalseNoneFalse10507.020
232136568590NoneVol 1 P-8 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Work Should be carried out in site as per Engineer inchargeCum102.0102.0189.5FalseNoneNoneFalseNoneFalse19329.00
232136668590NoneVol 1 P-8 1.15.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting Depth upto 1.5 m depth ---- Work Should be carried out in site as per Engineer inchargeCum363.0363.081.21FalseNoneNoneFalseNoneFalse29479.230
232136768590NoneVol 1 P-7 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Work Should be carried out in site as per Engineer inchargeCum266.0266.0189.5FalseNoneNoneFalseNoneFalse50407.00
232136868590NoneVol 1 P-7 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Work Should be carried out in site as per Engineer inchargeCum474.0474.0163.65FalseNoneNoneFalseNoneFalse77570.10
232136968590NoneVol 1 P-18 2.10.aProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M10 Grade ---- Work Should be carried out in site as per Engineer inchargeCum5866.05866.038.39FalseNoneNoneFalseNoneFalse225195.740
232137068590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Isolated Footing ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.053.54FalseNoneNoneFalseNoneFalse332965.260
232137168590NoneVol 1 P-111 1.aFormwork, Centering & Scaffloding 8% For Isolated Footing ---- Work Should be carried out in site as per Engineer inchargeCum497.52497.5253.54FalseNoneNoneFalseNoneFalse26637.22080
232137268590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Columns up to plinth ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.05.72FalseNoneNoneFalseNoneFalse35572.680
232137368590NoneVol 1 P-111 9Formwork, Centering & Scaffloding 70% For Columns up to plinth ---- Work Should be carried out in site as per Engineer inchargeCum4353.34353.35.72FalseNoneNoneFalseNoneFalse24900.8760
232137468590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Columns ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.010.2FalseNoneNoneFalseNoneFalse63433.80
232137568590NoneVol 1 P-111 9Formwork, Centering & Scaffloding 70% For Columns ---- Work Should be carried out in site as per Engineer inchargeCum4353.34353.310.2FalseNoneNoneFalseNoneFalse44403.660
232137668590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Plinth beams ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.013.03FalseNoneNoneFalseNoneFalse81033.570
232137768590NoneVol 1 P-111 2Formwork, Centering & Scaffloding 50% For Plinth Beams ---- Work Should be carried out in site as per Engineer inchargeCum3109.53109.513.03FalseNoneNoneFalseNoneFalse40516.7850
232137868590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Beams ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.014.16FalseNoneNoneFalseNoneFalse88061.040
232137968590NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% For Beams ---- Work Should be carried out in site as per Engineer inchargeCum3731.43731.414.16FalseNoneNoneFalseNoneFalse52836.6240
232138068590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Slab ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.038.01FalseNoneNoneFalseNoneFalse236384.190
232138168590NoneVol 1 P-112 15Formwork, Centering & Scaffloding 50% For Roof Slab & Staircase ---- Work Should be carried out in site as per Engineer inchargeCum3109.53109.538.01FalseNoneNoneFalseNoneFalse118192.0950
232138268590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Lintel ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.03.49FalseNoneNoneFalseNoneFalse21704.310
232138368590NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% FOR Lintel ---- Work Should be carried out in site as per Engineer inchargeCum3731.43731.43.49FalseNoneNoneFalseNoneFalse13022.5860
232138468590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Sill ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.01.47FalseNoneNoneFalseNoneFalse9141.930
232138568590NoneVol 1 P-111 1b.Formwork, Centering & Scaffloding 3% For Sill ---- Work Should be carried out in site as per Engineer inchargeCum186.57186.571.47FalseNoneNoneFalseNoneFalse274.25790
232138668590NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Chejja ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.01.242FalseNoneNoneFalseNoneFalse7723.9980
232138768590NoneVol 1 P-112 19Formwork, Centering & Scaffloding 45% For Chejja ---- Work Should be carried out in site as per Engineer inchargeCum2798.552798.551.242FalseNoneNoneFalseNoneFalse3475.79910
232138868590NoneVol 1 P-18 2.11.aSteel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Work Should be carried out in site as per Engineer inchargeTonne89457.089457.012.07FalseNoneNoneFalseNoneFalse1079745.990
232138968590NoneVol 2 P-9 5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Work Should be carried out in site as per Engineer inchargeCum6389.06389.06.83FalseNoneNoneFalseNoneFalse43636.870
232139068590NoneVol 2 P-9 5.1.1Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Work Should be carried out in site as per Engineer inchargeCum5611.05611.038.75FalseNoneNoneFalseNoneFalse217426.250
232139168590NoneVol 2 P-17 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1310.01310.0226.68FalseNoneNoneFalseNoneFalse296950.80
232139268590NoneVol 2 P-17 6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1104.01104.022.66FalseNoneNoneFalseNoneFalse25016.640
232139368590NoneVol 2 P-77 11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeSqm4242.04242.010.08FalseNoneNoneFalseNoneFalse42759.360
232139468590NoneVol 2 P-86 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Work Should be carried out in site as per Engineer inchargeKg183.0183.0559.44FalseNoneNoneFalseNoneFalse102377.520
232139568590NoneVol 2 P-104 12.54Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeMtr318.0318.019.8FalseNoneNoneFalseNoneFalse6296.40
232139668590NoneVol 2 P-104 12.55.1Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges with both side prelam ---- Work Should be carried out in site as per Engineer inchargeSqm2366.02366.06.3FalseNoneNoneFalseNoneFalse14905.80
232139768590NoneVol 2 P-110 12.88Providing & fixing of 2 track x 2panel sliding door made out of multi chambered UPVC (Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having a overall size of 60 mm width x 45 mm height with reinforcement of 1 mm thickness and Sash with overall size of 39 mm X 58 mm with GI reinforcement of 1 mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20 mm x 24 mm. Windows shall be provided with 5 mm plain float glass, standard hardware & single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 2.5 mm. Maximum possible size 1819 mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Work Should be carried out in site as per Engineer inchargeSqm5390.05390.01.89FalseNoneNoneFalseNoneFalse10187.10
232139868590NoneVol 2 P-41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm241.0241.0438.95FalseNoneNoneFalseNoneFalse105786.950
