createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1707238252916
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd1123500.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose21-02-2024 17:00:00
tenderQueryClose14-02-2024 11:00:00
technicalBidOpen22-02-2024 17:15:00
publishedDate07-02-2024 16:17:26
publishedByPostKREIS_EE1_EEOFF_BNG
publishedByUserKPE16759 - M JAYACHANDRARAJU
bidValidityPeriod90
noOfCalls1
preBidMeetingDate14-02-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonJayachandra Raju
splitEmdRequiredYnTrue
emdBankGuarantee1023500.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022283366
mobileNumber8050810068
tenderSupplierListNone
tenderSchedule
createdTs1707238252944
version6
createdDateNone
modifiedDateNone
tenderNumberKREIS/2023-24/BD/WORK_INDENT155
titleConstruction of (SC) DBRAR School complex at Munganahalli, Chintamani Taluk, Chikkaballapura District. (Phase-1)
descriptionConstruction of (SC) DBRAR School complex at Munganahalli, Chintamani Taluk, Chikkaballapura District. (Phase-1)
categoryWORKS
categoryTextWorks
ecv74880037.50
deptNameKarnataka Residential Educational Institutions Society
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2893
locationNameKREIS Executive Engineer Section Bengaluru
provisionalAmount95000000.0
groupOverheadTotalNone
fileNumberCHINTAMANI
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17072382530000NoneNoneBuildingsAcademic Block27990967.22
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248529674941None1.21.5Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Hard rock (blasting prohibited) Depth upto 1.50 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1014.01014.0284.8965FalseNoneNoneFalseNoneFalse288885.0510
248529774941NoneWRD2.8.Providing and fixing 25 mm dia 3 m long cold twisted defomed steel dowel bars with one end driven into 38 mm dia 1.50 m deep hole drilled in bed rock and other end provided with L - bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appurtenant works including cost of all materials, machinery, labour, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1345.01345.0320.0FalseNoneNoneFalseNoneFalse430400.00
248529874941None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum474.0474.01359.0014FalseNoneNoneFalseNoneFalse644166.66360
248529974941None4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm118.0118.0810.0FalseNoneNoneFalseNoneFalse95580.00
248530074941None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum5448.05448.081.0FalseNoneNoneFalseNoneFalse441288.00
248530174941None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6746.396746.392.4621FalseNoneNoneFalseNoneFalse16610.2868190
248530274941None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6802.616802.612.2FalseNoneNoneFalseNoneFalse14965.7420
248530374941None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6858.836858.833.1FalseNoneNoneFalseNoneFalse21262.3730
248530474941None2.1.6Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6243.06243.018.0FalseNoneNoneFalseNoneFalse112374.00
248530574941None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor Footing concrete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6842.876842.87182.4507FalseNoneNoneFalseNoneFalse1248486.4215090
248530674941None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Columns Concrete Upto PB ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10771.1910771.1911.1846FalseNoneNoneFalseNoneFalse120471.4516740
248530774941None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Plinth Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9504.09504.028.9786FalseNoneNoneFalseNoneFalse275412.61440
248530874941None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground For Grade Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9504.09504.061.7872FalseNoneNoneFalseNoneFalse587225.54880
248530974941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Columns Concrete Up to Roof ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10237.3910237.3925.6793FalseNoneNoneFalseNoneFalse262889.0090270
248531074941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9635.199635.1937.2586FalseNoneNoneFalseNoneFalse358993.6901340
248531174941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9033.09033.0123.1868FalseNoneNoneFalseNoneFalse1112746.36440
248531274941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground FloorFor Lintel Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9635.199635.199.4446FalseNoneNoneFalseNoneFalse91000.5154740
248531374941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Staircase ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6022.06022.07.77FalseNoneNoneFalseNoneFalse46790.940
248531474941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates First Floor For Columns Concrete Up to Roof ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10339.7610339.7624.3432FalseNoneNoneFalseNoneFalse251702.8456320
248531574941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates First Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9731.549731.5431.1038FalseNoneNoneFalseNoneFalse302687.8738520
248531674941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates First Floor Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9123.329123.3297.1454FalseNoneNoneFalseNoneFalse886288.5707280
248531774941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates First Floor For Lintel Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9731.549731.547.9935FalseNoneNoneFalseNoneFalse77789.064990
248531874941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates First Floor For Staircase ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6082.216082.213.885FalseNoneNoneFalseNoneFalse23629.385850
248531974941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor For Columns ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10442.1410442.141.6767FalseNoneNoneFalseNoneFalse17508.3361380
248532074941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9827.99827.99.0838FalseNoneNoneFalseNoneFalse89274.678020
248532174941None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor For Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9213.659213.658.7956FalseNoneNoneFalseNoneFalse81039.579940
248532274941None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9748.539748.536.0FalseNoneNoneFalseNoneFalse58491.180
248532374941None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t89457.089457.040.0907FalseNoneNoneFalseNoneFalse3586393.74990
248532474941None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t90351.5690351.5615.9439FalseNoneNoneFalseNoneFalse1440556.2374840
248532574941None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t91246.1391246.132.7916FalseNoneNoneFalseNoneFalse254722.6965080
248532674941None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1192.01192.0805.0FalseNoneNoneFalseNoneFalse959560.00
248532774941None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1203.911203.91642.0FalseNoneNoneFalseNoneFalse772910.220
248532874941None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1215.831215.83191.0FalseNoneNoneFalseNoneFalse232223.530
248532974941None6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm937.0937.0128.0FalseNoneNoneFalseNoneFalse119936.00
248533074941None6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm946.36946.3698.0FalseNoneNoneFalseNoneFalse92743.280
248533174941None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum98815.098815.00.9FalseNoneNoneFalseNoneFalse88933.50
248533274941None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum99803.1499803.140.8FalseNoneNoneFalseNoneFalse79842.5120
248533374941None12.17Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm7085.07085.05.0FalseNoneNoneFalseNoneFalse35425.00
248533474941None12.57.3Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3005.03005.026.0FalseNoneNoneFalseNoneFalse78130.00
248533574941None12.57.3Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3035.043035.0426.0FalseNoneNoneFalseNoneFalse78911.040
248533674941None12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1477.01477.010.0FalseNoneNoneFalseNoneFalse14770.00
248533774941None12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1491.761491.769.0FalseNoneNoneFalseNoneFalse13425.840
248533874941None12.93.1Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr702.0702.0101.0FalseNoneNoneFalseNoneFalse70902.00
248533974941None12.93.1Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr709.01709.0191.0FalseNoneNoneFalseNoneFalse64519.910
248534074941None12.94.1Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3485.03485.033.0FalseNoneNoneFalseNoneFalse115005.00
248534174941None12.94.1Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3519.843519.8429.0FalseNoneNoneFalseNoneFalse102075.360
248534274941None12.88Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5390.05390.0104.0FalseNoneNoneFalseNoneFalse560560.00
248534374941None12.88Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5443.895443.8992.0FalseNoneNoneFalseNoneFalse500837.880
248534474941None12.88Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5497.795497.792.0FalseNoneNoneFalseNoneFalse10995.580
248534574941None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5719.05719.058.0FalseNoneNoneFalseNoneFalse331702.00
248534674941None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5776.185776.1853.0FalseNoneNoneFalseNoneFalse306137.540
248534774941None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5833.375833.371.0FalseNoneNoneFalseNoneFalse5833.370
248534874941None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs154.0154.02907.0FalseNoneNoneFalseNoneFalse447678.00
248534974941None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs155.53155.532589.0FalseNoneNoneFalseNoneFalse402667.170
248535074941None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs157.07157.0749.0FalseNoneNoneFalseNoneFalse7696.430
248535174941None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2864.02864.0775.0FalseNoneNoneFalseNoneFalse2219600.00
248535274941None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent.First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2892.632892.63523.0FalseNoneNoneFalseNoneFalse1512845.490
248535374941None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent.Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2921.272921.275.0FalseNoneNoneFalseNoneFalse14606.350
248535474941None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm756.0756.056.0FalseNoneNoneFalseNoneFalse42336.00
248535574941None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm763.55763.5547.0FalseNoneNoneFalseNoneFalse35886.850
248535674941None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1032.01032.0252.0FalseNoneNoneFalseNoneFalse260064.00
248535774941None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1042.311042.31169.0FalseNoneNoneFalseNoneFalse176150.390
248535874941None10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr328.0328.0157.0FalseNoneNoneFalseNoneFalse51496.00
248535974941None10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr331.27331.2766.0FalseNoneNoneFalseNoneFalse21863.820
248536074941None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm244.0244.01625.0FalseNoneNoneFalseNoneFalse396500.00
248536174941None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm246.43246.431294.0FalseNoneNoneFalseNoneFalse318880.420
248536274941None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm248.87248.8746.0FalseNoneNoneFalseNoneFalse11448.020
248536374941None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm304.0304.0665.0FalseNoneNoneFalseNoneFalse202160.00
248536474941None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm307.03307.03822.0FalseNoneNoneFalseNoneFalse252378.660
248536574941None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm310.07310.07452.0FalseNoneNoneFalseNoneFalse140151.640
248536674941None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg64.064.0100.0FalseNoneNoneFalseNoneFalse6400.00
248536774941None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg64.6364.63124.0FalseNoneNoneFalseNoneFalse8014.120
248536874941None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg65.2765.2767.8FalseNoneNoneFalseNoneFalse4425.3060
248536974941None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm244.0244.0261.0FalseNoneNoneFalseNoneFalse63684.00
248537074941None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm246.43246.43178.0FalseNoneNoneFalseNoneFalse43864.540
248537174941None8.16 aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixing chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1238.01238.05.0FalseNoneNoneFalseNoneFalse6190.00
248537274941None8.16 aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixing chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1250.371250.375.0FalseNoneNoneFalseNoneFalse6251.850
248537374941None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm100.0100.02455.2034FalseNoneNoneFalseNoneFalse245520.340
248537474941None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. First floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm101.0101.01924.4572FalseNoneNoneFalseNoneFalse194370.17720
248537574941None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm102.0102.069.1128FalseNoneNoneFalseNoneFalse7049.50560
248537674941None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm110.0110.02216.0284FalseNoneNoneFalseNoneFalse243763.1240
248537774941None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. First floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm111.09111.091706.5622FalseNoneNoneFalseNoneFalse189581.9947980
248537874941None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm112.19112.1969.1128FalseNoneNoneFalseNoneFalse7753.7650320
248537974941None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.053.02455.2034FalseNoneNoneFalseNoneFalse130125.78020
248538074941None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge.First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.5253.521924.4572FalseNoneNoneFalseNoneFalse102996.9493440
248538174941None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge.TerraceFloor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm54.0554.0569.1128FalseNoneNoneFalseNoneFalse3735.546840
248538274941None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm174.0174.0665.0FalseNoneNoneFalseNoneFalse115710.00
248538374941None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm175.73175.73822.0FalseNoneNoneFalseNoneFalse144450.060
248538474941None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm177.47177.47452.0FalseNoneNoneFalseNoneFalse80216.440
248538574941None8.34.1Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.053.072.0FalseNoneNoneFalseNoneFalse3816.00
248538674941None8.34.1Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.5253.5262.0FalseNoneNoneFalseNoneFalse3318.240
248538774941None8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm138.0138.072.0FalseNoneNoneFalseNoneFalse9936.00
248538874941None8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm139.37139.3762.0FalseNoneNoneFalseNoneFalse8640.940
248538974941None8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm139.0139.0162.0FalseNoneNoneFalseNoneFalse22518.00
248539074941None8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm140.38140.38144.0FalseNoneNoneFalseNoneFalse20214.720
248539174941None8.4Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm115.0115.0239.175FalseNoneNoneFalseNoneFalse27505.1250
248539274941None8.4Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm116.14116.14217.895FalseNoneNoneFalseNoneFalse25306.32530
248539374941None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs565.0565.0369.0FalseNoneNoneFalseNoneFalse208485.00
248539474941None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs570.64570.6472.0FalseNoneNoneFalseNoneFalse41086.080
248539574941None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr66.066.0382.0FalseNoneNoneFalseNoneFalse25212.00
248539674941None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth.First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr66.6566.65348.0FalseNoneNoneFalseNoneFalse23194.20
248539774941None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth.Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr67.3167.3141.0FalseNoneNoneFalseNoneFalse2759.710
248539874941None7.18Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications.First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum2037.162037.1625.0FalseNoneNoneFalseNoneFalse50929.00
248539974941None15.7Integral Crystalline Water Proofing Admixture Providing and supplying crystalline integral concrete waterproofing admixture that waterproofs concrete by forming crystals deep in the pores, capillaries and microcracks of the concrete, self-seal waterproofing compound to bridge shrinkage cracks upto 0.5mm in width & resist hydro-static pressure upto 16bar for both positive & negative pressure confirming to DIN 1048 part 5 for 56% reduction in depth of penetration against control, resistance to chloride penetration confirming to ASTM C 1202 with 64% improvement against control & protecting steel reinforcement against corrosion mixed @ 1% by weight of cementitious content in concrete. ie., integral crystaline waterproofing admix @ 0.5 kg/bag of cement. (For calculation purpose 320 kg of Cement for M-20 grade of Concrete is considered in the analysis) First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm621.14621.1480.0FalseNoneNoneFalseNoneFalse49691.20
248540074941None9.25Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm800.0800.044.58FalseNoneNoneFalseNoneFalse35664.00
248540174941None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8740.598740.594.0515FalseNoneNoneFalseNoneFalse35412.5003850
248540274941None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8800.878800.873.7672FalseNoneNoneFalseNoneFalse33154.6374640
248540374941None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8861.158861.1560.0FalseNoneNoneFalseNoneFalse531669.00
248540474941NoneVOL - 5 7.1.1Providing and fixing MS ladder between landings, 45 cms wide using angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre, with necessary supports of same angle iron etc. as directed, including hand railing on both sides with 25mm dia. GI pipes with angle iron props at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC 1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead and lifts etc. complete with: MS angle of 65 x 65 x 8mm Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr4420.764420.764.5FalseNoneNoneFalseNoneFalse19893.420
248540574941None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.038.0378.0FalseNoneNoneFalseNoneFalse14364.00
248540674941None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.3738.37309.6FalseNoneNoneFalseNoneFalse11879.3520
248540774941None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.7538.7514.4FalseNoneNoneFalseNoneFalse558.00
248540874941None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.038.0429.56FalseNoneNoneFalseNoneFalse16323.280
248540974941None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.3738.37358.02FalseNoneNoneFalseNoneFalse13737.22740
248541074941None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.7538.7518.0FalseNoneNoneFalseNoneFalse697.50
248541174941None22.15.7Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 250x10mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos200.0200.030.0FalseNoneNoneFalseNoneFalse6000.00
248541274941None22.15.7Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 250x10mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos202.0202.026.0FalseNoneNoneFalseNoneFalse5252.00
248541374941None22.15.8Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos50.050.0101.0FalseNoneNoneFalseNoneFalse5050.00
248541474941None22.15.8Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos50.550.587.0FalseNoneNoneFalseNoneFalse4393.50
248541574941None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Handles 200mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos450.0450.060.0FalseNoneNoneFalseNoneFalse27000.00
248541674941None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Handles 200mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos454.5454.552.0FalseNoneNoneFalseNoneFalse23634.00
248541774941None22.15.4Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Aldrop 16mm dia, 300mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos375.0375.029.0FalseNoneNoneFalseNoneFalse10875.00
