tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1706962522000 | 0 | None | None | Buildings | Sub Estimate-I First Floor Civil Works | 3891055.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2423674 | 72734 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, For Columns ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6281.19 | 6281.19 | 10.72 | False | None | None | False | None | False | 67334.3568 | 0 | 2423675 | 72734 | None | Vol 1 Page No 111 Item No 9 | Formwork, Centering & Scaffloding 70% For Columns ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 4396.83 | 4396.83 | 10.72 | False | None | None | False | None | False | 47134.0176 | 0 | 2423676 | 72734 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, For Beams & Lintel ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6281.19 | 6281.19 | 21.18 | False | None | None | False | None | False | 133035.6042 | 0 | 2423677 | 72734 | None | Vol 1 Page No 112 Item No 14 | Formwork, Centering & Scaffloding 60% For Beams & Lintel ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3768.71 | 3768.71 | 21.18 | False | None | None | False | None | False | 79821.2778 | 0 | 2423678 | 72734 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, For Roof Slab ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6281.19 | 6281.19 | 43.45 | False | None | None | False | None | False | 272917.7055 | 0 | 2423679 | 72734 | None | Vol 1 Page No 112 Item No 15 | Formwork, Centering & Scaffloding 50% For Roof Slab ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3140.6 | 3140.6 | 43.45 | False | None | None | False | None | False | 136459.07 | 0 | 2423680 | 72734 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, For Roof Staircase ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6281.19 | 6281.19 | 3.73 | False | None | None | False | None | False | 23428.8387 | 0 | 2423681 | 72734 | None | Vol 1 Page No 112 Item No 16 | Formwork, Centering & Scaffloding 50% For Roof Staircase ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3140.6 | 3140.6 | 3.73 | False | None | None | False | None | False | 11714.438 | 0 | 2423682 | 72734 | None | Vol 1 Page No 18 Item No 2.10 a | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M20 Grade, For Sill ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6163.02 | 6163.02 | 1.86 | False | None | None | False | None | False | 11463.2172 | 0 | 2423683 | 72734 | None | Vol 1 Page No 111 Item No 1b | Formwork, Centering & Scaffloding 3% For Sill ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 184.89 | 184.89 | 1.86 | False | None | None | False | None | False | 343.8954 | 0 | 2423684 | 72734 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, Chejja ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6281.19 | 6281.19 | 0.76 | False | None | None | False | None | False | 4773.7044 | 0 | 2423685 | 72734 | None | Vol 1 Page No 112 Item No 19 | Formwork, Centering & Scaffloding 45% For Chejja ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 2826.54 | 2826.54 | 0.76 | False | None | None | False | None | False | 2148.1704 | 0 | 2423686 | 72734 | None | Vol 1 Page No 18 Item No 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Work should be carried out as per the direction of engineer incharge of work. | t | 90351.57 | 90351.57 | 11.22 | False | None | None | False | None | False | 1013744.6154 | 0 | 2423687 | 72734 | None | Vol 2 Page No 17 Item No 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1323.1 | 1323.1 | 288.84 | False | None | None | False | None | False | 382164.204 | 0 | 2423688 | 72734 | None | Vol 2 Page No 44 Item No 8.16a | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1250.38 | 1250.38 | 20.04 | False | None | None | False | None | False | 25057.6152 | 0 | 2423689 | 72734 | None | Vol 2 Page No 77 Item No 11.5.2 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 4284.42 | 4284.42 | 8.64 | False | None | None | False | None | False | 37017.3888 | 0 | 2423690 | 72734 | None | Vol 2 Page No 86 Item No 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Work should be carried out as per the direction of engineer incharge of work. | Kg | 169.68 | 169.68 | 2471.67 | False | None | None | False | None | False | 419392.9656 | 0 | 2423691 | 72734 | None | Vol 2 Page No 109 Item No 12.86 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8+-0.2 mm. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 5443.9 | 5443.9 | 29.25 | False | None | None | False | None | False | 159234.075 | 0 | 2423692 | 72734 | None | Vol 2 Page No 41 Item No 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 243.41 | 243.41 | 344.37 | False | None | None | False | None | False | 83823.1017 | 0 | 2423693 | 72734 | None | Vol 2 Page No 50 Item No 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 101.0 | 101.0 | 773.2 | False | None | None | False | None | False | 78093.2 | 0 | 2423694 | 72734 | None | Vol 2 Page No 41 Item No 8.2.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 281.79 | 281.79 | 514.4 | False | None | None | False | None | False | 144952.776 | 0 | 2423695 | 72734 | None | Vol 2 Page No 61 Item No 9.17.2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1186.75 | 1186.75 | 228.34 | False | None | None | False | None | False | 270982.495 | 0 | 2423696 | 72734 | None | Vol 2 Page No 64 Item No 9.36 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1666.5 | 1666.5 | 118.42 | False | None | None | False | None | False | 197346.93 | 0 | 2423697 | 72734 | None | Vol 2 Page No 84 Item No 11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Work should be carried out as per the direction of engineer incharge of work. | Kg | 139.38 | 139.38 | 170.8 | False | None | None | False | None | False | 23806.104 | 0 | 2423698 | 72734 | None | Vol 2 Page No 46 Item No 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 159.58 | 159.58 | 773.2 | False | None | None | False | None | False | 123387.256 | 0 | 2423699 | 72734 | None | Vol 2 Page No 46 Item No 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 175.74 | 175.74 | 569.12 | False | None | None | False | None | False | 100017.1488 | 0 | 2423700 | 72734 | None | Vol 2 Page No 47 Item No 8.36.1 | Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 177.76 | 177.76 | 172.52 | False | None | None | False | None | False | 30667.1552 | 0 | 2423701 | 72734 | None | Vol 2 Page No 55 Item No 8.84 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 479.75 | 479.75 | 22.5 | False | None | None | False | None | False | 10794.375 | 0 |