232139968590NoneVol 2 P-50 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work Should be carried out in site as per Engineer inchargeSqm100.0100.0801.55FalseNoneNoneFalseNoneFalse80155.00
232140068590NoneVol 2 P-41 8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm279.0279.0264.83FalseNoneNoneFalseNoneFalse73887.570
232140168590NoneVol 2 P-61 9.17.2Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Work Should be carried out in site as per Engineer inchargeSqm1175.01175.0161.34FalseNoneNoneFalseNoneFalse189574.50
232140268590NoneVol 2 P-59 9.2Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge. ---- Work Should be carried out in site as per Engineer inchargeSqm800.0800.024.59FalseNoneNoneFalseNoneFalse19672.00
232140368590NoneVol 2 P-64 9.31Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeSqm2085.02085.0132.52FalseNoneNoneFalseNoneFalse276304.20
232140468590NoneVol 2 P-60 9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Work Should be carried out in site as per Engineer inchargeSqm889.0889.022.16FalseNoneNoneFalseNoneFalse19700.240
232140568590NoneVol 2 P-71 10.14Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Work Should be carried out in site as per Engineer inchargeSqm1106.01106.014.8FalseNoneNoneFalseNoneFalse16368.80
232140668590NoneVol 2 P-69 10.1.1Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. ---- Work Should be carried out in site as per Engineer inchargeSqm4006.04006.03.6FalseNoneNoneFalseNoneFalse14421.60
232140768590NoneVol 2 P-84 11.25.2Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeKg136.0136.0183.87FalseNoneNoneFalseNoneFalse25006.320
232140868590NoneVol 2 P-46 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm158.0158.0801.55FalseNoneNoneFalseNoneFalse126644.90
232140968590NoneVol 2 P-46 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm174.0174.0284.0FalseNoneNoneFalseNoneFalse49416.00
232141068590NoneVol 2 P-47 8.36.1Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm176.0176.036.72FalseNoneNoneFalseNoneFalse6462.720
232141168590NoneVol 2 P-110 12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm 2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Work Should be carried out in site as per Engineer inchargeSqm6734.06734.026.64FalseNoneNoneFalseNoneFalse179393.760
232141268590NoneVol 2 P-55 8.84Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. ---- Work Should be carried out in site as per Engineer inchargeSqm475.0475.017.28FalseNoneNoneFalseNoneFalse8208.00
232141368590NoneVol 2 P-44 8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1238.01238.019.71FalseNoneNoneFalseNoneFalse24400.980
17065075270000NoneNoneBuildingsHigh School FIRST FLOOR2926008.62
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232141468591NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Columns ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.1910.2FalseNoneNoneFalseNoneFalse64068.1380
232141568591NoneVol 1 P-111 9Formwork, Centering & Scaffloding 70% For Columns ---- Work Should be carried out in site as per Engineer inchargeCum4396.844396.8410.2FalseNoneNoneFalseNoneFalse44847.7680
232141668591NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Beams ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.1914.16FalseNoneNoneFalseNoneFalse88941.65040
232141768591NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% For Beams ---- Work Should be carried out in site as per Engineer inchargeCum3768.723768.7214.16FalseNoneNoneFalseNoneFalse53365.07520
232141868591NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Roof Slab ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.1935.35FalseNoneNoneFalseNoneFalse222040.06650
232141968591NoneVol 1 P-112 15Formwork, Centering & Scaffloding 50% For Roof Slab ---- Work Should be carried out in site as per Engineer inchargeCum3140.63140.635.35FalseNoneNoneFalseNoneFalse111020.210
232142068591NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Staircase ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.192.67FalseNoneNoneFalseNoneFalse16770.77730
232142168591NoneVol 1 P-112 15Formwork, Centering & Scaffloding 50% For Staircase ---- Work Should be carried out in site as per Engineer inchargeCum3140.63140.62.67FalseNoneNoneFalseNoneFalse8385.4020
232142268591NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Lintel ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.192.99FalseNoneNoneFalseNoneFalse18780.75810
232142368591NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% For Lintel ---- Work Should be carried out in site as per Engineer inchargeCum3768.723768.722.99FalseNoneNoneFalseNoneFalse11268.47280
232142468591NoneVol 1 18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Sill ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.191.33FalseNoneNoneFalseNoneFalse8353.98270
232142568591NoneVol 1 P-111 1b.Formwork, Centering & Scaffloding 3% For Sill ---- Work Should be carried out in site as per Engineer inchargeCum188.44188.441.33FalseNoneNoneFalseNoneFalse250.62520
232142668591NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Chejja ---- Work Should be carried out in site as per Engineer inchargeCum6281.196281.191.01FalseNoneNoneFalseNoneFalse6344.00190
232142768591NoneVol 1 P-112 19Formwork, Centering & Scaffloding 45% For Chejja ---- Work Should be carried out in site as per Engineer inchargeCum2826.542826.541.01FalseNoneNoneFalseNoneFalse2854.80540
232142868591NoneVol 1 P-18 2.11.aSteel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Work Should be carried out in site as per Engineer inchargeTonne90351.5790351.577.42FalseNoneNoneFalseNoneFalse670408.64940
232142968591NoneVol 2 P-17 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1323.11323.1261.21FalseNoneNoneFalseNoneFalse345606.9510
232143068591NoneVol 2 P-77 11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeSqm4284.424284.4210.08FalseNoneNoneFalseNoneFalse43186.95360
232143168591NoneVol 2 P-86 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Work Should be carried out in site as per Engineer inchargeKg184.83184.83574.56FalseNoneNoneFalseNoneFalse106195.92480
232143268591NoneVol 2 P-41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm243.41243.41361.81FalseNoneNoneFalseNoneFalse88068.17210
232143368591NoneVol 2 P-50 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work Should be carried out in site as per Engineer inchargeSqm101.0101.0724.41FalseNoneNoneFalseNoneFalse73165.410
232143468591NoneVol 2 P-41 8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm297.95297.95310.22FalseNoneNoneFalseNoneFalse92430.0490
232143568591NoneVol 2 P-61 9.17.2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Work Should be carried out in site as per Engineer inchargeSqm1186.751186.75187.44FalseNoneNoneFalseNoneFalse222444.420
232143668591NoneVol 2 P-64 9.31Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeSqm2105.852105.85103.33FalseNoneNoneFalseNoneFalse217597.48050
232143768591NoneVol 2 P-84 11.25.2Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeKg137.36137.36106.25FalseNoneNoneFalseNoneFalse14594.50
