noticeInvitingTenderDTO
createdTs1706700379029
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2110.00
emd169000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose19-02-2024 16:00:00
tenderQueryClose17-02-2024 17:30:00
technicalBidOpen20-02-2024 16:30:00
publishedDate08-02-2024 12:11:32
publishedByPostMI_EE_DIV_CTD
publishedByUserKPE14375 - RADHAKRISHNA K.V
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonANNAPPA
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8660797692
tenderSupplierListNone
tenderSchedule
createdTs1706700379054
version4
createdDateNone
modifiedDateNone
tenderNumberMI/2023-24/OW/WORK_INDENT822
titleCONSTRUCTION OF CHECKDAM NEAR M.D.KOTE VILLAGE IN HIRIYUR TALUK, CHITRADURGA DISTRICT.
descriptionCONSTRUCTION OF CHECKDAM NEAR M.D.KOTE VILLAGE IN HIRIYUR TALUK, CHITRADURGA DISTRICT.
categoryWORKS
categoryTextWorks
ecv8433674.16
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location110
locationNameMinor Irrigation Division Chitradurga
provisionalAmount10000000.0
groupOverheadTotal0.0
fileNumberMISDCTAHYR2024/01
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17067003790000NoneNoneOther WorksCONSTRUCTION OF CHECKDAM NEAR M.D.KOTE VILLAGE IN HIRIYUR TALUK, CHITRADURGA DISTRICT.8433674.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
235542669680NoneItem No 2.5 (ii) a, Volume-III, PAGE No-9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By mechanical means using Dozer (a) In area of light jungle. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work100 Sqm393.0393.0150.0FalseNoneNoneFalseNoneFalse58950.00
235542769680NoneItem No 8.2.1, Volume-IV, PAGE No-101De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle (excluding cost of transportation) including cost of all machinery, labour & all necessary works as directed and complete as per specificationCum54.054.015300.0FalseNoneNoneFalseNoneFalse826200.00
235542869680NoneItem No 1.14.1, Volume-I, PAGE No-8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of workCum102.0102.01069.05FalseNoneNoneFalseNoneFalse109043.10
235542969680NoneItem No 1.15.1 Volume-I, PAGE No-8Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labor, tools, usage of machinery & other appurtenances required to complete the work, In ordinary/soft rock without blasting up to 1.5 m depth. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of workCum363.0363.0156.26FalseNoneNoneFalseNoneFalse56722.380
235543069680NoneItem No 2.13, Volume-IV, PAGE No-39Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of workCum6067.06067.063.32FalseNoneNoneFalseNoneFalse384162.440
235543169680NoneItem No 1.12 Volume-IV, PAGE No-130Providing and laying insitu vibrated M-20 (28 days cube compressive strength not less than 20 N/sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam/pickups/irrigation tanks waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of workCum6955.06955.0584.37FalseNoneNoneFalseNoneFalse4064293.350
235543269680NoneItem No 2.11 e, Volume-I , PAGE No-18Supplying, fitting and placing TMT FE 550/550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire/soft annealed steel wire and other ancilary operations complete as per drawing and technial specification.e. Dam and Allied works. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of workt88842.088842.05.416FalseNoneNoneFalseNoneFalse481168.2720
235543369680NoneItem No 1.8, Volume-I, PAGE No-7Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum474.0474.03633.24FalseNoneNoneFalseNoneFalse1722155.760
235543469680NoneItem No 1.12, Volume-I, PAGE No-8Providing and constructing dry size stone pitching using 200 to 250 mm size stones with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of workSqm388.0388.01290.0FalseNoneNoneFalseNoneFalse500520.00
235543569680NoneItem No 1.8, Volume-IV, PAGE No-130Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of workCum1278.01278.0120.0FalseNoneNoneFalseNoneFalse153360.00
235543669680NoneItem No 1.1, Volume-IV, PAGE No-129Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of workm337.0337.0228.78FalseNoneNoneFalseNoneFalse77098.860
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17067003880000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17067003880001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17067003880001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of Kppp Portal on or before the last date and time of bid submission.None
17067005100000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of Kppp portal due to internet connectivity issues and technical glitches at bidders end. EMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17067005140000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17067005180000NoneNoneELIGIBILITYConditional tender will not be considered, Sub-Leasing/G.P.A of Work is prohibited. Tender application amount will not be refundable.None
17067005220000NoneNoneELIGIBILITYThe employer reserves the right to accept any tender and to reject any or all tenders without assigning any reason.None
17067005270000NoneNoneELIGIBILITYThe contractor has to compete the bid (quote the rates) for all schedule B items of the works mentioned.None
17067005310000NoneNoneELIGIBILITYThe Contractor shall pay the Earnest Money Deposit EMD & Tender Transaction fee in the Kppp portal using any of the following payment modes Credit Card, Direct Debit, National Electronic Fund Transfer NEFT, and Over the Counter OTC.None
17067005350000NoneNoneELIGIBILITYThe tenderer shall scan and upload all the original documents required for this bid to the Kppp portal. The uploaded documents should be clear (Visible), unclear documents will be rejected. The original documents shall be produced at the time of physical verification.None
17067005380000NoneNoneELIGIBILITYOne percent of the bill amount of the successful tenderer will be deducted towards cess as a labor welfare fund.None
17067005420000NoneNoneELIGIBILITYAll documents enclosed should be attested by Gazetted officer or Government Notary, otherwise the bids are liable for disqualification. Original documents should be produced for verification at any stage of the Tender process, as and when sought for. Failure to produce original documents will lead to disqualification. Work done certificates should have all the CR no, work order issuing date, work completion date and year. All documents to be furnished are to be counter signed by the employer in charge, not below the rank of an executive in-charge or equivalent.None