248541874941None22.15.4Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Aldrop 16mm dia, 300mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos378.75378.7526.0FalseNoneNoneFalseNoneFalse9847.50
248541974941None22.15.10Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Door stopper 75mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos100.0100.011.0FalseNoneNoneFalseNoneFalse1100.00
248542074941None22.15.10Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Door stopper 75mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos101.0101.09.0FalseNoneNoneFalseNoneFalse909.00
248542174941None15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New rrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm833.33833.33788.0FalseNoneNoneFalseNoneFalse656664.040
248542274941None20.107Providing and fixing plain rolled glass 4mm thick with teakwood beading of 10mm thick. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1147.01147.04.965FalseNoneNoneFalseNoneFalse5694.8550
248542374941None20.107Providing and fixing plain rolled glass 4mm thick with teakwood beading of 10mm thick. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1158.461158.464.365FalseNoneNoneFalseNoneFalse5056.67790
17072382530000NoneNoneBuildingsGirls Dormitory24157881.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248542474942None1.21.5Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Hard rock (blasting prohibited) Depth upto 1.50 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1014.01014.0120.0862FalseNoneNoneFalseNoneFalse121767.40680
248542574942NoneWRD2.8Providing and fixing 25 mm dia 3 m long cold twisted defomed steel dowel bars with one end driven into 38 mm dia 1.50 m deep hole drilled in bed rock and other end provided with L - bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appurtenant works including cost of all materials, machinery, labour, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1345.01345.0248.0FalseNoneNoneFalseNoneFalse333560.00
248542674942None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum474.0474.0757.7388FalseNoneNoneFalseNoneFalse359168.19120
248542774942None4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm118.0118.0404.0FalseNoneNoneFalseNoneFalse47672.00
248542874942None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum5448.05448.046.0FalseNoneNoneFalseNoneFalse250608.00
248542974942None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6746.46746.40.9929FalseNoneNoneFalseNoneFalse6698.500560
248543074942None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6802.626802.621.1201FalseNoneNoneFalseNoneFalse7619.6146620
248543174942None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6858.846858.841.1278FalseNoneNoneFalseNoneFalse7735.3997520
248543274942None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6915.066915.061.9FalseNoneNoneFalseNoneFalse13138.6140
248543374942None2.1.6Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6243.06243.014.0FalseNoneNoneFalseNoneFalse87402.00
248543474942None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor Footing concrete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6842.886842.88164.3164FalseNoneNoneFalseNoneFalse1124397.4072320
248543574942None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor For Pedastals ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10771.210771.27.9922FalseNoneNoneFalseNoneFalse86085.584640
248543674942None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor For Plinth Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9504.09504.016.1598FalseNoneNoneFalseNoneFalse153582.73920
248543774942None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor For Grade Beam ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9504.09504.051.2716FalseNoneNoneFalseNoneFalse487285.28640
248543874942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor For Columns Concrete Up to Roof ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10237.410237.419.0496FalseNoneNoneFalseNoneFalse195018.375040
248543974942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9635.29635.224.0478FalseNoneNoneFalseNoneFalse231705.362560
248544074942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9033.09033.068.8187FalseNoneNoneFalseNoneFalse621639.31710
248544174942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor For Lintel Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9635.29635.26.3535FalseNoneNoneFalseNoneFalse61217.24320
248544274942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Ground Floor For Staircase ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6022.06022.08.0469FalseNoneNoneFalseNoneFalse48458.43180
248544374942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-First Floor For Columns Concrete FFL to Roof ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10339.7710339.7718.3816FalseNoneNoneFalseNoneFalse190061.5162320
248544474942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-First Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9731.559731.5524.1333FalseNoneNoneFalseNoneFalse234854.4156150
248544574942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-First Floor Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9123.339123.3361.8004FalseNoneNoneFalseNoneFalse563825.4433320
248544674942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-First Floor For Lintel Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9731.559731.556.1206FalseNoneNoneFalseNoneFalse59562.924930
248544774942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-First Floor For Staircase ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6082.226082.228.0469FalseNoneNoneFalseNoneFalse48943.0161180
248544874942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Second Floor For Columns Concrete FFL to Roof ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10442.1410442.1414.7798FalseNoneNoneFalseNoneFalse154332.7407720
248544974942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Second Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9827.99827.918.3455FalseNoneNoneFalseNoneFalse180297.739450
248545074942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Second Floor Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9213.669213.6639.1743FalseNoneNoneFalseNoneFalse360938.6809380
248545174942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Second Floor For Lintel Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9827.99827.94.2021FalseNoneNoneFalseNoneFalse41297.818590
248545274942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Second Floor For Staircase ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6142.446142.444.0234FalseNoneNoneFalseNoneFalse24713.4930960
248545374942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Terrace Floor OHT Columns ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10544.5210544.523.205FalseNoneNoneFalseNoneFalse33795.18660
248545474942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Terrace Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9924.259924.2512.52FalseNoneNoneFalseNoneFalse124251.610
248545574942None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-Terrace Floor Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9303.999303.9911.9266FalseNoneNoneFalseNoneFalse110964.9671340
248545674942None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9844.129844.124.0FalseNoneNoneFalseNoneFalse39376.480
248545774942None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t89457.089457.032.4064FalseNoneNoneFalseNoneFalse2898979.32480
248545874942None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t90351.5790351.5712.7707FalseNoneNoneFalseNoneFalse1153852.7949990
248545974942None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t91246.1491246.148.8672FalseNoneNoneFalseNoneFalse809097.7726080
248546074942None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t92140.7192140.713.6145FalseNoneNoneFalseNoneFalse333042.5962950
248546174942None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1192.01192.0612.0FalseNoneNoneFalseNoneFalse729504.00
248546274942None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1203.921203.92553.0FalseNoneNoneFalseNoneFalse665767.760
248546374942None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1215.841215.84382.0FalseNoneNoneFalseNoneFalse464450.880
248546474942None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1227.761227.76117.0FalseNoneNoneFalseNoneFalse143647.920
248546574942None6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm937.0937.0110.0FalseNoneNoneFalseNoneFalse103070.00
248546674942None6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm946.37946.3780.0FalseNoneNoneFalseNoneFalse75709.60
248546774942None6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm946.37946.3753.0FalseNoneNoneFalseNoneFalse50157.610
248546874942None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum98815.098815.00.6FalseNoneNoneFalseNoneFalse59289.00
248546974942None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum99803.1599803.150.4FalseNoneNoneFalseNoneFalse39921.260
248547074942None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum100791.3100791.30.4FalseNoneNoneFalseNoneFalse40316.520
248547174942None12.17Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm7085.07085.03.8FalseNoneNoneFalseNoneFalse26923.00
248547274942None12.57.3Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3005.03005.013.3FalseNoneNoneFalseNoneFalse39966.50
248547374942None12.57.3Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3035.053035.0512.0FalseNoneNoneFalseNoneFalse36420.60
248547474942None12.57.3Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3065.13065.110.1FalseNoneNoneFalseNoneFalse30957.510
248547574942None12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1477.01477.07.0FalseNoneNoneFalseNoneFalse10339.00
248547674942None12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1491.771491.775.0FalseNoneNoneFalseNoneFalse7458.850
248547774942None12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1506.541506.544.0FalseNoneNoneFalseNoneFalse6026.160
248547874942None12.93.1Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr702.0702.0110.4FalseNoneNoneFalseNoneFalse77500.80
248547974942None12.93.1Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr709.02709.02105.0FalseNoneNoneFalseNoneFalse74447.10
248548074942None12.93.1Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr716.04716.0447.4FalseNoneNoneFalseNoneFalse33940.2960
248548174942None12.94.1Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3485.03485.033.4FalseNoneNoneFalseNoneFalse116399.00
248548274942None12.94.1Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3519.853519.8531.5FalseNoneNoneFalseNoneFalse110875.2750
248548374942None12.94.1Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3554.73554.714.5FalseNoneNoneFalseNoneFalse51543.150
248548474942None12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm6734.06734.030.0FalseNoneNoneFalseNoneFalse202020.00
248548574942None12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm6801.346801.3432.0FalseNoneNoneFalseNoneFalse217642.880
248548674942None12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm6868.686868.6837.0FalseNoneNoneFalseNoneFalse254141.160
248548774942None12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm6936.026936.023.0FalseNoneNoneFalseNoneFalse20808.060
248548874942None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5719.05719.024.0FalseNoneNoneFalseNoneFalse137256.00
248548974942None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5776.195776.1919.0FalseNoneNoneFalseNoneFalse109747.610
248549074942None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5833.385833.3820.0FalseNoneNoneFalseNoneFalse116667.60
248549174942None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5890.575890.572.0FalseNoneNoneFalseNoneFalse11781.140
248549274942None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs154.0154.0961.0FalseNoneNoneFalseNoneFalse147994.00
248549374942None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs155.54155.54896.0FalseNoneNoneFalseNoneFalse139363.840
248549474942None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs157.08157.081013.0FalseNoneNoneFalseNoneFalse159122.040
248549574942None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs158.62158.6259.0FalseNoneNoneFalseNoneFalse9358.580
248549674942None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2864.02864.0411.0FalseNoneNoneFalseNoneFalse1177104.00
248549774942None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2892.642892.64364.0FalseNoneNoneFalseNoneFalse1052920.960
248549874942None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2921.282921.28232.0FalseNoneNoneFalseNoneFalse677736.960
248549974942None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2949.922949.928.0FalseNoneNoneFalseNoneFalse23599.360
248550074942None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm756.0756.072.0FalseNoneNoneFalseNoneFalse54432.00
248550174942None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm763.56763.5669.0FalseNoneNoneFalseNoneFalse52685.640
248550274942None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm771.12771.1231.0FalseNoneNoneFalseNoneFalse23904.720
248550374942None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1032.01032.0262.0FalseNoneNoneFalseNoneFalse270384.00
248550474942None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1042.321042.32240.0FalseNoneNoneFalseNoneFalse250156.80
248550574942None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1052.641052.6492.0FalseNoneNoneFalseNoneFalse96842.880
248550674942None10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr328.0328.086.0FalseNoneNoneFalseNoneFalse28208.00
248550774942None10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr331.28331.2867.0FalseNoneNoneFalseNoneFalse22195.760
248550874942None10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr334.56334.5634.0FalseNoneNoneFalseNoneFalse11375.040
248550974942None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm244.0244.01105.0FalseNoneNoneFalseNoneFalse269620.00
248551074942None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm246.44246.441048.0FalseNoneNoneFalseNoneFalse258269.120
248551174942None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm248.88248.88626.0FalseNoneNoneFalseNoneFalse155798.880
248551274942None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm251.32251.3274.0FalseNoneNoneFalseNoneFalse18597.680
248551374942None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm304.0304.0510.0FalseNoneNoneFalseNoneFalse155040.00
248551474942None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm307.04307.04516.0FalseNoneNoneFalseNoneFalse158432.640
248551574942None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm310.08310.08497.0FalseNoneNoneFalseNoneFalse154109.760
248551674942None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm313.12313.12311.0FalseNoneNoneFalseNoneFalse97380.320
248551774942None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg64.064.077.0FalseNoneNoneFalseNoneFalse4928.00
248551874942None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg64.6464.6478.0FalseNoneNoneFalseNoneFalse5041.920
248551974942None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg65.2865.2874.55FalseNoneNoneFalseNoneFalse4866.6240
248552074942None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg65.9265.9246.65FalseNoneNoneFalseNoneFalse3075.1680
248552174942None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm244.0244.0279.0FalseNoneNoneFalseNoneFalse68076.00
248552274942None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm246.44246.44255.0FalseNoneNoneFalseNoneFalse62842.20
248552374942None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm248.88248.8899.0FalseNoneNoneFalseNoneFalse24639.120
248552474942None8.16 aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixing chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1238.01238.03.0FalseNoneNoneFalseNoneFalse3714.00
248552574942None8.16 aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixing chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1250.381250.383.0FalseNoneNoneFalseNoneFalse3751.140
248552674942None8.16 aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixing chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing complete as per specifications. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1262.761262.763.0FalseNoneNoneFalseNoneFalse3788.280
248552774942None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm100.0100.01574.0067FalseNoneNoneFalseNoneFalse157400.670
248552874942None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. First floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm101.0101.01468.5176FalseNoneNoneFalseNoneFalse148320.27760
248552974942None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm102.0102.0895.6766FalseNoneNoneFalseNoneFalse91359.01320
248553074942None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm103.0103.0123.8334FalseNoneNoneFalseNoneFalse12754.84020
248553174942None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm110.0110.01425.5917FalseNoneNoneFalseNoneFalse156815.0870
248553274942None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. First floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm111.1111.11319.5626FalseNoneNoneFalseNoneFalse146603.404860
248553374942None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm112.2112.2748.3416FalseNoneNoneFalseNoneFalse83963.927520
248553474942None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm113.3113.3123.8334FalseNoneNoneFalseNoneFalse14030.324220
248553574942None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.053.01574.0067FalseNoneNoneFalseNoneFalse83422.35510
248553674942None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.5353.531468.5176FalseNoneNoneFalseNoneFalse78609.7471280
248553774942None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm54.0654.06895.6766FalseNoneNoneFalseNoneFalse48420.2769960
248553874942None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm54.5954.59123.8334FalseNoneNoneFalseNoneFalse6760.0653060
248553974942None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm174.0174.0510.0FalseNoneNoneFalseNoneFalse88740.00
248554074942None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm175.74175.74516.0FalseNoneNoneFalseNoneFalse90681.840
248554174942None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Second floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm177.48177.48497.0FalseNoneNoneFalseNoneFalse88207.560
248554274942None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm179.22179.22311.0FalseNoneNoneFalseNoneFalse55737.420
248554374942None8.34.1Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.053.041.0FalseNoneNoneFalseNoneFalse2173.00
248554474942None8.34.1Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.5353.5325.0FalseNoneNoneFalseNoneFalse1338.250
248554574942None8.34.1Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm54.0654.0625.0FalseNoneNoneFalseNoneFalse1351.50
248554674942None8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm138.0138.041.0FalseNoneNoneFalseNoneFalse5658.00
248554774942None8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm139.38139.3825.0FalseNoneNoneFalseNoneFalse3484.50
248554874942None8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm140.76140.7625.0FalseNoneNoneFalseNoneFalse3519.00
248554974942None8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm139.0139.054.0FalseNoneNoneFalseNoneFalse7506.00
248555074942None8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm140.39140.3950.0FalseNoneNoneFalseNoneFalse7019.50
248555174942None8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm141.78141.7857.0FalseNoneNoneFalseNoneFalse8081.460
248555274942None8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm143.17143.174.0FalseNoneNoneFalseNoneFalse572.680
248555374942None8.4Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm115.0115.0148.415FalseNoneNoneFalseNoneFalse17067.7250
248555474942None8.4Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm116.15116.15148.955FalseNoneNoneFalseNoneFalse17301.123250
248555574942None8.4Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm117.3117.3147.335FalseNoneNoneFalseNoneFalse17282.39550
248555674942None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs565.0565.0298.0FalseNoneNoneFalseNoneFalse168370.00
248555774942None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs570.65570.65130.0FalseNoneNoneFalseNoneFalse74184.50
248555874942None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Second floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs576.3576.365.0FalseNoneNoneFalseNoneFalse37459.50