232143868591NoneVol 2 P-46 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm159.58159.58724.41FalseNoneNoneFalseNoneFalse115601.34780
232143968591NoneVol 2 P-46 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm175.74175.74329.39FalseNoneNoneFalseNoneFalse57886.99860
232144068591NoneVol 2 P-47 8.36.1Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm177.76177.7637.44FalseNoneNoneFalseNoneFalse6655.33440
232144168591NoneVol 2 P-110 12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm 2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Work Should be carried out in site as per Engineer inchargeSqm6801.346801.3427.36FalseNoneNoneFalseNoneFalse186084.66240
232144268591NoneVol 2 P-55 8.84Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. ---- Work Should be carried out in site as per Engineer inchargeSqm479.75479.758.64FalseNoneNoneFalseNoneFalse4145.040
232144368591NoneVol 2 P-44 8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1250.381250.3819.71FalseNoneNoneFalseNoneFalse24644.98980
17065075270000NoneNoneBuildingsHigh School TERRACE FLOOR503333.52
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232144468592NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Columns ---- Work Should be carried out in site as per Engineer inchargeCum6343.386343.383.79FalseNoneNoneFalseNoneFalse24041.41020
232144568592NoneVol 1 P-111 9Formwork, Centering & Scaffloding 70% For Columns ---- Work Should be carried out in site as per Engineer inchargeCum4440.374440.373.79FalseNoneNoneFalseNoneFalse16829.00230
232144668592NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Beams ---- Work Should be carried out in site as per Engineer inchargeCum6343.386343.381.51FalseNoneNoneFalseNoneFalse9578.50380
232144768592NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% For Beams ---- Work Should be carried out in site as per Engineer inchargeCum3806.033806.031.51FalseNoneNoneFalseNoneFalse5747.10530
232144868592NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Roof Slab ---- Work Should be carried out in site as per Engineer inchargeCum6343.386343.382.25FalseNoneNoneFalseNoneFalse14272.6050
232144968592NoneVol 1 P-112 15Formwork, Centering & Scaffloding 50% For Roof Slab ---- Work Should be carried out in site as per Engineer inchargeCum3171.693171.692.25FalseNoneNoneFalseNoneFalse7136.30250
232145068592NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Lintel ---- Work Should be carried out in site as per Engineer inchargeCum6343.386343.380.53FalseNoneNoneFalseNoneFalse3361.99140
232145168592NoneVol 1 P-112 14Formwork, Centering & Scaffloding 60% For Lintel ---- Work Should be carried out in site as per Engineer inchargeCum3806.033806.030.53FalseNoneNoneFalseNoneFalse2017.19590
232145268592NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Sill ---- Work Should be carried out in site as per Engineer inchargeCum6343.386343.380.28FalseNoneNoneFalseNoneFalse1776.14640
232145368592NoneVol 1 P-111 1b.Formwork, Centering & Scaffloding 3% For Sill ---- Work Should be carried out in site as per Engineer inchargeCum190.3190.30.28FalseNoneNoneFalseNoneFalse53.2840
232145468592NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Chejja ---- Work Should be carried out in site as per Engineer inchargeCum6343.386343.380.13FalseNoneNoneFalseNoneFalse824.63940
232145568592NoneVol 1 P-112 19Formwork, Centering & Scaffloding 45% For Chejja ---- Work Should be carried out in site as per Engineer inchargeCum2854.522854.520.13FalseNoneNoneFalseNoneFalse371.08760
232145668592NoneVol 1 P-18 2.11.aSteel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Work Should be carried out in site as per Engineer inchargeTonne91246.1491246.141.27FalseNoneNoneFalseNoneFalse115882.59780
232145768592NoneVol 2 P-17 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1336.21336.238.01FalseNoneNoneFalseNoneFalse50788.9620
232145868592NoneVol 2 P-17 6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work Should be carried out in site as per Engineer inchargeSqm1126.081126.0849.06FalseNoneNoneFalseNoneFalse55245.48480
232145968592NoneVol 2 P-86 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Work Should be carried out in site as per Engineer inchargeKg186.66186.6645.36FalseNoneNoneFalseNoneFalse8466.89760
232146068592NoneVol 2 P-77 11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Work Should be carried out in site as per Engineer inchargeSqm4326.844326.842.52FalseNoneNoneFalseNoneFalse10903.63680
232146168592NoneVol 2 P-41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm245.82245.8246.11FalseNoneNoneFalseNoneFalse11334.76020
232146268592NoneVol 2 P-50 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work Should be carried out in site as per Engineer inchargeSqm102.0102.073.19FalseNoneNoneFalseNoneFalse7465.380
232146368592NoneVol 2 P-41 8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm300.9300.9208.8FalseNoneNoneFalseNoneFalse62827.920
232146468592NoneVol 2 P-46 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm161.16161.1673.19FalseNoneNoneFalseNoneFalse11795.30040
232146568592NoneVol 2 P-46 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm177.48177.48208.8FalseNoneNoneFalseNoneFalse37057.8240
232146668592NoneVol 2 P-47 8.36.1Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm179.52179.524.68FalseNoneNoneFalseNoneFalse840.15360
232146768592NoneVol 2 P-21 7.1.1Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. ---- Work Should be carried out in site as per Engineer inchargeSqm896.58896.5821.44FalseNoneNoneFalseNoneFalse19222.67520
232146868592NoneVol 2 P-77 11.1Providing and fixing Structural Steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work Should be carried out in site as per Engineer inchargeKg108.12108.1298.56FalseNoneNoneFalseNoneFalse10656.30720
232146968592NoneVol 2 P-110 12.90Providing & fixing of 3 track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mm height with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm 2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Work Should be carried out in site as per Engineer inchargeSqm6868.686868.682.16FalseNoneNoneFalseNoneFalse14836.34880
17065075270000NoneNoneBuildingsHigh School Sanitary & water supply471249.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232147068593NoneVol 2 P-117 13.3.1Providing and fixing brass stop cock of approved quality :15 mm nominal bore ---- Work Should be carried out in site as per Engineer inchargeNos299.0299.010.0FalseNoneNoneFalseNoneFalse2990.00
232147168593NoneVol 2 P-120 13.20.2Providing and fixing PTMT pillar cock of approved quality and colour. 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 gms ---- Work Should be carried out in site as per Engineer inchargeNos314.0314.08.0FalseNoneNoneFalseNoneFalse2512.00
232147268593NoneVol 2 P-131 14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- Work Should be carried out in site as per Engineer inchargeNos4884.04884.02.0FalseNoneNoneFalseNoneFalse9768.00
232147368593NoneVol 2 P-131 14.2.1Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid ---- Work Should be carried out in site as per Engineer inchargeNos4838.04838.01.0FalseNoneNoneFalseNoneFalse4838.00
232147468593NoneVol 2 P-135 14.23Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively. ---- Work Should be carried out in site as per Engineer inchargeNos1154.01154.01.0FalseNoneNoneFalseNoneFalse1154.00
232147568593NoneVol 2 P-133 14.7.8White Vitreous China Surgeon type wash basin of size 660x460 mm with a pair of 15 mm C.P. brass pillar taps with elbow including operated levers ---- Work Should be carried out in site as per Engineer inchargeNos4113.04113.08.0FalseNoneNoneFalseNoneFalse32904.00
232147668593NoneVol 2 P-133 14.8Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings. ---- Work Should be carried out in site as per Engineer inchargeNos1423.01423.08.0FalseNoneNoneFalseNoneFalse11384.00
232147768593NoneVol 2 P-137 14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g ---- Work Should be carried out in site as per Engineer inchargeEach496.0496.04.0FalseNoneNoneFalseNoneFalse1984.00
232147868593NoneVol 2 P-136 14.32.2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 453x357 mm ---- Work Should be carried out in site as per Engineer inchargeNos1018.01018.08.0FalseNoneNoneFalseNoneFalse8144.00
232147968593NoneVol 2 P-122 13.31.2Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 20mm nominal dia pipes ---- Work Should be carried out in site as per Engineer inchargeMtr242.0242.030.0FalseNoneNoneFalseNoneFalse7260.00
232148068593NoneVol 2 P-122 13.31.3Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 25mm nominal dia pipes ---- Work Should be carried out in site as per Engineer inchargeMtr318.0318.030.0FalseNoneNoneFalseNoneFalse9540.00
232148168593NoneVol 2 P-122 13.31.4Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 32mm nominal dia pipes ---- Work Should be carried out in site as per Engineer inchargeMtr400.0400.075.0FalseNoneNoneFalseNoneFalse30000.00
232148268593NoneVol 2 P-122 13.31.6Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 50mm nominal dia pipes ---- Work Should be carried out in site as per Engineer inchargeMtr781.0781.090.0FalseNoneNoneFalseNoneFalse70290.00
232148368593NoneVol 2 P-117 13.4.4Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) :50 mm nominal bore ---- Work Should be carried out in site as per Engineer inchargeNos855.0855.015.0FalseNoneNoneFalseNoneFalse12825.00
232148468593NoneVol 2 P-118 13.8.2.2Providing and fixing unplasticised PVC connection pipe with brass unions :45 cm length 20 mm nominal bore ---- Work Should be carried out in site as per Engineer inchargeNos110.0110.015.0FalseNoneNoneFalseNoneFalse1650.00
232148568593NoneVol 2 P-123 13.34Providing and placing on terrace, polyethylene water storage tanks as per IS 12701 : 1996 with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes but without fittings and the base support for tank ---- Work Should be carried out in site as per Engineer inchargeLtr9.09.05000.0FalseNoneNoneFalseNoneFalse45000.00
232148668593NoneVol 5 P-A-44 660PVC pipes of 8 Kg/cm2 for 140mm(3.097) ---- Work Should be carried out in site as per Engineer inchargeMtr456.0456.0128.0FalseNoneNoneFalseNoneFalse58368.00
232148768593NoneVol 5 A-44 664PVC pipes of 10 Kg/cm2 for 200mm ---- Work Should be carried out in site as per Engineer inchargeMtr1155.01155.030.0FalseNoneNoneFalseNoneFalse34650.00
232148868593NoneVol 2 P-125 13Providing and fixing on wall face unplasticised Rigid PVC rain water pipes of 150mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes ---- Work Should be carried out in site as per Engineer inchargeMtr568.0568.038.0FalseNoneNoneFalseNoneFalse21584.00
232148968593NoneVol 5 P-208 16.60.1Providing PVC-U INDIVIDUAL U.G.D House service connection (which shall be laid from inside the customer property ) which includes: a) Supply of PVC-U pipe (b) providing and fixing of 315 mm dia the PE Inspection chambres with lid consisting of inlet & outlet arrangements with base, riser of min. 0.42 m depth which includes earth work, fixing in CC-1:2:4 with appurtenances., complete. (c) civil works like Earthwork excavation for the pipeline trenches for laying of PVC-U pipes for the house connections in all types of soils , disintegrated rock,soft rock, hard rock, including cutting of any road using , crossing drains, compound, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, c.c. wood work, steel work, including T & P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable and stacking the serviceable material with all lifts and lead , restoring the damaged portions inside or outside the property premises, refilling the portions of trenches that are dug open including linking to existing sewer network with appurtenances. complete. 110 mm dia ---- Work Should be carried out in site as per Engineer inchargeNos8134.08134.02.0FalseNoneNoneFalseNoneFalse16268.00
232149068593NoneVol 1 P-5 1.4.1Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- Work Should be carried out in site as per Engineer inchargeCum242.0242.09.0FalseNoneNoneFalseNoneFalse2178.00
232149168593NoneVol 1 P-7 1.90Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Work Should be carried out in site as per Engineer inchargeCum266.0266.020.0FalseNoneNoneFalseNoneFalse5320.00
232149268593NoneVol 5 P-191 16.9Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover ---- Work Should be carried out in site as per Engineer inchargeNos5454.05454.04.0FalseNoneNoneFalseNoneFalse21816.00
232149368593NoneVol 5 P-192 16.15.1Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland / Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40 mm and down size graded metal of approved quality and with an offset of 0.15 M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12 mm thick, except for the conical surface outside where the plaster thickness shall be 20 mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size. Supplying and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Supplying and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3 mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm diaCirc. B M.HConstructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.0 M depth & SFRC cover & frame ---- Work Should be carried out in site as per Engineer inchargeNos29047.029047.02.0FalseNoneNoneFalseNoneFalse58094.00
232149468593NoneVol 2 P-135 14.29Providing and fixing 100 mm sand cast Iron grating for gully trap. ---- Work Should be carried out in site as per Engineer inchargeNos47.047.08.0FalseNoneNoneFalseNoneFalse376.00
232149568593NoneVol 2 P-120 13.22.1.2Providing and fixing PTMT grating of approved quality and colour 125 mm nominal dia ---- Work Should be carried out in site as per Engineer inchargeNos44.044.08.0FalseNoneNoneFalseNoneFalse352.00
