tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1706439475000 | 0 | None | None | Buildings | GROUND FLOOR | 7618619.65 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318297 | 68461 | None | PWD 2021-22 S R I No. 19.3 Vol-II Page No. 163 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 1950.9 | 1950.9 | 20.62 | False | None | None | False | None | False | 40227.558 | 0 | 2318298 | 68461 | None | PWD 2021-22 S R I. No. 19.7.3 Vol-II Page No. 163 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. In cement mortar ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 828.45 | 828.45 | 63.48 | False | None | None | False | None | False | 52590.006 | 0 | 2318299 | 68461 | None | PWD 2021-22 S R I No. 19.3 Vol-II Page No. 163 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 1950.9 | 1950.9 | 20.62 | False | None | None | False | None | False | 40227.558 | 0 | 2318300 | 68461 | None | PWD 2021-22 S R I. No. 19.7.3 Vol-II Page No. 163 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. In cement mortar ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 828.45 | 828.45 | 63.48 | False | None | None | False | None | False | 52590.006 | 0 | 2318301 | 68461 | None | Item No.1.14.1, Page No.8, Vol - I,PWD CSR 2021-22 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 76.65 | 76.65 | 221.56 | False | None | None | False | None | False | 16982.574 | 0 | 2318302 | 68461 | None | P:5, I.No 1.4.1 PWD SR 2021-22 Volume 1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 195.3 | 195.3 | 178.2 | False | None | None | False | None | False | 34802.46 | 0 | 2318303 | 68461 | None | Item No.1.9, Page No.7, Vol - I 2021-22 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 214.2 | 214.2 | 319.81 | False | None | None | False | None | False | 68503.302 | 0 | 2318304 | 68461 | None | Item No. 1.8, Page No.7, Vol - I, Chapter 1 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 422.1 | 422.1 | 280.82 | False | None | None | False | None | False | 118534.122 | 0 | 2318305 | 68461 | None | Item No.2.1.2, Page No.15, Vol - I,2021-22 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 5466.3 | 5466.3 | 61.25 | False | None | None | False | None | False | 334810.875 | 0 | 2318306 | 68461 | None | Item No.2.1.4, Page No.15, Vol - I,2021-22 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6014.4 | 6014.4 | 12.08 | False | None | None | False | None | False | 72653.952 | 0 | 2318307 | 68461 | None | Item No.2.2.1.1, Page No.15, Vol - I,2021-22 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6240.15 | 6240.15 | 56.37 | False | None | None | False | None | False | 351757.2555 | 0 | 2318308 | 68461 | None | PWD 2021-22 S R SL No. 1.a Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Foundation upto Plinth a. Isolated add 8% ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 499.21 | 499.21 | 56.37 | False | None | None | False | None | False | 28140.4677 | 0 | 2318309 | 68461 | None | Item No.2.2.1.1, Page No.15, Vol - I2021-22 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6240.15 | 6240.15 | 9.61 | False | None | None | False | None | False | 59967.8415 | 0 | 2318310 | 68461 | None | PWD 2021-22 S R SL No. 8 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Columns add 70% ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4368.11 | 4368.11 | 9.61 | False | None | None | False | None | False | 41977.5371 | 0 | 2318311 | 68461 | None | Item No. 2.5.1, Page No. 17, Vol - I,2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6491.1 | 6491.1 | 20.21 | False | None | None | False | None | False | 131185.131 | 0 | 2318312 | 68461 | None | PWD 2021-22 S R SL No. 1.c Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Plinth Beams add 50% ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3245.55 | 3245.55 | 20.21 | False | None | None | False | None | False | 65592.5655 | 0 | 2318313 | 68461 | None | Item No. 2.5.1, Page No. 17, Vol - I, 2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6491.1 | 6491.1 | 12.87 | False | None | None | False | None | False | 83540.457 | 0 | 2318314 | 68461 | None | PWD 2021-22 S R SL No. 8 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Columns add 70% ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4543.77 | 4543.77 | 12.87 | False | None | None | False | None | False | 58478.3199 | 0 | 2318315 | 68461 | None | Item No. 2.5.1, Page No. 17, Vol - I, 2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6491.1 | 6491.1 | 23.77 | False | None | None | False | None | False | 154293.447 | 0 | 2318316 | 68461 | None | PWD 2021-22 S R SL No. 12 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Beams & Lintels of Building add 60% ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3894.66 | 3894.66 | 23.77 | False | None | None | False | None | False | 92576.0682 | 0 | 2318317 | 68461 | None | Item No. 2.5.1, Page No. 17, Vol - I-2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6491.1 | 6491.1 | 45.18 | False | None | None | False | None | False | 293267.898 | 0 | 2318318 | 68461 | None | PWD 2021-22 S R SL No. 13 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Roof (Straight & Arched) add 50% ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3894.66 | 3894.66 | 45.18 | False | None | None | False | None | False | 175960.7388 | 0 | 2318319 | 68461 | None | Item No. 2.5.1 Page No. 17, Vol - I | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6491.1 | 6491.1 | 1.29 | False | None | None | False | None | False | 8373.519 | 0 | 2318320 | 68461 | None | PWD 2021-22 S R SL No. 20 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections add 45% ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 2921.0 | 2921.0 | 2.57 | False | None | None | False | None | False | 7506.97 | 0 | 2318321 | 68461 | None | Item No.5.1.1, Page No.9, Vol - 2 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4987.5 | 4987.5 | 79.45 | False | None | None | False | None | False | 396256.875 | 0 | 2318322 | 68461 | None | Item No.5.4, Page No.9, Vol - 2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 5619.6 | 5619.6 | 49.66 | False | None | None | False | None | False | 279069.336 | 0 | 2318323 | 68461 | None | Item No.6.8, Page No.14, Vol - 2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 7024.5 | 7024.5 | 84.7 | False | None | None | False | None | False | 594975.15 | 0 | 2318324 | 68461 | None | P:14, I.No 6.15 PWD SR 2021-22 Volume 2 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 909.3 | 909.3 | 34.05 | False | None | None | False | None | False | 30961.665 | 0 | 2318325 | 68461 | None | Item No.12.12 Page No.100, Vol - 2, | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials,labour, usage charges complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 79111.2 | 79111.2 | 2.8 | False | None | None | False | None | False | 221511.36 | 0 | 2318326 | 68461 | None | Item No.12.18 Page No.101, Vol - 2PWD CSR -2021-22 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with, stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4227.3 | 4227.3 | 30.24 | False | None | None | False | None | False | 127833.552 | 0 | 2318327 | 68461 | None | P:102, I.No 12.28 PWD SR 2021-22 Volume 2 | Providing and fixing in position fully panelled shutters of Mathi/Nandi wood for windows with stiles and rails of 30mm thick, 75mm wide in two halves with panels of 20mm thick including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4302.9 | 4302.9 | 37.26 | False | None | None | False | None | False | 160326.054 | 0 | 2318328 | 68461 | None | P:102, I.No 12.55 PWD SR 