248555974942None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr66.066.0201.0FalseNoneNoneFalseNoneFalse13266.00
248556074942None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr66.6666.66201.0FalseNoneNoneFalseNoneFalse13398.660
248556174942None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr67.3267.32237.0FalseNoneNoneFalseNoneFalse15954.840
248556274942None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr67.9867.9841.0FalseNoneNoneFalseNoneFalse2787.180
248556374942None7.18Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum2037.172037.1716.0FalseNoneNoneFalseNoneFalse32594.720
248556474942None7.18Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum2057.342057.3411.0FalseNoneNoneFalseNoneFalse22630.740
248556574942None15.7Integral Crystalline Water Proofing Admixture Providing and supplying crystalline integral concrete waterproofing admixture that waterproofs concrete by forming crystals deep in the pores, capillaries and microcracks of the concrete, self-seal waterproofing compound to bridge shrinkage cracks upto 0.5mm in width & resist hydro-static pressure upto 16bar for both positive & negative pressure confirming to DIN 1048 part 5 for 56% reduction in depth of penetration against control, resistance to chloride penetration confirming to ASTM C 1202 with 64% improvement against control & protecting steel reinforcement against corrosion mixed @ 1% by weight of cementitious content in concrete. ie., integral crystaline waterproofing admix @ 0.5 kg/bag of cement. (For calculation purpose 320 kg of Cement for M-20 grade of Concrete is considered in the analysis) First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm621.15621.1566.0FalseNoneNoneFalseNoneFalse40995.90
248556674942None15.7Integral Crystalline Water Proofing Admixture Providing and supplying crystalline integral concrete waterproofing admixture that waterproofs concrete by forming crystals deep in the pores, capillaries and microcracks of the concrete, self-seal waterproofing compound to bridge shrinkage cracks upto 0.5mm in width & resist hydro-static pressure upto 16bar for both positive & negative pressure confirming to DIN 1048 part 5 for 56% reduction in depth of penetration against control, resistance to chloride penetration confirming to ASTM C 1202 with 64% improvement against control & protecting steel reinforcement against corrosion mixed @ 1% by weight of cementitious content in concrete. ie., integral crystaline waterproofing admix @ 0.5 kg/bag of cement. (For calculation purpose 320 kg of Cement for M-20 grade of Concrete is considered in the analysis) Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm627.3627.335.0FalseNoneNoneFalseNoneFalse21955.50
248556774942None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8740.68740.63.4015FalseNoneNoneFalseNoneFalse29731.15090
248556874942None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8800.888800.884.2669FalseNoneNoneFalseNoneFalse37552.4748720
248556974942None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8861.168861.162.0155FalseNoneNoneFalseNoneFalse17859.667980
248557074942None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8921.448921.4438.5675FalseNoneNoneFalseNoneFalse344077.63720
248557174942None9.25Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm800.0800.025.0FalseNoneNoneFalseNoneFalse20000.00
248557274942NoneVOL- 5 7.1.1Providing and fixing MS ladder between landings, 45 cms wide using angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre, with necessary supports of same angle iron etc. as directed, including hand railing on both sides with 25mm dia. GI pipes with angle iron props at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC 1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead and lifts etc. complete with: MS angle of 65 x 65 x 8mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr4508.314508.314.5FalseNoneNoneFalseNoneFalse20287.3950
248557374942None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide-Column & Wall junction Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.038.0241.2FalseNoneNoneFalseNoneFalse9165.60
248557474942None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide-Column & Wall junction First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.3838.38165.6FalseNoneNoneFalseNoneFalse6355.7280
248557574942None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide-Column & Wall junction Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.7638.76165.6FalseNoneNoneFalseNoneFalse6418.6560
248557674942None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide-Column & Wall junction Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr39.1439.147.65FalseNoneNoneFalseNoneFalse299.4210
248557774942None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide-Beam & Wall junction Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.038.0243.69FalseNoneNoneFalseNoneFalse9260.220
248557874942None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide-Beam & Wall junction First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.3838.38232.09FalseNoneNoneFalseNoneFalse8907.61420
248557974942None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide-Beam & Wall junction Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.7638.76151.23FalseNoneNoneFalseNoneFalse5861.67480
248558074942None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide-Beam & Wall junction Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr39.1439.1415.11FalseNoneNoneFalseNoneFalse591.40540
248558174942None22.15.7Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 250x10mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos200.0200.029.0FalseNoneNoneFalseNoneFalse5800.00
248558274942None22.15.7Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 250x10mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos202.0202.025.0FalseNoneNoneFalseNoneFalse5050.00
248558374942None22.15.7Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 250x10mm Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos204.0204.013.0FalseNoneNoneFalseNoneFalse2652.00
248558474942None22.15.8Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos50.050.095.0FalseNoneNoneFalseNoneFalse4750.00
248558574942None22.15.8Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos50.550.580.0FalseNoneNoneFalseNoneFalse4040.00
248558674942None22.15.8Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos51.051.043.0FalseNoneNoneFalseNoneFalse2193.00
248558774942None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Handles 200mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos450.0450.058.0FalseNoneNoneFalseNoneFalse26100.00
248558874942None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Handles 200mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos454.5454.550.0FalseNoneNoneFalseNoneFalse22725.00
248558974942None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Handles 200mm Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos459.0459.026.0FalseNoneNoneFalseNoneFalse11934.00
248559074942None22.15.4Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Aldrop 16mm dia, 300mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos375.0375.028.0FalseNoneNoneFalseNoneFalse10500.00
248559174942None22.15.4Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Aldrop 16mm dia, 300mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos378.75378.7525.0FalseNoneNoneFalseNoneFalse9468.750
248559274942None22.15.4Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Aldrop 16mm dia, 300mm Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos382.5382.513.0FalseNoneNoneFalseNoneFalse4972.50
248559374942None22.15.10Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Door stopper 75mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos100.0100.08.0FalseNoneNoneFalseNoneFalse800.00
248559474942None22.15.10Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Door stopper 75mm First Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos101.0101.05.0FalseNoneNoneFalseNoneFalse505.00
248559574942None22.15.10Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Door stopper 75mm Second Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos102.0102.04.0FalseNoneNoneFalseNoneFalse408.00
248559674942None15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New rrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm833.34833.34385.0FalseNoneNoneFalseNoneFalse320835.90
17072382530000NoneNoneBuildingsKitchen and Dining9480618.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248559774943NoneVol4 WRD:8.2.1Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each25.525.5200.0FalseNoneNoneFalseNoneFalse5100.00
248559874943NoneVol 3 2.1b(i)Removal of stumps and roots including backfilling with suitable material to required compaction Girth from 300 mm to 600 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each356.0356.0200.0FalseNoneNoneFalseNoneFalse71200.00
248559974943None1.21.5Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Hard rock (blasting prohibited) Depth upto 1.50 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1014.01014.030.7632FalseNoneNoneFalseNoneFalse31193.88480
248560074943None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum474.0474.0824.4804FalseNoneNoneFalseNoneFalse390803.70960
248560174943None4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm118.0118.0446.0FalseNoneNoneFalseNoneFalse52628.00
248560274943None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum5448.05448.047.0FalseNoneNoneFalseNoneFalse256056.00
248560374943None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6746.396746.391.0FalseNoneNoneFalseNoneFalse6746.390
248560474943None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6802.616802.612.1FalseNoneNoneFalseNoneFalse14285.4810
248560574943None2.1.6Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6243.06243.013.0FalseNoneNoneFalseNoneFalse81159.00
248560674943None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor Footing concrete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6842.876842.8744.9976FalseNoneNoneFalseNoneFalse307912.7271120
248560774943None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Columns Concrete Upto PB ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10771.1910771.197.1964FalseNoneNoneFalseNoneFalse77513.7917160
248560874943None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Plinth Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9504.09504.010.9765FalseNoneNoneFalseNoneFalse104320.6560
248560974943None2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground For Grade Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9504.09504.034.4055FalseNoneNoneFalseNoneFalse326989.8720
248561074943None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Columns Concrete Up to Roof ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10237.3910237.3915.8675FalseNoneNoneFalseNoneFalse162441.7858250
248561174943None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9635.199635.1924.961FalseNoneNoneFalseNoneFalse240503.977590
248561274943None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9033.09033.066.7308FalseNoneNoneFalseNoneFalse602779.31640
248561374943None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground FloorFor Lintel Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9635.199635.194.1886FalseNoneNoneFalseNoneFalse40357.9568340
248561474943None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor For Staircase ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6022.06022.02.495FalseNoneNoneFalseNoneFalse15024.890
248561574943None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor For Columns ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum10339.7610339.760.978FalseNoneNoneFalseNoneFalse10112.285280
248561674943None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor For Roof Beams ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9731.549731.541.5649FalseNoneNoneFalseNoneFalse15228.8869460
248561774943None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor For Roof Slab ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9123.329123.322.0928FalseNoneNoneFalseNoneFalse19093.2840960
248561874943None2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9652.979652.974.0FalseNoneNoneFalseNoneFalse38611.880
248561974943None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t89457.089457.019.5225FalseNoneNoneFalseNoneFalse1746424.28250
248562074943None2.11 aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t90351.5690351.561.003FalseNoneNoneFalseNoneFalse90622.614680
248562174943None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1192.01192.0406.0FalseNoneNoneFalseNoneFalse483952.00
248562274943None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1203.911203.91142.0FalseNoneNoneFalseNoneFalse170955.220
248562374943None6.34Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm937.0937.027.0FalseNoneNoneFalseNoneFalse25299.00
248562474943None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum98815.098815.00.5FalseNoneNoneFalseNoneFalse49407.50
248562574943None12.17Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm7085.07085.03.8FalseNoneNoneFalseNoneFalse26923.00
248562674943None12.57.3Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3005.03005.011.4FalseNoneNoneFalseNoneFalse34257.00
248562774943None12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1477.01477.07.0FalseNoneNoneFalseNoneFalse10339.00
248562874943None12.93.1Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr702.0702.010.7FalseNoneNoneFalseNoneFalse7511.40
248562974943None12.94.1Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3485.03485.03.5FalseNoneNoneFalseNoneFalse12197.50
248563074943None12.88Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5390.05390.040.0FalseNoneNoneFalseNoneFalse215600.00
248563174943None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm5719.05719.023.0FalseNoneNoneFalseNoneFalse131537.00
248563274943None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs154.0154.01233.0FalseNoneNoneFalseNoneFalse189882.00
248563374943None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2864.02864.0427.0FalseNoneNoneFalseNoneFalse1222928.00
248563474943None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent.Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2892.632892.633.0FalseNoneNoneFalseNoneFalse8677.890
248563574943None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm756.0756.035.0FalseNoneNoneFalseNoneFalse26460.00
248563674943None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1032.01032.067.0FalseNoneNoneFalseNoneFalse69144.00
248563774943None10.18Providing and fixing of wall cladding using 20mm thick gang saw water cut Shiva gold granite, grey granite in CM 1:3 (1 cement : 3 coarse sand) proportion cut to required shape, pattern with paper joints, finished with cement mortal using white cement and colour pigments to match the colour of slab making through jointing with sealant, making holes 25mmx12mm grooves in joints including cost of all materials, mortar, labour, curing etc., complete. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm3061.03061.084.8255FalseNoneNoneFalseNoneFalse259650.85550
248563874943None10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr328.0328.080.0FalseNoneNoneFalseNoneFalse26240.00
248563974943None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm244.0244.0582.1745FalseNoneNoneFalseNoneFalse142050.5780
248564074943None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm246.43246.4345.0FalseNoneNoneFalseNoneFalse11089.350
248564174943None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm304.0304.0320.0FalseNoneNoneFalseNoneFalse97280.00
248564274943None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm307.03307.03282.92FalseNoneNoneFalseNoneFalse86864.92760
248564374943None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg64.064.048.0FalseNoneNoneFalseNoneFalse3072.00
248564474943None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin- Charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kg64.6364.6343.0FalseNoneNoneFalseNoneFalse2779.090
248564574943None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm244.0244.0161.0FalseNoneNoneFalseNoneFalse39284.00
248564674943None8.16 aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixing chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing complete as per specifications. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1238.01238.015.0FalseNoneNoneFalseNoneFalse18570.00
248564774943None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm100.0100.01127.4867FalseNoneNoneFalseNoneFalse112748.670
248564874943None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm101.0101.058.952FalseNoneNoneFalseNoneFalse5954.1520
248564974943None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm110.0110.01127.4867FalseNoneNoneFalseNoneFalse124023.5370
248565074943None8.54.2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm111.09111.0958.952FalseNoneNoneFalseNoneFalse6548.977680
248565174943None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.053.01127.4867FalseNoneNoneFalseNoneFalse59756.79510
248565274943None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer in charge.TerraceFloor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.5253.5258.952FalseNoneNoneFalseNoneFalse3155.111040
248565374943None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm174.0174.0320.0FalseNoneNoneFalseNoneFalse55680.00
248565474943None8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm175.73175.73283.0FalseNoneNoneFalseNoneFalse49731.590
248565574943None8.34.1Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm53.053.037.0FalseNoneNoneFalseNoneFalse1961.00
248565674943None8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm138.0138.037.0FalseNoneNoneFalseNoneFalse5106.00
248565774943None8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm139.0139.069.0FalseNoneNoneFalseNoneFalse9591.00
248565874943None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs565.0565.0270.0FalseNoneNoneFalseNoneFalse152550.00
248565974943None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr66.066.0180.0FalseNoneNoneFalseNoneFalse11880.00
248566074943None8.8Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth.Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr66.6566.6547.0FalseNoneNoneFalseNoneFalse3132.550
248566174943None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8740.598740.591.8943FalseNoneNoneFalseNoneFalse16557.2996370
248566274943None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Terrace Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum8800.878800.8742.2249FalseNoneNoneFalseNoneFalse371615.8556630
248566374943None9.25Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm800.0800.042.0FalseNoneNoneFalseNoneFalse33600.00
248566474943None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.038.0133.2FalseNoneNoneFalseNoneFalse5061.60
248566574943None8.16.2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment Plaster mesh 150mm wide Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr38.038.0181.33FalseNoneNoneFalseNoneFalse6890.540
248566674943None22.15.7Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 250x10mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos200.0200.010.0FalseNoneNoneFalseNoneFalse2000.00
248566774943None22.15.8Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos50.050.038.0FalseNoneNoneFalseNoneFalse1900.00
248566874943None22.15.1Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Handles 200mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos450.0450.020.0FalseNoneNoneFalseNoneFalse9000.00
248566974943None22.15.4Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Aldrop 16mm dia, 300mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos375.0375.09.0FalseNoneNoneFalseNoneFalse3375.00
248567074943None22.15.10Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Door stopper 75mm Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos100.0100.09.0FalseNoneNoneFalseNoneFalse900.00
248567174943None15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New rrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm825.16825.16422.0FalseNoneNoneFalseNoneFalse348217.520
248567274943None20.107Providing and fixing plain rolled glass 4mm thick with teakwood beading of 10mm thick. Ground Floor ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1147.01147.00.54FalseNoneNoneFalseNoneFalse619.380
17072382530000NoneNoneBuildingsINTERNAL WATER SUPPLY WORKS1081148.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248567374944None13.32.3Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 25 mm nominal dia pipes ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m477.0477.0320.0FalseNoneNoneFalseNoneFalse152640.00
248567474944None13.31.4Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 32 mm nominal dia pipes. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m557.0557.036.0FalseNoneNoneFalseNoneFalse20052.00
248567574944None10.14.2SANITARY PIPING Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. 75mm(weight of pipe -0.917 kg) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr161.0161.0145.0FalseNoneNoneFalseNoneFalse23345.00
248567674944None10.14.4Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. 110mm(weight of pipe -1.894 kg) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr282.0282.0213.0FalseNoneNoneFalseNoneFalse60066.00
248567774944None14.74-aSANITARY FIXTURES Providing and fixing Single lever Bib cock Long Nose (Lifting type cold water cartridge) with wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1250.01250.0111.0FalseNoneNoneFalseNoneFalse138750.00
248567874944None14.67-aProviding and fixing Exposed set for concealed stop cock made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each602.0602.013.0FalseNoneNoneFalseNoneFalse7826.00
248567974944None14.2.1Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4838.04838.05.0FalseNoneNoneFalseNoneFalse24190.00
248568074944None14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4884.04884.050.0FalseNoneNoneFalseNoneFalse244200.00
248568174944None13.6Providing and fixing PVC (S.W.R) P Trap 10cms x 10cms with all fitting arrangements & all necessary accessories complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each309.0309.012.0FalseNoneNoneFalseNoneFalse3708.00
248568274944None14.4.1Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4884.04884.06.0FalseNoneNoneFalseNoneFalse29304.00
248568374944None13.63Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0 cm X 4.0 cm with all fitting arrangements & all necessary accessories complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each244.0244.045.0FalseNoneNoneFalseNoneFalse10980.00
248568474944None14.24Providing and fixing white vitreous china squatting plate urinal with integral rim longitudinal flush pipe. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2835.02835.06.0FalseNoneNoneFalseNoneFalse17010.00
248568574944None14.7.1Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Unit3082.03082.05.0FalseNoneNoneFalseNoneFalse15410.00
248568674944None14.10.1Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required Kitchen sink with drain board ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos5618.05618.03.0FalseNoneNoneFalseNoneFalse16854.00
248568774944None14.37.1Providing and fixing PTMT Bottle Trap for Wash basin and sink. Bottle trap 31mm single piece moulded with height of 270 mm, effective length of tail pipe 260 mm from the centre of the waste coupling, 77 mm breadth with 25 mm minimum water seal, weighing not less than 260 g ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos306.0306.05.0FalseNoneNoneFalseNoneFalse1530.00
248568874944None14.48Providing and fixing Pillar Cock made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1223.01223.08.0FalseNoneNoneFalseNoneFalse9784.00
248568974944None14.2.1Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required :- PH TOILET W.C. pan with ISI marked white solid plastic seat and lid ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos4838.04838.03.0FalseNoneNoneFalseNoneFalse14514.00
248569074944None14.71Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: -PH TOILET White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps -PH TOILET ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Unit3082.03082.03.0FalseNoneNoneFalseNoneFalse9246.00
248569174944None14.95Providing and fixing Bidet spray made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class - PH TOILET ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos839.0839.03.0FalseNoneNoneFalseNoneFalse2517.00
248569274944None14.96Providing and fixing Stainless Steel Grab Bar 600 mm Long with all concealed fitting arrangements & all necessary accesories complete - Class PH TOILET ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos8159.08159.03.0FalseNoneNoneFalseNoneFalse24477.00
248569374944None13.48RAIN WATER DISPOSAL SYSTEM "Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter "M150Y:110mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m291.0291.0195.0FalseNoneNoneFalseNoneFalse56745.00
248569474944None13.34AProviding and fixing rectangular high density polyethylene water storage loft tank with cover, conforming to ISI : 12701, colour of opaque white or as approved by Engineer-in-charge. The rate includes making necessary holes for inlet, outlet & over flow pipes. The base support i/c fittings & fixtures for tank shall be paid separately." ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Ltr9.09.012000.0FalseNoneNoneFalseNoneFalse108000.00
248569574944None13.34AProviding and fixing rectangular high density polyethylene water storage loft tank with cover, conforming to ISI : 12701, colour of opaque white or as approved by Engineer-in-charge. The rate includes making necessary holes for inlet, outlet & over flow pipes. The base support i/c fittings & fixtures for tank shall be paid separately." ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Ltr9.09.010000.0FalseNoneNoneFalseNoneFalse90000.00
17072382530000NoneNoneBuildingsEXTERNAL WATER SUPPLY WORKS513011.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248569674945None1.6.1A.WATER SUPPLY WORKS Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. 1.6.1 In all kinds of soils. Depth upto In all kinds of soils. Depth upto 1.50m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm242.0242.0450.0FalseNoneNoneFalseNoneFalse108900.00
248569774945None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications Rate as per Item no 1.10 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm160.0160.0340.0FalseNoneNoneFalseNoneFalse54400.00
248569874945None13.50.1Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work External plumbing 32mm pipe outer dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr272.0272.010.0FalseNoneNoneFalseNoneFalse2720.00
248569974945None13.50.2Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work. 40mm pipe outer dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr304.0304.022.0FalseNoneNoneFalseNoneFalse6688.00
248570074945None13.50.3Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 50mm pipe outer dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr386.0386.0165.0FalseNoneNoneFalseNoneFalse63690.00
248570174945None13.50.4Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 65 mm pipe outer dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr543.0543.0110.0FalseNoneNoneFalseNoneFalse59730.00
248570274945None13.50.5Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 80 mm pipe outer dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr674.0674.0165.0FalseNoneNoneFalseNoneFalse111210.00
248570374945None13.35KSRB13-6.3-6 -Providing and fixing in position brass gate valve with C.I wheel of approved quality ( screwed end ) nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. (external domestic water supply) 32 mm dia nominal ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos272.0272.04.0FalseNoneNoneFalseNoneFalse1088.00
248570474945None13.36KSRB13-6.3-6 -Providing and fixing in position brass gate valve with C.I wheel of approved quality ( screwed end ) nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. (external domestic water supply) 40 mm dia nominal ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos304.0304.04.0FalseNoneNoneFalseNoneFalse1216.00
248570574945None13.38KSRB13-6.3-6 -Providing and fixing in position brass gate valve with C.I wheel of approved quality ( screwed end ) nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification (external irrigation ) 63 mm dia nominal ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos536.0536.025.0FalseNoneNoneFalseNoneFalse13400.00
248570674945None13.39KSRB13-6.3-6 -Providing and fixing in position brass gate valve with C.I wheel of approved quality ( screwed end ) nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification (external irrigation ) 80 mm dia nominal ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos781.0781.010.0FalseNoneNoneFalseNoneFalse7810.00
248570774945None13.40KSRB13-6.3-6 -Providing and fixing in position brass gate valve with C.I wheel of approved quality ( screwed end ) nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification (external irrigation ) 100 mm dia nominal ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos1333.01333.03.0FalseNoneNoneFalseNoneFalse3999.00
248570874945None13.67Providing and fixing to wall, ceiling and floor medium density polyethylene pipes 6.00 kgf/sq.cm working pressure outside diameter raising mains & exposed distribution pipes with special flange, compression type fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. Specification No. KBS 13.2.15.1 / 13.9 Page No : 95, Item No :13.66 PWD SR 18-19 (FOR External domestic& Flushing water shaft , terrace piping ) 25 mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr224.0224.015.0FalseNoneNoneFalseNoneFalse3360.00
248570974945None13.68Providing and fixing to wall, ceiling and floor medium density polyethylene pipes 6.00 kgf/sq.cm working pressure outside diameter raising mains & exposed distribution pipes with special flange, compression type fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. Specification No. KBS 13.2.15.1 / 13.9 Page No : 95, Item No :13.66 PWD SR 18-19 (FOR External domestic& Flushing water shaft , terrace piping ) 32 mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr272.0272.0275.0FalseNoneNoneFalseNoneFalse74800.00
17072382530000NoneNoneBuildingsEXTERNAL SEWAGE WORKS1157020.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248571074946None1.6.1A.EXTERNAL SEWAGE WORKS Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum242.0242.0385.0FalseNoneNoneFalseNoneFalse93170.00
248571174946None2.4Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications Rate as per Item no 1.10 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum160.0160.0160.0FalseNoneNoneFalseNoneFalse25600.00
248571274946None2.28.1 Providing and fixing Wafer type single flange Butterfly valve conforming to relevant IS 13099/9991 EN GGG40/50 with latest amendments as detailed below of the following diameter and types with TP set and conveying to work site, loading and unloading, stacking etc. with all lead and lift. The rate is inclusive of the cost of valve, TP set, rubber insertion, bolts and nuts and excluding earth work excavation.For PN 10.0 (Note: TP set should be be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in estimate For Valve of PN - 10.0 and 100mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each5849.05849.04.0FalseNoneNoneFalseNoneFalse23396.00
248571374946None2.33.1Providing and fixing kinetic AIR VALVE of PN 16.0 for automatic discharge of accumulate air during working condition, conforming to IS 14845 / EN 1074-4. Body and bonnet of DI conforming to IS-1865 of grade GGG-40/50, seals are made of approved EPDM, SS 304 float, guide and internals. Flange drilling according to IS-1538 with appurtenances. complete. Body and bonnet shall be coated with electrostatically applied epoxy powder coating with a coating thickness of 250 micron both inside and outside etc. complete For K Air Valves of 80mm dia. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each26343.026343.04.0FalseNoneNoneFalseNoneFalse105372.00
248571474946None2.72.2Supply of PPR Ball Valve Plastic (Heavy Body) confirming to IS 15801- PPR Ball Valve Plastic (Heavy Body) 25mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each206.0206.035.0FalseNoneNoneFalseNoneFalse7210.00
248571574946None13.23.4Providing and fixing PTMT Ball cock of approved quality, colour and makecomplete with Epoxy coated aluminium rod with L.P./ H.P.H.D. plastic ball. 40 mm nominal bore, 206mm long, weighing not less than 690 g ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each725.0725.03.0FalseNoneNoneFalseNoneFalse2175.00
248571674946None13.23.5Providing and fixing PTMT Ball cock of approved quality, colour and makecomplete with Epoxy coated aluminium rod with L.P./ H.P.H.D. plastic ball. 50 mm nominal bore, 242mm long , weighing not less than 1240 g ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1344.01344.02.0FalseNoneNoneFalseNoneFalse2688.00
248571774946None7.5.1Providing and fixing DI/CI puddle flanges conforming to IS 7181-1986 with latest ammendments., in position for RCC walls including hoisting and conveying them to work spot with all lead and lifts etc. complete . For DI/CI puddle flanges of 80mm dia. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1580.01580.03.0FalseNoneNoneFalseNoneFalse4740.00
248571874946None13.58Providing and fixing PVC (S.W.R) Gully Trap 10cms x 10cms with all fitting arrangements & all necessary accessories complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each346.0346.020.0FalseNoneNoneFalseNoneFalse6920.00
248571974946None16.3.2Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED)pipes NP-3 Class conforming to IS:458-1988 with latest amentmentsusing ordinary portland cement, for sanitary works and conveyingto work site, rolling and lowering into trenches, laying true to lineand level including loading and unloading at both destinations andjointing of pipes and specials, perfect linking of joints with jack tocorrect position including cost of jointing materials, i.e, rubber ringsconforming to IS: 5382 for S&S RCC pipes, with all leads and lifts asdirected and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the executionof the work, the contractor shall carry out the survey" RCC NP3 Class pipe of 300 mm dia. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m1332.01332.0160.0FalseNoneNoneFalseNoneFalse213120.00
248572074946None10.7Erection and positioning of RCC Hume pipe pump house/Cistern on size stone masory platform including transportation charges and handling,finishing with all necessary tools ,plants and materials etc.,complete as directed by the Engineer in charge of the work ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr1882.01882.026.0FalseNoneNoneFalseNoneFalse48932.00
248572174946None16.11Constructing brick masonry chamber of internal dimension 450x300mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos3549.03549.012.0FalseNoneNoneFalseNoneFalse42588.00
248572274946None10.14.6Providing and installing at site of work P.V.C. pipes including cost of pipesand specials and labour, including lowering into trenches, laying trueto line, level and perfect linking at joints leak proof including jointingof approved type with all labour charges and all lift charges, handlingcharges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. 160mm(weight of pipe -2.753 kg) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m489.0489.0385.0FalseNoneNoneFalseNoneFalse188265.00
248572374946None16.9Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos5454.05454.015.0FalseNoneNoneFalseNoneFalse81810.00
248572474946None16.10Constructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos4236.04236.08.0FalseNoneNoneFalseNoneFalse33888.00
248572574946None13.40.4Supply and delivery of Centrifugal pumpset at site brand new bestmake and with discharge duty confirming to ISI standards and its latestamendments. 12.5 HP, size 100x100 Head 25M, Discharge 1560 LPM(centralized UG sump to centralized OHT tank 2W +1S ) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos38331.038331.02.0FalseNoneNoneFalseNoneFalse76662.00
248572674946None13.40.3Supply and delivery of Centrifugal pumpset at site brand new bestmake and with discharge duty confirming to ISI standards and its latestamendments. 3 HP, size 50x40 Head 30M, Discharge 198 LPM (IRRIGATION PUMP 1W +1S ) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos18816.018816.02.0FalseNoneNoneFalseNoneFalse37632.00
248572774946None13.40.3Supply and delivery of Centrifugal pumpset at site brand new bestmake and with discharge duty confirming to ISI standards and its latestamendments. 3 HP, size 50x40 Head 30M, Discharge 198 LPM (STP To Irrigation PUMP 2W +1S ) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos18816.018816.02.0FalseNoneNoneFalseNoneFalse37632.00
248572874946None13.40.1Supply and delivery of Centrifugal pumpset at site brand new bestmake and with discharge duty confirming to ISI standards and its latestamendments. 2 HP, Size 65x50 Head 13M, Discharge 462 LPM (For RO PUMP 2W +1S ) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos15610.015610.02.0FalseNoneNoneFalseNoneFalse31220.00
248572974946None21.1.3Water purification plants: Providing, Installation and Commissioning of automatic Water purification plant (RO+UF) with all accessories piping, product water tank on single phase power supply as per the enclosed detailed Technical Specifications including cost of material, loading and unloading and as directed by the Engineer in charge. (Ref- detailed specification enclosed seperatly). Note:- 1.The above rates mentioned are only for the preparation of estimate purpose. 2. All items are to be of BSI /NFS standards,with BSI / NFS mark . 3. Tenders to be invited for procurement. 4. No direct payment should be made under any situation or condition or on any account. 5. After commissioning of plant necessary testing to be done for the satisfactory of Engineer Incharge. Note : Refer the ANNEXURE : F for Detailed Specification of Each components" 100 LPH : Cabin Type ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos94000.094000.01.0FalseNoneNoneFalseNoneFalse94000.00
17072382530000NoneNoneBuildingsSEPTIC TANK1165325.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248573074947None1.21.7Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Depth exceeding 3 m, but not exceeding 4.50 m" ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1196.01196.053.0FalseNoneNoneFalseNoneFalse63388.00
248573174947None1.21.4Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials." ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum156.0156.0109.0FalseNoneNoneFalseNoneFalse17004.00
248573274947None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum474.0474.0186.0FalseNoneNoneFalseNoneFalse88164.00
248573374947None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum5448.05448.00.1FalseNoneNoneFalseNoneFalse544.80
248573474947None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6323.06323.048.0FalseNoneNoneFalseNoneFalse303504.00
248573574947None2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Tonne79011.079011.05.76FalseNoneNoneFalseNoneFalse455103.360
248573674947None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Pump Room ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm304.0304.0186.0FalseNoneNoneFalseNoneFalse56544.00
248573774947NoneVOL - 5, 7.3Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2140.02140.05.0FalseNoneNoneFalseNoneFalse10700.00
248573874947None8.6.1Providing 12 mm cement plaster with Cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm323.0323.035.0FalseNoneNoneFalseNoneFalse11305.00
248573974947None1.21.7Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Depth exceeding 3 m, but not exceeding 4.50 m" ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1196.01196.0133.0FalseNoneNoneFalseNoneFalse159068.00
17072382530000NoneNoneBuildingsSOAK PITS260005.53
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248574074948None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum102.0102.099.0FalseNoneNoneFalseNoneFalse10098.00
248574174948None1.5.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth 3 m to 6 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum117.0117.015.0FalseNoneNoneFalseNoneFalse1755.00
248574274948None1.18Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials." ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum87.087.064.0FalseNoneNoneFalseNoneFalse5568.00
248574374948NoneMI SR 1.8Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1278.01278.028.76FalseNoneNoneFalseNoneFalse36755.280
248574474948None5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum5315.05315.030.0FalseNoneNoneFalseNoneFalse159450.00
