1707313337000 | 0 | None | None | Other Works | Construction pipe culvert near kaman chowk toilet in wno 11 | 167441.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2501106 | 75928 | None | 001 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.In all kinds of soils Depth upto 1.5 m .KPWD Common DSR 2023-24 Volume 1 (P No: 5 I.No:1.4.1 ) | Cum | 254.1 | 254.1 | 24.0 | False | None | None | False | None | False | 6098.4 | 0 | 2501107 | 75928 | None | 002 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.KPWD Common DSR 2023-24 Volume 1 (P No: 7 I.No:1.8 ) | Cum | 497.7 | 497.7 | 18.64 | False | None | None | False | None | False | 9277.128 | 0 | 2501108 | 75928 | None | 003 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 .750 mm dia mm dia KPWD Common DSR 2023-24 Volume 3 (P No: 146 I.No:16.15.C ) | m | 3501.75 | 3501.75 | 10.0 | False | None | None | False | None | False | 35017.5 | 0 | 2501109 | 75928 | None | 004 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 .1000mm dia KPWD Common DSR 2023-24 Volume 3 (P No: 146 I.No:16.15.b ) | m | 8355.9 | 8355.9 | 5.0 | False | None | None | False | None | False | 41779.5 | 0 | 2501110 | 75928 | None | 005 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery,curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates .KPWD Common DSR 2023-24 Volume 1 (P No: 16 I.No:2.3.1) | Cum | 6639.15 | 6639.15 | 5.76 | False | None | None | False | None | False | 38241.504 | 0 | 2501111 | 75928 | None | 006 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate Cement Concrete Drain Walls Form Works Consider 35% KPWD Common DSR 2023-24 Volume 1 (P No: 111 SI.No : 4) | Cum | 2323.7 | 2323.7 | 5.4 | False | None | None | False | None | False | 12547.98 | 0 | 2501112 | 75928 | None | 007 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.All other type of structures.KPWD Common DSR 2023-24 Volume 1 (P No: 18 I.No : 2.1 h) | MT | 82961.55 | 82961.55 | 0.259 | False | None | None | False | None | False | 21487.04145 | 0 | 2501113 | 75928 | None | 008 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications KPWD Common DSR 2023-24 Volume 1 (P.No.7; I. No.1.1) | Cum | 168.0 | 168.0 | 17.81 | False | None | None | False | None | False | 2992.08 | 0 |
|