| 1706962522000 | 0 | None | None | Buildings | Sub Estimate-II Second Floor Civil Works | 3743019.19 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2423702 | 72735 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, For Columns ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6343.38 | 6343.38 | 10.72 | False | None | None | False | None | False | 68001.0336 | 0 | 2423703 | 72735 | None | Vol 1 Page No 111 Item No 9 | Formwork, Centering & Scaffloding 70% For Columns ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 4440.37 | 4440.37 | 10.72 | False | None | None | False | None | False | 47600.7664 | 0 | 2423704 | 72735 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, For Beams & Lintel ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6343.38 | 6343.38 | 21.18 | False | None | None | False | None | False | 134352.7884 | 0 | 2423705 | 72735 | None | Vol 1 Page No 112 Item No 14 | Formwork, Centering & Scaffloding 60% For Beams & Lintel ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3806.03 | 3806.03 | 21.18 | False | None | None | False | None | False | 80611.7154 | 0 | 2423706 | 72735 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, For Roof Slab ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6343.38 | 6343.38 | 43.45 | False | None | None | False | None | False | 275619.861 | 0 | 2423707 | 72735 | None | Vol 1 Page No 112 Item No 15 | Formwork, Centering & Scaffloding 50% For Roof Slab ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3171.69 | 3171.69 | 43.45 | False | None | None | False | None | False | 137809.9305 | 0 | 2423708 | 72735 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, For Roof Staircase ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6343.38 | 6343.38 | 3.73 | False | None | None | False | None | False | 23660.8074 | 0 | 2423709 | 72735 | None | Vol 1 Page No 112 Item No 16 | Formwork, Centering & Scaffloding 50% For Roof Staircase ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3171.69 | 3171.69 | 3.73 | False | None | None | False | None | False | 11830.4037 | 0 | 2423710 | 72735 | None | Vol 1 Page No 18 Item No 2.10 a | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M20 Grade, For Sill ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6224.04 | 6224.04 | 1.86 | False | None | None | False | None | False | 11576.7144 | 0 | 2423711 | 72735 | None | Vol 1 Page No 111 Item No 1b | Formwork, Centering & Scaffloding 3% For Sill ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 186.72 | 186.72 | 1.86 | False | None | None | False | None | False | 347.2992 | 0 | 2423712 | 72735 | None | Vol 1 Page No 18 Item No 2.10 c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade, Chejja ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6343.38 | 6343.38 | 0.76 | False | None | None | False | None | False | 4820.9688 | 0 | 2423713 | 72735 | None | Vol 1 Page No 112 Item No 19 | Formwork, Centering & Scaffloding 45% For Chejja ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 2854.52 | 2854.52 | 0.76 | False | None | None | False | None | False | 2169.4352 | 0 | 2423714 | 72735 | None | Vol 1 Page No 18 Item No 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Work should be carried out as per the direction of engineer incharge of work. | t | 91246.14 | 91246.14 | 11.22 | False | None | None | False | None | False | 1023781.6908 | 0 | 2423715 | 72735 | None | Vol 2 Page No 17 Item No 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1336.2 | 1336.2 | 288.84 | False | None | None | False | None | False | 385948.008 | 0 | 2423716 | 72735 | None | Vol 2 Page No 44 Item No 8.16a | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1262.76 | 1262.76 | 20.04 | False | None | None | False | None | False | 25305.7104 | 0 | 2423717 | 72735 | None | Vol 2 Page No 77 Item No 11.5.2 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 4326.84 | 4326.84 | 8.64 | False | None | None | False | None | False | 37383.8976 | 0 | 2423718 | 72735 | None | Vol 2 Page No 86 Item No 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Work should be carried out as per the direction of engineer incharge of work. | Kg | 171.36 | 171.36 | 1342.32 | False | None | None | False | None | False | 230019.9552 | 0 | 2423719 | 72735 | None | Vol 2 Page No 109 Item No 12.86 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8+-0.2 mm. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 5497.8 | 5497.8 | 29.25 | False | None | None | False | None | False | 160810.65 | 0 | 2423720 | 72735 | None | Vol 2 Page No 41 Item No 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 245.82 | 245.82 | 344.37 | False | None | None | False | None | False | 84653.0334 | 0 | 2423721 | 72735 | None | Vol 2 Page No 50 Item No 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 102.0 | 102.0 | 773.2 | False | None | None | False | None | False | 78866.4 | 0 | 2423722 | 72735 | None | Vol 2 Page No 41 Item No 8.2.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 284.58 | 284.58 | 522.29 | False | None | None | False | None | False | 148633.2882 | 0 | 2423723 | 72735 | None | Vol 2 Page No 61 Item No 9.17.2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1198.5 | 1198.5 | 228.34 | False | None | None | False | None | False | 273665.49 | 0 | 2423724 | 72735 | None | Vol 2 Page No 64 Item No 9.36 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1683.0 | 1683.0 | 127.92 | False | None | None | False | None | False | 215289.36 | 0 | 2423725 | 72735 | None | Vol 2 Page No 84 Item No 11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Work should be carried out as per the direction of engineer incharge of work. | Kg | 140.76 | 140.76 | 170.8 | False | None | None | False | None | False | 24041.808 | 0 | 2423726 | 72735 | None | Vol 2 Page No 46 Item No 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 161.16 | 161.16 | 773.2 | False | None | None | False | None | False | 124608.912 | 0 | 2423727 | 72735 | None | Vol 2 Page No 46 Item No 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 177.48 | 177.48 | 577.01 | False | None | None | False | None | False | 102407.7348 | 0 | 2423728 | 72735 | None | Vol 2 Page No 47 Item No 8.36.1 | Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 179.52 | 179.52 | 101.94 | False | None | None | False | None | False | 18300.2688 | 0 | 2423729 | 72735 | None | Vol 2 Page No 55 Item No 8.84 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 484.5 | 484.5 | 22.5 | False | None | None | False | None | False | 10901.25 | 0 |
| 1706962522000 | 0 | None | None | Buildings | Sub Estimate-III Terrace Floor Civil Works | 866681.33 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2423730 | 72736 | None | Vol 1 Page No 18 Item No 2.10.c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Columns ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6405.57 | 6405.57 | 4.23 | False | None | None | False | None | False | 27095.5611 | 0 | 2423731 | 72736 | None | Vol 1 Page No 111 Item No 9 | Formwork, Centering & Scaffloding 70% For Columns ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 4483.9 | 4483.9 | 4.23 | False | None | None | False | None | False | 18966.897 | 0 | 2423732 | 72736 | None | Vol 1 Page No 18 Item No 2.10.c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Beams ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6405.57 | 6405.57 | 2.13 | False | None | None | False | None | False | 13643.8641 | 0 | 2423733 | 72736 | None | Vol 1 Page No 112 Item No 14 | Formwork, Centering & Scaffloding 60% For Beams ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3843.34 | 3843.34 | 2.13 | False | None | None | False | None | False | 8186.3142 | 0 | 2423734 | 72736 | None | Vol 1 Page No 18 Item No 2.10.c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Roof Slab ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6405.57 | 6405.57 | 3.83 | False | None | None | False | None | False | 24533.3331 | 0 | 2423735 | 72736 | None | Vol 1 Page No 112 Item No 15 | Formwork, Centering & Scaffloding 50% For Roof Slab ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3202.79 | 3202.79 | 3.83 | False | None | None | False | None | False | 12266.6857 | 0 | 2423736 | 72736 | None | Vol 1 Page No 18 Item No 2.10.c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Lintel ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6405.57 | 6405.57 | 0.78 | False | None | None | False | None | False | 4996.3446 | 0 | 2423737 | 72736 | None | Vol 1 Page No 112 Item No 14 | Formwork, Centering & Scaffloding 60% For Lintel ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 3843.34 | 3843.34 | 0.78 | False | None | None | False | None | False | 2997.8052 | 0 | 2423738 | 72736 | None | Vol 1 Page No 18 Item No 2.10 a | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M20 Grade, For Sill ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6285.06 | 6285.06 | 0.37 | False | None | None | False | None | False | 2325.4722 | 0 | 2423739 | 72736 | None | Vol 1 Page No 112 Item No 14 | Formwork, Centering & Scaffloding 3% For Sill ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 188.55 | 188.55 | 0.37 | False | None | None | False | None | False | 69.7635 | 0 | 2423740 | 72736 | None | Vol 1 Page No 18 Item No 2.10.c | Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade. Chejja ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 6405.57 | 6405.57 | 0.11 | False | None | None | False | None | False | 704.6127 | 0 | 2423741 | 72736 | None | Vol 1 Page No 112 Item No 19 | Formwork, Centering & Scaffloding 45% For Chejja ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 2882.51 | 2882.51 | 0.11 | False | None | None | False | None | False | 317.0761 | 0 | 2423742 | 72736 | None | Vol 1 Page No 18 Item No 2.11.a | Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Work should be carried out as per the direction of engineer incharge of work. | t | 92140.71 | 92140.71 | 1.64 | False | None | None | False | None | False | 151110.7644 | 0 | 2423743 | 72736 | None | Vol 2 Page No 17 Item No 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 1349.3 | 1349.3 | 140.41 | False | None | None | False | None | False | 189455.213 | 0 | 2423744 | 72736 | None | Vol 2 Page No 86 Item No 11.34B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Work should be carried out as per the direction of engineer incharge of work. | Kg | 188.49 | 188.49 | 36.0 | False | None | None | False | None | False | 6785.64 | 0 | 2423745 | 72736 | None | Vol 2 Page No 77 Item No 11.5.2 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 4369.26 | 4369.26 | 2.52 | False | None | None | False | None | False | 11010.5352 | 0 | 2423746 | 72736 | None | Vol 2 Page No 109 Item No 12.86 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8+-0.2 mm. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 5551.7 | 5551.7 | 2.25 | False | None | None | False | None | False | 12491.325 | 0 | 2423747 | 72736 | None | Vol 2 Page No 41 Item No 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 248.23 | 248.23 | 58.61 | False | None | None | False | None | False | 14548.7603 | 0 | 2423748 | 72736 | None | Vol 2 Page No 50 Item No 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 103.0 | 103.0 | 105.55 | False | None | None | False | None | False | 10871.65 | 0 | 2423749 | 72736 | None | Vol 2 Page No 41 Item No 8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 303.85 | 303.85 | 293.39 | False | None | None | False | None | False | 89146.5515 | 0 | 2423750 | 72736 | None | Vol 2 Page No 151 Item No 15.11 | Newly Constructed Roof/ Bathroom/ Toilet/ balcony/ utility with Cementatius Waterproof coating - Below 500 m2Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (5 Liquid :7 Powder) to the RCC surface like Roof, bathroom, toilet, balcony & utility area applied @ 2.2kg/m2 in 2 coats to achieve 1.2mm DFT, having Elongation at break 120% as per ASTM D 412, Tensile strength 1N/mm2as per ASTM D 412, Adhesion strength: 0.80N/mm2 as per ASTM D 4541, crack bridging upto 2mm as per ASTM C 836. The finished cost to include surface preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per specification. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 540.75 | 540.75 | 358.71 | False | None | None | False | None | False | 193972.4325 | 0 | 2423751 | 72736 | None | Vol 2 Page No 46 Item No 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 162.74 | 162.74 | 105.55 | False | None | None | False | None | False | 17177.207 | 0 | 2423752 | 72736 | None | Vol 2 Page No 46 Item No 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 179.22 | 179.22 | 296.27 | False | None | None | False | None | False | 53097.5094 | 0 | 2423753 | 72736 | None | VOL 2 Page No 47 Item No 8.36.1 | Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Work should be carried out as per the direction of engineer incharge of work. | Sqm | 181.28 | 181.28 | 5.02 | False | None | None | False | None | False | 910.0256 | 0 |
| 1706962522000 | 0 | None | None | Buildings | Sub Estimate-IV Water Supply & Sanitation | 159011.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2423754 | 72737 | None | Vol 2 Page No 125 Item No 13.47 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 75 mm Diameter ---- Work should be carried out as per the direction of engineer incharge of work. | m | 197.0 | 197.0 | 7.2 | False | None | None | False | None | False | 1418.4 | 0 | 2423755 | 72737 | None | Vol 2 Page No 125 Item No 13.48 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Work should be carried out as per the direction of engineer incharge of work. | m | 291.0 | 291.0 | 77.4 | False | None | None | False | None | False | 22523.4 | 0 | 2423756 | 72737 | None | Vol 2 Page No 125 Item No 13.49 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes of 150mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes ---- Work should be carried out as per the direction of engineer incharge of work. | m | 568.0 | 568.0 | 50.0 | False | None | None | False | None | False | 28400.0 | 0 | 2423757 | 72737 | None | Vol 2 Page No 123 Item No 13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- Work should be carried out as per the direction of engineer incharge of work. | l | 9.0 | 9.0 | 1000.0 | False | None | None | False | None | False | 9000.0 | 0 | 2423758 | 72737 | None | Vol 2 Page No 125 Item No 13.50.3 | Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes
---- Work should be carried out as per the direction of engineer incharge of work. | m | 224.0 | 224.0 | 25.0 | False | None | None | False | None | False | 5600.0 | 0 | 2423759 | 72737 | None | Vol 2 Page No 125 Item No 13.50.4 | Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 32 mm nominal dia Pipes ---- Work should be carried out as per the direction of engineer incharge of work. | m | 272.0 | 272.0 | 25.0 | False | None | None | False | None | False | 6800.0 | 0 | 2423760 | 72737 | None | Vol 2 Page No 125 Item No 13.50.6 | Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 50mm nominal dia Pipes ---- Work should be carried out as per the direction of engineer incharge of work. | m | 386.0 | 386.0 | 200.0 | False | None | None | False | None | False | 77200.0 | 0 | 2423761 | 72737 | None | Vol 2 Page No 117 Item No 13.5.3 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25 mm nominal bore ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 332.0 | 332.0 | 5.0 | False | None | None | False | None | False | 1660.0 | 0 | 2423762 | 72737 | None | Vol 2 Page No 117 Item No 13.4.2 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 32 mm nominal bore ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 598.0 | 598.0 | 5.0 | False | None | None | False | None | False | 2990.0 | 0 | 2423763 | 72737 | None | Vol 2 Page No 117 Item No 13.4.4 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 50 mm nominal bore ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 855.0 | 855.0 | 4.0 | False | None | None | False | None | False | 3420.0 | 0 |
| 1706962522000 | 0 | None | None | Buildings | Sub Estimate-V Internal Electrification | 825227.14 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2423764 | 72738 | None | Vol 6 Page No 2 of 105 Item No 1.2.1 | Supplying heavy gauge PVC conduit pipe mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick ---- Work should be carried out as per the direction of engineer incharge of work. | m | 66.0 | 66.0 | 240.0 | False | None | None | False | None | False | 15840.0 | 0 | 2423765 | 72738 | None | Vol 6 Page No 2 of 105 Item No 1.2.2 | Supplying heavy gauge PVC conduit pipe mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thick ---- Work should be carried out as per the direction of engineer incharge of work. | m | 78.0 | 78.0 | 180.0 | False | None | None | False | None | False | 14040.0 | 0 | 2423766 | 72738 | None | Vol 6 Page No 2 of 105 Item No 1.5.1 | Supplying and fixing PVC/metal conduit Deep junction box 19/20 mm deep Junction box ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 49.0 | 49.0 | 120.0 | False | None | None | False | None | False | 5880.0 | 0 | 2423767 | 72738 | None | Vol 6 Page No 3 of 105 Item No 1.5.2 | Supplying and fixing PVC/metal conduit Deep junction box 25 mm deep Junction box ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 56.0 | 56.0 | 120.0 | False | None | None | False | None | False | 6720.0 | 0 | 2423768 | 72738 | None | Vol 6 Page No 2 of 105 Item No 1.3.1 | Supplying heavy gauge PVC Conduit Pipe .... dia mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thick ---- Work should be carried out as per the direction of engineer incharge of work. | m | 68.0 | 68.0 | 120.0 | False | None | None | False | None | False | 8160.0 | 0 | 2423769 | 72738 | None | Vol 6 Page No 2 of 105 Item No 1.3.2 | Supplying heavy gauge PVC Conduit Pipe .... dia mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick ---- Work should be carried out as per the direction of engineer incharge of work. | m | 79.0 | 79.0 | 120.0 | False | None | None | False | None | False | 9480.0 | 0 | 2423770 | 72738 | None | Vol 6 Page No 4 of 105 Item No 1.13 | Supplying And Fixing Metal Fan Box with Round Hook. ---- Work should be carried out as per the direction of engineer incharge of work. | Nos | 117.0 | 117.0 | 30.0 | False | None | None | False | None | False | 3510.0 | 0 | 2423771 | 72738 | None | Vol 6 Page No 5 of 105 Item No 2.2.1 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch box ---- Work should be carried out as per the direction of engineer incharge of work. | Point | 269.0 | 269.0 | 60.0 | False | None | None | False | None | False | 16140.0 | 0 | 2423772 | 72738 | None | Vol 6 Page No 5 of 105 Item No 2.2.2 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3m upto 6m from tapping point to out let via switch box ---- Work should be carried out as per the direction of engineer incharge of work. | Point | 379.0 | 379.0 | 40.0 | False | None | None | False | None | False | 15160.0 | 0 | 2423773 | 72738 | None | Vol 6 Page No 8 of 105 Item No 3.4.1 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 1-2 Way ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 138.0 | 138.0 | 60.0 | False | None | None | False | None | False | 8280.0 | 0 | 2423774 | 72738 | None | Vol 6 Page No 8 of 105 Item No 3.4.3 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 4-5 Way ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 177.0 | 177.0 | 20.0 | False | None | None | False | None | False | 3540.0 | 0 | 2423775 | 72738 | None | Vol 6 Page No 8 of 105 Item No 3.4.4 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 6 Way ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 220.0 | 220.0 | 16.0 | False | None | None | False | None | False | 3520.0 | 0 | 2423776 | 72738 | None | Vol 6 Page No 8 of 105 Item No 3.4.5 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 8 Way ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 261.0 | 261.0 | 16.0 | False | None | None | False | None | False | 4176.0 | 0 | 2423777 | 72738 | None | Vol 6 Page No 8 of 105 Item No 3.5.1 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 1 to 2 Module ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 137.0 | 137.0 | 40.0 | False | None | None | False | None | False | 5480.0 | 0 | 2423778 | 72738 | None | Vol 6 Page No 8 of 105 Item No 3.5.3 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 4 Module ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 175.0 | 175.0 | 20.0 | False | None | None | False | None | False | 3500.0 | 0 | 2423779 | 72738 | None | Vol 6 Page No 8 of 105 Item No 3.5.4 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 6 Module ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 234.0 | 234.0 | 8.0 | False | None | None | False | None | False | 1872.0 | 0 | 2423780 | 72738 | None | Vol 6 Page No 8 of 105 Item No 3.5.5 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 8 Module ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 284.0 | 284.0 | 8.0 | False | None | None | False | None | False | 2272.0 | 0 | 2423781 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 102.0 | 102.0 | 60.0 | False | None | None | False | None | False | 6120.0 | 0 | 2423782 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Two Way Switch ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 166.0 | 166.0 | 20.0 | False | None | None | False | None | False | 3320.0 | 0 | 2423783 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 171.0 | 171.0 | 20.0 | False | None | None | False | None | False | 3420.0 | 0 | 2423784 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 357.0 | 357.0 | 30.0 | False | None | None | False | None | False | 10710.0 | 0 | 2423785 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.6.8 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Bell Push ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 177.0 | 177.0 | 6.0 | False | None | None | False | None | False | 1062.0 | 0 | 2423786 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 32A DP Switch ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 326.0 | 326.0 | 10.0 | False | None | None | False | None | False | 3260.0 | 0 | 2423787 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 236.0 | 236.0 | 18.0 | False | None | None | False | None | False | 4248.0 | 0 | 2423788 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.10.2 | Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size . mm conduit using necessary machine screws. 