248574574948None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6955.36955.33.3FalseNoneNoneFalseNoneFalse22952.490
248574674948None2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Tonne79011.079011.00.2965FalseNoneNoneFalseNoneFalse23426.76150
17072382530000NoneNoneBuildingsSOLAR WATER HEATER419916.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248574774949None7.3.2 of Part III Utilization (PWD Electrical)Supplying, installation, testing and commissioning of solar hot water heater comprising of solar flat plate collector of size 2120x1040x100mm and stainless steel hot water storage tank with stainless steel heat exchanger absorber made of copper sheet and copper tube of following capacity aluminium box collector with approximate capacity electrical back up arrangement excluding inlet and out let pipes. As per the directions SS Model with 100mm thick of 48Kg/Meter Cube density Rock wool insulation with 22SWG Aluminium cladding for 300 Liters Capacity Dormitory Block ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each69986.069986.06.0FalseNoneNoneFalseNoneFalse419916.00
17072382530000NoneNoneBuildingsBOREWELL956222.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248574874950None12.2.1Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all srata of earth,including over burden upto 20M, fixing of casing pipes, collars and capwith ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) - FOR 2 Nos. OF BOREWELLS Borewell depth of 0 to 50 Mtrs ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr309.0309.0100.0FalseNoneNoneFalseNoneFalse30900.00
248574974950None12.2.2 Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all srata of earth,including over burden upto 20M, fixing of casing pipes, collars and capwith ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) - FOR 2 Nos. OF BOREWELLS Borewell depth of 50 to 100 Mtrs ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr387.0387.0100.0FalseNoneNoneFalseNoneFalse38700.00
248575074950None12.2.3 Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all srata of earth,including over burden upto 20M, fixing of casing pipes, collars and capwith ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) - FOR 2 Nos. OF BOREWELLS Borewell depth of 100 to 150 Mtrs ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr412.0412.0100.0FalseNoneNoneFalseNoneFalse41200.00
248575174950None12.2.4 Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all srata of earth,including over burden upto 20M, fixing of casing pipes, collars and capwith ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) - FOR 2 Nos. OF BOREWELLS Borewell depth of 150 to 200 Mtrs ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr478.0478.0100.0FalseNoneNoneFalseNoneFalse47800.00
248575274950None12.2.5 Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all srata of earth,including over burden upto 20M, fixing of casing pipes, collars and capwith ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) - FOR 2 Nos. OF BOREWELLS Borewell depth of 200 to 250 Mtrs ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr560.0560.0100.0FalseNoneNoneFalseNoneFalse56000.00
248575374950None12.2.6 Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all srata of earth,including over burden upto 20M, fixing of casing pipes, collars and capwith ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) - FOR 2 Nos. OF BOREWELLS Borewell depth of 250 to 300 Mtrs ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr593.0593.0100.0FalseNoneNoneFalseNoneFalse59300.00
248575474950None12.4Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers's method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. etc. complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each5288.05288.03.0FalseNoneNoneFalseNoneFalse15864.00
248575574950None13.19.6Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. For 3 HP etc. complete 17.50 HP - 120 LPM @ 308 m = 26 STG Outlet Dia - 2.00" ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set77963.077963.02.0FalseNoneNoneFalseNoneFalse155926.00
248575674950None12.5Cleaning of borewells including yield testing of borewell either using slow or fast rigs for not more than 2 hours at the final depth with a minimum working of 2 hours continuously with air compressor or suitable pump as per specification, including the cost of transportation charges, crew charges, cost of consumables etc. complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each18962.018962.02.0FalseNoneNoneFalseNoneFalse37924.00
248575774950None9.10.2Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0 HDPE pipe grade PE100-PN 16.0, 75mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr213.0213.01000.0FalseNoneNoneFalseNoneFalse213000.00
248575874950None13.17.2Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. For 3 HP etc. complete. 12.50 HP - 300 LPM @ 104 m = 8 STG Outlet Dia - 2.50" ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each39179.039179.02.0FalseNoneNoneFalseNoneFalse78358.00
248575974950None2.6.3, of Part III Utilization (PWD Electrical)Electrical Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper with low resistance conductor confirmining to table 3 class 5 of IS:8130-1984 and virgin grade PVC insulation and powder coating extruded PVC sheathed suitable for working voltage upto 1100Volts as per IS -694:1990 confirming to GTP. 3C X 6Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr245.0245.0610.0FalseNoneNoneFalseNoneFalse149450.00
248576074950None13.23Supply, installing,testing and commissioning COMMON control panelconsisting of the following INCOMING:1 No set of Phase indicatinglamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No AnalogVoltmeter 1ni with Phase selector switch, Isolating switch OUTGOINGfor Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitablefor respective HP 1 No. Electrcal Protection Like single Phase preventor,under voltage overVolage, under current over current & dry runprotection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter etc. complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each15900.015900.02.0FalseNoneNoneFalseNoneFalse31800.00
17072382530000NoneNoneBuildingsSump Tank - 100000 Litres900748.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248576174951None1.21.5Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Hard rock (blasting prohibited) Depth upto 1.50 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1014.01014.0152.95FalseNoneNoneFalseNoneFalse155091.30
248576274951None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum5448.05448.07.0FalseNoneNoneFalseNoneFalse38136.00
248576374951None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Plinth Beam ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6955.36955.327.0FalseNoneNoneFalseNoneFalse187793.10
248576474951None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum9644.89644.89.0FalseNoneNoneFalseNoneFalse86803.20
248576574951None2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.t79011.079011.03.96FalseNoneNoneFalseNoneFalse312883.560
248576674951None8.36.1Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm176.0176.0142.34FalseNoneNoneFalseNoneFalse25051.840
248576774951None15.1Polyurethane based Single Component for New Surface Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm817.0817.077.5FalseNoneNoneFalseNoneFalse63317.50
248576874951NoneVOL-5, 7.3Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2140.02140.01.0FalseNoneNoneFalseNoneFalse2140.00
248576974951NoneVOL-5, 10.6RCC hume pipe Circular pump house: Supplying precast RCC Circular Hume pipe pump house with M.S door and RCC conical roof as per specification and drawings - Internal dia Mtr. 1200 mm & height of 2.5 Mtr. With Wall thickness 65mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each16401.016401.01.0FalseNoneNoneFalseNoneFalse16401.00
248577074951NoneVOL-5 7.1.1Providing and fixing MS ladder between landings, 45 cms wide using angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre, with necessary supports of same angle iron etc. as directed, including hand railing on both sides with 25mm dia. GI pipes with angle iron props at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC 1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead and lifts etc. complete with: MS angle of 65 x 65 x 8mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr4377.04377.03.0FalseNoneNoneFalseNoneFalse13131.00
17072382530000NoneNoneBuildingsELECTRICAL WORKS - INTERNAL ELECTRICAL WORKS4018602.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248577174952None1.2.1 of Part III Utilization (PWD Electrical)Concealed Conduit System Supplying 19/20 mm dia 2mm/2.5mm thick heavy gauge PVC conduit pipe with suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr66.066.01460.0FalseNoneNoneFalseNoneFalse96360.00
248577274952None1.1.1 of Part III Utilization (PWD Electrical)Open Conduit System Supplying heavy gauge PVC conduit pipe 19/20mm dia 2mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 19/20mm dia 2mm thick. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr69.069.0395.0FalseNoneNoneFalseNoneFalse27255.00
248577374952None1.2.2 of Part III Utilization (PWD Electrical)Concealed Conduit System Supplying 25 mm dia 2mm/2.5mm thick heavy gauge PVC conduit pipe with suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr78.078.0600.0FalseNoneNoneFalseNoneFalse46800.00
248577474952None1.3.1 of Part III Utilization (PWD Electrical)Supplying 19/20 dia 2mm/2.5mm thick heavy gauge PVC Conduit Pipe with bends, metal junction boxes adhesive paste etc.,by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr68.068.0700.0FalseNoneNoneFalseNoneFalse47600.00
248577574952None1.3.2 of Part III Utilization (PWD Electrical)Supplying 25 mm dia 2mm/2.5mm thick heavy gauge PVC Conduit Pipe with bends, metal junction boxes adhesive paste etc.,by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr355.0355.0430.0FalseNoneNoneFalseNoneFalse152650.00
248577674952None2.1.1 of Part III Utilization (PWD Electrical)Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm (Phase & Neutral) & 1x1.0 mm 2 (Earth wird) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A, flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Short point upto 3m from tapping point to out let via switch box ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Point285.0285.0144.0FalseNoneNoneFalseNoneFalse41040.00
248577774952None2.1.2 of Part III Utilization (PWD Electrical)Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm (Phase & Neutral) & 1x1.0 mm 2 (Earth wird) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A, flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Medium point above - 3Mtr up to 6Mtr from tapping point to out let via switch ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Point394.0394.0147.0FalseNoneNoneFalseNoneFalse57918.00
248577874952None2.1.3 of Part III Utilization (PWD Electrical)Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm (Phase & Neutral) & 1x1.0 mm 2 (Earth wird) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A, flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Long point above 6Mtr up to 10Mtr from tapping point to out let via switch ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Point570.0570.0145.0FalseNoneNoneFalseNoneFalse82650.00
248577974952None2.1.4 of Part III Utilization (PWD Electrical)Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm (Phase & Neutral) & 1x1.0 mm 2 (Earth wird) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A, flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Two outlet in a row, above 3Mtr upto 6Mtr from tapping point to out let via switches. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Point708.0708.0128.0FalseNoneNoneFalseNoneFalse90624.00
248578074952None2.1.5 of Part III Utilization (PWD Electrical)Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm (Phase & Neutral) & 1x1.0 mm 2 (Earth wird) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A, flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Three outlet in a row, above 6Mts upto 10Mtr from tapping point to out let via switches ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Point1035.01035.055.0FalseNoneNoneFalseNoneFalse56925.00
248578174952None3.4.1 of Part III Utilization (PWD Electrical)Supplying and fixing surface/flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. 1-3 Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each159.0159.0330.0FalseNoneNoneFalseNoneFalse52470.00
248578274952None3.4.2 of Part III Utilization (PWD Electrical)Supplying and fixing surface/flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. 4-5 Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each177.0177.0166.0FalseNoneNoneFalseNoneFalse29382.00
248578374952None3.4.3 of Part III Utilization (PWD Electrical)Supplying and fixing surface/flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. 6 Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each220.0220.090.0FalseNoneNoneFalseNoneFalse19800.00
248578474952None3.4.4 of Part III Utilization (PWD Electrical)Supplying and fixing surface/flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. 8 Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each261.0261.0112.0FalseNoneNoneFalseNoneFalse29232.00
248578574952None3.4.5 of Part III Utilization (PWD Electrical)Supplying and fixing surface/flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. 10-12Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each319.0319.086.0FalseNoneNoneFalseNoneFalse27434.00
248578674952None3.4.6 of Part III Utilization (PWD Electrical)Supplying and fixing surface/flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. 16Way ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each363.0363.046.0FalseNoneNoneFalseNoneFalse16698.00
248578774952None3.5.1 of Part III Utilization (PWD Electrical)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc, complete on the existing metal/PVC box. 1 to 3 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each161.0161.0330.0FalseNoneNoneFalseNoneFalse53130.00
248578874952None3.5.2 of Part III Utilization (PWD Electrical)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc, complete on the existing metal/PVC box. 4 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each175.0175.0166.0FalseNoneNoneFalseNoneFalse29050.00
248578974952None3.5.3 of Part III Utilization (PWD Electrical)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc, complete on the existing metal/PVC box. 6 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each234.0234.090.0FalseNoneNoneFalseNoneFalse21060.00
248579074952None3.5.4 of Part III Utilization (PWD Electrical)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc, complete on the existing metal/PVC box. 8 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each284.0284.0112.0FalseNoneNoneFalseNoneFalse31808.00
248579174952None3.5.5 of Part III Utilization (PWD Electrical)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc, complete on the existing metal/PVC box. 10 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each344.0344.086.0FalseNoneNoneFalseNoneFalse29584.00
248579274952None3.5.6 of Part III Utilization (PWD Electrical)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc, complete on the existing metal/PVC box. 12 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each344.0344.086.0FalseNoneNoneFalseNoneFalse29584.00
248579374952None3.5.7 of Part III Utilization (PWD Electrical)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc, complete on the existing metal/PVC box. 16 Module ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each397.0397.046.0FalseNoneNoneFalseNoneFalse18262.00
248579474952None3.6.1 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/Stepped electronic fan regulator/ dimmer / telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293. 6Amps One Way. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each102.0102.0352.0FalseNoneNoneFalseNoneFalse35904.00
248579574952None3.6.2 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/Stepped electronic fan regulator/ dimmer / telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293. 6Amps Two Way. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each166.0166.016.0FalseNoneNoneFalseNoneFalse2656.00
248579674952None3.6.3 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/Stepped electronic fan regulator/ dimmer / telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293. 6Amps 3way socket. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each171.0171.0210.0FalseNoneNoneFalseNoneFalse35910.00
248579774952None3.6.4 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/Stepped electronic fan regulator/ dimmer / telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293. 'Stepped Fan Regulator. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each357.0357.0142.0FalseNoneNoneFalseNoneFalse50694.00
248579874952None3.6.9 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/Stepped electronic fan regulator/ dimmer / telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293. 6 Amps Bell Push ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each177.0177.09.0FalseNoneNoneFalseNoneFalse1593.00
248579974952None3.6.11 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/Stepped electronic fan regulator/ dimmer / telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293. 6/16Amps Universal Socket ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each236.0236.028.0FalseNoneNoneFalseNoneFalse6608.00
248580074952None3.6.7 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/Stepped electronic fan regulator/ dimmer / telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293. 16A One Way Switch ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each180.0180.028.0FalseNoneNoneFalseNoneFalse5040.00
248580174952None3.6.12 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 TV/Telephone socket ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each156.0156.014.0FalseNoneNoneFalseNoneFalse2184.00
248580274952None3.6.13 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 RJ45/I.O Outlet Cat-6 Socket ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each337.0337.07.0FalseNoneNoneFalseNoneFalse2359.00
248580374952None8.2.2 of Part III Utilization (PWD Electrical)Supplying and drawing PVC flexible two pair telephone unarmoured tinned copper cable. 2 Pair. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr21.021.0420.0FalseNoneNoneFalseNoneFalse8820.00
248580474952None8.3 of Part III Utilization (PWD Electrical)Supplying and drawing PVC insulated gas injected physical foam jelly flooded co-axial TV cable.RG- 6 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr44.044.0280.0FalseNoneNoneFalseNoneFalse12320.00
248580574952None8.1 of Part III Utilization (PWD Electrical)Supplying and drawing UTP-CAT 6E LAN cable ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr34.034.0210.0FalseNoneNoneFalseNoneFalse7140.00
248580674952None2.3.2 of Part III Utilization (PWD Electrical)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring. with specified IS-694:1990 & conforming to GTP 1.5 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr26.026.01095.0FalseNoneNoneFalseNoneFalse28470.00
248580774952None2.3.3 of Part III Utilization (PWD Electrical)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring. with specified IS-694:1990 & conforming to GTP 2.5 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr42.042.03520.0FalseNoneNoneFalseNoneFalse147840.00
248580874952None2.3.4 of Part III Utilization (PWD Electrical)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring. with specified IS-694:1990 & conforming to GTP 4 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr63.063.01420.0FalseNoneNoneFalseNoneFalse89460.00
248580974952None2.3.5 of Part III Utilization (PWD Electrical)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring. with specified IS-694:1990 & conforming to GTP 6 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr92.092.0960.0FalseNoneNoneFalseNoneFalse88320.00
248581074952None3.10.3 of Part III Utilization (PWD Electrical)Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size 110 mm conduit using necessary machine screws. 110mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos21.021.0555.0FalseNoneNoneFalseNoneFalse11655.00
248581174952None1.13 of Part III Utilization (PWD Electrical)Supplying and Fixing Metal Fan Box with Round Hook. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Nos117.0117.0142.0FalseNoneNoneFalseNoneFalse16614.00
