noticeInvitingTenderDTO
createdTs1707805020484
version12
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee3290.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose20-02-2024 17:00:00
tenderQueryClose17-02-2024 17:30:00
technicalBidOpen22-02-2024 16:30:00
publishedDate13-02-2024 16:43:11
publishedByPostPWD_EE_DIV_CKD
publishedByUserKPE15950 - SUNILKUMAR N BALOL
bidValidityPeriod135
noOfCalls3
preBidMeetingDate16-02-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonShri.Sunilkumar N Balol EE PWD Division Chikodi
splitEmdRequiredYnTrue
emdBankGuarantee100000.00
emdCash100000.00
bgValidityPeriod45
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber8338273859
mobileNumber8338273859
tenderSupplierListNone
tenderSchedule
createdTs1707805020487
version30
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT6815/CALL-3
titleCONSTRUCTION OF TEN CLASS ROOMS FOR GOVT. HIGHER PRIMARY SCHOOL AT KIRANAGI IN ATHANI TALUKA OF BELAGAVI DISTRICT.
descriptionCONSTRUCTION OF TEN CLASS ROOMS FOR GOVT. HIGHER PRIMARY SCHOOL AT KIRANAGI IN ATHANI TALUKA OF BELAGAVI DISTRICT.
categoryWORKS
categoryTextWorks
ecv13127819.84
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1686
locationNamePWD Division Office Chikkodi
provisionalAmount15540000.0
groupOverheadTotalNone
fileNumberKPWD/ATN/KHPS(RMSA)/KIRANAGI/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17078050210001NoneNoneBuildingsCONSTRUCTION OF TEN CLASS ROOMS FOR GOVT. HIGHER PRIMARY SCHOOL AT KIRANAGI IN ATHANI TALUKA OF BELAGAVI DISTRICT.7058522.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
257189379140NoneVol.1, P.No.8,I.No.1.12)Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter includingdressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage ofmachinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- including cost of all materials, labor ,HOM,lCum65.065.065.42FalseNoneNoneFalseNoneFalse4252.30
257189479140NoneVol.1, P.No.8,I.No.1.14.1)Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- including cost of all materials, labor ,HOM,lCum73.073.0208.7FalseNoneNoneFalseNoneFalse15235.10
257189579140NoneVol.1, P.No.8,I.No.1.15.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth ---- including cost of all materials, labor ,HOM,lCum272.0272.0118.86FalseNoneNoneFalseNoneFalse32329.920
257189679140NoneVol.1, P.No.15,I.No.2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Formwork included and (The cost of steel reinforcement shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum5448.05448.062.79FalseNoneNoneFalseNoneFalse342079.920
257189779140NoneVol.2, P.No.5,I.No.4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications ---- including cost of all materials, labor ,HOM,lSqm95.095.0436.13FalseNoneNoneFalseNoneFalse41432.350
257189879140NonePWD SR V-2 2021-22 P.No. 9I.No.5.Providing Coursed rubble masonry (second sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including cost of all materials, labor ,HOM,lCum5162.05162.033.38FalseNoneNoneFalseNoneFalse172307.560
257189979140NonePWD SR V-2 2021-22,P.No. 9 I.No.5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including cost of all materials, labor ,HOM,lCum5315.05315.033.74FalseNoneNoneFalseNoneFalse179328.10
257190079140NoneVolume 1 Page No 15-Item No 2.2.2.1)Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (The cost of steel reinforcement & formwork to be paid separately) ---- including cost of all materials, labor ,HOM,lCum5815.05815.083.08FalseNoneNoneFalseNoneFalse483110.20
257190179140NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for Sub structures @ 8% ---- including cost of all materials, labor ,HOM,lPercentage465.2465.283.08FalseNoneNoneFalseNoneFalse38648.8160
257190279140NoneVol.1, P.No.17, I.No.2.4.3Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum5829.05829.024.3FalseNoneNoneFalseNoneFalse141644.70
257190379140NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for Coloumn @ 70% ---- including cost of all materials, labor ,HOM,lPercentage4080.34080.36.82FalseNoneNoneFalseNoneFalse27827.6460
257190479140NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4‍Formwork for plinth beams@ 50% ---- including cost of all materials, labor ,HOM,lPercentage2914.52914.517.48FalseNoneNoneFalseNoneFalse50945.460
257190579140NonePWD CSR V-1 2021-22,P.No. 7 I.No.1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- including cost of all materials, labor ,HOM,lCum204.0204.0460.25FalseNoneNoneFalseNoneFalse93891.00
257190679140NoneVol.1, P.No.17,I.No.2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum6022.06022.0112.44FalseNoneNoneFalseNoneFalse677113.680
257190779140NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4‍Formwork for column @ 70% ---- including cost of all materials, labor ,HOM,lPercentage4215.44215.413.66FalseNoneNoneFalseNoneFalse57582.3640
257190879140NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for Lintels, Beams @ 60% ---- including cost of all materials, labor ,HOM,lPercentage2529.242529.2432.85FalseNoneNoneFalseNoneFalse83085.5340
257190979140NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for Roof Slab @ 50% ---- including cost of all materials, labor ,HOM,lPercentage3011.03011.058.09FalseNoneNoneFalseNoneFalse174908.990
257191079140NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for chajja@ 45% ---- including cost of all materials, labor ,HOM,lPercentage2709.92709.95.67FalseNoneNoneFalseNoneFalse15365.1330
257191179140NoneA7 S.No.22(11)Formwark for staircase @ 45% ---- including cost of all materials, labor ,HOM,lPercentage2709.92709.92.16FalseNoneNoneFalseNoneFalse5853.3840
257191279140NonePWD CSR V-1 2021-22 P.No. 17 I.No.2.4.1)Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Thegranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum5765.05765.03.03FalseNoneNoneFalseNoneFalse17467.950
257191379140NoneVol.2, P.No.84,I.No.11.32Providing Thermo-Mechanically Treated bars of grade Fe-550D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- including cost of all materials, labor ,HOM,lKg90.090.016590.0FalseNoneNoneFalseNoneFalse1493100.00
257191479140NonePWD SR V-2 2021-22 P.No. 14 I.No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- including cost of all materials, labor ,HOM,lCum6659.06659.080.52FalseNoneNoneFalseNoneFalse536182.680
257191579140NoneVolume 2 Page No 99 Item No 12.11Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- including cost of all materials, labor ,HOM,lCum94912.6594912.650.5063FalseNoneNoneFalseNoneFalse48054.2746950
257191679140NoneVolume 2 Page No 106 Item No 12.57.8Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 40 mm thick one side teak and one side commercial. ---- including cost of all materials, labor ,HOM,lSqm3249.03249.025.2FalseNoneNoneFalseNoneFalse81874.80
257191779140NonePWD SR V-2 2021-22 P.No. 105 I.No.12.53Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges ---- including cost of all materials, labor ,HOM,lSqm2847.02847.07.98FalseNoneNoneFalseNoneFalse22719.060
257191879140NonePWD SR V-2 2021-22 P.No. 105 I.No.12.54Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lm475.0475.028.6FalseNoneNoneFalseNoneFalse13585.00
257191979140NoneVolume 2 Page No 63 Item No. 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent ---- including cost of all materials, labor ,HOM,lSqm2864.02864.0169.99FalseNoneNoneFalseNoneFalse486851.360
257192079140NoneVolume 2 Page No 69 Item No. 10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm269.0269.056.12FalseNoneNoneFalseNoneFalse15096.280
257192179140NoneVolume 2 Page No 110 Item No. 12.84Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm x53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made ---- including cost of all materials, labor ,HOM,lSqm4114.04114.014.64FalseNoneNoneFalseNoneFalse60228.960
257192279140NoneVol.2, P.No.112, I.No.12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labor ,HOM,lSqm7241.07241.021.96FalseNoneNoneFalseNoneFalse159012.360
257192379140NoneVolume 2 Material component S.No.245, P.No. A-19Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm ---- including cost of all materials, labor ,HOM,lSqm250.0250.052.26FalseNoneNoneFalseNoneFalse13065.00
257192479140NoneVolume 2 Page No 84 Item No 11.31Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In charge including cost of materials, labour, usage charges of machinery complete as per specifications. ---- including cost of all materials, labor ,HOM,lKg98.098.0391.5FalseNoneNoneFalseNoneFalse38367.00
257192579140NoneVolume 2 Page No 84 Item No 11.30.1Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 4.0 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- including cost of all materials, labor ,HOM,lSqm713.0713.015.66FalseNoneNoneFalseNoneFalse11165.580
257192679140NoneVol.2, P.No.85, I.No.11.34BProviding and fixing M.S. grills of required pattern in frames of win dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc ---- including cost of all materials, labor ,HOM,lKg154.0154.0461.16FalseNoneNoneFalseNoneFalse71018.640
257192779140NoneVol.2, P.No.61, I.No.9.17.2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete Size of Tile 600x600 m ---- including cost of all materials, labor ,HOM,lSqm1097.01097.0382.76FalseNoneNoneFalseNoneFalse419887.720
257192879140NonePWD SR V-2 2021-22 P.No. 41 I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm210.0210.0725.53FalseNoneNoneFalseNoneFalse152361.30
257192979140NonePWD SR V-2 2021-22 P.No. 50 I.No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labor ,HOM,lSqm83.083.01108.23FalseNoneNoneFalseNoneFalse91983.090
257193079140NonePWD SR V-2 2021-22 P.No. 42 I.No.8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labor ,HOM,lSqm322.35322.35412.41FalseNoneNoneFalseNoneFalse132940.36350
257193179140NoneVol.2, P.No.65, I.No.9.36Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. ---- including cost of all materials, labor ,HOM,lSqm1234.01234.09.45FalseNoneNoneFalseNoneFalse11661.30
257193279140NonePWD SR V-2 2021-22 P.No. 47 I.No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm106.0106.036.0FalseNoneNoneFalseNoneFalse3816.00
257193379140NonePWD SR V-2 2021-22 P.No. 46 I.No.8.33.2 Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm105.0105.012.6FalseNoneNoneFalseNoneFalse1323.00
257193479140Nonevol.2, P.No.46, I.No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm136.0136.0606.34FalseNoneNoneFalseNoneFalse82462.240
257193579140NoneVol.2, P.No.46, I.No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm118.0118.01108.23FalseNoneNoneFalseNoneFalse130771.140
257193679140NoneVolume 2 Page No 105 Item No 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- including cost of all materials, labor ,HOM,lNo1477.01477.015.0FalseNoneNoneFalseNoneFalse22155.00
257193779140NoneVol.2, 1st corrigendum I.No.13.48Providing and fixing on the wall face unplastisized rigid PVC rain water pipes confirmimg to IS:13592 Type A including jointing with seal ring confirmimg to IS:5382, leaving 10mm gap for thermal expansion, single socketed pipes 100mm diameter. ---- including cost of all materials, labor ,HOM,lm253.0253.0113.5FalseNoneNoneFalseNoneFalse28715.50
257193879140NonePWD SR V-2 2021-22 P.No. 82 I.No.11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in-Charge. ---- including cost of all materials, labor ,HOM,lKg111.0111.0568.0FalseNoneNoneFalseNoneFalse63048.00
257193979140NoneQuotation rateProviding and fixing Green board for class room ---- including cost of all materials, labor ,HOM,lEach8136.08136.010.0FalseNoneNoneFalseNoneFalse81360.00
257194079140NoneVol.2, P.No.176, I.No.20.34.1Providing and fixing chromium plated brass butt hinges with necessary chromium plated brass screws etc. complete.125x70x4 mm (ordinary type) ---- including cost of all materials, labor ,HOM,lEach151.0151.0156.0FalseNoneNoneFalseNoneFalse23556.00
257194179140NoneVol.2, P.No.A-27, S.No.285Hold fasts ---- including cost of all materials, labor ,HOM,lEach32.032.0156.0FalseNoneNoneFalseNoneFalse4992.00
257194279140NoneVol.2, P.No.108, I.No.12.73.1Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete 125mm ---- including cost of all materials, labor ,HOM,lEach30.030.0104.0FalseNoneNoneFalseNoneFalse3120.00
257194379140NoneVol.2, P.No.107, I.No.12.60Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. ---- including cost of all materials, labor ,HOM,lEach832.0832.030.0FalseNoneNoneFalseNoneFalse24960.00
257194479140NoneVol.2, P.No.107, I.No.12.63Providing and fixing aluminium tower bolts, ISI marked, anodised (an odic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- including cost of all materials, labor ,HOM,lEach111.0111.030.0FalseNoneNoneFalseNoneFalse3330.00
257194579140NoneVol.2, P.No.107, I.No.12.58Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete ---- including cost of all materials, labor ,HOM,lEach109.0109.030.0FalseNoneNoneFalseNoneFalse3270.00
257194679140NoneVol-2,1st corrigendum, I No-8.83Providing Lathe plaster with cement mortar 1:3 5cm thick with 6mm dai mild steel bars at 20cm center to center both horizontly , vertically fixed with chicken mesh for drop chejja, facia, backing to cup boards including cost of materials , labour providing and removing formwork usage charges, curing complete as per specifications. ---- including cost of all materials, labor ,HOM,lSqm1132.01132.060.14FalseNoneNoneFalseNoneFalse68078.480
17078050210001NoneNoneBuildingsCONSTRUCTION OF TEN CLASS ROOMS FOR GOVT. HIGHER PRIMARY SCHOOL AT KIRANAGI IN ATHANI TALUKA OF BELAGAVI DISTRICT.FIRST FLOOR4622685.39
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
257194779141NoneVol.1, P.No.17,I.No.2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum6082.226082.22109.62FalseNoneNoneFalseNoneFalse666732.95640
257194879141NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4‍Formwork for column @ 70% ---- including cost of all materials, labor ,HOM,lPercentage4257.554257.5513.66FalseNoneNoneFalseNoneFalse58158.1330
257194979141NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for Lintels, Beams @ 60% ---- including cost of all materials, labor ,HOM,lPercentage3649.333649.336.08FalseNoneNoneFalseNoneFalse22187.92640
257195079141NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for Roof Slab @ 50% ---- including cost of all materials, labor ,HOM,lPercentage3041.113041.1158.09FalseNoneNoneFalseNoneFalse176658.07990
257195179141NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for chajja@ 45% ---- including cost of all materials, labor ,HOM,lPercentage2737.02737.03.43FalseNoneNoneFalseNoneFalse9387.910
257195279141NoneA7 S.No.22(11)Formwark for chajja@ 45% ---- including cost of all materials, labor ,HOM,lPercentage2737.02737.02.16FalseNoneNoneFalseNoneFalse5911.920