2021-22 Volume 2 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. -do- with both side prelam ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 3993.15 | 3993.15 | 7.88 | False | None | None | False | None | False | 31466.022 | 0 | 2318329 | 68461 | None | Item No.12.51 Page No.105, Vol -2,PWD CSR -2021-22 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Nos | 1555.05 | 1555.05 | 17.0 | False | None | None | False | None | False | 26435.85 | 0 | 2318330 | 68461 | None | P:105, I.No 12.52 PWD SR 2021-22 Volume 2 | Fixing of window frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1057.35 | 1057.35 | 26.0 | False | None | None | False | None | False | 27491.1 | 0 | 2318331 | 68461 | None | Item No.11.34.B Page No.85, Vol 2 PWD CSR -2021-22 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 164.85 | 164.85 | 782.46 | False | None | None | False | None | False | 128988.531 | 0 | 2318332 | 68461 | None | P:82, I.No 11.26.1 PWD SR 2021-22 Volume 2 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer- in-Charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 116.55 | 116.55 | 123.3 | False | None | None | False | None | False | 14370.615 | 0 | 2318333 | 68461 | None | P:41, I.No 8.1.1 PWD SR 2021-22 Volume 2 | Providing12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 223.65 | 223.65 | 326.3 | False | None | None | False | None | False | 72976.995 | 0 | 2318334 | 68461 | None | P:41, I.No 8.2.2 PWD SR 2021-22 Volume 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 241.5 | 241.5 | 589.85 | False | None | None | False | None | False | 142448.775 | 0 | 2318335 | 68461 | None | P:41, I.No 8.3.2 PWD SR 2021-22 Volume 2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 289.8 | 289.8 | 388.48 | False | None | None | False | None | False | 112581.504 | 0 | 2318336 | 68461 | None | P:44, I.No 8.19.2 PWD SR 2021-22 Volume 2 | Providing Raised and cut pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 379.05 | 379.05 | 50.92 | False | None | None | False | None | False | 19301.226 | 0 | 2318337 | 68461 | None | Item No. 9.35 Page No.64, Vol -2PWD CSR -2021-22 | Flooring with 25mm thick polished shahabad slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 1377.6 | 1377.6 | 338.3 | False | None | None | False | None | False | 466042.08 | 0 | 2318338 | 68461 | None | P:64, I.No 9.30 PWD SR 2021-22 Volume 2 | Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints finished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 2514.75 | 2514.75 | 24.3 | False | None | None | False | None | False | 61108.425 | 0 | 2318339 | 68461 | None | P:60, I.No 9.11 PWD SR 2021-22 Volume 2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 800.1 | 800.1 | 9.0 | False | None | None | False | None | False | 7200.9 | 0 | 2318340 | 68461 | None | P:65, I.No 9.39 PWD SR 2021-22 Volume 2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 1088.85 | 1088.85 | 48.82 | False | None | None | False | None | False | 53157.657 | 0 | 2318341 | 68461 | None | Item No.8.51, Page No.50, Vol -2 PWD CSR -2021-22 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 87.15 | 87.15 | 916.15 | False | None | None | False | None | False | 79842.4725 | 0 | 2318342 | 68461 | None | Item No.8.25, Page No.45, Vol - 2 PWD CSR -2021-22 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 110.25 | 110.25 | 916.15 | False | None | None | False | None | False | 101005.5375 | 0 | 2318343 | 68461 | None | Item No.8.29, Page No.45, Vol -2, PWD CSR -2021-22 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m) over and including priming coat of exterior primer applied @ 2.20kg/10 m to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 218.4 | 218.4 | 439.41 | False | None | None | False | None | False | 95967.144 | 0 | 2318344 | 68461 | None | Item No.8.33.2 Page No.46, Vol -2,PWD CSR -2021-22 | Painting wood work with Deluxe Multi Surface Paint of requiredshade. Two coat applied @ 0.90 ltr/10 mover an under coat of primer applied @0.75 ltr/10 m of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 110.25 | 110.25 | 155.25 | False | None | None | False | None | False | 17116.3125 | 0 | 2318345 | 68461 | None | Item No.8.33.3 Page No.47, Vol 2 PWD CSR -2021-22 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m over an under coat of primer applied @ 0.80 ltr/10 m of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 111.3 | 111.3 | 74.52 | False | None | None | False | None | False | 8294.076 | 0 | 2318346 | 68461 | None | Item No.11.32, Page No.84, Vol -2 PWD CSR -2021-22 | Providing Thermo-Mechanically Treated bars of grade Fe-550D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 96.6 | 96.6 | 20262.42 | False | None | None | False | None | False | 1957349.772 | 0 |
| 1706439475000 | 0 | None | None | Buildings | FIRST FLOOR | 4298593.66 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318347 | 68462 | None | Item No. 2.5.1, Page No. 17, Vol -I, Chapter 2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6556.01 | 6556.01 | 12.87 | False | None | None | False | None | False | 84375.8487 | 0 | 2318348 | 68462 | None | PWD 2021-22 S R SL No. 8 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Columns add 70Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4589.21 | 4589.21 | 12.87 | False | None | None | False | None | False | 59063.1327 | 0 | 2318349 | 68462 | None | Item No. 2.5.1, Page No. 17, Vol -I | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6556.01 | 6556.01 | 23.77 | False | None | None | False | None | False | 155836.3577 | 0 | 2318350 | 68462 | None | PWD 2021-22 S R SL No. 12 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Beams & Lintels of Building add 60Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3933.61 | 3933.61 | 23.77 | False | None | None | False | None | False | 93501.9097 | 0 | 2318351 | 68462 | None | Item No. 2.5.1, Page No. 17 Vol I PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6556.01 | 6556.01 | 47.97 | False | None | None | False | None | False | 314491.7997 | 0 | 2318352 | 68462 | None | PWD 2021-22 S R SL No. 13 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Roof (Straight & Arched) add 50Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3933.61 | 3933.61 | 47.97 | False | None | None | False | None | False | 188695.2717 | 0 | 2318353 | 68462 | None | Item No. 2.5.1 Page No. 17, Vol -IPWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6556.01 | 6556.01 | 1.29 | False | None | None | False | None | False | 8457.2529 | 0 | 2318354 | 68462 | None | PWD 2021-22 S R SL No. 20 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections add 45Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 2950.21 | 2950.21 | 1.29 | False | None | None | False | None | False | 3805.7709 | 0 | 2318355 | 68462 | None | Item No.6.8 Page No.14, Vol -2 PWD CSR -2021-22 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 7094.74 | 7094.74 | 86.7 | False | None | None | False | None | False | 615113.958 | 0 | 2318356 | 68462 | None | P:14, I.No 6.15 PWD SR 2021-22 Volume 2 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 918.39 | 918.39 | 69.19 | False | None | None | False | None | False | 63543.4041 | 0 | 2318357 | 68462 | None | Item No.12.12 Page No.100, Vol -2 PWD CSR -2021-22 | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials,labour, usage charges complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 79902.31 | 79902.31 | 2.8 | False | None | None | False | None | False | 223726.468 | 0 | 2318358 | 68462 | None | Item No.12.18 Page No.101, Vol -2 PWD CSR -2021-22 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with, stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4269.57 | 4269.57 | 30.24 | False | None | None | False | None | False | 129111.7968 | 0 | 2318359 | 68462 | None | P:102, I.No 12.28 PWD SR 2021-22 Volume 2 | Providing and fixing in position fully panelled shutters of Mathi/Nandi wood for windows with stiles and rails of 30mm thick, 75mm wide in two halves with panels of 20mm thick including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4345.93 | 4345.93 | 37.26 | False | None | None | False | None | False | 161929.3518 | 0 | 2318360 | 68462 | None | P:102, I.No 12.55 PWD SR 2021-22 Volume 2 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. -do- with both side prelam ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4033.08 | 4033.08 | 7.88 | False | None | None | False | None | False | 31780.6704 | 0 | 2318361 | 68462 | None | Item No.12.51 Page No.105, Vol -2 PWD CSR -2021-22 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Nos | 1570.6 | 1570.6 | 17.0 | False | None | None | False | None | False | 26700.2 | 0 | 2318362 | 68462 | None | P:105, I.No 12.52 PWD SR 2021-22 Volume 2 | Fixing of window frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1067.92 | 1067.92 | 26.0 | False | None | None | False | None | False | 27765.92 | 0 | 2318363 | 68462 | None | Item No.11.34.B Page No.85 Vol 2 PWD CSR -2021-22 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 166.5 | 166.5 | 601.02 | False | None | None | False | None | False | 100069.83 | 0 | 2318364 | 68462 | None | P:82, I.No 11.26.1 PWD SR 2021-22 Volume 2 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer- in-Charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 117.72 | 117.72 | 123.3 | False | None | None | False | None | False | 14514.876 | 0 | 2318365 | 68462 | None | P:41, I.No 8.1.1 PWD SR 2021-22 Volume 2 | Providing12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 225.89 | 225.89 | 326.3 | False | None | None | False | None | False | 73707.907 | 0 | 2318366 | 68462 | None | P:41, I.No 8.2.1 PWD SR 2021-22 Volume 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 263.0 | 263.0 | 601.02 | False | None | None | False | None | False | 158068.26 | 0 | 2318367 | 68462 | None | P:41, I.No 8.3.1 PWD SR 2021-22 Volume 2 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 317.09 | 317.09 | 393.68 | False | None | None | False | None | False | 124831.9912 | 0 | 2318368 | 68462 | None | P:61, I.No 9.12.2 PWD SR 2021-22 Volume 2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08Percentage and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 1152.76 | 1152.76 | 343.4 | False | None | None | False | None | False | 395857.784 | 0 | 2318369 | 68462 | None | P:60, I.No 9.11 PWD SR 2021-22 Volume 2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 808.1 | 808.1 | 9.0 | False | None | None | False | None | False | 7272.9 | 0 | 2318370 | 68462 | None | P:65, I.No 9.39 PWD SR 2021-22 Volume 2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 1099.74 | 1099.74 | 48.82 | False | None | None | False | None | False | 53689.3068 | 0 | 2318371 | 68462 | None | Item No.8.51,Page No.50, Vol -2 PWD CSR -2021-22 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 88.02 | 88.02 | 927.32 | False | None | None | False | None | False | 81622.7064 | 0 | 2318372 | 68462 | None | Item No.8.25 Page No.45, Vol -2 PWD CSR -2021-22 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 111.35 | 111.35 | 927.32 | False | None | None | False | None | False | 103257.082 | 0 | 2318373 | 68462 | None | Item No.8.29 Page No.45, Vol -2 PWD CSR -2021-22 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m) over and including priming coat of exterior primer applied @ 2.20kg/10 m to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 220.58 | 220.58 | 393.68 | False | None | None | False | None | False | 86837.9344 | 0 | 2318374 | 68462 | None | Item No.8.33.2 Page No.46, Vol -2 PWD CSR -2021-22 | Painting wood work with Deluxe Multi Surface Paint of requiredshade. Two coat applied @ 0.90 ltr/10 m over an under coat of primer applied @0.75 ltr/10 mof approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 111.35 | 111.35 | 129.17 | False | None | None | False | None | False | 14383.0795 | 0 | 2318375 | 68462 | None | Item No.8.33.3 Page No.47, Vol -2 PWD CSR -2021-22 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 mover an under coat of primer applied @ 0.80 ltr/10 m of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 112.41 | 112.41 | 74.52 | False | None | None | False | None | False | 8376.7932 | 0 | 2318376 | 68462 | None | Item No.11.32, Page No.84, Vol -2 PWD CSR -2021-22 | Providing Thermo-Mechanically Treated bars of grade Fe-550D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 97.57 | 97.57 | 9103.25 | False | None | None | False | None | False | 888204.1025 | 0 |
| 1706439475000 | 0 | None | None | Buildings | SECOND FLOOR | 4241512.68 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318377 | 68463 | None | Item No. 2.5.1, Page No. 17, Vol -I, Chapter 2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6620.92 | 6620.92 | 12.87 | False | None | None | False | None | False | 85211.2404 | 0 | 2318378 | 68463 | None | PWD 2021-22 S R SL No. 8 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Columns add 70Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4634.65 | 4634.65 | 12.87 | False | None | None | False | None | False | 59647.9455 | 0 | 2318379 | 68463 | None | Item No. 2.5.1, Page No. 17, Vol -I | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6620.92 | 6620.92 | 23.77 | False | None | None | False | None | False | 157379.2684 | 0 | 2318380 | 68463 | None | PWD 2021-22 S R SL No. 12 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Beams & Lintels of Building add 60Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3972.56 | 3972.56 | 23.77 | False | None | None | False | None | False | 94427.7512 | 0 | 2318381 | 68463 | None | Item No. 2.5.1, Page No. 17, Vol-IPWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6620.92 | 6620.92 | 47.97 | False | None | None | False | None | False | 317605.5324 | 0 | 2318382 | 68463 | None | PWD 2021-22 S R SL No. 13 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Roof (Straight & Arched) add 50Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3972.56 | 3972.56 | 47.97 | False | None | None | False | None | False | 190563.7032 | 0 | 2318383 | 68463 | None | Item No. 2.5.1 Page No. 17, Vol -IPWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6620.92 | 6620.92 | 1.29 | False | None | None | False | None | False | 8540.9868 | 0 | 2318384 | 68463 | None | PWD 2021-22 S R SL No. 20 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections add 45Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 2979.42 | 2979.42 | 1.29 | False | None | None | False | None | False | 3843.4518 | 0 | 2318385 | 68463 | None | Item No.6.8 Page No.14, Vol -2PWD CSR -2021-22 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 7164.98 | 7164.98 | 86.7 | False | None | None | False | None | False | 621203.766 | 0 | 2318386 | 68463 | None | P:14, I.No 6.15 PWD SR 2021-22 Volume 2 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 927.48 | 927.48 | 69.19 | False | None | None | False | None | False | 64172.3412 | 0 | 2318387 | 68463 | None | Item No.12.12 Page No.100, Vol -2 PWD CSR -2021-22 | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials,labour, usage charges complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 