80/90 mm ---- Work should be carried out as per the direction of engineer incharge of work. | No | 15.0 | 15.0 | 120.0 | False | None | None | False | None | False | 1800.0 | 0 | 2423789 | 72738 | None | Vol 6 Page No 9 of 105 Item No 3.10.3 | Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size ...... mm conduit using necessary machine screws. 110 mm ---- Work should be carried out as per the direction of engineer incharge of work. | No | 21.0 | 21.0 | 120.0 | False | None | None | False | None | False | 2520.0 | 0 | 2423790 | 72738 | None | Vol 6 Page No 5 of 105 Item No 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mm2 ---- Work should be carried out as per the direction of engineer incharge of work. | m | 26.0 | 26.0 | 400.0 | False | None | None | False | None | False | 10400.0 | 0 | 2423791 | 72738 | None | Vol 6 Page No 5 of 105 Item No 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 mm2 ---- Work should be carried out as per the direction of engineer incharge of work. | m | 42.0 | 42.0 | 300.0 | False | None | None | False | None | False | 12600.0 | 0 | 2423792 | 72738 | None | Vol 6 Page No 5 of 105 Item No 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 4 mm2 ---- Work should be carried out as per the direction of engineer incharge of work. | m | 63.0 | 63.0 | 300.0 | False | None | None | False | None | False | 18900.0 | 0 | 2423793 | 72738 | None | Vol 6 Page No 5 of 105 Item No 2.3.5 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 6 mm2 ---- Work should be carried out as per the direction of engineer incharge of work. | m | 92.0 | 92.0 | 200.0 | False | None | None | False | None | False | 18400.0 | 0 | 2423794 | 72738 | None | Vol 6 Page No 14 of 105 Item No 5.7.4 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 100 A ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 691.0 | 691.0 | 6.0 | False | None | None | False | None | False | 4146.0 | 0 | 2423795 | 72738 | None | Vol 6 Page No 17 of 105 Item No 5.18.1 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SP ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 415.0 | 415.0 | 6.0 | False | None | None | False | None | False | 2490.0 | 0 | 2423796 | 72738 | None | Vol 6 Page No 17 of 105 Item No 5.18.4 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A DP ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 739.0 | 739.0 | 6.0 | False | None | None | False | None | False | 4434.0 | 0 | 2423797 | 72738 | None | Vol 6 Page No 17 of 105 Item No 5.18.6 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 50-63 Amps DP ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 1102.0 | 1102.0 | 6.0 | False | None | None | False | None | False | 6612.0 | 0 | 2423798 | 72738 | None | Vol 6 Page No 17 of 105 Item No 5.18. 7 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32Amps TPN ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 1717.0 | 1717.0 | 6.0 | False | None | None | False | None | False | 10302.0 | 0 | 2423799 | 72738 | None | Vol 6 Page No 18 of 105 Item No 5.19.7 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. 6 Way SP & N ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 1791.0 | 1791.0 | 2.0 | False | None | None | False | None | False | 3582.0 | 0 | 2423800 | 72738 | None | Vol 6 Page No 18 of 105 Item No 5.19.13 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. 8 Way TP & N ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 6091.0 | 6091.0 | 2.0 | False | None | None | False | None | False | 12182.0 | 0 | 2423801 | 72738 | None | Vol 6 Page No 17 of 105 Item No 5.15.9 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. 100 A 25 kA ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 8487.0 | 8487.0 | 6.0 | False | None | None | False | None | False | 50922.0 | 0 | 2423802 | 72738 | None | Vol 6 Page No 17 of 105 Item No 5.15.11 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. 160 A 25 kA ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 13447.0 | 13447.0 | 6.0 | False | None | None | False | None | False | 80682.0 | 0 | 2423803 | 72738 | None | Vol 6 Page No 18 of 105 Item No 5.20.1 | Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board.
16-25 A 2 pole ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 4277.0 | 4277.0 | 4.0 | False | None | None | False | None | False | 17108.0 | 0 | 2423804 | 72738 | None | Vol 6 Page No 18 of 105 Item No 5.20.10 | Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board.
63 A 4 pole ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 5545.0 | 5545.0 | 4.0 | False | None | None | False | None | False | 22180.0 | 0 | 2423805 | 72738 | None | Vol 6 Page No 15 of 105 Item No 5.12.1 | Supplying of on load change over switches 4 poles, AC 23A Duty, 415V, 50Hz, AC Supply. With all accessories. (SM