257195379141NonePWD CSR V-1 2021-22 P.No. 17 I.No.2.4.1Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Thegranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum5822.655822.653.07FalseNoneNoneFalseNoneFalse17875.53550
257195479141NoneVol.2, P.No.84,I.No.11.32Providing Thermo-Mechanically Treated bars of grade Fe-550D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- including cost of all materials, labor ,HOM,lKg90.990.911681.12FalseNoneNoneFalseNoneFalse1061813.8080
257195579141NonePWD SR V-2 2021-22 P.No. 14 I.No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- including cost of all materials, labor ,HOM,lCum6725.596725.5977.82FalseNoneNoneFalseNoneFalse523385.41380
257195679141NoneVolume 2 Page No 99 Item No 12.11Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- including cost of all materials, labor ,HOM,lCum95861.7895861.780.5063FalseNoneNoneFalseNoneFalse48534.8192140
257195779141NoneVolume 2 Page No 106 Item No 12.57.8Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 40 mm thick one side teak and one side commercial. ---- including cost of all materials, labor ,HOM,lSqm3281.493281.4925.2FalseNoneNoneFalseNoneFalse82693.5480
257195879141NoneVolume 2 Page No 63 Item No. 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent ---- including cost of all materials, labor ,HOM,lSqm2892.642892.64141.85FalseNoneNoneFalseNoneFalse410320.9840
257195979141NoneVolume 2 Page No 69 Item No. 10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm271.69271.6916.02FalseNoneNoneFalseNoneFalse4352.47380
257196079141NoneVolume 2 Page No 110 Item No. 12.84Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made ---- including cost of all materials, labor ,HOM,lSqm4155.144155.1416.1FalseNoneNoneFalseNoneFalse66897.7540
257196179141NoneVol.2, P.No.112, I.No.12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labor ,HOM,lSqm7240.07240.025.92FalseNoneNoneFalseNoneFalse187660.80
257196279141NoneVolume 2 Material component S.No.245, P.No. A-19Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm ---- including cost of all materials, labor ,HOM,lSqm252.5252.562.82FalseNoneNoneFalseNoneFalse15862.050
257196379141NoneVolume 2 Page No 84 Item No 11.31Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In charge including cost of materials, labour, usage charges of machinery complete as per pecifications. ---- including cost of all materials, labor ,HOM,lKg98.9898.98357.75FalseNoneNoneFalseNoneFalse35410.0950
257196479141NoneVolume 2 Page No 84 Item No 11.30.1Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 4.0 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- including cost of all materials, labor ,HOM,lSqm720.13720.1314.31FalseNoneNoneFalseNoneFalse10305.06030
257196579141NoneVol.2, P.No.85, I.No.11.34BProviding and fixing M.S. grills of required pattern in frames of win dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc ---- including cost of all materials, labor ,HOM,lKg155.54155.54285.12FalseNoneNoneFalseNoneFalse44347.56480
257196679141NoneVol.2, P.No.61, I.No.9.17.2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete Size of Tile 600x600 ---- including cost of all materials, labor ,HOM,lSqm1107.971107.97285.04FalseNoneNoneFalseNoneFalse315815.76880
257196779141NonePWD SR V-2 2021-22 P.No. 41 I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm212.1212.1495.23FalseNoneNoneFalseNoneFalse105038.2830
257196879141NonePWD SR V-2 2021-22 P.No. 50 I.No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labor ,HOM,lSqm83.8383.83884.57FalseNoneNoneFalseNoneFalse74153.50310
257196979141NonePWD SR V-2 2021-22 P.No. 42 I.No.8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labor ,HOM,lSqm307.04307.04469.87FalseNoneNoneFalseNoneFalse144268.88480
257197079141NoneVol.2, P.No.65, I.No.9.36Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. ---- including cost of all materials, labor ,HOM,lSqm1240.281240.2817.82FalseNoneNoneFalseNoneFalse22101.78960
257197179141NonePWD SR V-2 2021-22 P.No. 47 I.No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm112.41112.4116.1FalseNoneNoneFalseNoneFalse1809.8010
257197279141NonePWD SR V-2 2021-22 P.No. 46 I.No.8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm106.05106.0512.6FalseNoneNoneFalseNoneFalse1336.230
257197379141NoneVol.2, P.No.46, I.No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm137.36137.36565.24FalseNoneNoneFalseNoneFalse77641.36640
257197479141NoneVol.2, P.No.46, I.No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm119.18119.18884.57FalseNoneNoneFalseNoneFalse105423.05260
257197579141NoneVolume 2 Page No 105 Item No 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- including cost of all materials, labor ,HOM,lNo1491.771491.7710.0FalseNoneNoneFalseNoneFalse14917.70
257197679141NonePWD SR V-2 2021-22 P.No. 82 I.No.11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in-Charge. ---- including cost of all materials, labor ,HOM,lKg112.11112.11218.0FalseNoneNoneFalseNoneFalse24439.980
257197779141NoneVol.2, P.No.133, I.No.15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- including cost of all materials, labor ,HOM,lSqm759.9759.9378.0FalseNoneNoneFalseNoneFalse287242.20
17078050210001NoneNoneBuildingsSECOND FLOOR HEAD ROOM CIVIL WORK519307.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
257197879142NoneVol.1, P.No.17,I.No.2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum6142.496142.499.83FalseNoneNoneFalseNoneFalse60380.67670
257197979142NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4‍Formwork for column @ 70% ---- including cost of all materials, labor ,HOM,lPercentage4299.714299.714.63FalseNoneNoneFalseNoneFalse19907.65730
257198079142NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for Roof Slab @ 50% ---- including cost of all materials, labor ,HOM,lPercentage3071.223071.222.77FalseNoneNoneFalseNoneFalse8507.27940
257198179142NoneA7 S.No.22(11)Formwark for chajja@ 45% ---- including cost of all materials, labor ,HOM,lPercentage2456.982456.980.19FalseNoneNoneFalseNoneFalse466.82620
257198279142NonePWD CSR V-1 2021-22 P.No. 17 I.No.2.4.1Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Thegranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum5880.35880.31.79FalseNoneNoneFalseNoneFalse10525.7370
257198379142NoneVol.2, P.No.84,I.No.11.32Providing Thermo-Mechanically Treated bars of grade Fe-550D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- including cost of all materials, labor ,HOM,lKg91.891.8582.05FalseNoneNoneFalseNoneFalse53432.190
257198479142NonePWD SR V-2 P.No. 14 I.No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- including cost of all materials, labor ,HOM,lCum6792.186792.1831.28FalseNoneNoneFalseNoneFalse212459.39040
257198579142NoneVolume 2 Page No 99 Item No 12.11Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- including cost of all materials, labor ,HOM,lCum92200.8692200.860.0619FalseNoneNoneFalseNoneFalse5707.2332340
257198679142NoneVolume 2 Page No 106 Item No 12.57.8Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 40 mm thick one side teak and one side commercial. ---- including cost of all materials, labor ,HOM,lSqm3313.983313.982.52FalseNoneNoneFalseNoneFalse8351.22960
257198779142NonePWD SR V-2 P.No. 41 I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm214.2214.239.48FalseNoneNoneFalseNoneFalse8456.6160
257198879142NonePWD SR V-2 P.No. 41 I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm84.6684.6659.64FalseNoneNoneFalseNoneFalse5049.12240
257198979142NonePWD SR V-2 2021-22 P.No. 50 I.No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labor ,HOM,lSqm310.08310.08260.44FalseNoneNoneFalseNoneFalse80757.23520
257199079142NonePWD SR V-2 P.No. 42 I.No.8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labor ,HOM,lSqm107.1107.11.26FalseNoneNoneFalseNoneFalse134.9460
257199179142NonePWD SR V-2 P.No. 46 I.No.8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm138.72138.72263.02FalseNoneNoneFalseNoneFalse36486.13440
257199279142NoneVol.2, P.No.46, I.No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm120.36120.3659.64FalseNoneNoneFalseNoneFalse7178.27040
257199379142NoneVolume 2 Page No 105 Item No 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications ---- including cost of all materials, labor ,HOM,lNo1506.541506.541.0FalseNoneNoneFalseNoneFalse1506.540
17078050210000NoneNoneBuildingsELECTRICAL WORK311582.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
257199479143None1.8.2Supplying and fixing of PVC casing and capping on the wall or ceiling using necessary materials like bends, junction box,elbows, screws at an interval of 300 mm . etc. as required.25 MM ---- including cost of all materials, labor ,HOM,lm28.028.0500.0FalseNoneNoneFalseNoneFalse14000.00
257199579143None1.6.5Supplying and flush mounting teak wooden box without frontplank, made of not less than 12 mm thick wood, after duegroove cutting, finishing with necessary cement plasteringcomplete.4"x4"x3" ( 101x101x76mm) ---- including cost of all materials, labor ,HOM,lEach69.069.060.0FalseNoneNoneFalseNoneFalse4140.00
257199679143None2.1.2I. Point wiring using Copper wire with switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existingplastic sheet/ gang box, the other end of the wires shall beterminated with sufficient loose length in a wood/PVC roundblock. complete for each outlet.b) Medium point above 3Mtr up to 6Mtr from tapping point to out let via switch ---- including cost of all materials, labor ,HOM,lPoint386.0386.030.0FalseNoneNoneFalseNoneFalse11580.00
257199779143None2.1.3Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existingplastic sheet/ gang box, the other end of the wires shall beterminated with sufficient loose length in a wood/PVC roundblock. complete for each outlet.c) Long point above 6Mtr up to 10Mtr from tapping point to out let via switch ---- including cost of all materials, labor ,HOM,lPoint567.0567.035.0FalseNoneNoneFalseNoneFalse19845.00
257199879143None2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with lowconductor resistance single core in open or concealed system ofwiring with specified IS-694:confirming to latest amendments 1.5 SQMM ---- including cost of all materials, labor ,HOM,lm26.026.0600.0FalseNoneNoneFalseNoneFalse15600.00
257199979143None2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with lowconductor resistance single core in open or concealed system ofwiring with specified IS-694:confirming to latest amendments2.5 SQMM ---- including cost of all materials, labor ,HOM,lm40.040.0200.0FalseNoneNoneFalseNoneFalse8000.00
257200079143None2.3.4Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with lowconductor resistance single core in open or concealed system ofwiring with specified IS-694:confirming to latest amendments 4 SQMM ---- including cost of all materials, labor ,HOM,lm59.059.0600.0FalseNoneNoneFalseNoneFalse35400.00
257200179143None3.4.1Supplying and flush mounting powder coated / galvanizedmetal box suitable for mounting modular switch plates. The boxshould be firmly flush mounted after due groove cutting inBrick/Stone/C.C wall 1-3 WAY ---- including cost of all materials, labor ,HOM,lEach123.0123.030.0FalseNoneNoneFalseNoneFalse3690.00
257200279143None3.4.4Supplying and flush mounting powder coated / galvanizedmetal box suitable for mounting modular switch plates. The boxshould be firmly flush mounted after due groove cutting inBrick/Stone/C.C wall 8 WAY ---- including cost of all materials, labor ,HOM,lEach250.0250.010.0FalseNoneNoneFalseNoneFalse2500.00
257200379143None3.4.5Supplying and flush mounting powder coated / galvanizedmetal box suitable for mounting modular switch plates. The boxshould be firmly flush mounted after due groove cutting inBrick/Stone/C.C wall 10-12 WAY ---- including cost of all materials, labor ,HOM,lEach325.0325.050.0FalseNoneNoneFalseNoneFalse16250.00
257200479143None3.5.1Supplying and fixing superior quality modular switch mountingpolycarbonate plate with necessary supporting back plate withrequired nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box. 1 TO 3 MODULE ---- including cost of all materials, labor ,HOM,lEach152.0152.030.0FalseNoneNoneFalseNoneFalse4560.00
257200579143None3.5.4Supplying and fixing superior quality modular switch mountingpolycarbonate plate with necessary supporting back plate withrequired nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box.8 MODULE ---- including cost of all materials, labor ,HOM,lEach302.0302.010.0FalseNoneNoneFalseNoneFalse3020.00
257200679143None3.5.6Supplying and fixing superior quality modular switch mountingpolycarbonate plate with necessary supporting back plate withrequired nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box.16-18 MODULE ---- including cost of all materials, labor ,HOM,lEach403.0403.020.0FalseNoneNoneFalseNoneFalse8060.00
257200779143None3.6.1Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps one way. ---- including cost of all materials, labor ,HOM,lEach88.088.0150.0FalseNoneNoneFalseNoneFalse13200.00
257200879143None3.6.4Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator. ---- including cost of all materials, labor ,HOM,lEach313.0313.020.0FalseNoneNoneFalseNoneFalse6260.00
257200979143None3.6.8Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 16Amps one way switch ---- including cost of all materials, labor ,HOM,lEach249.0249.060.0FalseNoneNoneFalseNoneFalse14940.00
257201079143None3.6.10Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 32Amps DP switch ---- including cost of all materials, labor ,HOM,lEach375.0375.020.0FalseNoneNoneFalseNoneFalse7500.00
257201179143None3.6.11Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16Amps universal socket ---- including cost of all materials, labor ,HOM,lEach249.0249.040.0FalseNoneNoneFalseNoneFalse9960.00
257201279143None3.6.3Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps 3way socket. ---- including cost of all materials, labor ,HOM,lEach162.0162.040.0FalseNoneNoneFalseNoneFalse6480.00
257201379143None11.3.2Supplying of .feet PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input 220 240V@ 5060Hz & Power factor 0.9 along with CE approved. years Warranty against any manufacturing defect working under standard electrical condition.12.3.2 LED light fitting 1 x 4' 20/22 w Each LED light fitting 1 x 4' 2022 w Each ---- including cost of all materials, labor ,HOM,lEach740.0740.050.0FalseNoneNoneFalseNoneFalse37000.00
257201479143None5.7.2Supplying & fixing of Porcelain fuse channel with cut out onexisting wooden/panel using necessary nuts, bolts andwashers 32 AMPS ---- including cost of all materials, labor ,HOM,lEach200.0200.010.0FalseNoneNoneFalseNoneFalse2000.00
257201579143None5.17.1Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacityMCB's single phase/3 phase/single door with powder coatedpainting Made out of 14 SWG MS enclosure. a) 6 32Amps SP GROUP A ---- including cost of all materials, labor ,HOM,lEach523.0523.01.0FalseNoneNoneFalseNoneFalse523.00
257201679143None5.17.4Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacityMCB's sinle phase/3 phase/single door with powder coatedpainting Made out of 14 SWG MS enclosure.6-32 Amps DP ---- including cost of all materials, labor ,HOM,lEach1103.01103.01.0FalseNoneNoneFalseNoneFalse1103.00
257201779143None5.18.6Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.a) 4Way TP &N ---- including cost of all materials, labor ,HOM,lEach1368.01368.01.0FalseNoneNoneFalseNoneFalse1368.00
257201879143None54.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long,3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg HESCOM SR ---- including cost of all materials, labor ,HOM,lNo770.0770.01.0FalseNoneNoneFalseNoneFalse770.00
257201979143None54.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each HESCOM SR ---- including cost of all materials, labor ,HOM,lNo660.0660.01.0FalseNoneNoneFalseNoneFalse660.00
257202079143None54.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag HESCOM SR ---- including cost of all materials, labor ,HOM,lBag303.0303.01.0FalseNoneNoneFalseNoneFalse303.00
257202179143None1.6.2Digging of Pit for providing GI Pipe type Earthing LABOUR RATE HESCOM SR HARD SOIL ---- including cost of all materials, labor ,HOM,lPer Pit2267.02267.01.0FalseNoneNoneFalseNoneFalse2267.00
257202279143None7.3.1.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system and as per technical data approved.48" Sweep (1200mm)REGULAR MODEL ---- including cost of all materials, labor ,HOM,lEach2085.02085.021.0FalseNoneNoneFalseNoneFalse43785.00
257202379143None5.6.1Supply and fixing polished wood board made of not lessthan 15mm thick plank on both sides of not more than 2pieces and fixing the same to the wall using tapered invertedwooden plugs screws. 8"x6"1.5" ---- including cost of all materials, labor ,HOM,lEach76.076.021.0FalseNoneNoneFalseNoneFalse1596.00
257202479143None5.6.4Supply and fixing polished wood board made of not lessthan 15mm thick plank on both sides of not more than 2pieces and fixing the same to the wall using tapered invertedwooden plugs screws.12"x12"2" ---- including cost of all materials, labor ,HOM,lEach162.0162.021.0FalseNoneNoneFalseNoneFalse3402.00
257202579143None13.7.1Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling /rafters / girders using 23/0.0076" twin twisted PVC insulatedwires, required Nos of round blocks and clA.On wall / ceiling / Rafter / Girders ---- including cost of all materials, labor ,HOM,lEach119.0119.050.0FalseNoneNoneFalseNoneFalse5950.00
257202679143None13.81Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality withnecessary length of 23/0.0076 inch PVC insulated twin twistedwire of approved quality, mounted on a suitable size woodenboard and wired. ---- including cost of all materials, labor ,HOM,lEach281.0281.020.0FalseNoneNoneFalseNoneFalse5620.00
257202779143None1.9.1Supplying PVC/GI flexible conduit pipe…mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely 20MM ---- including cost of all materials, labor ,HOM,lm25.025.010.0FalseNoneNoneFalseNoneFalse250.00
17078050210000NoneNoneBuildingsWater Supply And Sanitation WORK110881.75
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
257202879144NonePWD SR V-2 ,2021-22,P.No 116,I No 13.8.1.1Providing and fixing unplasticised PVC connection pipe with brass unions :.15 mm nominal bore ---- including cost of all materials, labor ,HOM,lNo105.0105.010.0FalseNoneNoneFalseNoneFalse1050.00
257202979144NonePWD SR V-2 ,2021-22,P.No 116,I No 13.8.1.1Providing and fixing unplasticised PVC connection pipe with brass unions :.25 mm nominal bore ---- including cost of all materials, labor ,HOM,lNo111.0111.010.0FalseNoneNoneFalseNoneFalse1110.00
257203079144NonePWD SR V-2, 2021-22 ,P.No. 115, I.No.13.5.2Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete :20 mm nominal bore ---- including cost of all materials, labor ,HOM,lNo360.0360.05.0FalseNoneNoneFalseNoneFalse1800.00
257203179144NonePWD SR V-2,2021-22 P.No. 115,I.No.13.3.1Providing and fixing brass stop cock of approved quality : :15 mm nominal bore ---- including cost of all materials, labor ,HOM,lNo326.0326.05.0FalseNoneNoneFalseNoneFalse1630.00
257203279144NonePWD SR V-2 2021-22 ,P.No. 115,I.No.13.2.1Providing and fixing brass bib cock of approved quality- 15 mm nominal bore: ---- including cost of all materials, labor ,HOM,lNo326.0326.05.0FalseNoneNoneFalseNoneFalse1630.00
257203379144NonePWD SR V-2 2021-22 P.No. 125,I.No.14.7.5White Vitreous China Angle back wash basin size 600 x 480 mm with single 15mm C.P. brass pillar tap ---- including cost of all materials, labor ,HOM,lEach2156.02156.03.0FalseNoneNoneFalseNoneFalse6468.00
257203479144NonePWD SR V-2 2021-22 P.No. 130 ,I.No.14.42Providing and fixing PTMT 15 mm Urinal spreader size 95x69x100 mm with 1/2" BSP thread and shapes, weighing not less than 60 g ---- including cost of all materials, labor ,HOM,lEach242.0242.07.0FalseNoneNoneFalseNoneFalse1694.00
257203579144NonePWD SR V-2 2021-22 P.No. 123,I.No.14.1.1 Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required-White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- including cost of all materials, labor ,HOM,lEach4246.04246.02.0FalseNoneNoneFalseNoneFalse8492.00
257203679144NonePWD SR V-2 2021-22 P.No. 129 I.No.14.35.1White vitreous china dual purpose WC pan with white solid plastic seat and lid with white vitreous china flushing cistern and C.P. flush bend. ---- including cost of all materials, labor ,HOM,lEach6775.06775.01.0FalseNoneNoneFalseNoneFalse6775.00
257203779144NonePWD SR V-2 2021-22 P.No. 128 I.No.14.32.2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing . ---- including cost of all materials, labor ,HOM,lEach869.0869.03.0FalseNoneNoneFalseNoneFalse2607.00
257203879144NonePWD SR V-2 2021-22 P.No. 130, I.No.14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- including cost of all materials, labor ,HOM,lEach380.0380.05.0FalseNoneNoneFalseNoneFalse1900.00
257203979144NonePWD Circle BGM SR 2018-19,P.No 96,I No 13.78 KSRB 13-11.1 : Providing and placing on terrace, polyethylene water storage tanks with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes, including cost of all materials, labour, transport charges, HOM of equipments and testing complete as per specifications.(For 1000 litre capacity) Specification No.KBS 13.22 ---- including cost of all materials, labor ,HOM,lNo6828.06828.03.0FalseNoneNoneFalseNoneFalse20484.00
257204079144NoneWS &UGDW CSR V-5 2021-22 P.No. 187, I.No.11-T13Constructing brick masonry chamber of internal dimension 450x300mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame andcover. ---- including cost of all materials, labor ,HOM,lEach3240.03240.04.0FalseNoneNoneFalseNoneFalse12960.00
257204179144NonePWD CSR V-1 2021-22 P.No. 8 I.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work- In all kinds of soils Depth upto 3 m ---- including cost of all materials, labor ,HOM,lCum73.073.011.25FalseNoneNoneFalseNoneFalse821.250
257204279144NonePWD CSR V-5 2021-22P.No134 ,I No 1.1Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to therequired pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for PVC pipes 32 mm dia 10kg/sqm ---- including cost of all materials, labor ,HOM,lm47.047.040.0FalseNoneNoneFalseNoneFalse1880.00