17065075270000NoneNoneBuildingsHigh School Electrical Work563904.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232149668594None1.2.1 (2 of 105)Concealed Conduit System :Supplying heavy gauge PVC conduit pipe mm dia mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary19/20mm dia 2mm thick (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr66.066.0525.0FalseNoneNoneFalseNoneFalse34650.00
232149768594None1.2.2 (2 of 105)Concealed Conduit System :Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary25mm dia 2mm thick.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr78.078.0175.0FalseNoneNoneFalseNoneFalse13650.00
232149868594None1.3.1 (2 of 105)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.19/20mm dia 2mm thick.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr68.068.0130.0FalseNoneNoneFalseNoneFalse8840.00
232149968594None1.3.2 (2 of 105)Supplying heavy gauge PVC Conduit Pipe 25dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.25mm dia 2mm thick.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr79.079.0100.0FalseNoneNoneFalseNoneFalse7900.00
232150068594None1.9.2 (3 of 105)Supplying PVC/GI flexible conduit pipe .... mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely25mm.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr22.022.030.0FalseNoneNoneFalseNoneFalse660.00
232150168594None2.1.1 (5 of 105)Point wiring using Copper wire with out switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2 X1.5Sq.mm (Phase&Neutral) &1x1.0 Sqmm(earth Wire)Cable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto3mtr from tapping point to out let via Switch.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargePoint285.0285.030.0FalseNoneNoneFalseNoneFalse8550.00
232150268594None2.1.2 (5 of 105)Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargePoint394.0394.062.0FalseNoneNoneFalseNoneFalse24428.00
232150368594None2.1.3 (5 of 105)Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargePoint570.0570.08.0FalseNoneNoneFalseNoneFalse4560.00
232150468594None2.3.2 (5 of 105)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,1.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr26.026.0300.0FalseNoneNoneFalseNoneFalse7800.00
232150568594None2.3.3 (5 of 105)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,2.5 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr42.042.0600.0FalseNoneNoneFalseNoneFalse25200.00
232150668594None2.3.4 (5 of 105)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,4 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr63.063.0200.0FalseNoneNoneFalseNoneFalse12600.00
232150768594None2.3.5 (5 of 105)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade,6 SQMM multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr92.092.0100.0FalseNoneNoneFalseNoneFalse9200.00
232150868594None3.4.2 (8 of 105)Supplying and flush mounting powder coated / galvanized metal box size 1-3way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach159.0159.04.0FalseNoneNoneFalseNoneFalse636.00
232150968594None3.4.3 (8 of 105)Supplying and flush mounting powder coated / galvanized metal box size 4-5way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach177.0177.03.0FalseNoneNoneFalseNoneFalse531.00
232151068594None3.4.5 (8 of 105)Supplying and flush mounting powder coated / galvanized metal box size 8way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach261.0261.025.0FalseNoneNoneFalseNoneFalse6525.00
232151168594None3.4.6 (8 of 105)Supplying and flush mounting powder coated / galvanized metal box size 10-12way suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach319.0319.030.0FalseNoneNoneFalseNoneFalse9570.00
232151268594None3.5.2 (8 of 105)Supplying and fixing superior quality 3Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach161.0161.04.0FalseNoneNoneFalseNoneFalse644.00
232151368594None3.5.3 (8 of 105)Supplying and fixing superior quality 4Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal box.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach175.0175.03.0FalseNoneNoneFalseNoneFalse525.00
232151468594None3.5.5 (8 of 105)Supplying and fixing superior quality 8 modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach284.0284.025.0FalseNoneNoneFalseNoneFalse7100.00
232151568594None3.5.6 (8 of 105)Supplying and fixing superior quality 10-12Mudular modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metalbox.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach344.0344.030.0FalseNoneNoneFalseNoneFalse10320.00
232151668594None3.6.1 (9 of 105)Supplying and fixing of 6Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach102.0102.0130.0FalseNoneNoneFalseNoneFalse13260.00
232151768594None3.6.3 (9 of 105)Supplying and fixing of 6Amps 3way modular Socketc on existing modular switch plate as per IS 3854 and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach171.0171.055.0FalseNoneNoneFalseNoneFalse9405.00
232151868594None3.6.4 (9 of 105)Supplying and fixing of modular stepped fan regulator Two Module on existing modular switch plate as per and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach357.0357.040.0FalseNoneNoneFalseNoneFalse14280.00
232151968594None3.6.7 (9 of 105)Supplying and fixing of 16Amps 0ne way modular switch on existing modular switch plate as per IS 3854 and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach180.0180.04.0FalseNoneNoneFalseNoneFalse720.00
232152068594None3.6.9 (9 of 105)Supplying and fixing of32Amps modular DP Switch on existing modular switch plate as per IS 3854 and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach326.0326.04.0FalseNoneNoneFalseNoneFalse1304.00
232152168594None3.6.10 (9 of 105)Supplying and fixing of 6/16amps modular Universal Socket on existing modular switch plate as per IS 3854 and IS 1293.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach236.0236.04.0FalseNoneNoneFalseNoneFalse944.00
232152268594None3.14.6 (10 of 105)Supplying and fixing of 6AmpsLamp holder on existing board.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach71.071.0100.0FalseNoneNoneFalseNoneFalse7100.00
232152368594None5.7.3 (14 of 105)Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.63amps.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach401.0401.03.0FalseNoneNoneFalseNoneFalse1203.00
232152468594None5.18.1 (17 of 105)Supplying and fixingof 6to32 Amps Single pole miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach415.0415.020.0FalseNoneNoneFalseNoneFalse8300.00
232152568594None5.18.4 (17 of 105)Supplying and fixingof 6to32 Amps Double pole miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach739.0739.06.0FalseNoneNoneFalseNoneFalse4434.00
232152668594None5.19.9 (18 of 105)Supplying and fixing 12way regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.I - doble Door12way sp&n.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach2329.02329.04.0FalseNoneNoneFalseNoneFalse9316.00
232152768594None6.3.1 (30 of 105)Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) Economy model.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach2984.02984.030.0FalseNoneNoneFalseNoneFalse89520.00
232152868594None11.3.2 (43 of 105)LED Indood supplying of 1x4 feet LED PVC square batten 20/22 W with high quality diffuser with life of 25000 burning hours at 70% lumen maintenance with CRI 80 power input 220-240V@ 50Hz & Power Factor 0.9 along with CE approved drivers. 2 years Warrenty againest any manufacturing defect working under standard electrical condition (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach690.0690.053.0FalseNoneNoneFalseNoneFalse36570.00
232152968594None11..11.4 (47 of 105)Supplying & fixing of retrofi ttype LED bulb...... Wwith OPALacry licdiffuser comprising of LED source with CCT 6500 degreeK, CRI70%. efficacy 80lumenper W, life25000 burning hoursand Compliance to IS10322/IEC60598, LM79&LM80. The LED are driven byHFelectronicdriverintegratedinthesystem,withPF0.95,powerlossshould 5 oflampWage.,shortcircuit&opencircuitprotectiontobeintegratedinthecircuit,THDlessthan20%,LifeasperLM79.Theoperatinginputvoltageshouldbebetween130to275V.BISApprovedandTestedbyNABL/CPRIaccreditedlaboratorywith2yearsWarrantyagains tany manufacturing defect working under standard electrical condition. (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach154.0154.010.0FalseNoneNoneFalseNoneFalse1540.00
232153068594None13.7.1 (56 of 105)Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach122.0122.053.0FalseNoneNoneFalseNoneFalse6466.00
232153168594None13.10 (57 of 105)Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach171.0171.030.0FalseNoneNoneFalseNoneFalse5130.00
232153268594None12.56 (54 of 105)Supplying,fixing,wiring,earthelectrodeforgroundingconduits,I.C.cutoutsandotherequipment'sonthemeterboardusing40mmdia2.90mmthickGIpipe2.5mlongburiedinapit.Thepitshouldbefilledwithequalproportionofsaltandcharcoal150mmall-roundthepipetocompletedepth.Theconnectionfromthepipetotheconduitetc.,istobeestablishedthroughGIwireofsizeasperlSIspecification7.3.3.ofIS732using12mmdiabolts,nuts,washersandchecknutsetc., the pipe shall have 16 through holes of 12 mm dia (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeNo3510.03510.03.0FalseNoneNoneFalseNoneFalse10530.00
232153368594None32.07 (13 of 81)1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip25Sqmm, 3.5 Core, (12 GI Strips - 4 x 0.8 mm) (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeKm139549.0139549.00.06FalseNoneNoneFalseNoneFalse8372.940
232153468594None11.1.5 127Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete Light Duty GI pipe of 40mm dia (Volume - 5 SR Water Supply and Sewerage Works) ---- Work Should be carried out in site as per Engineer inchargeRmtr412.0412.010.0FalseNoneNoneFalseNoneFalse4120.00
232153568594None1.4.1 5Earth work excavation by manual means for drains, canals, waste weir, draft,approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.( PWD common SR Vol-I 2023-24) ---- Work Should be carried out in site as per Engineer inchargeCum242.0242.022.0FalseNoneNoneFalseNoneFalse5324.00
232153668594None1.10 7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications ( PWD common SR Vol-I 2023-24) ---- Work Should be carried out in site as per Engineer inchargeCum160.0160.022.0FalseNoneNoneFalseNoneFalse3520.00
232153768594None21.05 (52 of 81)Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 2.5 to 25 Sqmm (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeKm20886.020886.00.06FalseNoneNoneFalseNoneFalse1253.160
232153868594None5.37 (19 of 105)Supplying, fixing and wiring heavy duty low voltage capacitors conforming to IS 2834. 3 phase, 400/440 V grade, for power factor improvement of rotating machineries like induction motor.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeKvar480.0480.050.0FalseNoneNoneFalseNoneFalse24000.00
232153968594None5.38 (19 of 105)Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz12/24V D.C (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach515.0515.03.0FalseNoneNoneFalseNoneFalse1545.00
232154068594None5.40.1 (20 of 105)Supplying ......... A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete.100 A 4 x 30 x 10 mm Aluminium Strips (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr2465.02465.01.5FalseNoneNoneFalseNoneFalse3697.50
232154168594None5.41.2 (20 of 105)Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint.50 x 50 x 6 mm (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeMtr395.0395.010.0FalseNoneNoneFalseNoneFalse3950.00
232154268594None5.42.2 (21 of 105)Fabricating supplying and mounting MS box made out ....SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete.16 SWG ((PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeSq CM0.430.4375000.0FalseNoneNoneFalseNoneFalse32250.00
232154368594None6.1 (30 of 105)Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeNos1492.01492.01.0FalseNoneNoneFalseNoneFalse1492.00
232154468594None11.8.2 (46 of 105)Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 &LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part.Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source..LED Streetlight 40 W (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeNos4024.04024.03.0FalseNoneNoneFalseNoneFalse12072.00
232154568594None13.1.1 (56 of 105)Supplying and Fixing of........mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket 1x40/2x40 W fluorescent tube street light fitting of all capacities to GI or GI or rail or RCC pole / wall using suitable clA, bolts, and nuts and wiring using suitable capacity wires.Using 25mm dia G.I.Pipe(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach978.0978.03.0FalseNoneNoneFalseNoneFalse2934.00
232154668594None13.14 (57 of 105)Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire..(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach492.0492.01.0FalseNoneNoneFalseNoneFalse492.00
232154768594None5.15.9 (17 of 105)Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism.FOUR Pole.100A 25 kA (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach8487.08487.01.0FalseNoneNoneFalseNoneFalse8487.00
232154868594None5.20.1 (18 of 105)Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board.16A-25A 2 pole (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach4277.04277.01.0FalseNoneNoneFalseNoneFalse4277.00
232154968594None5.21 (18 of 105)Supplying,fixingandwiringearthleakagerelaywithcorebalancedcurrenttransformersuitableforsinglephase50HzACwithlatestmicrocontrollerbased,digitalreadoutofpercentageleakagecurrent,programmabledelay/auto/manualresetfacilitysuitabletomountonDIN rail/ flush mounting on panel board.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeNos9255.09255.01.0FalseNoneNoneFalseNoneFalse9255.00
232155068594None5.22 (18 of 105)Supplying, fixing and wiring 0 to 600V 96x96mm AC Voltmeter on existing panel/wood board. pole (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach452.0452.01.0FalseNoneNoneFalseNoneFalse452.00
