createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1707549547572
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd17612.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose26-02-2024 16:00:00
tenderQueryClose15-02-2024 16:00:00
technicalBidOpenNone
publishedDate10-02-2024 15:56:11
publishedByPostUHS_EE_BGK
publishedByUserKPE13659 - VIJAYBHASKAR M BHAJANTRI
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonVijaybhaskar Bhajantri
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9480696398
tenderSupplierListNone
tenderSchedule
createdTs1707549547599
version7
createdDateNone
modifiedDateNone
tenderNumberUHS/2023-24/OW/WORK_INDENT6
titleConstruction of Polyhouse under CSS-MIDH scheme (500 sqm)at Udyanagiri, UHS, Bagalkot
descriptionConstruction of Polyhouse under CSS-MIDH scheme (500 sqm)at Udyanagiri, UHS, Bagalkot
categoryWORKS
categoryTextWorks
ecv704460.00
deptNameUniversity of Horticultural Sciences
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location6400
locationNameUniversity of Horticultural Sciences Bagalkote
provisionalAmount704460.0
groupOverheadTotal107460.0
fileNumberTN-240-1
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17075495480000NoneNoneOther WorksConstruction of Polyhouse under CSS-MIDH scheme (500 sqm)at Udyanagiri, UHS, Bagalkot597000.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
254339677785None001Construction of Polyhouse under CSS-MIDH scheme (500 sqm)at Udyanagiri, UHS, BagalkotNo.597000.0597000.01.0FalseNoneNoneFalseNoneFalse597000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17075495480001NoneNoneELIGIBILITYTenders from joint ventures are not acceptableNone
17075495480001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17075495480001NoneNoneELIGIBILITYThe bidder shall ensure credit of tender processing fee and EMD into the respective receiving bank accounts of Karnataka Public Procurement Portal on or before the last date of bid submissionNone
17075495480001NoneNoneELIGIBILITYIn the event of total amount quoted is below the estimated cost the tenderer has to deposit the difference amount in the form of D.D / F.D.R, at the time agreement as additional S.D for the un-balanced amount.None
17075495480001NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of Karnataka Public Procurement Portal due to internet connectivity issues and technical glitches.None
17075495480001NoneNoneELIGIBILITYEMD payments through e-payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17075495480001NoneNoneELIGIBILITYThe intending tenderer is instructed to note that they should abide by the detailed instructions and conditions contained in the standard tender documents of applicable works manual and further orders there on.None
17075495480001NoneNoneELIGIBILITYRoyalty on construction materials & GST and other taxes will be deducted as per prevailing Government orders.None
17075547500000NoneNoneELIGIBILITYContractor should compulsory submit the material dispatch permit (MDP) obtained from the department of mines and geology for royalty materials. If the bill is submitted without attaching the MDP it will be rejected. As per latest orders, 5 times the normal royalty will be deducted from the bills if PERMIT (MDP) is not annexed by the vendor.None
17075547640000NoneNoneELIGIBILITYThe responsibility of safe custody of mechanical / electrical equipments / materials, etc., shall be with the contractor until they are finally handed over to be department.None
17075547750000NoneNoneELIGIBILITYThe cable trench and laying shall be executed as per ISS No.1255-1967 duly taking all necessary precaution.None
17075547860000NoneNoneELIGIBILITYAll necessary drawings, paper works, etc., and any other formalities required to be observed shall be the responsibility of contractor.None
17075548030000NoneNoneELIGIBILITYWhenever executing authority insist proof of having purchased the materials (used during executing the work) for verification the contractor shall produce the purchase bills.None
17075548180000NoneNoneELIGIBILITYIt is the responsibility of contractor to observe all necessary formalities of electricity companies for charging the lines and taking over the infrastructure like breaker lines TCs by electricity companies satisfactorily duly acknowledging the inventory of materials used in the work.None
17075548310000NoneNoneELIGIBILITYThe contractor is responsible for safety and security of all materials.None
17075548460000NoneNoneELIGIBILITYThe contractor shall guarantee all the materials supplied by him including erection, electrification work for trouble free top class performance and against manufacturing defects, for a period of one year from the date of satisfactory completion and commissioning. The contractor shall make his own arrangement for rectifying defects/replacement of defective materials immediately on receipt of intimation from executing authority and power supply shall be restored. Failure of which, action will be taken to get the work rectification through other agency at the cost and risk of the contractor.None
17075548610000NoneNoneELIGIBILITYThe contractor shall not deviate/alter/execute excess quantities or additional items without the prior approval of the competent authority.None
17075548740000NoneNoneELIGIBILITYThe intending tenderer is instructed to note that they should abide by the detailed instructions and conditions contained in the standard tender documents of applicable works manual and further orders there on from time to time. The University will not upload the KW manuals separately.None
17075548870000NoneNoneELIGIBILITYIt is the responsibility of the contractor to pursue and obtain all necessary approvals.None
17075549020000NoneNoneELIGIBILITYAfter delivery at site, the materials will be inspected, if the materials do not conform to relevant ISS/ISI and technical specifications by the University, then such materials will be rejected. The contractor shall replace the rejected materials at his own cost.None
17075549160000NoneNoneELIGIBILITYThe tenderer shall pass on to the department all the warranties, benefits etc., from the original equipment manufactures.None
17075550180000NoneNoneELIGIBILITYThe Contractor shall be solely responsible, not withstanding any stipulation by Owner or Engineer, for initiating, maintaining and supervising all safety precautions and programs, in connection with the work, and shall comply with all laws, ordinances, codes, rules, regulations and lawful orders of any public authority having jurisdiction for the safety of persons or property or to protect them from damages, injury or loss during the entire contract period, including non working hours. Contractor shall maintain first aid facilities at site. All critical injuries shall be reported promptly to Engineer with a copy of Contractors report covering each personal injury, requiring the attention of a physician.None
17075550380000NoneNoneELIGIBILITYThe Contractor shall supervise and carry out the Works as per the approved shop drawings or part there of efficiently and with his best skill and attention. He shall be solely responsible for means, methods, techniques, procedures and sequences of construction. The Contractor shall coordinate all parts of the Works and shall be responsible to see that the finished work complies fully with the Contract Documents, and such other instructions and variation orders as the Engineer may issue during the progress of the Works.None
17075550550000NoneNoneELIGIBILITYAs per Karnataka State Government order No. LD/300/LET/2006 Bangalore Dated 01.01.2007 and G.No. PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1% of the bill amount will be deducted labour welfare fund.None
17075550670000NoneNoneELIGIBILITYConditional Tenders will not be accepted.None
17075550810000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17075551100000NoneNoneELIGIBILITYThe bidders should submit the Bid capacity of his firm. The details of 1.4.A & 1.4.B as applicable should be submitted in the prescribed format & should be signed by the concerned by the competent authority. In case the bidder does not furnish the above details/suppresses the actual facts/ produces false facts, along with the Technical bid, the technical bid of such bidder shall be considered for rejection.None
17075551250000NoneNoneELIGIBILITYAll the documents to be furnished are to be attested by the Gazetted officer or by Notary before uploading in the e- Procurement portal.None
17075551380000NoneNoneELIGIBILITYAll the tenderers shall get updated with corrigendum / addendum issued from time to time during the entire tender process.None
17075551510000NoneNoneELIGIBILITYContractors are advised to contact the department about the documentation and for other information before uploading the tender. Insufficient documentation will result in rejection of tenderNone
17075551700000NoneNoneELIGIBILITYTenders shall remain valid for a period not less than 90 days from the date of submission of tender.None
17075551860000NoneNoneELIGIBILITYThe Tenderer should maintain the WORKS during defect liability period of 1 year from the date of handing over of the building / road / work.None
17075552010000NoneNoneELIGIBILITYThe item rates quoted shall include cost of royalty charges on construction materials & other taxes as per the rates provided in prevailing cost & conveyance of all materials, Curing, Watering, unloading with all leads & lifts, labour, hire charges of machinery equipments etc., complete including all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work. GST will be deducted in the bills as per prevailing Government orders.None
17075552390000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the standard tender documents KW-1/2/3 of KPWD (as applicable).None
17075552590000NoneNoneELIGIBILITYMobilization / material advance will not be paid by the University.None
17075553570000NoneNoneELIGIBILITYIt is the responsibility of the vendors to get the licenses obtained from the Deputy Labour Commissioner. It shall be the responsibility of the vendors for the safety of the labourers deployed by them at work spot. University will not be responsible for any accidental injury / death occurred to the labourers deployed by the vendors.None
17075553770000NoneNoneELIGIBILITYIt is the responsibility of the contractor to pursue and obtain all necessary temporary electrical connections and approvals from HESCOM (if any) and the vendor has to pay all the charges to HESCOM etc., related to specific work. Any mishaps / accidents occurred either by electrical means or any other means is the whole responsibility of the vendor.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Current certificate of the Registration in KPWD/CPWD / Registration as a private limited company or limited company registered with Indian company act 1956 / Certificate of registration under shop & establishment Act/ or any other equivalent certificate.TrueTechnical Bid
PAN cardTrueTechnical Bid
Income tax returns of preceeding three years 2020-21, 2021-22 & 2022-23.TrueTechnical Bid
GST Registration CertificateTrueTechnical Bid
Certificates for having completed one single work of similar nature during the past 5 years satisfactorily from the date of notification. The value of such works should be minimum 50 percentage of the amount put to tender for the works mentioned in the notification with any Govt. or Semi-Government organization with work done certificate issued by an officer not below the rank of Executive Engineer.TrueTechnical Bid
Information on works for which tenders have been submitted and works which are yet to be completed as on the date of this tender under section 1.4.A of qualification information of standard bid document for existing commitments and ongoing works Information shall be as per the relevant table. The contractor shall enclose/attach all necessary certificates duly attested by the employer. Enclose 1.4 .ATrueTechnical Bid
Information on works for which tenders have been submitted and works which are yet to be completed as on the date of this tender under section 1.4.B of qualification information of standard bid document for works for which tenders already submitted Information shall be as per the relevant table. Enclose 1.4.BTrueTechnical Bid
Details of total value of engineering construction works executed and payments received in the last five years in lakhs i.e 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23. Enclose the certificate issued by the chartered accountant. Attach Turnover certificate.TrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone