createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1707287719081
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee670.00
emd66000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose14-02-2024 16:00:00
tenderQueryClose12-02-2024 11:00:00
technicalBidOpen15-02-2024 16:30:00
publishedDate07-02-2024 16:42:04
publishedByPostBBMP_EE_DIV_DAS
publishedByUserKPE12057 - B M DHARENDRAKUMAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonB M DHARENDRAKUMAR
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber9480688264
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1707287719110
version4
createdDateNone
modifiedDateNone
tenderNumberBBMP/2023-24/RD/WORK_INDENT1940
titleImprovements ro Roads and Construction of CC Drain at N/s Side of Nadakerappa Industrial Area Main road (I0037) from Shrushruthi School road to SWD (13.00396835379800377.49713116213631) in Ward No. 25 (Old Ward No. 71).
descriptionImprovements ro Roads and Construction of CC Drain at N/s Side of Nadakerappa Industrial Area Main road (I0037) from Shrushruthi School road to SWD (13.00396835379800377.49713116213631) in Ward No. 25 (Old Ward No. 71).
categoryWORKS
categoryTextWorks
ecv2661181.31
deptNameBruhat Bengaluru Mahanagara Palike
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location891
locationNameBBMP Dasarahalli Division
provisionalAmount3300000.0
groupOverheadTotalNone
fileNumberBBMP/EE/DD/Ten/16/2023-24/01
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17072877190000NoneNoneRoadsImprovements ro Roads and Construction of CC Drain at N/s Side of Nadakerappa Industrial Area Main road (I0037) from Shrushruthi School road to SWD (13.00396835379800377.49713116213631) in Ward No. 25 (Old Ward No. 71).2661181.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
249100975390NoneCSR 2023-24, Volume-I, Page No.5, Item No.1.4.1Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost. In all kinds of soils Depth upto 1.5 m Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Cum266.2266.2127.2FalseNoneNoneFalseNoneFalse33860.640
249101075390NoneCSR 2023-24, Volume-I, Page No.15, Item No.2.1.2Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Cum6230.46230.419.08FalseNoneNoneFalseNoneFalse118876.0320
249101175390NoneCSR 2023-24, Volume-I, Page No.16, Item No.2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Cum6955.36955.346.11FalseNoneNoneFalseNoneFalse320708.8830
249101275390NoneCSR 2023-24Adding Extra for Formwork, Centering & Shuttering for M20 Design Mix.As mentioned in Appendix in CSR 2023-24, Page No Additionalities for Formwork, Centering & Scaffolding Cement Concrete Drain Walls 35 percent with all lead and lift as per he directions of Engineer in Charge Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Cum2434.352434.3546.11FalseNoneNoneFalseNoneFalse112247.87850
249101375390NoneP.No. 18, Sl.No.2.11.h, Vol-1, 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h.All other type of structures Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Tonne86912.186912.12.76FalseNoneNoneFalseNoneFalse239877.3960
249101475390NoneCSR 2023-24, Volume-II, Page No.177, Item No.17.14Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utility ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 550 @ 6kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Sqm1287.01287.095.4FalseNoneNoneFalseNoneFalse122779.80
249101575390NoneCSR 2023-24, Volume-I, Page No.5, Item No.1.1Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.Sqm100.1100.11060.0FalseNoneNoneFalseNoneFalse106106.00
249101675390NoneCSR 2023-24, Volume-III, Page No.26, Item No. 4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Cum2814.92814.9243.8FalseNoneNoneFalseNoneFalse686272.620
249101775390NoneCSR 2023-24, Vol-III, Page No.31, Item No.5.1Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Sqm45.145.11060.0FalseNoneNoneFalseNoneFalse47806.00
249101875390NoneCSR 2023-24, Vol-III, Page No.32, Item No.5.6CProviding and laying Bituminous Macadam with 40/60 tph capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Cum8208.28208.253.0FalseNoneNoneFalseNoneFalse435034.60
249101975390NoneCSR 2023-24, Vol-III, Page No.29, Item No.5.32Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Sqm13.213.21060.0FalseNoneNoneFalseNoneFalse13992.00
249102075390NoneCSR 2023-24, Vol-III, Page No.42, Item No.5.29AProviding and laying Bituminous Concrete with not less than 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.78% Bitumen and waste plastic 8% of Bitumen of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Cum11100.111100.131.8FalseNoneNoneFalseNoneFalse352983.180
249102175390NoneCSR 2023-24, Vol-III, Page No.57, Item No. 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface, Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Sqm583.0583.021.2FalseNoneNoneFalseNoneFalse12359.60
249102275390NoneCSR 2023-24, Volume-III, Page No.3, Item No.1.1 BLoading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum Complete as per standard technical detailed specification and design and direction of the Engineer-in-Charge of the work.Cum130.9130.9445.2FalseNoneNoneFalseNoneFalse58276.680
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17072877310000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17072877310000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17072877310000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17072878010000NoneNoneELIGIBILITYAll terms and Conditions as per tender documentNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNoneMandating satisfactory completion as prime contractor for at least one similar work to an extent of 50% of Rs.33.00 Lakh i.e. Rs. 16.50 Lakhs of the cost of the workPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneLicense CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneBid CapacityCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneachieved in at least two financial years a minimum financial turnover Rs.66.00 Lakh (2018-19 to 2022-23)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Contractor License RegistrationTrueTechnical Bid
Bid capacityTrueTechnical Bid
similar nature of work doneTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone