createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1706947933885
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeEXCLUSIVE_TAX
tenderFee500.00
emd16261.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose19-02-2024 16:00:00
tenderQueryClose17-02-2024 17:00:00
technicalBidOpenNone
publishedDate03-02-2024 19:54:00
publishedByPostRDPR_EE_DIV_BID
publishedByUserKPE12975 - RAJKUMAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9844686454
tenderSupplierListNone
tenderSchedule
createdTs1706947933919
version4
createdDateNone
modifiedDateNone
tenderNumberRDPR/2023-24/BD/WORK_INDENT3859
titleConstruction of Compund Wall to Samshan Bhoomi at Jonnikeri Village in Aurad (B) taluka
descriptionConstruction of Compund Wall to Samshan Bhoomi at Jonnikeri Village in Aurad (B) taluka
categoryWORKS
categoryTextWorks
ecv650443.25
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location793
locationNameRDPR Division Office Bidar
provisionalAmount768000.0
groupOverheadTotalNone
fileNumberMLA-LAD/2019-20/ARD/Jonnikeri/011
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17069479340000NoneNoneBuildingsConstruction of Compund Wall to Samshan Bhoomi at Jonnikeri Village in Aurad (B) taluka650443.25
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
241638272409NoneVol (I) 1.15.1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.Cum381.15381.1530.11FalseNoneNoneFalseNoneFalse11476.42650
241638372409NoneVol (l) 2.1.2Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Cum5947.25947.26.02FalseNoneNoneFalseNoneFalse35802.1440
241638472409NoneVol (II) 5.1.1Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level withCum5891.555891.5524.08FalseNoneNoneFalseNoneFalse141868.5240
241638572409NoneVol (II) 5.6Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc., complete as per specification for Basement in CM 1:6Cum6770.46770.418.06FalseNoneNoneFalseNoneFalse122273.4240
241638672409NoneVol (II) 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum8367.458367.4519.97FalseNoneNoneFalseNoneFalse167097.97650
241638772409NoneVol (ll) 2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.Cum6601.356601.353.51FalseNoneNoneFalseNoneFalse23170.73850
241638872409NoneVol (ll) 8.9Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm404.25404.25250.88FalseNoneNoneFalseNoneFalse101418.240
241638972409NoneVol (II) 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm182.7182.7250.88FalseNoneNoneFalseNoneFalse45835.7760
241639072409NoneM.R.Name BoardNo1500.01500.01.0FalseNoneNoneFalseNoneFalse1500.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17069479350000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17069479350000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17069479350000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17069479350000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17069479350000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17069479350000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17069479350000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17069479350000NoneNoneELIGIBILITYBanker DetailsNone
17069479460000NoneNoneELIGIBILITYAs per attached KW-1 Bid documents.None
17069479520000NoneNoneELIGIBILITYIf the tenderer quotes less rates difference amount should be submitted in the form of DD/FDR, which shall be scanned along with documents and original DD/FDR should be submitted to the division office.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Registration CertificateTrueTechnical Bid
Similar nature of work done certificate 50 Percent from competent authority not Below the rank of EE.TrueTechnical Bid
Annual Turnover Certificate with UDINTrueTechnical Bid
Works in Hand in Format-5TrueTechnical Bid
Difference Amount DD/ FDRTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone