1707549548000 | 1 | None | None | ELIGIBILITY | Tenders from joint ventures are not acceptable | None |
1707549548000 | 1 | None | None | ELIGIBILITY | Bidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka | None |
1707549548000 | 1 | None | None | ELIGIBILITY | The bidder shall ensure credit of tender processing fee and EMD into the respective receiving bank accounts of Karnataka Public Procurement Portal on or before the last date of bid submission | None |
1707549548000 | 1 | None | None | ELIGIBILITY | In the event of total amount quoted is below the estimated cost the tenderer has to deposit the difference amount in the form of D.D / F.D.R, at the time agreement as additional S.D for the un-balanced amount. | None |
1707549548000 | 1 | None | None | ELIGIBILITY | The tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of Karnataka Public Procurement Portal due to internet connectivity issues and technical glitches. | None |
1707549548000 | 1 | None | None | ELIGIBILITY | EMD payments through e-payment mode shall be made as one single transaction and payments made in part are liable for rejection. | None |
1707549548000 | 1 | None | None | ELIGIBILITY | The intending tenderer is instructed to note that they should abide by the detailed instructions and conditions contained in the standard tender documents of applicable works manual and further orders there on. | None |
1707549548000 | 1 | None | None | ELIGIBILITY | Royalty on construction materials & GST and other taxes will be deducted as per prevailing Government orders. | None |
1707554750000 | 0 | None | None | ELIGIBILITY | Contractor should compulsory submit the material dispatch permit (MDP) obtained from the department of mines and geology for royalty materials. If the bill is submitted without attaching the MDP it will be rejected. As per latest orders, 5 times the normal royalty will be deducted from the bills if PERMIT (MDP) is not annexed by the vendor. | None |
1707554764000 | 0 | None | None | ELIGIBILITY | The responsibility of safe custody of mechanical / electrical equipments / materials, etc., shall be with the contractor until they are finally handed over to be department. | None |
1707554775000 | 0 | None | None | ELIGIBILITY | The cable trench and laying shall be executed as per ISS No.1255-1967 duly taking all necessary precaution. | None |
1707554786000 | 0 | None | None | ELIGIBILITY | All necessary drawings, paper works, etc., and any other formalities required to be observed shall be the responsibility of contractor. | None |
1707554803000 | 0 | None | None | ELIGIBILITY | Whenever executing authority insist proof of having purchased the materials (used during executing the work) for verification the contractor shall produce the purchase bills. | None |
1707554818000 | 0 | None | None | ELIGIBILITY | It is the responsibility of contractor to observe all necessary formalities of electricity companies for charging the lines and taking over the infrastructure like breaker lines TCs by electricity companies satisfactorily duly acknowledging the inventory of materials used in the work. | None |
1707554831000 | 0 | None | None | ELIGIBILITY | The contractor is responsible for safety and security of all materials. | None |
1707554846000 | 0 | None | None | ELIGIBILITY | The contractor shall guarantee all the materials supplied by him including erection, electrification work for trouble free top class performance and against manufacturing defects, for a period of one year from the date of satisfactory completion and commissioning. The contractor shall make his own arrangement for rectifying defects/replacement of defective materials immediately on receipt of intimation from executing authority and power supply shall be restored. Failure of which, action will be taken to get the work rectification through other agency at the cost and risk of the contractor. | None |
1707554861000 | 0 | None | None | ELIGIBILITY | The contractor shall not deviate/alter/execute excess quantities or additional items without the prior approval of the competent authority. | None |
1707554874000 | 0 | None | None | ELIGIBILITY | The intending tenderer is instructed to note that they should abide by the detailed instructions and conditions contained in the standard tender documents of applicable works manual and further orders there on from time to time. The University will not upload the KW manuals separately. | None |
1707554887000 | 0 | None | None | ELIGIBILITY | It is the responsibility of the contractor to pursue and obtain all necessary approvals. | None |
1707554902000 | 0 | None | None | ELIGIBILITY | After delivery at site, the materials will be inspected, if the materials do not conform to relevant ISS/ISI and technical specifications by the University, then such materials will be rejected. The contractor shall replace the rejected materials at his own cost. | None |
1707554916000 | 0 | None | None | ELIGIBILITY | The tenderer shall pass on to the department all the warranties, benefits etc., from the original equipment manufactures. | None |
1707555018000 | 0 | None | None | ELIGIBILITY | The Contractor shall be solely responsible, not withstanding any stipulation by Owner or Engineer, for initiating, maintaining and supervising all safety precautions and programs, in connection with the work, and shall comply with all laws, ordinances, codes, rules, regulations and lawful orders of any public authority having jurisdiction for the safety of persons or property or to protect them from damages, injury or loss during the entire contract period, including non working hours. Contractor shall maintain first aid facilities at site. All critical injuries shall be reported promptly to Engineer with a copy of Contractors report covering each personal injury, requiring the attention of a physician. | None |
1707555038000 | 0 | None | None | ELIGIBILITY | The Contractor shall supervise and carry out the Works as per the approved shop drawings or part there of efficiently and with his best skill and attention. He shall be solely responsible for means, methods, techniques, procedures and sequences of construction. The Contractor shall coordinate all parts of the Works and shall be responsible to see that the finished work complies fully with the Contract Documents, and such other instructions and variation orders as the Engineer may issue during the progress of the Works. | None |
1707555055000 | 0 | None | None | ELIGIBILITY | As per Karnataka State Government order No. LD/300/LET/2006 Bangalore Dated 01.01.2007 and G.No. PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1% of the bill amount will be deducted labour welfare fund. | None |
1707555067000 | 0 | None | None | ELIGIBILITY | Conditional Tenders will not be accepted. | None |
1707555081000 | 0 | None | None | ELIGIBILITY | The Employer reserves the right to reject any or all Tenders without assigning any reason. | None |
1707555110000 | 0 | None | None | ELIGIBILITY | The bidders should submit the Bid capacity of his firm. The details of 1.4.A & 1.4.B as applicable should be submitted in the prescribed format & should be signed by the concerned by the competent authority. In case the bidder does not furnish the above details/suppresses the actual facts/ produces false facts, along with the Technical bid, the technical bid of such bidder shall be considered for rejection. | None |
1707555125000 | 0 | None | None | ELIGIBILITY | All the documents to be furnished are to be attested by the Gazetted officer or by Notary before uploading in the e- Procurement portal. | None |
1707555138000 | 0 | None | None | ELIGIBILITY | All the tenderers shall get updated with corrigendum / addendum issued from time to time during the entire tender process. | None |
1707555151000 | 0 | None | None | ELIGIBILITY | Contractors are advised to contact the department about the documentation and for other information before uploading the tender. Insufficient documentation will result in rejection of tender | None |
1707555170000 | 0 | None | None | ELIGIBILITY | Tenders shall remain valid for a period not less than 90 days from the date of submission of tender. | None |
1707555186000 | 0 | None | None | ELIGIBILITY | The Tenderer should maintain the WORKS during defect liability period of 1 year from the date of handing over of the building / road / work. | None |
1707555201000 | 0 | None | None | ELIGIBILITY | The item rates quoted shall include cost of royalty charges on construction materials & other taxes as per the rates provided in prevailing cost & conveyance of all materials, Curing, Watering, unloading with all leads & lifts, labour, hire charges of machinery equipments etc., complete including all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work. GST will be deducted in the bills as per prevailing Government orders. | None |
1707555239000 | 0 | None | None | ELIGIBILITY | The intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the standard tender documents KW-1/2/3 of KPWD (as applicable). | None |
1707555259000 | 0 | None | None | ELIGIBILITY | Mobilization / material advance will not be paid by the University. | None |
1707555357000 | 0 | None | None | ELIGIBILITY | It is the responsibility of the vendors to get the licenses obtained from the Deputy Labour Commissioner. It shall be the responsibility of the vendors for the safety of the labourers deployed by them at work spot. University will not be responsible for any accidental injury / death occurred to the labourers deployed by the vendors. | None |
1707555377000 | 0 | None | None | ELIGIBILITY | It is the responsibility of the contractor to pursue and obtain all necessary temporary electrical connections and approvals from HESCOM (if any) and the vendor has to pay all the charges to HESCOM etc., related to specific work. Any mishaps / accidents occurred either by electrical means or any other means is the whole responsibility of the vendor. | None |