248581274952None12.45 of Part III Utilization (PWD Electrical)Supplying & Fixing of 230 V 20/40 W Fluorescent Lamp holder ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each33.033.0419.0FalseNoneNoneFalseNoneFalse13827.00
248581374952None11.15 of Part III Utilization (PWD Electrical)Supplying and fixing of LED Bulkhead of 10W with IP65 protection and IK 08 impact resistance suitable for surface and wall mounting applications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each842.0842.018.0FalseNoneNoneFalseNoneFalse15156.00
248581474952None11.11.7 of Part III Utilization (PWD Electrical)Supplying & fixing of retrofit type LED bulb . W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70% efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5 of lamp Wage. short circuit & open circuit protection to be integrated in the circuit, THD less than 20, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL-CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.- 18W, 6500K ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No426.0426.0100.0FalseNoneNoneFalseNoneFalse42600.00
248581574952None11.11.5 of Part III Utilization (PWD Electrical)Supplying & fixing of retrofit type LED bulb . W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy .80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 12W, 6500K ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No269.0269.058.0FalseNoneNoneFalseNoneFalse15602.00
248581674952None11.2.1 of Part III Utilization (PWD Electrical)Supplying & fixing retrofit type-PL-LED Lamp . W LED linear source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to275 V. Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.- 8-9W ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No623.0623.026.0FalseNoneNoneFalseNoneFalse16198.00
248581774952None11.3.32 of Part III Utilization (PWD Electrical)Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. - LED light fitting 1 x 4 - 20/22 W ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each690.0690.0419.0FalseNoneNoneFalseNoneFalse289110.00
248581874952None13.7.1 of Part III Utilization (PWD Electrical)Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps. - On wall / celilin / Rafter / Girders ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each122.0122.0621.0FalseNoneNoneFalseNoneFalse75762.00
248581974952None6.2.1 of Part III Utilization (PWD Electrical)Supplying of 1440rpm heavy duty exhaust fan bracket blades suitable to operate on 230V 50Hz, AC Supply complete.12"Sweep(300mm) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2969.02969.074.0FalseNoneNoneFalseNoneFalse219706.00
248582074952None13.14 of Part III Utilization (PWD Electrical)Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps ceiling rose with sufficient length of 23 / 0.0076 inch PVC insulated twin core wire of approved make. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each492.0492.074.0FalseNoneNoneFalseNoneFalse36408.00
248582174952None6.4.1 of Part III Utilization (PWD Electrical)Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/19 and also comply with IS: 1709/1984 with latest amendment, rated voltage 220 V/50 Hz, Rated power upto 35 W +/- 10 %, Rated current As per IS:374/19, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value 6.2 CMM / W, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification, Motor winding. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 V, Insulation resistance Shall not be less than Two Mega Ohms (2M Ohms), Leakage current Should not exceed 210 micro Amp, Power input, W& current, Air Delivery & Fan Speed as per IS:374/2019 with latest amendment, 2year manufacturer Warranty. (BLDC fans) - 48"" Sweep 5 Star (1200 mm) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2677.02677.0142.0FalseNoneNoneFalseNoneFalse380134.00
248582274952None13.10 of Part III Utilization (PWD Electrical)Fixing a ceiling/Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing a 5 amps, ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each171.0171.0142.0FalseNoneNoneFalseNoneFalse24282.00
248582374952None5.42.2 of Part III Utilization (PWD Electrical)Fabricating supplying and mounting MS box made out 16 SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 2 coats of red oxide primer paint and finally finished with approved colour enameled metal paint etc., complete. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sq CM0.430.4354000.0FalseNoneNoneFalseNoneFalse23220.00
248582474952None5.40.1 of Part III Utilization (PWD Electrical)Supplying 100 amps rated 4x30x6mm Alluminium Strips 3phase with neutral bus bar using required capacity electrolytic alluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing MDB. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary botls,nuts and washers etc., complete - 100 A 4 x 30 x 6 mm Aluminium Strips ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr2465.02465.012.0FalseNoneNoneFalseNoneFalse29580.00
248582574952None3.9 of Part III Utilization (PWD Electrical)Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N.F screws. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sq CM0.350.3513500.0FalseNoneNoneFalseNoneFalse4725.00
248582674952None5.38 of Part III Utilization (PWD Electrical)Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 220v A.C. 50 Hz 12/24v D.C. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each515.0515.09.0FalseNoneNoneFalseNoneFalse4635.00
248582774952None5.31 of Part III Utilization (PWD Electrical)Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4390.04390.05.0FalseNoneNoneFalseNoneFalse21950.00
248582874952None5.21 of Part III Utilization (PWD Electrical)Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each9255.09255.03.0FalseNoneNoneFalseNoneFalse27765.00
248582974952None5.15.9 of Part III Utilization (PWD Electrical)Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. - 100A, 25kA, 4 Pole ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8487.08487.03.0FalseNoneNoneFalseNoneFalse25461.00
248583074952None5.16 of Part III Utilization (PWD Electrical)Supplying and fixing of Shunt trip suitable for MCCB.CBCT ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1703.01703.03.0FalseNoneNoneFalseNoneFalse5109.00
248583174952None5.34 of Part III Utilization (PWD Electrical)Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each562.0562.018.0FalseNoneNoneFalseNoneFalse10116.00
248583274952None5.33 of Part III Utilization (PWD Electrical)Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, kVA, kWH, kVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each9315.09315.03.0FalseNoneNoneFalseNoneFalse27945.00
248583374952None5.18.9 of Part III Utilization (PWD Electrical)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve , indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required. 63Amps TPN ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3088.03088.03.0FalseNoneNoneFalseNoneFalse9264.00
248583474952None5.18.4 of Part III Utilization (PWD Electrical)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve , indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required. 6 - 32Amps DP ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each739.0739.010.0FalseNoneNoneFalseNoneFalse7390.00
248583574952None5.1 of Part III Utilization (PWD Electrical)Supplying push button operated direct online starter with an antiweld silver cadmium oxide contactor with replaceable fixed and moving contacts and bimetallic thermal overload relay help in anticorrosion treated sheet steel or iron clad enclosure and fixing the same to suitable capacity wires for 230/440 V 1/3 phase motor upto 5 HP. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1927.01927.03.0FalseNoneNoneFalseNoneFalse5781.00
248583674952None5.19.13 of Part III Utilization (PWD Electrical)Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. III- Double Door 12way TP & N ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8735.08735.06.0FalseNoneNoneFalseNoneFalse52410.00
248583774952None5.18.9 of Part III Utilization (PWD Electrical)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required. 50-63Amps TPN ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3088.03088.01.0FalseNoneNoneFalseNoneFalse3088.00
248583874952None5.18.7 of Part III Utilization (PWD Electrical)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve , indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required. b) 5-32Amps TPN ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1717.01717.05.0FalseNoneNoneFalseNoneFalse8585.00
248583974952None5.20.10 of Part III Utilization (PWD Electrical)Supplying, fixing and wiring Earth Leakage Miniature Circuit Breaker [ELMCB] 240/450V up to 300mA sensitivity on existing wood/panel board. - 63 A 4 pole ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each5147.05147.03.0FalseNoneNoneFalseNoneFalse15441.00
248584074952None5.20.4 of Part III Utilization (PWD Electrical)Supplying, fixing and wiring Earth Leakage Miniature Circuit Breaker [ELMCB] 240/450V up to 300mA sensitivity on existing wood/panel board. 32 to 40 Amps 2 pole ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4559.04559.015.0FalseNoneNoneFalseNoneFalse68385.00
248584174952None5.18.1 of Part III Utilization (PWD Electrical)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve , indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required. b) 5-32Amps SP ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each415.0415.0144.0FalseNoneNoneFalseNoneFalse59760.00
248584274952None12.56 of Part III Utilization (PWD Electrical)Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No3510.03510.06.0FalseNoneNoneFalseNoneFalse21060.00
248584374952None32.18, of Standard Stock Material (11kV System) - Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 - 3.5 core 240sqmm (2 Runs) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr862.67862.6790.0FalseNoneNoneFalseNoneFalse77640.30
248584474952None32.13, of Standard Stock Material (11kV System) - Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 - 3.5 core 70sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr317.91317.91282.0FalseNoneNoneFalseNoneFalse89650.620
248584574952None32.07, of Standard Stock Material (11kV System) - Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 - 3.5core 25sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr139.55139.5530.0FalseNoneNoneFalseNoneFalse4186.50
248584674952None32.03, of Standard Stock Material (11kV System) - Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 4core 10sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr118.0118.040.0FalseNoneNoneFalseNoneFalse4720.00
248584774952None21.05, of Labour Charges (11kV System) - Part II DLabour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required - In exixting trench/duct. 2.5 sqmm to 25 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr20.8920.8940.0FalseNoneNoneFalseNoneFalse835.60
248584874952None21.06, of Labour Charges (11kV System) - Part II DLabour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required - In exixting trench/duct. 35 sqmm to 95 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr31.1431.14282.0FalseNoneNoneFalseNoneFalse8781.480
248584974952None21.07, of Labour Charges (11kV System) - Part II DLabour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required - In exixting trench/duct. 120 to 240 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr32.2832.2890.0FalseNoneNoneFalseNoneFalse2905.20
248585074952None1.6.1Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum389.0389.093.6FalseNoneNoneFalseNoneFalse36410.40
248585174952None11.2.6Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete. Medium Duty GI pipe of 50mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr383.0383.0185.0FalseNoneNoneFalseNoneFalse70855.00
248585274952None30.12, of Major Work Materials Equipments (PartSupplying and fixing of class B (medium duty) GI pipe of wall thickness not less than 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV class - 100 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr1350.01350.0200.0FalseNoneNoneFalseNoneFalse270000.00
248585374952None35.04, of Standard Stock Material (11kV System) - Supplying and fixing Epoxy Terminating Kit (Potheac) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 3.5 x 225/240/300 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each588.0588.02.0FalseNoneNoneFalseNoneFalse1176.00
248585474952None35.02, of Standard Stock Material (11kV System) - Supplying and fixing Epoxy Terminating Kit (Potheac) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 3.5 x 70/95/120 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each382.0382.06.0FalseNoneNoneFalseNoneFalse2292.00
248585574952None35.01, of Standard Stock Material (11kV System) - Supplying and fixing Epoxy Terminating Kit (Potheac) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - Up to 4C x 50 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each324.0324.08.0FalseNoneNoneFalseNoneFalse2592.00
248585674952None59.10, of Standard Stock Material (11kV System) - Supplying and fixing Heavy Duty Copper Terminal Long Barrel suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 240 Sqmm Copper Terminal, Apprx Wt: 218 Gm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each355.0355.012.0FalseNoneNoneFalseNoneFalse4260.00
248585774952None59.06, of Standard Stock Material (11kV System) - Supplying and fixing Heavy Duty Copper Terminal Long Barrel suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 120 Sqmm Copper Terminal, Apprx Wt: 64 Gm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each140.0140.06.0FalseNoneNoneFalseNoneFalse840.00
248585874952None59.04, of Standard Stock Material (11kV System) - Supplying and fixing Heavy Duty Copper Terminal Long Barrel suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 70 Sqmm Copper Terminal, Apprx Wt: 38 Gm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each89.089.018.0FalseNoneNoneFalseNoneFalse1602.00
248585974952None59.02, of Standard Stock Material (11kV System) - Supplying and fixing Heavy Duty Copper Terminal Long Barrel suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 35 Sqmm Copper Terminal, Apprx Wt: 17 Gm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each40.040.06.0FalseNoneNoneFalseNoneFalse240.00
248586074952None59.01, of Standard Stock Material (11kV System) vSupplying and fixing Heavy Duty Copper Terminal Long Barrel suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 25 Sqmm Copper Terminal, Apprx Wt: 11 Gm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each27.027.024.0FalseNoneNoneFalseNoneFalse648.00
248586174952None60.12, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Luf) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 240 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each61.061.012.0FalseNoneNoneFalseNoneFalse732.00
248586274952None60.08, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Luf) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 120 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each20.020.06.0FalseNoneNoneFalseNoneFalse120.00
248586374952None60.06, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Luf) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 70 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each13.013.018.0FalseNoneNoneFalseNoneFalse234.00
248586474952None60.04, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Luf) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 35 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4.04.06.0FalseNoneNoneFalseNoneFalse24.00
248586574952None60.03, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Luf) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 25 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3.03.018.0FalseNoneNoneFalseNoneFalse54.00
248586674952None60.02, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Luf) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 16 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2.02.06.0FalseNoneNoneFalseNoneFalse12.00
248586774952None60.01, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Luf) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 10 Sqmm a) Security Room ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2.02.08.0FalseNoneNoneFalseNoneFalse16.00
248586874952None63.01, of Standard Stock Material (11kV System) - Supplying and fixing Brass Cable Gland suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 25mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each79.079.08.0FalseNoneNoneFalseNoneFalse632.00
248586974952None63.04, of Standard Stock Material (11kV System) - Supplying and fixing Brass Cable Gland suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 45mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each197.0197.04.0FalseNoneNoneFalseNoneFalse788.00
248587074952None12.58.5 of Part III Utilization (PWD Electrical)Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. GI Strip 50 x 6 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr218.0218.0150.0FalseNoneNoneFalseNoneFalse32700.00
248587174952None12.58.3 of Part III Utilization (PWD Electrical)Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. GI Strip 25x6mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr128.0128.0225.0FalseNoneNoneFalseNoneFalse28800.00
248587274952None12.58.2 of Part III Utilization (PWD Electrical)Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. GI Strip 25x3mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr82.082.0225.0FalseNoneNoneFalseNoneFalse18450.00
248587374952None8.02 of Standard Stock Material (11kV System) - PaSupplying and running GI/Copper conductor for grounding and (along with other wires in conduit systm of wirinf) using necessary suitable size clamps, nails, guttas/spacers etc. GI Wire 8SWG ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr9.839.83250.0FalseNoneNoneFalseNoneFalse2457.50
248587474952None19.3, of Major Work Materials Equipments (Part I)Supplying and fixing of DANGER / CAUTION board ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No318.0318.03.0FalseNoneNoneFalseNoneFalse954.00
248587574952None5.37, of Part III Utilization (PWD Electrical)Suplying fixing and wiring heavy duty low voltage capacitors conforming to IS 2834. 3 phase, 400/400 volts grade, for power factor improvement of roating machinery. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kvar480.0480.09.0FalseNoneNoneFalseNoneFalse4320.00
248587674952None5.3, of Part III Utilization (PWD Electrical)Supplying and fixing single phase preventer using necessary wires over an existing panel board suitable for motor up to 20HP capacities. k) Sump Tank & RWH ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each904.02904.023.0FalseNoneNoneFalseNoneFalse2712.060
248587774952None5.6.6, of Part III Utilization (PWD Electrical)Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. - 20"x20"x2.5" k) Sump Tank & RWH ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each326.13326.132.0FalseNoneNoneFalseNoneFalse652.260
248587874952None5.1 of Part III Utilization (PWD Electrical)Supplying push button operated direct online starter with an antiweld silver cadmium oxide contactor with replaceable fixed and moving contacts and bimetallic thermal overload relay help in anticorrosion treated sheet steel or iron clad enclosure and fixing the same to suitable capacity wires for 400/440 volts 3 phase motor/single phase motor upto 5 Hp. k) Sump Tank ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1927.01927.06.0FalseNoneNoneFalseNoneFalse11562.00
248587974952None15.117 of Part III Utilization (PWD Electrical)Supplying and installation of RUBBER MAT 1mtr x 1mtr -1Omm thick. complete including cost of materials, labour, usage charges of machinery complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1900.01900.014.0FalseNoneNoneFalseNoneFalse26600.00
248588074952None15.117 of Part III Utilization (PWD Electrical)Supplying and installation of RUBBER MAT 1mtr x 1mtr -1Omm thick. complete including cost of materials, labour, usage charges of machinery complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1900.01900.014.0FalseNoneNoneFalseNoneFalse26600.00
248588174952None1.Materia l RateMonoblock Pump set 3HP 3Phase 21 Stage 3/2.2 ATALANTA / SUGUNA / C.R.I, KIRLOSKAR and other Equivalent Pumps(XXXXV) k)Sump Tank ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No16800.016800.03.0FalseNoneNoneFalseNoneFalse50400.00