17067005460000NoneNoneELIGIBILITYThe contractor has to make his own arrangement for procurement of all materials required for the work. There is no departmental supply of materials. There is no departmental supply of materials. Contractor should procure only ISI mark materials and submit necessary quality control certificates from the authorized quality control authority, before execution. Transportation charges from the site of work to Q.C. Lab of all the samples collected for testing should borne by the contractor himself.None
17067005500000NoneNoneELIGIBILITYThe intending bidder firm/ company are advised to visit the work site before submission of tenders.None
17067005540000NoneNoneELIGIBILITYOmission and typographical errors which are in the opinion of the executive Engineer will not be a ground for claims of extra payment.None
17067005580000NoneNoneELIGIBILITYRoyalty charges will be deducted from the contractors running bill as per the prevailing royalty charges at the time of payment. IT, GST and others taxes will be deducted as per the prevailing Government Order. GST & EPF registration certificate from competent authority.None
17067005630000NoneNoneELIGIBILITYThe tender is invited as per Standard tender Bid Document KW-3 and shall abide for the conditions contained in Standard tender Bid Document KW-3.None
17067005670000NoneNoneELIGIBILITYPrice adjustment clause will not be applicable as per prevailing government order and only star rates are applicable. The contractor shall quote the rates without adding GST for either materials or works contract (Service).None
17067005700000NoneNoneELIGIBILITYExecutive engineer reserves the right to accept or reject any tender and to cancel the tender process and reject all tenders at any time prior to award of contract, without there by incurring any liability to the affected tenderer or tenderers or any obligation to inform the affected tenderer or tenderers of the grounds for the employers action.None
17067005750000NoneNoneELIGIBILITYThe contractor must upload existing commitment of the ongoing works in hand for the calculation of tender capacity. Tenderers shall provide the requested information accurately and in sufficient detail in section 3.None
17067005790000NoneNoneELIGIBILITYThe contractor should obtain the Material Dispatch Permit for stone, aggregates, sand and Murom etc will be used in the construction work from the Mines and Geology department at the time of execution and same should be submitted along with the work bill, then for such work bills no Royalty will be deducted. If the contractor failed to submit the Material Dispatch Permit along with the work bill Five times Royalty will be deducted from the work bill as per KMMCR 2016 amendment rule 44(4) and the circular vide No.Ga.Bhu.E/DCB/DCB/Takte/2019-20/4497 Dated: 12/12/2019 by Mines and Geology department.None
17067005830000NoneNoneELIGIBILITYRestrictions on Public Procurement from Bidders of certain countries as per Government order No.FD 455 Exp-12 2020 Bangalore dated: 25-08-2020.None
17067005870000NoneNoneELIGIBILITYItem for which 0.00 rates entered will not be paid for by the employer when executed and shall be deemed covered by the other rates & prices in the bill of quantities.None
17067005910000NoneNoneELIGIBILITYThe Defects Liability Period is 365 Days after the completion of work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNone3.2To qualify for award of this contract, each tenderer in his name should have in the last five years Period (2018-19 to 2022-23) b) satisfactorily completion (at least 50% of the contract value) as a prime contractor for at least one similar works such as Construction of Check Dam/pickup/ bridge/Barrage/Barrage cum Bridge/ Aqueduct/Check dam cum Causeway/ CHECK DAM CUM BRIDGE works costing value not less than Rs 42.17 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneITT 3.3(b)Liquid assets and /or availability of credit facilities of no less than Rs 25.30 Lakh (Credit lines/letter of credit/certificates from banks for meeting the fund requirement etc. (usually 30% of the amount of contract) for works costing up to Rs.100.00 Lakhs.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNone3.2To qualify for award of this contract, each tenderer in his name should have in the last five years Period (2018-19 to 2022-23) a) Achieved in at least two financial years a minimum financial turnover (In all classes of Civil Engineering Construction works) of Rs 84.34 Lakhs. (usually not less the estimated cost under this contract, for works costing up to Rs.100 lakhs) (Annual Turnover Certificate along with Balance sheet certified/attested by Chartered Accountants should be uploaded with 18-Digits system generated unique number UDIN Number)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneITT 3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years period. (c) Executed in any one year (for a continuous period of 12 months), the following minimum quantities of work: (Usually 80% of Annual Requirement for work costing up to Rs. 100.00 Lakhs.) 1- Earthwork including excavation, embankment etc.- 32253.68 Cum, 2- Cement Concrete (RCC/PCC)- 1036.00 Cum, 3-Reinforcement steel for RCC structures-8.67 t, 4- Pitching/revetment-2064.00 SqmOthersQUANTITY WISE WORK DONE CERTIFICATE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- QUANTITY WISE WORK DONE CERTIFICATE
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractor Registration/Company Registration Certificate/PWD registration certificate.TrueTechnical Bid
Annual Turnover Certificate along with Balance sheet certified/attested by Chartered Accountants should be uploaded with 18-Digits system generated unique number UDIN NumberTrueTechnical Bid
Details of Existing commitments and on-going works as per bid document and Details Works for which Tenders already submitted as per section 3 of Standard bid document K/W-3.TrueTechnical Bid
Latest Address and contact number for communication to be furnished.TrueTechnical Bid
Contractor should produce the GST Registration Certificate along with latest updated G.S.T Clearance Certificates.TrueTechnical Bid
Contractor shall have one Graduate Engineer with 5 years Experience for work SupervisionTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone