1707721367000 | 0 | None | None | Other Works | Construction of YOGA platform at basavalingappa park in ward no 04 | 8473045.03 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2550777 | 78303 | None | code01 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.( Pwd Sr 2023-24 Vol-01 Page No 07 Item No 1.8 ) | Cum | 521.4 | 521.4 | 167.67 | False | None | None | False | None | False | 87423.138 | 0 | 2550778 | 78303 | None | code02 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. 1.4.1 In all kinds of soils Depth upto 1.5 m ( Pwd Sr 2023-24 Vol-01 Page No 05 Item No 1.4.1 ) | Cum | 266.2 | 266.2 | 343.85 | False | None | None | False | None | False | 91532.87 | 0 | 2550779 | 78303 | None | code03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ( Pwd Sr 2023-24 Vol-01 Page No 05 Item No 1.9 ) | Cum | 292.6 | 292.6 | 258.19 | False | None | None | False | None | False | 75546.394 | 0 | 2550780 | 78303 | None | code04 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ( Pwd Sr 2023-24 Vol-01 Page No 15 Item No 2.1.2 ) | Cum | 6230.4 | 6230.4 | 143.4224 | False | None | None | False | None | False | 893578.92096 | 0 | 2550781 | 78303 | None | code05 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Pwd Sr 2023-24 Vol-01 Page No 15 Item No 2.2.3 ) | Cum | 7527.16 | 7527.16 | 51.144 | False | None | None | False | None | False | 384969.07104 | 0 | 2550782 | 78303 | None | code06 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ( Pwd Sr 2023-24 Vol-01 Page No 18 Item No 2.11 ) | Tonne | 98402.7 | 98402.7 | 5.0482 | False | None | None | False | None | False | 496756.51014 | 0 | 2550783 | 78303 | None | code07 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ( Pwd Sr 2023-24 Vol-02 Page No 9 Item No 5.4 ) | Cum | 7027.9 | 7027.9 | 82.68 | False | None | None | False | None | False | 581066.772 | 0 | 2550784 | 78303 | None | code08 | Providing Flush Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lin x0002 ing including cost of materials, labour curing as per specifications | Sqm | 280.5 | 280.5 | 138.99 | False | None | None | False | None | False | 38986.695 | 0 | 2550785 | 78303 | None | code09 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ( Pwd Sr 2023-24 Vol-02 Page No 82 Item No 11.16.1 ) | Kgs | 149.6 | 149.6 | 9093.557 | False | None | None | False | None | False | 1360396.1272 | 0 | 2550786 | 78303 | None | code10 | Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. 0.63 mm thick with zinc coating not less than 275 g/ m² ( Pwd Sr 2023-24 Vol-02 Page No 21 Item No 7.1.1 ) | Sqm | 966.9 | 966.9 | 399.0399 | False | None | None | False | None | False | 385831.67931 | 0 | 2550787 | 78303 | None | code11 | Providing,fabricating and fixing Profiled Poly Urethane insulated Roof(PUF Sheet) having modular density 40kg/m2 and size 1.06m width and 7.60m length sheets roof having external sheet of 0.5mm steel, bottom sheet of 0.40mm steel with powder coated finish. The precoated sheet shall be of minimum 240MPa steel conforming to IS 14246 : 1995 and shal have zinc coating with minimum 120gsm as per IS 277:1992,.The roofing system shall have suitable water proof over lapping arrangments and GRIHA ceritifed.The fasting shall be of self tapping screws of required length with PVC head along with washer pre-painted aluminium cap unit with build in seal arrangments.The entire roof shall be firmly fastened to the existng frame including all lead and lifts, loading & unloading ,usage charges of machinery and equipments, transportation charges,labour charges and all other incidental charges etc.,complete as per standard technical detailed specifications and as directed by the Engineer in charge of the work. 30 mm thickness ( Pwd Sr 2023-24 Vol-02 Page No 38 Item No 7.67.1 ) | Sqm | 2417.8 | 2417.8 | 78.6 | False | None | None | False | None | False | 190039.08 | 0 | 2550788 | 78303 | None | code12 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.( Pwd Sr 2023-24 Vol-02 Page No 47 Item No 8.34.3 ) | Sqm | 55.0 | 55.0 | 1638.87 | False | None | None | False | None | False | 90137.85 | 0 | 2550789 | 78303 | None | code13 | Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge..( Pwd Sr 2023-24 Vol-02 Page No 47 Item No 8.34.3 ) | Sqm | 193.6 | 193.6 | 1638.8799 | False | None | None | False | None | False | 317287.14864 | 0 | 2550790 | 78303 | None | code14 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates ( Pwd Sr 2023-24 Vol-01 Page No 15 Item No 2.1.6 ) | Cum | 6867.3 | 6867.3 | 54.738 | False | None | None | False | None | False | 375902.2674 | 0 | 2550791 | 78303 | None | code15 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. ( Pwd Sr 2023-24 Vol-02 Page No 63 Item No 9.24 ) | Sqm | 3137.2 | 3137.2 | 350.12 | False | None | None | False | None | False | 1098396.464 | 0 | 2550792 | 78303 | None | code16 | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge ( Pwd Sr 2023-24 Vol-02 Page No 63 Item No 9.25 ) | Sqm | 880.0 | 880.0 | 377.51 | False | None | None | False | None | False | 332208.8 | 0 | 2550793 | 78303 | None | code17 | Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) ( Pwd Sr 2023-24 Vol-03 Page No 74 Item No 8.42.3 ) | Mtr | 509.3 | 509.3 | 255.4 | False | None | None | False | None | False | 130075.22 | 0 | 2550794 | 78303 | None | code18 | Painting Two Coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. (The cost of PCC shall be paid extra) ( Pwd Sr 2023-24 Vol-03 Page No 66 Item No 8.10 (803) ) | Sqm | 119.9 | 119.9 | 114.93 | False | None | None | False | None | False | 13780.107 | 0 | 2550795 | 78303 | None | code19 | Supply of LED floodlight luminaire with pressure die cast aluminium housingbody for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonateclear glass material delivering superior light output Rated life Burning Hrs 50000 hr Lumen Maintenance of 70% CCT 5500K IP 66 optical and electrical compartment& impact resistance of complete luminaire IK08 Power Factor 0.9 with mains Surge Protection- Min 5KV along with Over voltage Overload,short circuit miss-wiring protection. Compatible for pole mauling with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage rangefrom 100 V to 270V 50 60Hz application. Compliance to IS 10322 IEC 60598 LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top accessstreet light with single screw to ensure ease of maintenance at the sight sit location with minimized minimal tools. LED Light fixture with W SystemPower consumption nominal CRI 75. Luminaireame shall be Engraved Embossing on the die cast housing Body part Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree Nichia LumiledsOsram make LED Source.PWD Ele | Each | 20439.1 | 20439.1 | 25.0 | False | None | None | False | None | False | 510977.5 | 0 | 2550796 | 78303 | None | code20 | Executive Bench Made Out of Sadarahalli Grey Granite Stone with Hand Supports with 3 Line Finishing with arch/plain design with 100mm slabs Height 90 x Length 1500 width 45 cms (1.50* 0.45* 0.90m) including lead and Lift Charges as per direction of Engineer In charge Apprroved Rate | Each | 18200.0 | 18200.0 | 40.0 | False | None | None | False | None | False | 728000.0 | 0 | 2550797 | 78303 | None | code21 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ( Pwd Sr 2023-24 Vol-02 Page No 85 Item No 11.28 ) | Sqm | 621.5 | 621.5 | 133.65 | False | None | None | False | None | False | 83063.475 | 0 | 2550798 | 78303 | None | code22 | Loading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum.(Tipper 14 m3) (P.No. 3, I.No.1.1 C of Vol-3 PWP & IWTD SR 2021-22) | Cum | 81.4 | 81.4 | 275.0792 | False | None | None | False | None | False | 22391.44688 | 0 | 2550799 | 78303 | None | code23 | Cost of Haulage Excluding Loading and Unloading Taking output 25 t load and lead 10 km = 250 t.km(P.No. 3, I.No.1.4 (i) C of Vol-3 PWP & IWTD SR 2021-22) | T.Km | 105.6 | 105.6 | 275.0792 | False | None | None | False | None | False | 29048.36352 | 0 | 2550800 | 78303 | None | code24 | Providing and fixing Steel work welded in built up sections framed work, including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc as required. In gratings frames guard bar, ladder railings brackets gates and similar works including cost of materials labour usage charges of machinery complete as per specifications and as per directions of the Engineer in x 0002 Charge Pwd Sr 2023-24 Vol 02 Page No 84 Item No 11.25.2 | Sqm | 149.6 | 149.6 | 818.4 | False | None | None | False | None | False | 122432.64 | 0 | 2550801 | 78303 | None | code25 | Providing, laying & fixing cement base, precast, pre polished cement concrete, designer tiles 25mm thick conforming to IS 1237 heavy duty tiles for flooring, treads of steps and landing, laid on a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing using white cement, including cost of materials, mortar, including cutting, griding the edge to half/full round wherever required, labour, curing complete as per specification. ( Pwd Sr 2023-24 Vol-02 Page No 65 Item No 9.40 ) | Sqm | 1025.2 | 1025.2 | 32.4 | False | None | None | False | None | False | 33216.48 | 0 |
|