Enclosure Sheet Metal Execution) 63 A ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 6881.0 | 6881.0 | 6.0 | False | None | None | False | None | False | 41286.0 | 0 | 2423806 | 72738 | None | Vol 6 Page No 30 of 105 Item No 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 2984.0 | 2984.0 | 30.0 | False | None | None | False | None | False | 89520.0 | 0 | 2423807 | 72738 | None | Vol 6 Page No 57 of 105 Item No 13.11 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 315.0 | 315.0 | 30.0 | False | None | None | False | None | False | 9450.0 | 0 | 2423808 | 72738 | None | Vol 6 Page No 57 of 105 Item No 13.12 | Extra length of GI pipe of class B 19mm dia for down rod. ---- Work should be carried out as per the direction of engineer incharge of work. | m | 197.0 | 197.0 | 30.0 | False | None | None | False | None | False | 5910.0 | 0 | 2423809 | 72738 | None | Vol 6 Page No 43 of 105 Item No 11.3.1 | Supplying of .....feet -PVC Batten with integrated LED tube ....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 2' - 9/10 W ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 551.0 | 551.0 | 12.0 | False | None | None | False | None | False | 6612.0 | 0 | 2423810 | 72738 | None | Vol 6 Page No 43 of 105 Item No 11.3.2 | Supplying of .....feet -PVC Batten with integrated LED tube ....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 20/22 W ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 690.0 | 690.0 | 42.0 | False | None | None | False | None | False | 28980.0 | 0 | 2423811 | 72738 | None | Vol 6 Page No 10 of 105 Item No 3.14.6 | Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board. 6A Pendent Holder ---- Work should be carried out as per the direction of engineer incharge of work. | No | 71.0 | 71.0 | 8.0 | False | None | None | False | None | False | 568.0 | 0 | 2423812 | 72738 | None | Vol 6 Page No 47 of 105 Item No 11.11.7 | Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 18W, 6500K ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 426.0 | 426.0 | 12.0 | False | None | None | False | None | False | 5112.0 | 0 | 2423813 | 72738 | None | Vol 6 Page No 44 of 105 Item No 11.4.3 | Supplying of recess mounting non integrated type LED down light...... W luminaire comprising of pressure decast/ extruded aluminium housing, with spring loaded false ceiling clA, LED of Power/COB with CCT 6500 degree K, CRI 70%. efficacy 100 lumen per W, 120degree beam spread, life 25000 burning hours and Compliance to IS10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level. LED's are driven by HF electronic driver integrated in a separate control gear assembly., with PF 0.95, power loss should 5% of lamp Wage, short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 15-18W ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 1671.0 | 1671.0 | 20.0 | False | None | None | False | None | False | 33420.0 | 0 | 2423814 | 72738 | None | Vol 6 Page No 56 of 105 Item No 13.7.1 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA. On wall/ ceiling / Rafter / Girders ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 122.0 | 122.0 | 94.0 | False | None | None | False | None | False | 11468.0 | 0 | 2423815 | 72738 | None | Vol 6 Page No 46 of 105 Item No 11.8.4 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect LED Streetlight 90 W ---- Work should be carried out as per the direction of engineer incharge of work. | No | 8860.0 | 8860.0 | 2.0 | False | None | None | False | None | False | 17720.0 | 0 | 2423816 | 72738 | None | Vol 6 Page No 56 of 105 Item No 13.2.1 | Supplying and Fixing........mm dia class A GI pipe bracket upto 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole, using suitable clA, bolts, nuts and wiring using suitable capacity wires. Using 25mm dia G.I.Pipe ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 1203.0 | 1203.0 | 2.0 | False | None | None | False | None | False | 2406.0 | 0 | 2423817 | 72738 | None | Vol 6 Page No 18 of 105 Item No 5.21 | Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 9255.0 | 9255.0 | 2.0 | False | None | None | False | None | False | 18510.0 | 0 | 2423818 | 72738 | None | Vol 6 Page No 19 of 105 Item No 5.29 | Supplying, fixing and wiring 3 Phase Digital Ammeter /Voltmeter ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 1425.0 | 1425.0 | 2.0 | False | None | None | False | None | False | 2850.0 | 0 | 2423819 | 72738 | None | Vol 6 Page No 19 of 105 Item No 5.34 | Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound. ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 562.0 | 562.0 | 2.0 | False | None | None | False | None | False | 1124.0 | 0 | 2423820 | 72738 | None | Vol 6 Page No 19 of 105 Item No 5.35 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 A three phase 4 wire whole current class-1 Accuracy
Energy Meter. ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 5705.0 | 5705.0 | 2.0 | False | None | None | False | None | False | 11410.0 | 0 | 2423821 | 72738 | None | Vol 6 Page No 19 of 105 Item No 5.38 | Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. ---- Work should be carried out as per the direction of engineer incharge of work. | Each | 515.0 | 515.0 | 2.0 | False | None | None | False | None | False | 1030.0 | 0 | 2423822 | 72738 | None | Vol 6 Page No 20 of 105 Item No 5.40.1 | Supplying ......... A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 100 A 4 x 30 x 6 mm Aluminium Strips ---- Work should be carried out as per the direction of engineer incharge of work. | m | 2465.0 | 2465.0 | 2.0 | False | None | None | False | None | False | 4930.0 | 0 | 2423823 | 72738 | None | Vol 6 Page No 20 of 105 Item No 5.42.2 | Fabricating supplying and mounting MS box made out ...SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. 16 SWG ---- Work should be carried out as per the direction of engineer incharge of work. | Sq CM | 0.43 | 0.43 | 20000.0 | False | None | None | False | None | False | 8600.0 | 0 | 2423824 | 72738 | None | Vol 6 Page No 13 of 81 Item No 32.11 | 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 50 Sqmm, 3.5 Core, (16 GI Strips - 4 x 0.8 mm) ---- Work should be carried out as per the direction of engineer incharge of work. | Km | 178973.0 | 178973.0 | 0.18 | False | None | None | False | None | False | 32215.14 | 0 | 2423825 | 72738 | None | Vol I Item No 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m In Ordinary Soil ---- Work should be carried out as per the direction of engineer incharge of work. | Cum | 262.0 | 262.0 | 90.0 | False | None | None | False | None | False | 23580.0 | 0 | 2423826 | 72738 | None | Vol 6 Page No 20 of 105 Item No 5.41.1 | Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40 x 40 x 6 mm ---- Work should be carried out as per the direction of engineer incharge of work. | m | 305.0 | 305.0 | 12.0 | False | None | None | False | None | False | 3660.0 | 0 | 2423827 | 72738 | None | Vol 6 Page No 20 of 105 Item No 5.41.2 | Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 50 x 50 x 6 mm ---- Work should be carried out as per the direction of engineer incharge of work. | m | 395.0 | 395.0 | 12.0 | False | None | None | False | None | False | 4740.0 | 0 | 2423828 | 72738 | None | Vol 6 Page No 23 of 81 Item No 51.04 | Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ---- Work should be carried out as per the direction of engineer incharge of work. | No | 2172.0 | 2172.0 | 6.0 | False | None | None | False | None | False | 13032.0 | 0 | 2423829 | 72738 | None | Vol 6 Page No 23 of 81 Item No 51.05 | Bentonite clay slurry for earthing in 50 Kg Bag ---- Work should be carried out as per the direction of engineer incharge of work. | Bag | 368.0 | 368.0 | 6.0 | False | None | None | False | None | False | 2208.0 | 0 | 2423830 | 72738 | None | Vol 6 Page No 22 of 81 Item No 51.02 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- Work should be carried out as per the direction of engineer incharge of work. | No | 676.0 | 676.0 | 6.0 | False | None | None | False | None | False | 4056.0 | 0 | 2423831 | 72738 | None | Vol 6 Page No 22 of 81 Item No 51.03 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- Work should be carried out as per the direction of engineer incharge of work. | Bag | 310.0 | 310.0 | 6.0 | False | None | None | False | None | False | 1860.0 | 0 |
| 1706962522000 | 0 | None | None | Buildings | Sub Estimate-VI Furnitures & Other Essentials | 1689730.62 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2423832 | 72739 | None | KSFIC.DWD 089 | Notice Board: Of size 3'x2' using 18mm plywood for body, back 8mm plywood and 12mm soft board with cloth. And 5mm plain glass for door with lock, and alluminium chanal with teak wood beading. Outerside laminated sheet or veneer with polish, inner side paint or polish. ---- Work should be carried out as per the direction of engineer incharge of work. | Nos | 8450.0 | 8450.0 | 6.0 | False | None | None | False | None | False | 50700.0 | 0 | 2423833 | 72739 | None | KSFIC.DWD 116 | Steel S type office chair: Teak wood handle. Chair using 16g round pipe and 18g sheet Perforated sheet with arm ---- Work should be carried out as per the direction of engineer incharge of work. | Nos | 4060.0 | 4060.0 | 9.0 | False | None | None | False | None | False | 36540.0 | 0 | 2423834 | 72739 | None | KSFIC.DWD 117 | Steel office table: of size 5'x2.5' or 5'x3' steel frame with novapan ply with sunmica top with teak wood beeding 3 drawers on one side another side one cabinet using 16G pipe and box 18 gauge. ---- Work should be carried out as per the direction of engineer incharge of work. | Nos | 14650.0 | 14650.0 | 9.0 | False | None | None | False | None | False | 131850.0 | 0 | 2423835 | 72739 | None | GEM PRODUCT ID: 5116877-4599573958 | Classroom Desk Bench: Three seater classroom desking drawing having 1800mm length of desking, seating and backrest. Width of desk top: 520mm Width of seating :300mm Width of back rest: 240mm, Height of desk top from floor: 750mm, Height of Seat from floor: 440mm with 1.2mm thick Mild Steel ERW hollow section for desking under structure support, 18mm thick BWR Plywood confirming to IS 303 (with latest amendment) for desking top, seating, backrest and shelf and rest as per the specifications mentioned in Gem product ID: 5116877-4599573958
---- Work should be carried out as per the direction of engineer incharge of work. | Nos | 10593.22 | 10593.22 | 126.0 | False | None | None | False | None | False | 1334745.72 | 0 | 2423836 | 72739 | None | GEM PRODUCT ID: 5116877-85947074813 | BenQ Standard Throw (0.91 to 2.5) Multimedia Projector (MMP) With 1280 x 800 (WXGA) Resolution BenQR (LW500) as per the specifications mentioned in Gem Product ID: 5116877-85947074813
---- Work should be carried out as per the direction of engineer incharge of work. | Nos | 37397.46 | 37397.46 | 2.0 | False | None | None | False | None | False | 74794.92 | 0 | 2423837 | 72739 | None | GEM PRODUCT ID 5116877-82049028474 | Wall mount spring action manual pull down SPS-ACMERA Projector Screen 120 Inches SPS-ACMERAR (6x8 SPS) as per the specifications mentioned in Gem Product ID: 5116877-82049028474 ---- Work should be carried out as per the direction of engineer incharge of work. | Nos | 5761.86 | 5761.86 | 2.0 | False | None | None | False | None | False | 11523.72 | 0 | 2423838 | 72739 | None | Gem Product ID: 5116877-96007022403 | Supplying and installation of B2N Portable
Water Purifiers or Filters of kent mineral RO
Make with Hollow Fiber MF (Micro Filtration) with activated carbon filter tachnology having maximum filteration rate of 1 Ltrs/min, 50000 litre Life of Filtering cartridge Purifier storage capacity 1000ml. Warranty period 1 year
Gem Product ID: 5116877-96007022403 ---- Work should be carried out as per the direction of engineer incharge of work. | Nos | 16525.42 | 16525.42 | 3.0 | False | None | None | False | None | False | 49576.26 | 0 |
|
|
---|