232155168594None5.24 (18 of 105)Supplying, fixing and wiring 0 to 30A Direct Reading AC analog type Ammeter (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach465.0465.01.0FalseNoneNoneFalseNoneFalse465.00
232155268594None5.26 (18 of 105)Supplying, fixing and wiring 0 to 1500A CT operated AC analog type Ammeter without CT (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach480.0480.01.0FalseNoneNoneFalseNoneFalse480.00
232155368594None5.29 (19 of 105)Supplying, fixing and wiring 3 Phase Digital Ammeter / Voltmeter (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach1425.01425.02.0FalseNoneNoneFalseNoneFalse2850.00
232155468594None5.31 (19 of 105)Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired.(PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeNos4390.04390.01.0FalseNoneNoneFalseNoneFalse4390.00
232155568594None5.33 (19 of 105)Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, kVA, kWH, kVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy (PWD Electrical SR-II 2023-24) ---- Work Should be carried out in site as per Engineer inchargeEach9315.09315.01.0FalseNoneNoneFalseNoneFalse9315.00
232155668594NoneHESCOM approvalProviding TC for power supply arrangement as per HESCOM approval ---- Work Should be carried out in site as per Engineer inchargeEach5000.05000.01.0FalseNoneNoneFalseNoneFalse5000.00
17065075270000NoneNoneBuildingsHigh School SEPTIC TANK186307.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
232155768595NoneVol 1 P-8 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Work Should be carried out in site as per Engineer inchargeCum95.095.03.29FalseNoneNoneFalseNoneFalse312.550
232155868595NoneVol 1 P-8 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Work Should be carried out in site as per Engineer inchargeCum102.0102.032.92FalseNoneNoneFalseNoneFalse3357.840
232155968595NoneVol 2 P-13 6.1Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Work Should be carried out in site as per Engineer inchargeCum8220.08220.09.09FalseNoneNoneFalseNoneFalse74719.80
232156068595NoneVol 1 P-18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Plinth Beam ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.01.92FalseNoneNoneFalseNoneFalse11940.480
232156168595NoneVol 1 P-111 1.aFormwork, Centering & Scaffloding 50% For Plinth Beams ---- Work Should be carried out in site as per Engineer inchargeCum3109.53109.51.92FalseNoneNoneFalseNoneFalse5970.240
232156268595NoneVol 1 18 2.10.cProviding and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. For Slab ---- Work Should be carried out in site as per Engineer inchargeCum6219.06219.03.01FalseNoneNoneFalseNoneFalse18719.190
232156368595NoneVol 1 111 9Formwork, Centering & Scaffloding 50% For Slab ---- Work Should be carried out in site as per Engineer inchargeCum3109.53109.53.01FalseNoneNoneFalseNoneFalse9359.5950
232156468595NoneVol 2 18 2.11.aSteel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Work Should be carried out in site as per Engineer inchargeTonne89457.089457.00.53FalseNoneNoneFalseNoneFalse47412.210
232156568595NoneVol 2 41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeSqm241.0241.043.95FalseNoneNoneFalseNoneFalse10591.950
232156668595NoneVol 5 221 18.3Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge. ---- Work Should be carried out in site as per Engineer inchargeEach1962.01962.02.0FalseNoneNoneFalseNoneFalse3924.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17065075280000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17065075280000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17065075280001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of kppp on or before the last date and time of bid submission.None
17065086230000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of kppp portal due to internet connectivity issues and technical glitches at bidders endNone
17065147860000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17065148120000NoneNoneELIGIBILITYTender invited only for eligible contractors registered under Karnataka Public Works DeptNone
17065148300000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17065148460000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer(District Level Officer)and scan the Original Certificate and attach the scanned file to the Bid.None
17065148590000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thiry first day of March of succeeding year(both days inclusive)None
17065148720000NoneNoneELIGIBILITYThe Tenderer shall scan the Original Ownership Documents/ Lease/ Hire committement Agreement for the Machinery and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17065148870000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the BidderNone
17065148980000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reasonNone
17065149090000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kpp portalNone
17065149330000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17065149530000NoneNoneELIGIBILITYAll materials required for the work shall be procured by the tenderer himself and should be got tested by the quality control authorities at his own cost before use on work.None
17065149640000NoneNoneELIGIBILITYThe items quoted shall include cost of Royalty charges on constructive materials and other taxes as per the rates prevailing Govt Orders at the time of execution and including all the cost and conveyance of all materials, curing, loading and unloading with all lead and lifts, labour, hire charges of machinary and equipments, etc., complete and all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17065149770000NoneNoneELIGIBILITYPhysical quantities requirement to qualify the Tenderer is 80% of the estimated quantity as per Govt Order No. .PW/630/CRM/2014 Bangalore Dated: 17-11-2014None
17065149890000NoneNoneELIGIBILITYDepartment will not supply any materials.None
17065149980000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17065150080000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWD Division Gadag during office hours on all working days. It may be noted that if any of the dates mentioned above happened next working day will holds good in lieu of the dates mentioned.None
17065150260000NoneNoneELIGIBILITYEpayment Challan should be ScannedNone
17065150370000NoneNoneELIGIBILITYThe Tenderer must be present during opening of tender and submit uploaded documents duly attested by Gazzeted Officer not below the rank of Executive Engineer and also produce original documents for confirmation at the time of opening.None
17065150470000NoneNoneELIGIBILITYAs per Karnataka State Govt Order No:LD/300/LET/2006/Bangalore Dt: 1-1-2007 and Govt Ltr No:PW/134/BMS/2007, Dt: 27-7-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17065150560000NoneNoneELIGIBILITYTHE CONTRACTORS ARE INSTRUCTED TO SUBMIT ONLY RELEVENT INFORMATION WITH RECORDS AS REQUIRED AND SPECIFIED IN QUALIFICATION CRITERIA.ANY JUNK ,SURPLUS AND UNNECESARY DOCUMENTS IF UPLOADED WILL TREATED AS MISLEADING AND SUCH TENDERS ARE LIABLE TO BE REJECTION.None
17065150630000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next sectionNone
17065150720000NoneNoneELIGIBILITYThe item rates are excluding GST but inclusive of all other charges.None
17065150830000NoneNoneELIGIBILITYGST shall be paid to the tendered amount separately.None
17065151270000NoneNoneELIGIBILITYThe Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delays as determined by the authority while granting the extension of time.None
17065151530000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes (excluding GST) as per prevailing Government OrdersNone
17065152580000NoneNoneELIGIBILITYWork Completion/Execution Period : 11 Months.None
17065152670000NoneNoneELIGIBILITYThe Project Completion period is 11 months and the Tenderer should maintain work during the defect liability period, which is (1) one year after successful completion of the work.None
17065152780000NoneNoneELIGIBILITYStar rates are applicable, As per the Government Circular No. PWD 159 CRM 2009 Bangalore dated 30-9-2010None
17065152890000NoneNoneELIGIBILITYBidder Should Carry out the Electrical works As per instruction of Site Eng of PWD and HESCOM . The bidder Should get the necessary approvals required for execution of electrical works from HESCOM dept & electrical inspector. Any necessary deposits & supervision charges will be borne by the department, if paid by the bidder it will be reimbursed.None
17065152980000NoneNoneELIGIBILITYAll necessary arrangements shall be made and precaution taken to prevent completely or partially, damage to the structure or labours / employees during construction period. (As per recent Labour Act) Contractor shall be fully responsible for any damage to the structure during the construction and maintenance period.Any damage caused due to any reasons shall be rectified / replaced at his own cost as per the direction of Engineer in charge. Nothing shall be payable by the Department on account of inclusive of all such arrangements/ precautions work needed.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19,2019-20 ,and 2020-21,2021-22,2022-23 Satisfactorily completed as prime contractor, at least one similar work such as Construction of Building Works of value not less then Rs 75.53 lakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work1)Earthwork-1477.088 Cum 2)Concrete work (Including PCC/RCC)-342.94 Cum 3)Steel-26.84 Tonne 4)Solid concrete blocks/BBM/UCR/SSM-224.59 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Quantity Wise Work done Certificate
NoneNoneNoneNoneList of existing commitments and ongoing worksPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- on letter head
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified,if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity-( AxNx1.5-B )whereA-Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress.N -Number of years prescribed for completion of the works for which tenders are invited -0.916 Year.B-Value at 2023-24 price level, of existing commitments and on-going works to be completed during the next 0.916 year (Period of completion of the works for which tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Calculation sheet on letter head
NoneNoneNoneNoneAssessed Tender Capacity shall be more than the Tendered AmountCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Assessment on the Letter Head of the Tenderer
NoneNoneNoneNone3.3 a Each Tenderer should further demonstrate :As per this note, each tenderer should demonstrate availability of few key equipments /machinery for execution of the work . However as per Govt circular no GO-FD/AE 263/EXP12-2022 dt-11-05-2022, this clause for owning key equipments for works costing up to Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the following machineries for various activities involved in construction as per Morth specification.Sl No. Name of machinery 1)Excavator JCB / Hitachi 2)Tippers3)Concrete Batching Plant4)Water Tanker5)Shuttering Materials6)Transit Mixers7)Selfloading Moblie Concrete Batching Plant of min 2 cum capacityCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- list of machinery
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. , 2018-19, 2019-20,2020-21,2021-22 & 2022-23 , (a) acheived in at least two financial years a minimum financial turnover of Rs. 302.08 lakhs (in all classes of civil engineering construction works only) 33.( As per GOVT Circuler No PW 60 CRM 2021 Bangaluru Dtd-08-11-2021)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneMaximum of Civil Engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. (Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on the Letter Head of the tenderer
NoneNoneNoneNoneValue at 2023-24 price level, of existing commitments and on-going works to be executed during the next 12 months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24), (Monthwise commitment shall be furnished).Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Statement on the Letter head of the tenderer
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. 41.20 Lakhs (estimated cash flow for 3 months of peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneThe EMD of Rs.2,26,600.00 shall be paid in full through e-payment or in two parts i.e,Part(1)Rs. 1,00,000.00 by e-payment part (2)1,26,600.00 in the form of BG to be upload.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- EMD Details
NoneNoneNoneNoneBanker Details for referenceOthersBanker Details for reference
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Banker Details for reference
NoneNoneNoneNoneInformation on litigation in which the Tender is involved.OthersInformation on litigation in which the Tender is involved.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on litigation in which the Tender is involved.
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew work
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- New work
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Contractor PWD Registration CertificateTrueTechnical Bid
Similar Nature of workdone certificate Building from competant authority not less than Rs 4.25 LakhsTrueTechnical Bid
LOC should be preescribed formate-2, If not then the tender will not be acceptedTrueTechnical Bid
Existing commitments & ongoing works listTrueTechnical Bid
Personal detailsTrueTechnical Bid
Other related documentsTrueTechnical Bid
Quantity wise workdone certificateTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VIllageNoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
BuildingsGadagMundaragiDharwad SouthRONDONI VILLAGENoneNoneNoneNoneNoneNone
tenderAddress
createdTs1706783800000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer PWD Division Office Gadaga
streetNone
cityGadag
stateKarnataka
pin582101
tenderRecallDTONone