| 1707105374000 | 1 | None | None | Buildings | Construction of Pourakarmikas Dining hall building near STP in Ward No 09 at TMC Bommasandra limits(1st stage) | 2486237.98 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2434222 | 73227 | None | 001 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-In all kinds of soils Depth upto 3 m Page No. 8,Sl. No.1.14.1 VOL-1 a.In soft soil Depth exceeding 1.5 m, but not exceeding 3 m/Vol.1/pg no.8/Sl.no.1.14.1 | Cum | 105.06 | 105.06 | 210.42 | False | None | None | False | None | False | 22106.7252 | 0 | | 2434223 | 73227 | None | 002 | Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. Vol-1 11/1.23 | Cum | 2762.46 | 2762.46 | 23.38 | False | None | None | False | None | False | 64586.3148 | 0 | | 2434224 | 73227 | None | 003 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (Below Grade slab, Below Footing, & Flagging and all other places) Vol-1 15/2.1.4 | Cum | 6403.51 | 6403.51 | 38.51 | False | None | None | False | None | False | 246599.1701 | 0 | | 2434225 | 73227 | None | 004 | Providing & laying in position RCC for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) For Footing, Retaining wall Base, Column, Plinth Beam, Retaining wall, Verticle fins with M-25 (Below Ground level) Vol-1 15/2.2.3 Footing Concrete (M25) | Cum | 6526.08 | 6526.08 | 55.9 | False | None | None | False | None | False | 364807.872 | 0 | | 2434226 | 73227 | None | 005 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. ( PWD SR 2023-24 Vol:1P.NO.111 I.No: 1) | Cum | 522.09 | 522.09 | 55.9 | False | None | None | False | None | False | 29184.831 | 0 | | 2434227 | 73227 | None | 006 | Providing & laying in position RCC for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) For Footing, Retaining wall Base, Column, Plinth Beam, Retaining wall, Verticle fins with M-25 (Below Ground level) Vol-1 15/2.2.3 Column Concrete (M25) | Cum | 6526.08 | 6526.08 | 7.76 | False | None | None | False | None | False | 50642.3808 | 0 | | 2434228 | 73227 | None | 007 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. ( PWD SR 2023-24 Vol:1P.NO.111 I.No: 9) | Cum | 4568.26 | 4568.26 | 7.76 | False | None | None | False | None | False | 35449.6976 | 0 | | 2434229 | 73227 | None | 008 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Vol-1 pg no.7 item no 1.9 | Cum | 273.98 | 273.98 | 135.43 | False | None | None | False | None | False | 37105.1114 | 0 | | 2434230 | 73227 | None | 009 | Providing & laying in position RCC for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) For Footing, Retaining wall Base, Column, Plinth Beam, Retaining wall, Verticle fins with M-25 (Below Ground level) Vol-1 15/2.2.3 Plinth beam (M25) | Cum | 6526.08 | 6526.08 | 7.96 | False | None | None | False | None | False | 51947.5968 | 0 | | 2434231 | 73227 | None | 010 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. ( PWD SR 2023-24 Vol:1P.NO.111 I.No: 2). | Cum | 3263.04 | 3263.04 | 7.96 | False | None | None | False | None | False | 25973.7984 | 0 | | 2434232 | 73227 | None | 011 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specificationsM25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Roof beam Vol-1 16/2.5.2 | Cum | 7048.29 | 7048.29 | 14.0 | False | None | None | False | None | False | 98676.06 | 0 | | 2434233 | 73227 | None | 012 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. ( PWD SR 2023-24 Vol:1P.NO.112 I.No: 14) | Cum | 4228.97 | 4228.97 | 14.0 | False | None | None | False | None | False | 59205.58 | 0 | | 2434234 | 73227 | None | 013 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specificationsM25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Roof slab Vol-1 16/2.5.2 | Cum | 7048.29 | 7048.29 | 26.31 | False | None | None | False | None | False | 185440.5099 | 0 | | 2434235 | 73227 | None | 014 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. ( PWD SR 2023-24 Vol:1P.NO.111 I.No: 15) | Cum | 3524.15 | 3524.15 | 26.31 | False | None | None | False | None | False | 92720.3865 | 0 | | 2434236 | 73227 | None | 015 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings (P.No. 18, It.No. 2.11a of CSR 2023-24 Volume 1) | MT | 92140.71 | 92140.71 | 9.937 | False | None | None | False | None | False | 915602.23527 | 0 | | 2434237 | 73227 | None | 016 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of
work.(Page No.13, Item No. 6.7, Common SR 2023-24 volume 2) | Cum | 8457.33 | 8457.33 | 24.38 | False | None | None | False | None | False | 206189.7054 | 0 |
|