80693.42 | 80693.42 | 2.8 | False | None | None | False | None | False | 225941.576 | 0 | 2318388 | 68463 | None | Item No.12.18 Page No.101, Vol -2 PWD CSR -2021-22 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with, stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4311.84 | 4311.84 | 30.24 | False | None | None | False | None | False | 130390.0416 | 0 | 2318389 | 68463 | None | P:102, I.No 12.28 PWD SR 2021-22 Volume 2 | Providing and fixing in position fully panelled shutters of Mathi/Nandi wood for windows with stiles and rails of 30mm thick, 75mm wide in two halves with panels of 20mm thick including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4388.96 | 4388.96 | 37.26 | False | None | None | False | None | False | 163532.6496 | 0 | 2318390 | 68463 | None | P:102, I.No 12.55 PWD SR 2021-22 Volume 2 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. -do- with both side prelam ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4073.01 | 4073.01 | 7.88 | False | None | None | False | None | False | 32095.3188 | 0 | 2318391 | 68463 | None | Item No.12.51 Page No.105 Vol -2 PWD CSR -2021-22 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Nos | 1586.15 | 1586.15 | 17.0 | False | None | None | False | None | False | 26964.55 | 0 | 2318392 | 68463 | None | P:105, I.No 12.52 PWD SR 2021-22 Volume 2 | Fixing of window frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1078.49 | 1078.49 | 26.0 | False | None | None | False | None | False | 28040.74 | 0 | 2318393 | 68463 | None | Item No.11.34.B Page No.85, Vol 2 PWD CSR -2021-22 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 168.15 | 168.15 | 601.02 | False | None | None | False | None | False | 101061.513 | 0 | 2318394 | 68463 | None | P:82, I.No 11.26.1 PWD SR 2021-22 Volume 2 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer- in-Charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 118.89 | 118.89 | 123.3 | False | None | None | False | None | False | 14659.137 | 0 | 2318395 | 68463 | None | P:41, I.No 8.1.1 PWD SR 2021-22 Volume 2 | Providing12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 228.13 | 228.13 | 326.3 | False | None | None | False | None | False | 74438.819 | 0 | 2318396 | 68463 | None | P:41, I.No 8.2.1 PWD SR 2021-22 Volume 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 265.6 | 265.6 | 601.02 | False | None | None | False | None | False | 159630.912 | 0 | 2318397 | 68463 | None | P:41, I.No 8.3.1 PWD SR 2021-22 Volume 2 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 320.23 | 320.23 | 393.68 | False | None | None | False | None | False | 126068.1464 | 0 | 2318398 | 68463 | None | P:61, I.No 9.12.2 PWD SR 2021-22 Volume 2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08Percentage and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 1164.17 | 1164.17 | 343.4 | False | None | None | False | None | False | 399775.978 | 0 | 2318399 | 68463 | None | P:60, I.No 9.11 PWD SR 2021-22 Volume 2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 816.1 | 816.1 | 9.0 | False | None | None | False | None | False | 7344.9 | 0 | 2318400 | 68463 | None | P:65, I.No 9.39 PWD SR 2021-22 Volume 2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 1110.63 | 1110.63 | 48.82 | False | None | None | False | None | False | 54220.9566 | 0 | 2318401 | 68463 | None | Item No.8.51, Page No.50, Vol -2 PWD CSR -2021-22 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 88.89 | 88.89 | 927.32 | False | None | None | False | None | False | 82429.4748 | 0 | 2318402 | 68463 | None | Item No.8.25 Page No.45, Vol -2 PWD CSR -2021-22 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 112.45 | 112.45 | 927.32 | False | None | None | False | None | False | 104277.134 | 0 | 2318403 | 68463 | None | Item No.8.29 Page No.45, Vol -2 PWD CSR -2021-22 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m) over and including priming coat of exterior primer applied @ 2.20kg/10 m to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 222.76 | 222.76 | 393.68 | False | None | None | False | None | False | 87696.1568 | 0 | 2318404 | 68463 | None | Item No.8.33.2 Page No.46, Vol -2 PWD CSR -2021-22 | Painting wood work with Deluxe Multi Surface Paint of requiredshade. Two coat applied @ 0.90 ltr/10 m over an under coat of primer applied @0.75 ltr/10 m of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 112.45 | 112.45 | 129.17 | False | None | None | False | None | False | 14525.1665 | 0 | 2318405 | 68463 | None | Item No.8.33.3 Page No.47, Vol -2 PWD CSR -2021-22 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m over an under coat of primer applied @ 0.80 ltr/10 m of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 113.52 | 113.52 | 74.52 | False | None | None | False | None | False | 8459.5104 | 0 | 2318406 | 68463 | None | Item No.11.32, Page No.84, Vol -2 PWD CSR -2021-22 | Providing Thermo-Mechanically Treated bars of grade Fe-550D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 98.54 | 98.54 | 8091.78 | False | None | None | False | None | False | 797364.0012 | 0 |
| 1706439475000 | 0 | None | None | Buildings | THIRD FLOOR | 2275232.04 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318407 | 68464 | None | Item No. 2.5.1, Page No. 17, Vol-I PWD CSR 2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6685.83 | 6685.83 | 7.42 | False | None | None | False | None | False | 49608.8586 | 0 | 2318408 | 68464 | None | PWD 2021-22 S R SL No. 8 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Columns add 70Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4680.09 | 4680.09 | 7.42 | False | None | None | False | None | False | 34726.2678 | 0 | 2318409 | 68464 | None | Item No. 2.5.1, Page No.17, Vol-I PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6685.83 | 6685.83 | 12.38 | False | None | None | False | None | False | 82770.5754 | 0 | 2318410 | 68464 | None | PWD 2021-22 S R SL No. 12 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Beams & Lintels of Building add 60Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4011.5 | 4011.5 | 12.38 | False | None | None | False | None | False | 49662.37 | 0 | 2318411 | 68464 | None | Item No.2.5.1, Page No. 17, Vol-I PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6685.83 | 6685.83 | 25.45 | False | None | None | False | None | False | 170154.3735 | 0 | 2318412 | 68464 | None | PWD 2021-22 S R SL No. 13 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Roof (Straight & Arched) add 50Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4011.5 | 4011.5 | 25.45 | False | None | None | False | None | False | 102092.675 | 0 | 2318413 | 68464 | None | Item No 2.5.1 Page No. 17 Vol - I PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6685.83 | 6685.83 | 0.64 | False | None | None | False | None | False | 4278.9312 | 0 | 2318414 | 68464 | None | PWD 2021-22 S R SL No. 20 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections add 45Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3008.63 | 3008.63 | 0.64 | False | None | None | False | None | False | 1925.5232 | 0 | 2318415 | 68464 | None | Item No.6.8, Page No.14, Vol -2 PWD CSR -2021-22 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 7235.23 | 7235.23 | 51.12 | False | None | None | False | None | False | 369864.9576 | 0 | 2318416 | 68464 | None | Item No.12.12 Page No.100, Vol - 2PWD CSR -2021-22 | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials,labour, usage charges complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 81484.53 | 81484.53 | 1.41 | False | None | None | False | None | False | 114893.1873 | 0 | 2318417 | 68464 | None | Item No.12.18 Page No.101, Vol -2,PWD CSR -2021-22 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with, stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4354.12 | 4354.12 | 17.64 | False | None | None | False | None | False | 76806.6768 | 0 | 2318418 | 68464 | None | P:102, I.No 12.28 PWD SR 2021-22 Volume 2 | Providing and fixing in position fully panelled shutters of Mathi/Nandi wood for windows with stiles and rails of 30mm thick, 75mm wide in two halves with panels of 20mm thick including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 4431.99 | 4431.99 | 17.82 | False | None | None | False | None | False | 78978.0618 | 0 | 2318419 | 68464 | None | Item No.12.51 Page No.105, Vol -2 PWD CSR -2021-22 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Nos | 1601.7 | 1601.7 | 7.0 | False | None | None | False | None | False | 11211.9 | 0 | 2318420 | 68464 | None | P:105, I.No 12.52 PWD SR 2021-22 Volume 2 | Fixing of window frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1089.07 | 1089.07 | 12.0 | False | None | None | False | None | False | 13068.84 | 0 | 2318421 | 68464 | None | Item No.11.34.B Page No.85, Vol -2PWD CSR -2021-22 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 169.8 | 169.8 | 283.5 | False | None | None | False | None | False | 48138.3 | 0 | 2318422 | 68464 | None | P:82, I.No 11.26.1 PWD SR 2021-22 Volume 2 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer- in-Charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 120.05 | 120.05 | 139.5 | False | None | None | False | None | False | 16746.975 | 0 | 2318423 | 68464 | None | P:41, I.No 8.1.1 PWD SR 2021-22 Volume 2 | Providing12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 230.36 | 230.36 | 175.1 | False | None | None | False | None | False | 40336.036 | 0 | 2318424 | 68464 | None | P:41, I.No 8.2.1 PWD SR 2021-22 Volume 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 268.21 | 268.21 | 278.98 | False | None | None | False | None | False | 74825.2258 | 0 | 2318425 | 68464 | None | P:41, I.No 8.3.1 PWD SR 2021-22 Volume 2 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 323.37 | 323.37 | 264.32 | False | None | None | False | None | False | 85473.1584 | 0 | 2318426 | 68464 | None | P:61, I.No 9.12.2 PWD SR 2021-22 Volume 2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08Percentage and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 1175.59 | 1175.59 | 217.58 | False | None | None | False | None | False | 255784.8722 | 0 | 2318427 | 68464 | None | Item No.8.51, Page No.50, Vol -2 PWD CSR -2021-22 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 89.76 | 89.76 | 454.08 | False | None | None | False | None | False | 40758.2208 | 0 | 2318428 | 68464 | None | Item No.8.25, Page No.45, Vol -2 PWD CSR -2021-22 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 113.55 | 113.55 | 454.08 | False | None | None | False | None | False | 51560.784 | 0 | 2318429 | 68464 | None | Item No.8.29, Page No.45, Vol 2 PWD CSR -2021-22 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m) over and including priming coat of exterior primer applied @ 2.20kg/10 m to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 224.95 | 224.95 | 264.32 | False | None | None | False | None | False | 59458.784 | 0 | 2318430 | 68464 | None | Item No.8.33.2 Page No.46, Vol -2 PWD CSR -2021-22 | Painting wood work with Deluxe Multi Surface Paint of requiredshade. Two coat applied @ 0.90 ltr/10 m over an under coat of primer applied @0.75 ltr/10 m of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 113.55 | 113.55 | 70.38 | False | None | None | False | None | False | 7991.649 | 0 | 2318431 | 68464 | None | Item No.8.33.3 Page No.47, Vol 2, PWD CSR -2021-22 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m over an under coat of primer applied @ 0.80 ltr/10 m of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 114.64 | 114.64 | 35.64 | False | None | None | False | None | False | 4085.7696 | 0 | 2318432 | 68464 | None | Item No.11.32, Page No.84, Vol -2,PWD CSR -2021-22 | Providing Thermo-Mechanically Treated bars of grade Fe-550D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 99.5 | 99.5 | 4321.9 | False | None | None | False | None | False | 430029.05 | 0 |
| 1706439475000 | 0 | None | None | Buildings | WATER SUPPLY & SANITATION | 606373.95 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318433 | 68465 | None | It. No. 14.1.1 P123 V2 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 4458.3 | 4458.3 | 12.0 | False | None | None | False | None | False | 53499.6 | 0 | 2318434 | 68465 | None | It. No. 14.3.1 P123 V2 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of proved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 5255.25 | 5255.25 | 3.0 | False | None | None | False | None | False | 15765.75 | 0 | 2318435 | 68465 | None | It. No. 14.4.1 P123 V2 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and40x410x 265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 3712.8 | 3712.8 | 30.0 | False | None | None | False | None | False | 111384.0 | 0 | 2318436 | 68465 | None | It. No. 14.7.11 P125 V2 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: \White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1549.8 | 1549.8 | 9.0 | False | None | None | False | None | False | 13948.2 | 0 | 2318437 | 68465 | None | It. No. 14.37.1 P129 V2 | Bottle trap 31mm single piece moulded with height of 270 mm, effective length of tail pipe 260 mm from the centre of the waste coupling, 77 mm breadth with 25 mm minimum water seal, weighing not less than 260 gms ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 299.25 | 299.25 | 30.0 | False | None | None | False | None | False | 8977.5 | 0 | 2318438 | 68465 | None | It. No. 13.34 | Providing and placing on terrace polyethylene water storage tank with manhole lid and suitable locking arrangement making of suitable diameter for inlet and outlet and overflow pipe including cost of material labour transport charges equipments etc complete as per specification for 1000 litre capacity ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 13177.5 | 13177.5 | 4.0 | False | None | None | False | None | False | 52710.0 | 0 | 2318439 | 68465 | None | It. No. 13.13 P117 V2 | Providing and fixing C.P. brass long nose bib cock of approved quality conforming to IS standards and weighing not less than 810 g. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 707.7 | 707.7 | 30.0 | False | None | None | False | None | False | 21231.0 | 0 | 2318440 | 68465 | None | It. No. 13.13 P117 V2 | Providing and fixing C.P. brass long nose bib cock of approved quality conforming to IS standards and weighing not less than 810 g. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 707.7 | 707.7 | 36.0 | False | None | None | False | None | False | 25477.2 | 0 | 2318441 | 68465 | None | It. No.13.86.4 P99 SR 2018-19 | Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes conforming to IS 15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete. (Concealed work including cutting chases and good the walls etc.) 32mm dia' ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Rmtr | 392.7 | 392.7 | 150.0 | False | None | None | False | None | False | 58905.0 | 0 | 2318442 | 68465 | None | It. No.13.86.3 P99 SR 2018-19 | Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes conforming to IS 15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete. (Concealed work including cutting chases and good the walls etc.) 25mm dia' ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Rmtr | 307.65 | 307.65 | 120.0 | False | None | None | False | None | False | 36918.0 | 0 | 2318443 | 68465 | None | It. No.13.86.2 P99 SR 2018-19 | Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes conforming to IS 15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete. (Concealed work including cutting chases and good the walls etc.) 25mm dia' ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Rmtr | 246.75 | 246.75 | 120.0 | False | None | None | False | None | False | 29610.0 | 0 | 2318444 | 68465 | None | It. No. 13.6.1 P115 V2 | Providing and fixing gun metal non- return valve of approved quality (screwed end) : 32 mm nominal bore Horizontal ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 803.25 | 803.25 | 6.0 | False | None | None | False | None | False | 4819.5 | 0 | 2318445 | 68465 | None | It. No. 13.6.1 P115 V2 | Providing and fixing gun metal non- return valve of approved quality (screwed end) : 25 mm nominal bore Horizontal ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 517.65 | 517.65 | 6.0 | False | None | None | False | None | False | 3105.9 | 0 | 2318446 | 68465 | None | It. No. 14.31 P129 V2 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1019.55 | 1019.55 | 6.0 | False | None | None | False | None | False | 6117.3 | 0 | 2318447 | 68465 | None | It. No. 14.40.2 P130 V2 | 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 399.0 | 399.0 | 6.0 | False | None | None | False | None | False | 2394.0 | 0 | 2318448 | 68465 | None | It. No. T130C P187 V5 | Constructing brick masonry chamber of internal dimension450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 9450.0 | 9450.0 | 10.0 | False | None | None | False | None | False | 94500.0 | 0 | 2318449 | 68465 | None | It.No.1.7 M010G P135 V5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Rmtr | 413.7 | 413.7 | 130.0 | False | None | None | False | None | False | 53781.0 | 0 | 2318450 | 68465 | None | It.No.1.5 M010G P135 V5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 75mm dia., 6 kg/sqcm & class 3 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Rmtr | 220.5 | 220.5 | 60.0 | False | None | None | False | None | False | 13230.0 | 0 |
| 1706439475000 | 0 | None | None | Buildings | Rain Water Harvesting | 41364.31 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318451 | 68466 | None | It No 17.1 P151 C17 | Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. - Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 1008.0 | 1008.0 | 13.45 | False | None | None | False | None | False | 13557.6 | 0 | 2318452 | 68466 | None | It. No. 17.4 P151 | Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge. - Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 420.0 | 420.0 | 13.45 | False | None | None | False | None | False | 5649.0 | 0 | 2318453 | 68466 | None | It. No. 17.5 P151 | Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000x 450x50 mm, reinforced with 8mm dia four nos longitudinal & 9nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1248.45 | 1248.45 | 1.0 | False | None | None | False | None | False | 1248.45 | 0 | 2318454 | 68466 | None | It. No. 17.7.2 P151 | Supplying, assembling, lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 41O plain slotted (having slot of size 1.613.2 mm) mild steel threaded and socketed/ plain bevel ended pipe (type A) of required dia, conforming to IS: 8110, of reputed and approved make, having wall thickness not less than 5.40 mm, including painted with outside surface with two coats of antlcorroslve bltumastlc paint of approved brand and manufacture, lncluding usage & labour charges, fittings & accessories, all complete, for all depths, as per direction of Engineer -in-charge. 150 mm nominal size dia ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1352.4 | 1352.4 | 9.0 | False | None | None | False | None | False | 12171.6 | 0 | 2318455 | 68466 | None | It. No. 17.14 | Providing and laying 100mm thick pre-cast cover slabs over Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 500 @ 6kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 1169.7 | 1169.7 | 7.47 | False | None | None | False | None | False | 8737.659 | 0 |
| 1706439475000 | 0 | None | None | Buildings | Borewell | 254137.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318456 | 68467 | None | it. No. 4 P151 v-5 | Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technicalpersonal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 5398.05 | 5398.05 | 1.0 | False | None | None | False | None | False | 5398.05 | 0 | 2318457 | 68467 | None | It. No.1.1 P151 v-5 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 0 to 50 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 364.35 | 364.35 | 50.0 | False | None | None | False | None | False | 18217.5 | 0 | 2318458 | 68467 | None | It. No.1.2 P151 v-5 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 50 to 100 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 464.1 | 464.1 | 50.0 | False | None | None | False | None | False | 23205.0 | 0 | 2318459 | 68467 | None | It. No.1.3 P151 v-5 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 100 to 150 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 478.8 | 478.8 | 50.0 | False | None | None | False | None | False | 23940.0 | 0 | 2318460 | 68467 | None | It. No.37 P 2 | Suplly and fixing of MS casing pipe 175mm Nominal bore MS casing Pipe ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 1732.5 | 1732.5 | 6.0 | False | None | None | False | None | False | 10395.0 | 0 | 2318461 | 68467 | None | It. No.1.8 P No. 134 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC Filter pipe ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 595.35 | 595.35 | 150.0 | False | None | None | False | None | False | 89302.5 | 0 | 2318462 | 68467 | None | It. No.1.1 P No. 121 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 150.15 | 150.15 | 150.0 | False | None | None | False | None | False | 22522.5 | 0 | 2318463 | 68467 | None | It. No.11.1 P No. 160 | Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications,as per necessary ammendments and instructions of engineer incharge of work. For 3 HP3.00 HP - 300 LPM @ 26 m 2 STG Outlet Dia - 2.50 Submersible pump ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 27158.25 | 27158.25 | 1.0 | False | None | None | False | None | False | 27158.25 | 0 | 2318464 | 68467 | None | It. No.22.2 P No. 161 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. PVC Cable 2.5Sqmm ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 102.9 | 102.9 | 180.0 | False | None | None | False | None | False | 18522.0 | 0 | 2318465 | 68467 | None | It. No.29.1 P No. 162 | Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOLDirect Online Starter 2)S-D- Star Delta Starter ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 9975.0 | 9975.0 | 1.0 | False | None | None | False | None | False | 9975.0 | 0 | 2318466 | 68467 | None | It. No.45 P No. 164 | Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. Earthing ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 3937.5 | 3937.5 | 1.0 | False | None | None | False | None | False | 3937.5 | 0 | 2318467 | 68467 | None | It. No.28.2 P No. 162 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 1564.5 | 1564.5 | 1.0 | False | None | None | False | None | False | 1564.5 | 0 |