248588274952None3.6.10 of Part III Utilization (PWD Electrical)Supplying and fixing of modular switch/ Socket/Stepped electronic fan regulator/ dimmer / telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293. 32Amps DP switch ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each326.0326.01.0FalseNoneNoneFalseNoneFalse326.00
248588374952None2.3.7 of Part III Utilization (PWD Electrical)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring. with specified IS-694:1990 & conforming to GTP 16 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr318.0318.015.0FalseNoneNoneFalseNoneFalse4770.00
248588474952None11.9.1 of Part III Utilization (PWD Electrical)Supply of LED floodlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate/clear glass material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, CCT 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mauling with outer dia of 40mm to 50mm. Universal voltage driver to operate wide voltage range from 100 V to 270V 50/60Hz application. Compliance to IS 10322/ IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with . W System Power consumption. LED Efficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in- house facility accredited by NABL / CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark / name shall be Engraved / Embossing on the die cast housing / Body part Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. - LED Floodlight 70W " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each6768.06768.01.0FalseNoneNoneFalseNoneFalse6768.00
248588574952None5.11.2 of Part III Utilization (PWD Electrical)Supplying of on load change over switches 4 poles, AC-23A Duty, 415V, 50Hz, AC Supply. (Open Execution) - 100A ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each7090.07090.01.0FalseNoneNoneFalseNoneFalse7090.00
248588674952None2.3.6 of Part III Utilization (PWD Electrical)2.3.Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring. with specified IS-694:1990 & conforming to GTP 10 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr167.0167.010.0FalseNoneNoneFalseNoneFalse1670.00
248588774952None13.5 of Part III Utilization (PWD Electrical)Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each162.0162.01.0FalseNoneNoneFalseNoneFalse162.00
248588874952None5.6.5 of Part III Utilization (PWD Electrical)Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. - 15"" x 12"" x 2"" " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each201.0201.02.0FalseNoneNoneFalseNoneFalse402.00
248588974952None5.7.4 of Part III Utilization (PWD Electrical)Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. - 100A ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each691.0691.02.0FalseNoneNoneFalseNoneFalse1382.00
248589074952None5.9.3 of Part III Utilization (PWD Electrical)Supplying and fixing HRC fuse units base on existing switch / panel board - 100 to 300A ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each919.0919.02.0FalseNoneNoneFalseNoneFalse1838.00
248589174952None5.10.2 of Part III Utilization (PWD Electrical)Supplying and fixing HRC fuse link on existing switch fuse base with W loss as per IS-13703. - Above 63 A to 200 A " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each381.0381.02.0FalseNoneNoneFalseNoneFalse762.00
248589274952None12.58.4 of Part III Utilization (PWD Electrical)Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. GI Strip 40 x 6 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr181.0181.020.0FalseNoneNoneFalseNoneFalse3620.00
17072382530000NoneNoneBuildingsELECTRICAL WORKS - ESTABLISHING SUB STATION1612040.82
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248589374953None21.08, of Standard Stock Material (11kV System) - Supply and erection of Double Pole TC structural set including all hardwares suitable for 100/300 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each30694.030694.01.0FalseNoneNoneFalseNoneFalse30694.00
248589474953None24.07, of Standard Stock Material (11kV System) - Supplying and Fixing H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each6071.06071.01.0FalseNoneNoneFalseNoneFalse6071.00
248589574953None2.12, of Standard Stock Material (11kV System) - PSupplying and Fixing …. including all Hardwares etc complete as per the standard technical specification BESCOM - HT ST Support 50x8 mm Flat - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each121.0121.02.0FalseNoneNoneFalseNoneFalse242.00
248589674953None2.02, of Standard Stock Material (11kV System) - PSupply and fixing of …….cross arm including all Hardwares complete as per the standard technical specification BESCOM - 11 kV, Horizontal Cross Arm - Galvanised Iron (GI) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each487.0487.02.0FalseNoneNoneFalseNoneFalse974.00
248589774953None24.01, of Standard Stock Material (11kV System) - Supplying and Fixing …. including all Hardwares etc complete as per the standard technical specification.of BESCOM - 11 kV, 200 Amps Single Break GOS ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
248589874953None20.01, of Standard Stock Material (11kV System) - Supplying and Fixing …. including all Hardwares etc complete as per the standard technical specification.of BESCOM - 11 kV, HG Fuse Unit with Solid Core Insulator ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1069.01069.03.0FalseNoneNoneFalseNoneFalse3207.00
248589974953None19.02, of Standard Stock Material (11kV System) - Supplying and Fixing …. including all Hardwares etc complete as per the standard technical specification of BESCOM. - 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1584.01584.03.0FalseNoneNoneFalseNoneFalse4752.00
248590074953None5.16, of Standard Stock Material (11kV System) - PSupplying and Fixing Strain Clamp, 3 Bolt type for 70/90 kN Disc Insulator including all Hardwares etc complete as per the standard technical specification of BESCOM ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each707.0707.03.0FalseNoneNoneFalseNoneFalse2121.00
248590174953None6.06, of Standard Stock Material (11kV System) - PSupplying and Fixing ….including all Hardwares etc complete as per the standard technical specification BESCOM - 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each205.0205.06.0FalseNoneNoneFalseNoneFalse1230.00
248590274953None5.10,5.11,5.13,5.15, 5.16 & 8.02 of Standard StockSupplying and Fixing …. including all Hardwares etc complete as per the standard technical specification BESCOM - GUY Set ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1628.451628.454.0FalseNoneNoneFalseNoneFalse6513.80
248590374953None12.57, of Part III Utilization (PWD Electrical)Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.No4256.04256.08.0FalseNoneNoneFalseNoneFalse34048.00
248590474953None30.12, of Major Work Materials Equipments (PartSupplying and fixing of class B GI pipe on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV class - 100 mm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr1350.01350.020.0FalseNoneNoneFalseNoneFalse27000.00
248590574953None25.02, of Standard Stock Material (11kV System) -Supplying and fixing of 11 kV, DOLO Cutout REC Specification(Dwg No. BESCOM/GM/QS&S/20 Dtd 24.11.2018) on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV class ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set4241.04241.03.0FalseNoneNoneFalseNoneFalse12723.00
248590674953None45.07, of Standard Stock Material (11kV System) -Supplying and making 11KV (E) Extruded "X" linked for tubing & moulded & cross-linked components using Heat Shrink Stress Control tube having High Permittivity XLPE Terminations- INDOOR & OUTDOOR JOINTING KIT & conforming to th GTP. OUTDOOR 3cx95sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kit4067.04067.01.0FalseNoneNoneFalseNoneFalse4067.00
248590774953None45.04, of Standard Stock Material (11kV System) -Supplying and making 11KV (E) Extruded "X" linked for tubing & moulded & cross-linked components using Heat Shrink Stress Control tube having High Permittivity XLPE Terminations- INDOOR & OUTDOOR JOINTING KIT & conforming to th GTP.INDOOR 3cx95sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kit3744.03744.01.0FalseNoneNoneFalseNoneFalse3744.00
248590874953None36.01, of Standard Stock Material (11kV System) -HT Cable - Supplying and laying of high tension 11KV cable, Dry Curing & Dry Cooling with true triple extrusion, simultaneously through a single common head, 3 core under ground XLPE (E) cable having stranded comapact circular aluminium conductor, screened insulated, insulation screened with extruded semiconduting compound in combination with copper tape, core laid up inner sheate of PVC tape GI flat strip armoured and overall PVC sheathed with specified IS 7098/11/85 with latest amendments of conforming to the GTP . 3 Core x 95 Sqmm, (54 GI Wires - 2.5 mm Dia) - 2 Runs ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr889.67889.67150.0FalseNoneNoneFalseNoneFalse133450.50
248590974953None12.16, of Standard Stock Material (11kV System) -Supply,erection, testing and commissioning of Distribution Transformer - 3 Phase, 11kV/433V - Stacked CRGO Core with Oil as per IS-1180 (Part-1): 2014 tap switch Butchholtz relay winding Temperature indicator, oil temperature indicator, marshalling box with wiring, magnetic oil level indicator with +5% to-10% Steps of 2.5% with HT and LT cable and boxes including all standard accessories as per latest IS Standard Technical Specification. - 100 kVA, Aluminium Wdg, Star 2 (5 Star) with cable entry type ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each225576.0225576.01.0FalseNoneNoneFalseNoneFalse225576.00
248591074953None11.59Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin- charge. (Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm841.0841.093.6FalseNoneNoneFalseNoneFalse78717.60
248591174953None37.4Providing and fixing M.S.Block pipe of 38mm dia, of heavy guage of 14 including removing the bends, cutting the pipe and fixing pipe in between the existing two verticle poles (M.S rectangular poles) and spot welding the chain link with M.S block pipe including cost of all materials wastage in cutting, and scaffolding wherever necessary with all lead and lifts as directed by the Engineer-in-charge of eork etc.,complete including two coats of approved quality paint over one coat of shop paint.(Top Length 10+8+10+8=36& Bottom Length 10+8+10+8=36=72) (PW,P & IWTD, North Zone, Dharwad Circle 2016-17, Page No 262 , Item No.37.4) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.m322.0322.020.0FalseNoneNoneFalseNoneFalse6440.00
248591274953None1, of Civil works - Part IV)Jelly Spreading (20-25 mm) : Supplying and providing jelly in the station yard of uniform thickness of 100 mm including the cost of materials, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer- in-charge of works as per the standard procedure. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1773.01773.014.04FalseNoneNoneFalseNoneFalse24892.920
248591374953None51.5.2, of Major Work Materials Equipments (PartSupplying and installing of CO2 -4-5 Kgs capacity Fire Extinguishers ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8691.08691.01.0FalseNoneNoneFalseNoneFalse8691.00
248591474953None15.111 of Part III Utilization (PWD Electrical)Supplying of four bucket stand alongwith buckets. Complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1850.01850.01.0FalseNoneNoneFalseNoneFalse1850.00
248591574953None15.113 of Part III Utilization (PWD Electrical)Supplying of Rubber HAND GLOVES ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Pair975.0975.01.0FalseNoneNoneFalseNoneFalse975.00
248591674953None15.116 of Part III Utilization (PWD Electrical)Supplying of FIRST AID CHART with lamination. Complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each400.0400.01.0FalseNoneNoneFalseNoneFalse400.00
248591774953None35.50, of Major Work Materials Equipments (Part 11 KV Hickery rod set ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set5399.05399.01.0FalseNoneNoneFalseNoneFalse5399.00
248591874953None35.51, of Major Work Materials Equipments (Part Grounding sticks extendable upto 18 ft : 3 nos. of each 6 ft Sticks of 3 phase R, Y, B (3 nos. of 1 set) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Set1755.01755.01.0FalseNoneNoneFalseNoneFalse1755.00
248591974953None15.114 of Part III Utilization (PWD Electrical)Supplying of first aid box. complete ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each600.0600.01.0FalseNoneNoneFalseNoneFalse600.00
248592074953None19.3, of Major Work Materials Equipments (Part ISupplying and fixing of DANGER / CAUTION board ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each318.0318.04.0FalseNoneNoneFalseNoneFalse1272.00
248592174953None15.117 of Part III Utilization (PWD Electrical)Supplying and installation of RUBBER MAT 1mtr x 1mtr -1Omm thick. complete including cost of materials, labour, usage charges of machinery complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1900.01900.02.0FalseNoneNoneFalseNoneFalse3800.00
248592274953None1.6.1Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum484.0484.09.0FalseNoneNoneFalseNoneFalse4356.00
248592374953None2.16, of Labour Charges (11kV System) - Part II DiProviding Spiral Earth Electrode type earthing (without charcoal, salt etc.,) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each93.093.02.0FalseNoneNoneFalseNoneFalse186.00
248592474953None12.58.5 of Part III Utilization (PWD Electrical)Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. GI Strip 50 x 6 ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr218.0218.0200.0FalseNoneNoneFalseNoneFalse43600.00
248592574953None39.01, of Standard Stock Material (11kV System) - Compact RMU (VCB/SF6 Type) with Copper Busbar, 350 MVA, 630 Amps as per IEC62271/IS-3427 - 3 Way RMU, 2 OD + 1 VL (One Incomer + One Breaker + One Outgoing) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each549550.0549550.01.0FalseNoneNoneFalseNoneFalse549550.00
248592674953None18.01, of Standard Stock Material (11kV System) - LT Distribution Box for 100 kVA DTC with MCCB's (Sheet Metal) (Dwg No. BESCOM/GM/QS&S/58 Dtd 24.11.2018) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each22686.022686.01.0FalseNoneNoneFalseNoneFalse22686.00
248592774953None5.40.2 of Part III Utilization (PWD Electrical)Supplying - amps rated -mm Alluminium Strips 3phase with neutral bus bar using required capacity electrolytic alluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing MDB. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary botls,nuts and washers etc., complete - 250 A 4 x 30 x 10 mm Aluminium Strips ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr3435.03435.040.0FalseNoneNoneFalseNoneFalse137400.00
248592874953None3.9 of Part III Utilization (PWD Electrical)Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N.F screws. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sq CM0.350.35105300.0FalseNoneNoneFalseNoneFalse36855.00
248592974953None5.38 of Part III Utilization (PWD Electrical)Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 220v A.C. 50 Hz 12/24v D.C. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each515.0515.018.0FalseNoneNoneFalseNoneFalse9270.00
248593074953None5.21 of Part III Utilization (PWD Electrical)Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each9255.09255.01.0FalseNoneNoneFalseNoneFalse9255.00
248593174953None5.11.4 of Part III Utilization (PWD Electrical)Supplying of on load change over switches 4 poles, AC-23A Duty, 415V, 50Hz, AC Supply. (Open Execution) - 200A ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each13230.013230.01.0FalseNoneNoneFalseNoneFalse13230.00
248593274953None5.34 of Part III Utilization (PWD Electrical)Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each562.0562.03.0FalseNoneNoneFalseNoneFalse1686.00
248593374953None5.33 of Part III Utilization (PWD Electrical)Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, kVA, kWH, kVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each9315.09315.01.0FalseNoneNoneFalseNoneFalse9315.00
248593474953None5.16 of Part III Utilization (PWD Electrical)Supplying and fixing of Shunt trip suitable for MCCB.CBCT ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1703.01703.03.0FalseNoneNoneFalseNoneFalse5109.00
248593574953None5.15.12 of Part III Utilization (PWD Electrical)Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. - 200A, 25kA, 4 Pole ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each17301.017301.01.0FalseNoneNoneFalseNoneFalse17301.00
248593674953None5.15.1 of Part III Utilization (PWD Electrical)Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. - 100A, 25kA, 3 Pole ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each6086.06086.04.0FalseNoneNoneFalseNoneFalse24344.00
248593774953None5.18.9 of Part III Utilization (PWD Electrical)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve , indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required. b) 63Amps TPN ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each3088.03088.03.0FalseNoneNoneFalseNoneFalse9264.00
248593874953None45.16, of Standard Stock Material (11kV System) - Heat Shrinkable Straight Through Jointing Kit for XLPE Cable with Copper Lug & Al Ferrule - 3x95 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each7311.07311.01.0FalseNoneNoneFalseNoneFalse7311.00
248593974953None1.02, of Standard Stock Material (11kV System) - PSupply and erection of 9 Mtr RCC Pole including earth work etc,. complete as per the standard technical specification of BESCOM. RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8316.08316.01.0FalseNoneNoneFalseNoneFalse8316.00
248594074953None32.18, of Standard Stock Material (11kV System) - Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 - 3.5 core 240sqmm (2 Runs) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr862.67862.6760.0FalseNoneNoneFalseNoneFalse51760.20
248594174953None21.07, of Labour Charges (11kV System) - Part II DLabour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required - In exixting trench/duct. 120 to 240 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr32.2832.2860.0FalseNoneNoneFalseNoneFalse1936.80
248594274953None35.04, of Standard Stock Material (11kV System) - Supplying and fixing Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 3.5 x 225/240/300 Sqmm " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each588.0588.02.0FalseNoneNoneFalseNoneFalse1176.00
248594374953None59.10, of Standard Stock Material (11kV System) - Supplying and fixing Heavy Duty Copper Terminal Long Barrel suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 240 Sqmm Copper Terminal, Apprx Wt: 218 Gm " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each355.0355.06.0FalseNoneNoneFalseNoneFalse2130.00
248594474953None59.06, of Standard Stock Material (11kV System) - Supplying and fixing Heavy Duty Copper Terminal Long Barrel suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 120 Sqmm Copper Terminal, Apprx Wt: 64 Gm " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each140.0140.02.0FalseNoneNoneFalseNoneFalse280.00
248594574953None60.12, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Lug) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 240 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each61.061.04.0FalseNoneNoneFalseNoneFalse244.00
248594674953None60.08, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Lug) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 120 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each20.020.02.0FalseNoneNoneFalseNoneFalse40.00
248594774953None63.04, of Standard Stock Material (11kV System) - Supplying and fixing Brass Cable Gland suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 45mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each197.0197.02.0FalseNoneNoneFalseNoneFalse394.00
248594874953None5.31 of Part III Utilization (PWD Electrical)Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired. " ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each4390.04390.01.0FalseNoneNoneFalseNoneFalse4390.00
17072382540000NoneNoneBuildingsELECTRICAL WORKS - 11 KV LINE TAPPING POINT786168.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248594974954None21.08, of Standard Stock Material (11kV System) - Supply and erection of Double Pole TC structural set including all hardwares suitable for 100/300 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each30694.030694.01.0FalseNoneNoneFalseNoneFalse30694.00
248595074954None24.07, of Standard Stock Material (11kV System) - Supplying and Fixing H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each6071.06071.01.0FalseNoneNoneFalseNoneFalse6071.00
248595174954None24.01, of Standard Stock Material (11kV System) - Supplying and Fixing …. including all Hardwares etc complete as per the standard technical specification.of BESCOM - 11 kV, 200 Amps Single Break GOS ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
248595274954None20.01, of Standard Stock Material (11kV System) - Supplying and Fixing …. including all Hardwares etc complete as per the standard technical specification.of BESCOM - 11 kV, HG Fuse Unit with Solid Core Insulator ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1069.01069.03.0FalseNoneNoneFalseNoneFalse3207.00
248595374954None19.02, of Standard Stock Material (11kV System) - Supplying and Fixing …. including all Hardwares etc complete as per the standard technical specification of BESCOM. - 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1584.01584.03.0FalseNoneNoneFalseNoneFalse4752.00
248595474954None1.02, of Standard Stock Material (11kV System) - PSupply and erection of 9 Mtr RCC Pole including earth work etc,. complete as per the standard technical specification of BESCOM. RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each8316.08316.050.0FalseNoneNoneFalseNoneFalse415800.00
248595574954None2.02, of Standard Stock Material (11kV System) - PSupply and fixing of …….cross arm including all Hardwares complete as per the standard technical specification BESCOM - 11 kV, Horizontal Cross Arm - Galvanised Iron (GI) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each487.0487.050.0FalseNoneNoneFalseNoneFalse24350.00
248595674954None2.12, of Standard Stock Material (11kV System) - PSupplying and Fixing …. including all Hardwares etc complete as per the standard technical specification BESCOM - HT ST Support 50x8 mm Flat - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each121.0121.050.0FalseNoneNoneFalseNoneFalse6050.00
248595774954None2.04, of Standard Stock Material (11kV System) - PSupplying and Fixing …. including all Hardwares etc complete as per the standard technical specification BESCOM - 11 kV, Special 3 Pin Cross Arm - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1151.01151.050.0FalseNoneNoneFalseNoneFalse57550.00
248595874954None5.02, of Standard Stock Material (11kV System) - PSupplying and Fixing …. including all Hardwares etc complete as per the standard technical specification - RCC Pole Clamp - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each109.0109.050.0FalseNoneNoneFalseNoneFalse5450.00
248595974954None9.03, of Standard Stock Material (11kV System) - PSupplying and fixing of P.G Clamp inluding all Hardware's etc. complete as per the standard technical specification of BESCOM ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each86.086.050.0FalseNoneNoneFalseNoneFalse4300.00
248596074954None5.16, of Standard Stock Material (11kV System) - PSupplying and Fixing Strain Clamp, 3 Bolt type for 70/90 kN Disc Insulator including all Hardwares etc complete as per the standard technical specification of BESCOM ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each707.0707.03.0FalseNoneNoneFalseNoneFalse2121.00
248596174954None6.06, of Standard Stock Material (11kV System) - PSupplying and Fixing ….including all Hardwares etc complete as per the standard technical specification BESCOM - 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each205.0205.050.0FalseNoneNoneFalseNoneFalse10250.00
248596274954None5.10,5.11,5.13,5.15, 5.16 & 8.02 of Standard StockSupplying and Fixing …. including all Hardwares etc complete as per the standard technical specification BESCOM - GUY Set ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1628.451628.454.0FalseNoneNoneFalseNoneFalse6513.80
248596374954None2.16, of Labour Charges (11kV System) - Part II DiProviding Spiral Earth Electrode type earthing (without charcoal, salt etc.,) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each93.093.02.0FalseNoneNoneFalseNoneFalse186.00
248596474954None2.06 of Standard Stock Material (11kV System) - PaSupply and fixing of …….cross arm including all Hardwares complete as per the standard technical specification BESCOM - LT 4 Pin Cross Arm - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each379.0379.050.0FalseNoneNoneFalseNoneFalse18950.00
248596574954None7.02 of Standard Stock Material (11kV System) - PaSupplying and fixing of Rabbit ACSR (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr46.2346.233900.0FalseNoneNoneFalseNoneFalse180297.00
248596674954None6.08 of Standard Stock Material (11kV System) - PaSupplying and Fixing ….including all Hardwares etc complete as per the standard technical specification BESCOM - No. 15 Strain Insulator ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each59.059.03.0FalseNoneNoneFalseNoneFalse177.00
17072382540000NoneNoneBuildingsELECTRICAL WORKS - STREET LIGHT WORKS240373.52
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248596774955None1.03, of Standard Stock Material (11kV System) - PSupply of 8Mtr RCC Pole including earth work etc,. complete as per the standard technical specification BESCOM - b) 8Mtr 115Kg WL ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each5129.05129.011.0FalseNoneNoneFalseNoneFalse56419.00
248596874955None2.01, of Labour Charges (11kV System) - Part II DiErection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each922.0922.011.0FalseNoneNoneFalseNoneFalse10142.00
248596974955None2.08 of Standard Stock Material (11kV System) - PaSupply and fixing of …….cross arm including all Hardwares complete as per the standard technical specification BESCOM - LT 2 Pin Cross Arms - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each379.0379.011.0FalseNoneNoneFalseNoneFalse4169.00
248597074955None5.02, of Standard Stock Material (11kV System) - PSupplying and Fixing …. including all Hardwares etc complete as per the standard technical specification - RCC Pole Clamp - GI ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each109.0109.011.0FalseNoneNoneFalseNoneFalse1199.00
248597174955None5.10,5.11,5.13,5.15, 5.16 & 8.02 of Standard StockSupplying and Fixing …. including all Hardwares etc complete as per the standard technical specification BESCOM - GUY Set ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each1628.451628.454.0FalseNoneNoneFalseNoneFalse6513.80
248597274955None6.05 of Standard Stock Material (11kV System) - PaSupplying and Fixing ….including all Hardwares etc complete as per the standard technical specification. 1.1 kV Polymeric Pin Insulator ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each87.087.022.0FalseNoneNoneFalseNoneFalse1914.00
248597374955None6.07 of Standard Stock Material (11kV System) - PaSupplying and Fixing ….including all Hardwares etc complete as per the standard technical specification BESCOM - No. 8 Strain Insulator ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each27.027.08.0FalseNoneNoneFalseNoneFalse216.00
248597474955None42.08 of Standard Stock Material (11kV System) - P1.1 kV, LT Aerial Bunched Cable, XLPE insulation confirming to IS-14255: 1995, 3x16 + 1x25 + 1x16 Sqmm Street light (Insulated Messenger cum Neutral) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr108.77108.77726.0FalseNoneNoneFalseNoneFalse78967.020
248597574955None2.16, of Labour Charges (11kV System) - Part II DiProviding Spiral Earth Electrode type earthing (without charcoal, salt etc.,) ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each93.093.011.0FalseNoneNoneFalseNoneFalse1023.00
248597674955None1.1.2 of Part III Utilization (PWD Electrical)Open Conduit System Supplying heavy gauge PVC conduit pipe 25mm dia 2mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 19/20mm dia 2mm thick. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr81.081.033.0FalseNoneNoneFalseNoneFalse2673.00
248597774955None2.3.4 of Part III Utilization (PWD Electrical)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring. with specified IS-694:1990 & conforming to GTP 4 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr63.063.099.0FalseNoneNoneFalseNoneFalse6237.00
248597874955None11.8.3 of Part III Utilization (PWD Electrical)Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. - LED Streetlight 70W ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each5992.05992.011.0FalseNoneNoneFalseNoneFalse65912.00
248597974955None32.03, of Standard Stock Material (11kV System) - Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 4core 10sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr118.0118.030.0FalseNoneNoneFalseNoneFalse3540.00
248598074955None21.05, of Labour Charges (11kV System) - Part II DLabour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required - In exixting trench/duct. 2.5 sqmm to 25 sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Mtr20.8920.8930.0FalseNoneNoneFalseNoneFalse626.70
248598174955None35.01, of Standard Stock Material (11kV System) - Supplying and fixing Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - Up to 4C x 50 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each324.0324.02.0FalseNoneNoneFalseNoneFalse648.00
248598274955None60.01, of Standard Stock Material (11kV System) - Supplying and fixing Aluminium End Terminal (Lug) suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 10 Sqmm ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each2.02.08.0FalseNoneNoneFalseNoneFalse16.00
248598374955None63.01, of Standard Stock Material (11kV System) - Supplying and fixing Brass Cable Gland suitable for 1.1 kV, LTUG Cable filled with necessary bituumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc - 25mm dia ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Each79.079.02.0FalseNoneNoneFalseNoneFalse158.00
17072382540000NoneNoneBuildingsFlagpost139987.48
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
248598474956None1.21.5Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Hard rock (blasting prohibited) Depth upto 1.50 m" ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum1014.01014.03.34FalseNoneNoneFalseNoneFalse3386.760
248598574956None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum474.0474.03.3FalseNoneNoneFalseNoneFalse1564.20
248598674956None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum5448.05448.01.728FalseNoneNoneFalseNoneFalse9414.1440
248598774956None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Cum6828.846828.841.458FalseNoneNoneFalseNoneFalse9956.448720
248598874956None2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Tonne79011.079011.00.1166FalseNoneNoneFalseNoneFalse9212.68260
248598974956None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm1192.01192.018.18FalseNoneNoneFalseNoneFalse21670.560
248599074956None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm304.0304.031.11FalseNoneNoneFalseNoneFalse9457.440
248599174956None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Sqm2864.02864.010.568FalseNoneNoneFalseNoneFalse30266.7520
248599274956None10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Rmtr328.0328.018.0FalseNoneNoneFalseNoneFalse5904.00
248599374956None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of the Engineer in charge of the work.Kgs565.0565.069.3FalseNoneNoneFalseNoneFalse39154.50
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17072382550001NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17072382550001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17072382550001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submissionNone
17072384350000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17072384440000NoneNoneELIGIBILITYThe tenderer has to furnish the details of the Head Office including Telephone No.s, E-mail address, the fax and the mobile numbers of the person whom to be contacted.None
17072384850000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17072384910000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17072384970000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17072385040000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17072385100000NoneNoneELIGIBILITYMaterials like bitumen,steel,cement etc.,required for the work shell be procured by the tenderer themselves and should got tested by the quality Assurance authority before use on the work.None
17072385160000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17072385200000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original, Submit the original document at the time of technical bid opening or next day and the Executive Director reserves the right to verify the original documents before approval.None
17072385420000NoneNoneELIGIBILITYIf any, additional information required, the same may be obtained from the office of the Executive Director, 8, M S B-1, 6th & 7th Floor, Cunningham Road, Bangalore-52 during office hours on all working days. It may be noted that if any of the dates mentioned above happened to be a General Holiday , the next working day will be consideredNone
17072385560000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasonsNone
17072385620000NoneNoneELIGIBILITYThe contractors assessed available tender capacity shall be more than the tender value, it will be calculated as per the STD tender document Attached.None
17072385670000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17072385780000NoneNoneELIGIBILITYTenderer who qualifying in the technical bid such tenderer financial bid will be opened.None
17072385830000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at no extra cost in order to carry out all the required tests for the materials being used in the project.None
17072385950000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost. Contractor should carryout additional test required to test the suitability of materials before using the same to the work.None
17072386220000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost Contractor should execute the project with least impact to the environment.None
17072386310000NoneNoneELIGIBILITYWhen Structure constructed disputes arising on account of damages to the existing bunds, Structure and other private properties, if any, has to be resolved by the contractor. All precautions should be taken by the contractor so that there are no damages to such public /private properties.None
17072386360000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17072386430000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17072386500000NoneNoneELIGIBILITYThe Bidder shall not furnish any fake/fabricated/false information or withhold facts etc., if the bidder is found to have violated any of these above (found either during evaluation or after awarding the tender), the tender shall be rejected and action as per rules and regulations shall be taken against the Bidder.None
17072386770000NoneNoneELIGIBILITYIf the Successful Bidder has quoted lesser rates than the estimated rates then he should without fail remit the Unbalanced Tender Amount along with the Security Deposit within the stipulated time as that shall be specified in the Letter of Acceptance, failing which the tender of the Successful Bidder shall be rejectedNone
17072386870000NoneNoneELIGIBILITYThe bidders should submit the Bid capacity compulsorily. The details of balance work B value (works on hand & works for which tender submitted). Should be submitted in the prescribed format & should be signed by the concerned Executive Engineer / District level officer. In case the bidder does not furnish the above details/suppresses the actual facts/ produces false facts, along with the Technical bid, the technical bid of such bidder shall be considered for rejection.None
17072386930000NoneNoneELIGIBILITYWith regard to tenders where lesser rates are quoted by the tenderer as per Standard Tender Document the contractor along with his financial bid shall furnish a detailed rate analysis for such of the items where has quoted lesser rates than the estimated rates. The rate analysis must indicated break up of rates for various components such as materials, labour, machinery and other relevant components. He shall also explain & substantiate how such lesser quoted rates would work out for him from the point of view of doing quality work. He shall also give undertaking that the rates quoted by me are workable to execute quality wok as per specifications and to the full satisfaction of the department Any failure on the part of the contractor in not submitting the above said information along with his financial bid in E-proc will be viewed seriously during evaluation of his financial bidNone
17072387000000NoneNoneELIGIBILITYAll the items of work as Maintained in the Bill of Quantity (BOQ) are including lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the workNone
17072387040000NoneNoneELIGIBILITYTerms and condition of Contract as per Approved STD KW-4.None
17072387100000NoneNoneELIGIBILITYQAP & PERT chart should be submitted by the successful bidder within 3 Days From date of Agreement.None
17072387150000NoneNoneELIGIBILITYDesign mix For Concrete shall be obtained from the approved NABL acredated laboratories and same shall be got approved from the department before incorporating in the work.None
17072387260000NoneNoneELIGIBILITYThe intended bidders shall visit the site and quote his offer accordingly and for having visited the site, they should upload the Geo-tag Photos and Document for having visited the site duly certified by concerned Assistant Executive Engineer KREIS, while submitting the tenders.None
17072387870001NoneNoneELIGIBILITYThe rates are exclusive of GST.The GST will be paid seperately.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTenderer should Satisfactorily completed as prime contractor, atleast one similar work such as Building work of value not less than Rs 374.00 Lakhs. The workdone certificate duly signed not below the Rank of Executive Engineer.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year, the following minimum quantities of work:(2018-19 to 2022-23) RCC 1738.00 Cum Steel 117.00MT BBM/Laterite Stone/Solid Block 3399.00 Sqm Flooring 3254.00 Sqm. Tenderer Shall submit Workdone Certificate stating the above quantities executed issued by not below the rank of executive Engineer.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing building electrification works and should have executed similar electrical works totaling Rs 33.00 Lakhs in any one year during 2018-19 to 2022-23Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe Tenderer or his identified sub-contractor should possess valid license for executing water supply/sanitary engineering works and should have executed similar water supply/sanitary engineering works totaling Rs 26.00 Lakhs in any one year during 2018-19 to 2022-23.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe Tenderer shall give details of the works on hand. (Present contract commitment).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- RELEVANT DETAILS
NoneNoneNoneNoneThe tenderer shall produce Critical Machineries (50% to be owned & 50% to be hired with supporting documents): Trucks/Tipper/Dumpers - 1 Nos Excavators/Dozers - 1 Nos Mechanical Concrete Mixer with Hopper - 1 No Centering Sheet - 1400 Sqm Water Tanker of minimum Capacity 6000 Liters - 1 Nos Laboratory Equipments - 1 UnitCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- RELEVANT DETAILS
NoneNoneNoneNoneTenderer has to furnish Annual turnover for the last 5 years i.e. 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Duly certified by CA with UDIN.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneAchieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs 1498.00 Lakhs. Duly certified by CA with UDIN.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneThe tenderer has to furnish liquid assets and /or availability of credit facilities of no less than Rs: 250.00 Lakhs Credit lines/ letter of credit/ certificates from Nationalized/ Scheduled banks.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneThe Tenderer shall have valid class-I KPWD/CPWD/MES/Railways/Public sectors licence.OthersREGISTRATION
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneThe tenderer has to furnish Company Profile and details of Technical Personnel working/Associated with him the qualification and experience of individual are to be mentionedOthersCOMPANY PROFILE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- RELEVANT DETAILS
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1707294492000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of superintendent engineer 1st Floor Cunningham Road
streetNone
cityBangalore
stateKarnataka
pin560052
tenderRecallDTONone