| 1706439475000 | 0 | None | None | Buildings | ELECTRICAL WORK | 1173674.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318468 | 68468 | None | Electrical CSR 2022-23 I No 1.2.1 Page No. 1 of 47 | Concealed Conduit System Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary a) 19/20 mm dia 2 mm thick ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 61.0 | 61.0 | 590.0 | False | None | None | False | None | False | 35990.0 | 0 | 2318469 | 68468 | None | Electrical CSR 2022-23 I No1.2.2 Page No. 1 of 47 | Concealed Conduit System Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thick ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 70.0 | 70.0 | 390.0 | False | None | None | False | None | False | 27300.0 | 0 | 2318470 | 68468 | None | Electrical CSR 2022-23 No. 1.2.3 Page No. 1 of 47 | Concealed Conduit System Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 32 mm dia 2.5 mm thick ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 93.0 | 93.0 | 210.0 | False | None | None | False | None | False | 19530.0 | 0 | 2318471 | 68468 | None | Electrical CSR 2022-23 I No 1.2.4 Page No. 1 of 47 | Concealed Conduit System Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 40 mm dia 2.5 mm thick ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 106.0 | 106.0 | 210.0 | False | None | None | False | None | False | 22260.0 | 0 | 2318472 | 68468 | None | Electrical CSR 2022-23I No. 1.3.1 Page No. 1 of 47 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thick ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 75.0 | 75.0 | 590.0 | False | None | None | False | None | False | 44250.0 | 0 | 2318473 | 68468 | None | Electrical CSR 2022-23I No. 1.3.2 Page No. 1 of 47 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 80.0 | 80.0 | 390.0 | False | None | None | False | None | False | 31200.0 | 0 | 2318474 | 68468 | None | ElectricalCSR 2022-23 I No. 1.3.3 Page No. 1 of 47 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 32 mm dia 2.5 mm thick ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 105.0 | 105.0 | 210.0 | False | None | None | False | None | False | 22050.0 | 0 | 2318475 | 68468 | None | Electrical CSR 2022-23I No. 1.3.4 Page No. 1 of 47 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 40 mm dia 2.5 mm thick ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 119.0 | 119.0 | 210.0 | False | None | None | False | None | False | 24990.0 | 0 | 2318476 | 68468 | None | Electrical CSR 2022-23 I No. 15.1 Page No. 1 of 47 | Supplying and fixing PVC/metal conduit Deep junction box 19/20 mm deep Junction box ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 49.0 | 49.0 | 105.0 | False | None | None | False | None | False | 5145.0 | 0 | 2318477 | 68468 | None | Electrical CSR 2022-23 I No. 15.2 Page No. 1 of 47 | Supplying and fixing PVC/metal conduit Deep junction box 25 mm deep Junction box ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 51.0 | 51.0 | 105.0 | False | None | None | False | None | False | 5355.0 | 0 | 2318478 | 68468 | None | Electrical CSR 2022-23I No. 1.5.3 Page No. 1 of 47 | Supplying and fixing PVC/metal conduit Deep junction box 32 mm deep Junction box ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 69.0 | 69.0 | 105.0 | False | None | None | False | None | False | 7245.0 | 0 | 2318479 | 68468 | None | Electrical CSR 2022-23I No. 1.6.4 Page No. 2 of 47 | Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 8" x 6" x 3" (203 x 152 x 76 mm) 8" x 6" x 3" (203 x 152 x 76 mm) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 75.0 | 75.0 | 42.0 | False | None | None | False | None | False | 3150.0 | 0 | 2318480 | 68468 | None | Electrical CSR 2022-23 I No 2.1.1 Page No. 2 of 47 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch box ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Point | 276.0 | 276.0 | 42.0 | False | None | None | False | None | False | 11592.0 | 0 | 2318481 | 68468 | None | Electrical CSR 2022-23 I No 2.1.2 Page No. 3 of 47 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3m upto 6m from tapping point to out let via switch box ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Point | 386.0 | 386.0 | 42.0 | False | None | None | False | None | False | 16212.0 | 0 | 2318482 | 68468 | None | Electrical CSR 2022-23 I No.2.3.1 Page No. 3 of 47 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.0 mm2 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 18.0 | 18.0 | 1050.0 | False | None | None | False | None | False | 18900.0 | 0 | 2318483 | 68468 | None | Electrical CSR 2022-23 I No. 2..3 Page No. 3 of 47 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 mm2 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 40.0 | 40.0 | 390.0 | False | None | None | False | None | False | 15600.0 | 0 | 2318484 | 68468 | None | Electrical CSR 2022-23 I No. 23.4 Page No. 3 of 47 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 4 mm2 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 59.0 | 59.0 | 210.0 | False | None | None | False | None | False | 12390.0 | 0 | 2318485 | 68468 | None | Electrical CSR 2022-23 I No 2.3.5 Page No. 3 of 47 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 6 mm2 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 87.0 | 87.0 | 210.0 | False | None | None | False | None | False | 18270.0 | 0 | 2318486 | 68468 | None | Electrical CSR 2022-23I No. 2.3.7 Page No. 3 of 47 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 10 mm2 ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | m | 157.0 | 157.0 | 210.0 | False | None | None | False | None | False | 32970.0 | 0 | 2318487 | 68468 | None | Elec CSR 2022-23 I No. 3.8 Page No. 6 of 47 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sq CM | 0.29 | 0.29 | 10500.0 | False | None | None | False | None | False | 3045.0 | 0 | 2318488 | 68468 | None | Elec CSR 2022-23 I No. 3.10.1 Page No. 6 of 47 | Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size ...... mm conduit using necessary machine screws.80 mm ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 10.0 | 10.0 | 105.0 | False | None | None | False | None | False | 1050.0 | 0 | 2318489 | 68468 | None | Elec CSR 2022-23 I No. 3.10.2 Page No. 6 of 47 | Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size ...... mm conduit using necessary machine screws.110 mm ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 12.0 | 12.0 | 105.0 | False | None | None | False | None | False | 1260.0 | 0 | 2318490 | 68468 | None | Electrical CSR 2022-23 I No. 1.12 Page No. 2 of 47 | Supplying And Fixing Metal Fan Box with Round Hook. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 163.0 | 163.0 | 78.0 | False | None | None | False | None | False | 12714.0 | 0 | 2318491 | 68468 | None | Elec CSR 2022-23 I No. 11.3.2 Page No. 34 of 47 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor greater than0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 20/22 W ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 740.0 | 740.0 | 78.0 | False | None | None | False | None | False | 57720.0 | 0 | 2318492 | 68468 | None | Elec CSR 2022-23 I No. 6.3.1 Page No. 22 of 47 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 2085.0 | 2085.0 | 78.0 | False | None | None | False | None | False | 162630.0 | 0 | 2318493 | 68468 | None | Elec CSR 2022-23I No. 13.7.1 Page No. 45 of 47 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling /rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA. On wall/ ceiling/ Rafter /Girders ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 119.0 | 119.0 | 78.0 | False | None | None | False | None | False | 9282.0 | 0 | 2318494 | 68468 | None | Elec CSR 2022-23 I No. 13.11 Page No. 46 of 47 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size woodenboard and wired. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 281.0 | 281.0 | 78.0 | False | None | None | False | None | False | 21918.0 | 0 | 2318495 | 68468 | None | Elec CSR 2022-23 I No. 5.16.3 Page No. 13 of 47 | Supplying and fixing regular MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCB's as an incomer for 3 phase Double door with ecessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCB's as outgoings confirming to IS/IEC 60898 - 2. 12 Way ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 14457.0 | 14457.0 | 22.0 | False | None | None | False | None | False | 318054.0 | 0 | 2318496 | 68468 | None | Elec CSR 2022-23 I No. 3.14.1 Page No. 6 of 47 | Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board. 6A SP Switch 6A SP Switch ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 43.0 | 43.0 | 120.0 | False | None | None | False | None | False | 5160.0 | 0 | 2318497 | 68468 | None | Elec CSR 2022-23 I No. 3.14.5 Page No. 6 of 47 | Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board. 6A Bakelite Ceiling Rose ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | No | 63.0 | 63.0 | 120.0 | False | None | None | False | None | False | 7560.0 | 0 | 2318498 | 68468 | None | Elec CSR 2022-23 I No. 12.6 Page No. 5 of 47 | Supplying and replacing ceiling fan regulator 900mm to 1500mm. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 189.0 | 189.0 | 78.0 | False | None | None | False | None | False | 14742.0 | 0 | 2318499 | 68468 | None | Elec CSR 2022-23 I No. 5.33 Page No. 14 of 47 | Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, kVA, kWH, kVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Each | 8370.0 | 8370.0 | 22.0 | False | None | None | False | None | False | 184140.0 | 0 |
| 1706439475000 | 0 | None | None | Buildings | COMPOUND WALL | 688531.53 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2318500 | 68469 | None | P:8, I.No 1.14.1. PWD SR 2021-22 Volume 1 | Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 76.65 | 76.65 | 50.04 | False | None | None | False | None | False | 3835.566 | 0 | 2318501 | 68469 | None | P:5, I.No 1.4.1 PWD SR 2021-22 Volume 1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 195.3 | 195.3 | 17.51 | False | None | None | False | None | False | 3419.703 | 0 | 2318502 | 68469 | None | P:15, I.No 2.1.2 PWD SR 2021-22 Volume 1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 5466.3 | 5466.3 | 5.54 | False | None | None | False | None | False | 30283.302 | 0 | 2318503 | 68469 | None | P:15, I.No 2.1.4 PWD SR 2021-22 Volume 1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6014.4 | 6014.4 | 2.58 | False | None | None | False | None | False | 15517.152 | 0 | 2318504 | 68469 | None | Item No.2.2.1.1 Page No.15 Vol-I PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6240.15 | 6240.15 | 3.53 | False | None | None | False | None | False | 22027.7295 | 0 | 2318505 | 68469 | None | PWD 2021-22 S R SL No. 1.a Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Foundation upto Plinth a. Isolated add 8Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 499.21 | 499.21 | 3.53 | False | None | None | False | None | False | 1762.2113 | 0 | 2318506 | 68469 | None | Item No.2.2.1.1 Page No.15 Vol -I PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6240.15 | 6240.15 | 1.54 | False | None | None | False | None | False | 9609.831 | 0 | 2318507 | 68469 | None | PWD 2021-22 S R SL No. 8 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Columns add 70Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4368.11 | 4368.11 | 1.54 | False | None | None | False | None | False | 6726.8894 | 0 | 2318508 | 68469 | None | Item No. 2.5.1 Page No. 17,Vol -I PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6491.1 | 6491.1 | 0.38 | False | None | None | False | None | False | 2466.618 | 0 | 2318509 | 68469 | None | PWD 2021-22 S R SL No. 1.c Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Plinth Beams add 50Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3245.55 | 3245.55 | 0.38 | False | None | None | False | None | False | 1233.309 | 0 | 2318510 | 68469 | None | Item No2.5.1 Page No. 17, Vol -I PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6491.1 | 6491.1 | 0.96 | False | None | None | False | None | False | 6231.456 | 0 | 2318511 | 68469 | None | PWD 2021-22 S R SL No. 8 Vol-I page No. 115 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Columns add 70Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4543.77 | 4543.77 | 0.96 | False | None | None | False | None | False | 4362.0192 | 0 | 2318512 | 68469 | None | Item No. 2.5.1 Page No. 17 Vol -I,PWD CSR -2021-22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 6491.1 | 6491.1 | 0.96 | False | None | None | False | None | False | 6231.456 | 0 | 2318513 | 68469 | None | PWD 2021-22 S R SL No. 13 Vol-I page No. 116 | Appendix I-Additionalities for Formwork, Centering & Scaffolding for Roof (Straight & Arched) add 50Percentage ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 3894.66 | 3894.66 | 0.96 | False | None | None | False | None | False | 3738.8736 | 0 | 2318514 | 68469 | None | Item No.5.1.1, Page No.9, Vol -2 PWD CSR -2021-22 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 4987.5 | 4987.5 | 27.32 | False | None | None | False | None | False | 136258.5 | 0 | 2318515 | 68469 | None | Item No.5.4, Page No.9, Vol -2 PWD CSR -2021-22 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 5619.6 | 5619.6 | 10.25 | False | None | None | False | None | False | 57600.9 | 0 | 2318516 | 68469 | None | Item No.6.8, Page No.14, Vol -2 PWD CSR -2021-22 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Cum | 7024.5 | 7024.5 | 22.36 | False | None | None | False | None | False | 157067.82 | 0 | 2318517 | 68469 | None | Item No.11.34.B Page No.85, Vol -2PWD CSR -2021-22 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 164.85 | 164.85 | 182.7 | False | None | None | False | None | False | 30118.095 | 0 | 2318518 | 68469 | None | P:41, I.No 8.3.2 PWD SR 2021-22 Volume 2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 289.8 | 289.8 | 202.48 | False | None | None | False | None | False | 58678.704 | 0 | 2318519 | 68469 | None | P:44, I.No 8.19.2 PWD SR 2021-22 Volume 2 | Providing Raised and cut pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 379.05 | 379.05 | 30.36 | False | None | None | False | None | False | 11507.958 | 0 | 2318520 | 68469 | None | Item No.8.29 Page No.45, Vol - 2 PWD CSR -2021-22 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m) over and including priming coat of exterior primer applied @ 2.20kg/10 mto give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 218.4 | 218.4 | 232.84 | False | None | None | False | None | False | 50852.256 | 0 | 2318521 | 68469 | None | Item No.8.33.3 Page No.47, Vol -2 PWD CSR -2021-22 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m over an under coat of primer applied @ 0.80 ltr/10 m of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Sqm | 111.3 | 111.3 | 17.4 | False | None | None | False | None | False | 1936.62 | 0 | 2318522 | 68469 | None | Item No.11.32 Page No.84, Vol -2 PWD CSR -2021-22 | Providing Thermo-Mechanically Treated bars of grade Fe-550D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately ---- Including cost of all materials, labours, HOM, I & UL, Curing with all lead and lifts etc. complete as per specifications and as directed by engineer-in-charge of the work. | Kg | 96.6 | 96.6 | 694.25 | False | None | None | False | None | False | 67064.55 | 0 |
|
|
---|