257204379144NonePWD CSR V-5 2021-22,P.No134 I No 1.1Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to therequired pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for PVC pipes 32 mm dia 10kg/sqm ---- including cost of all materials, labor ,HOM,lm66.066.040.0FalseNoneNoneFalseNoneFalse2640.00
257204479144NonePWD CSR V-1 2021-22 P.No. 7 I.No.1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- including cost of all materials, labor ,HOM,lCum122.0122.011.25FalseNoneNoneFalseNoneFalse1372.50
257204579144NonePWD CSR V-2 2021-22 P.No. 124.No.14.5.2Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm with white PVC automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS : 2556, C.I. trap with outlet grating and other couplings in C.P. brass, including painting of fittings and cutting and making good the walls andfloors wherever required :Range of two half stall urinals with 5 litre P.V.C. automatic flushing cistern ---- including cost of all materials, labor ,HOM,lEach8892.08892.04.0FalseNoneNoneFalseNoneFalse35568.00
17078050210001NoneNoneBuildingsSeptic Tank WORK48315.62
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
257204679145NonePWD CSR V-1 2021-22 P.No. 8 I.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work- In all kinds of soils Depth upto 3 m ---- including cost of all materials, labor ,HOM,lCum73.073.013.23FalseNoneNoneFalseNoneFalse965.790
257204779145NonePWD CSR V-1 2021-22 P.No. 7 I.No.1.11Supplying and filling in plinth with sand under floors, foundation of Bridges including watering, ramming, consolidating and dressing complete. ---- including cost of all materials, labor ,HOM,lCum2177.02177.01.1FalseNoneNoneFalseNoneFalse2394.70
257204879145NonePWD CSR V-1 2021-22 P.No. 15 I.No.2.1.1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:5:10 (M5)Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum4797.04797.00.74FalseNoneNoneFalseNoneFalse3549.780
257204979145NonePWD SR V-1 2021-22 P.No. 17,I.No.2.4.3Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all otherappurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum5829.05829.01.91FalseNoneNoneFalseNoneFalse11133.390
257205079145NoneCorr-03 as Per SE PWD Circle Bangalore Letter No-4Formwark for Roof Slab @ 50% ---- including cost of all materials, labor ,HOM,lPercentage2914.52914.51.91FalseNoneNoneFalseNoneFalse5566.6950
257205179145NonePWD SR V-2 2021-22 P.No. 84 I.No.11.32Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- including cost of all materials, labor ,HOM,lTonne90.090.00.065FalseNoneNoneFalseNoneFalse5.850
257205279145NonePWD SR V-2 2021-22 P.No. 14 I.No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- including cost of all materials, labor ,HOM,lCum6659.06659.03.18FalseNoneNoneFalseNoneFalse21175.620
257205379145NonePWD SR V-2 2021-22 P.No. 41 I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm210.0210.016.78FalseNoneNoneFalseNoneFalse3523.80
17078050210000NoneNoneBuildingsSUB ESTIMATE FOR BOREWELL DRILLING WORK191005.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
257205479146NoneBWSSB SOR 2021-22, SOR code O040A ,Page No-151 Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test ---- including cost of all materials, labor ,HOM,lEach5141.05141.01.0FalseNoneNoneFalseNoneFalse5141.00
257205579146NoneBWSSB SOR 2021-22, SOR code O010 ,Page No-151 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) FOR 0-50 MTR ---- including cost of all materials, labor ,HOM,lRmtr347.0347.050.0FalseNoneNoneFalseNoneFalse17350.00
257205679146NoneBWSSB SOR 2021-22, SOR code O010 ,Page No-151 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 50-100MTR ---- including cost of all materials, labor ,HOM,lRmtr442.0442.050.0FalseNoneNoneFalseNoneFalse22100.00
257205779146NoneBWSSB SOR 2021-22, SOR code O010 ,Page No-151 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 100-150MTR ---- including cost of all materials, labor ,HOM,lRmtr456.0456.050.0FalseNoneNoneFalseNoneFalse22800.00
257205879146NoneBWSSB SOR 2021-22, SOR code O010 ,Page No-151 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 150-200MTR ---- including cost of all materials, labor ,HOM,lRmtr536.0536.050.0FalseNoneNoneFalseNoneFalse26800.00
257205979146NoneBWSSB SOR 2021-22, SOR code O160A ,Page No-154 Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty. ---- including cost of all materials, labor ,HOM,lRmtr1933.01933.050.0FalseNoneNoneFalseNoneFalse96650.00
257206079146NoneBWSSB SOR 2021-22, SOR code O180A,Page No-155 Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge ---- including cost of all materials, labor ,HOM,lEach164.0164.01.0FalseNoneNoneFalseNoneFalse164.00
17078050210000NoneNoneBuildingsBOREWELL PUMP WORK265520.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
257206179147NoneBWSSB SOR 2021-22, SOR code P110 ,Page No-160Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications,as per necessary ammendments and instructions of engineer incharge of work. For 3 HP ---- including cost of all materials, labor ,HOM,lEach35950.035950.01.0FalseNoneNoneFalseNoneFalse35950.00
257206279147NoneBWSSB SOR 2021-22, SOR code N020F ,Page No-142Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: ---- including cost of all materials, labor ,HOM,lm611.52611.52190.0FalseNoneNoneFalseNoneFalse116188.80
257206379147NoneBWSSB SOR 2021-22, SOR code P230C,Page No-161Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. ---- including cost of all materials, labor ,HOM,lm165.0165.0250.0FalseNoneNoneFalseNoneFalse41250.00
257206479147NoneBWSSB SOR 2021-22, SOR code P360A,Page No-163 Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. ---- including cost of all materials, labor ,HOM,lJob6150.06150.01.0FalseNoneNoneFalseNoneFalse6150.00
257206579147NoneItem No.5.42.1 (Part- I Electrical item)Fabricating supplying and mounting MS box made out .SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. ---- including cost of all materials, labor ,HOM,lSq CM0.380.3819500.0FalseNoneNoneFalseNoneFalse7410.00
257206679147NoneItem No.5.41.3 (Part- I Electrical itemSupplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. ---- including cost of all materials, labor ,HOM,lm497.0497.02.0FalseNoneNoneFalseNoneFalse994.00
257206779147NoneItem No.3.1.2 (Part- I Electrical item)Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 ---- including cost of all materials, labor ,HOM,lEach143.0143.02.0FalseNoneNoneFalseNoneFalse286.00
257206879147NoneItem No.2.3 (Part- I Electrical item)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 ---- including cost of all materials, labor ,HOM,lm40.040.020.0FalseNoneNoneFalseNoneFalse800.00
257206979147NoneItem No.2.3 (Part- I Electrical item)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 4 m²m ---- including cost of all materials, labor ,HOM,lm59.059.020.0FalseNoneNoneFalseNoneFalse1180.00
257207079147NoneItem No.5.7 (Part- I Electrical item)Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32 AMPS ---- including cost of all materials, labor ,HOM,lEach200.0200.02.0FalseNoneNoneFalseNoneFalse400.00
257207179147NoneItem No.5.17 (Part- I Electrical item)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- including cost of all materials, labor ,HOM,lEach2399.02399.02.0FalseNoneNoneFalseNoneFalse4798.00
257207279147NoneItem No.5.20 (Part- I Electrical item)Supplying, fixing and wiring Earth Leakage Miniature Circuit Breaker (ELMCB) 240/450V up to 300mA sensitivity on existing wood/panel board. ---- including cost of all materials, labor ,HOM,lEach2826.02826.01.0FalseNoneNoneFalseNoneFalse2826.00
257207379147NoneItem No.13.17 (Part- I Electrical item)Fixing a shunt capacitor of . KVAR capacity with necessary clamps, bolts, and nuts on existing wooden or metal board including banking of more than one capacitor. ---- including cost of all materials, labor ,HOM,lEach227.0227.03.0FalseNoneNoneFalseNoneFalse681.00
257207479147NoneItem No.5.38 (Part- I Electrical item)Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. ---- including cost of all materials, labor ,HOM,lEach464.0464.02.0FalseNoneNoneFalseNoneFalse928.00
257207579147NoneItem No.1.6 (Part IV- 11KV labour)Digging of Pit for providing GI Pipe type Earthing ---- including cost of all materials, labor ,HOM,lPer Pit578.0578.01.0FalseNoneNoneFalseNoneFalse578.00
257207679147NoneItem No.54.01 (Part III- 11KV material )GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- including cost of all materials, labor ,HOM,lNo770.0770.01.0FalseNoneNoneFalseNoneFalse770.00
257207779147NoneItem No.54.02 (Part III- 11KV material )Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- including cost of all materials, labor ,HOM,lNo660.0660.01.0FalseNoneNoneFalseNoneFalse660.00
257207879147NoneItem No.54.03 (Part III- 11KV material )Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- including cost of all materials, labor ,HOM,lBag303.0303.01.0FalseNoneNoneFalseNoneFalse303.00
257207979147NoneItem No.32.03 (Part III- 11KV material )Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 ---- including cost of all materials, labor ,HOM,lKm148612.0148612.00.015FalseNoneNoneFalseNoneFalse2229.180
257208079147NoneItem No.31 (Part IV- 11KV labour)Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable ---- including cost of all materials, labor ,HOM,lKm16159.016159.00.01FalseNoneNoneFalseNoneFalse161.590
257208179147NoneItem No.29.01 (Part IV- 11KV labour)Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed. ---- including cost of all materials, labor ,HOM,lCum389.0389.03.75FalseNoneNoneFalseNoneFalse1458.750
257208279147NoneItem No.29.07 (Part IV- 11KV labour)Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr ---- including cost of all materials, labor ,HOM,lCum58.058.03.75FalseNoneNoneFalseNoneFalse217.50
257208379147NoneItem No.49 (Part III- 11KV material )GI Pipe B - Class as per IS-1239 ---- including cost of all materials, labor ,HOM,lm330.4330.46.0FalseNoneNoneFalseNoneFalse1982.40
257208479147NoneItem No.29.15 (Part IV- 11KV labour)Laying the GI Pipe 80 mm to 150 mm dia at Drainage Water Supply Crossing including fixing collars elbows, bends, Tees and other fitting with Cuts and Threads wherever necessary complete. ---- including cost of all materials, labor ,HOM,lm58.058.06.0FalseNoneNoneFalseNoneFalse348.00
257208579147NoneItem No.35 (Part III- 11KV material )Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable ---- including cost of all materials, labor ,HOM,lEach316.0316.01.0FalseNoneNoneFalseNoneFalse316.00
257208679147NoneElectrical SR 2019-20 Item No.6.18Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. ---- including cost of all materials, labor ,HOM,lm19.019.010.0FalseNoneNoneFalseNoneFalse190.00
257208779147NoneItem No.5.35 (Part I Electrical items)Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 Amps three phase 4 wire whole current class-1 Accuracy Energy Meter. ---- including cost of all materials, labor ,HOM,lEach5125.05125.02.0FalseNoneNoneFalseNoneFalse10250.00
257208879147NoneCSR 2021-22, Vol- 1, Item No: 1.4,Page No-5 ERECTION OF PRECAST PUMP HOUSE Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- including cost of all materials, labor ,HOM,lCum186.0186.00.77FalseNoneNoneFalseNoneFalse143.220
257208979147NoneBWSSB SOR 2021-22SOR Code :H010C, Page no 107Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, plywood / steel formwork, cost of all materials of quality, labour, Usage charges of machineries, curing and all the other appurtenances required to complete the work as per technical specifications. ( The cost of steel reinforcement shall be paid separately).PCC 1:2:4 using 40 mm aggregate ---- including cost of all materials, labor ,HOM,lCum5911.05911.00.256FalseNoneNoneFalseNoneFalse1513.2160
257209079147NoneCSR 2021-22, Vol - 2 Item No: 5.4,Page No-9Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including cost of all materials, labor ,HOM,lCum5352.05352.00.9FalseNoneNoneFalseNoneFalse4816.80
257209179147NoneBWSSB SOR 2021-22 SOR Code : M070A, Page no136RCC hume pipe Circular pump house: Supplying precast RCC Circular Hume pipe pump house with M.S door and RCC conical roof as per specification and drawings - Internal dia Mtr. 1200 mm & height of 2.5 Mtr. With Wall thickness 65mm ---- including cost of all materials, labor ,HOM,lEach16401.016401.01.0FalseNoneNoneFalseNoneFalse16401.00
257209279147NoneBWSSB&S SR 2021-22 SOR Code : M080A, Page no136Erection and positioning of RCC Hume pipe pump house/Cistern on size stone masory platform including transportation charges and handling,finishing with all necessary tools ,plants and materials etc.,complete as directed by the Engineer in charge of the work. ---- including cost of all materials, labor ,HOM,lEach1882.01882.01.0FalseNoneNoneFalseNoneFalse1882.00
257209379147NoneCSR 2021-22 Item No: 8.40,Page No-48, Vol - 2Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lSqm90.090.010.37FalseNoneNoneFalseNoneFalse933.30
257209479147NoneCSR 2021-22 Item No: 8.40,Page No-53, Vol - 3Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman ---- including cost of all materials, labor ,HOM,lCentimeter10.510.550.0FalseNoneNoneFalseNoneFalse525.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17078050200000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17078050200000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17078050200000NoneNoneELIGIBILITYThe tenderer should be a KPWD registered Class-1 and above contractorsNone
17078050200000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17078050200000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPPP on or before the last date and time of bid submission.None
17078050200000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17078050200000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in Multiple Transactions are liable for rejection.None
17078050200000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17078050210000NoneNoneELIGIBILITYTender invited only for eligible contractors registered under Karnataka Public Works DeptNone
17078050210000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government OrdersNone
17078050210000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17078050210000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer(District Level Officer)and scan the Original Certificate and attach the scanned file to the Bid.None
17078050210000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thiry first day of March of succeeding year(both days inclusive)None
17078050210000NoneNoneELIGIBILITYThe Tenderer shall scan the Original Ownership Documents/ Lease/ Hire committement Agreement for the Machinery and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17078050210000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the BidderNone
17078050210000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reasonNone
17078050210000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing KP-procurement portalNone
17078050210000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17078050210000NoneNoneELIGIBILITYAll materials required for the work shall be procured by the tenderer himself and should be got tested by the quality control authorities at his own cost before use on work.None
17078050210000NoneNoneELIGIBILITYThe items quoted shall include cost of Royalty charges on constructive materials and other taxes as per the rates prevailing Govt Orders at the time of execution and including all the cost and conveyance of all materials, curing, loading and unloading with all lead and lifts, labour, hire charges of machinary and equipments, etc., complete and all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17078050210000NoneNoneELIGIBILITYPhysical quantities requirement to qualify the Tenderer is 80% of the estimated quantity as per Govt Order No. .PW/630/CRM/2014 Bangalore Dated: 17-11-2014None
17078050210000NoneNoneELIGIBILITYDepartment will not supply any materials.None
17078050210000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17078050210000NoneNoneELIGIBILITYEpayment Challan should be ScannedNone
17078050210000NoneNoneELIGIBILITYThe Tenderer must be present during opening of tender and submit uploaded documents duly attested by Gazzeted Officer not below the rank of Executive Engineer and also produce original documents for confirmation at the time of opening.None
17078050210000NoneNoneELIGIBILITYAs per Karnataka State Govt Order No:LD/300/LET/2006/Bangalore Dt: 1-1-2007 and Govt Ltr No:PW/134/BMS/2007, Dt: 27-7-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17078050210000NoneNoneELIGIBILITYTHE CONTRACTORS ARE INSTRUCTED TO SUBMIT ONLY RELEVENT INFORMATION WITH RECORDS AS REQUIRED AND SPECIFIED IN QUALIFICATION CRITERIA.ANY JUNK ,SUPERFLUOS AND UNNECESARY DOCUMENTS IF UPLOADED WILL TREATED AS MISLEADING AND SUCH TENDERS ARE LIABLE TO BE REJECTEDNone
17078050210000NoneNoneELIGIBILITYStar Rates are applicable for this work as per Govt Circular No. PWD/159/CRM/2009 Dated: 30-09-2010None
17078050210000NoneNoneELIGIBILITYThe Project Completion period is 9 months and the Tenderer should maintain work during the defect liability period, which is (1) One year after successful completion of the work.None
17078050210000NoneNoneELIGIBILITYWork Completion/Execution Period : 9 Months Including Mansoon.None
17078050210000NoneNoneELIGIBILITYFinancial turover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next sectionNone
17078050210000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWD Division Chikkodi during office hours on all working days. It may be noted that if any of the dates mentioned above happened next working day will holds good in lieu of the dates mentioned.None
17078050210000NoneNoneELIGIBILITYThe EMD of Rs. 2,00,000.00 shall be paid in full through e payment or in two parts i.e. part (1) Rs, 1,00,000.00 br e payment Part (2) Rs. 1,00,000.00 EMD shall be in the form Bank Guarantee in the prescribed format obtained from any Nationalised / Scheduled Bank in favour of Executive Engineer, PWD Division, Chikodi payable at Chikodi.None
17078050210000NoneNoneELIGIBILITYThe Tenderer should submit proposed methodology and program of construction, backed with equipment and materials duly supported with broad calculations and quality management, plan, proposed to be adopted, justifying of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17078050210000NoneNoneELIGIBILITYThe contractor should employ only registered labours Govt Circular No PWD198BMS2009 Dated 24 06 2009 As per EPF and MP act 1952 in respect of of the employees angaged by or through contractors agencies and contractors shall have provident fund code number all the contract employees deployed by them are enrolled as members of provident fundNone
17078050210000NoneNoneELIGIBILITYUnique Document Identification Number (UDIN) form practicing Chartered Account is preferredNone
17078050210000NoneNoneELIGIBILITYAppeal as per the Government Ltr No. 572/CRM/2020/PWD-COMM-1-PWD-SEC, Dtated: 09-10-2020 the appeal received in KPPP as per KTTP act/rules within the stipulated time will only the considered. Any written appeal received shall not be considered.None
17078050210000NoneNoneELIGIBILITYThe items quoted shall include cost of Royalty charges on constructive materials and other taxes (excluding GST)as per the rates prevailing Govt Orders at the time of execution and including all the cost and conveyance of all materials, curing, loading and unloading with all lead and lifts, labour, hire charges of machinary and equipments, etc., complete and all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17078050210000NoneNoneELIGIBILITYSince this work is approved under 8443- Deposit Contribution head, Quoted Amount Should be restricted to Amount Put to tender. If Quoted amount is more than Amount put to tender, then such tenders will be Rejected.None
17078050210000NoneNoneELIGIBILITYAll formats prescribed in the bid documents shall be filled in completed manner (Section 3 & 4 of the bid document) and shall be uploaded properly signed by the tenderer. Necessary certificates shall be uploaded along with the formats wherever required. General documents section can be used for this purpose.None
17078050210000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Government ordersNone
17078050210000NoneNoneELIGIBILITYIf no bid received auto extension will be done by KPPP itself for 2 daysNone
17078050210000NoneNoneELIGIBILITYContractor should prepare Quality Assurance Plan and get approved from Quality Assurance Executive Engineer before starting the work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work of value not less than Rs.65.63 Lakhs, in previous five years.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19,2019-20,2020-21,2021-22,2022-23 (c) executed in any one year, the following minimum quantities of work: 1)Excavation-337.00 CUM, 2)BBM/SSM-209.00 CUM, 3)Plastering-1824.00 SQM, 4)Concrete(PCC/RCC)-330.00 CUM, 5)Steel-24,308.00 KGS, 6)Flooring-806.00 SQMPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneEach tenderer should demonstrate availability of few key equipments/machinery for execution of the work.However as per Govt circular No.GO FD/AE 263/EXP12-2022 dt 11-05-2022,this clause for owning key equipments for works costing upto Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the following machineries for various activities involved in construction as per MORTH specificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire commitment Agreement ownership documents Lease Commitments Agreement Information in format-8
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22&2022-23 (a) achieved in at least two financial years a minimum financial turnover of Rs.262.55 Lakhs (in all classes of civil engineering construction works only)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneReport on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five yearsFinancial StatusAuditors Report
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Auditors Report
NoneNoneNoneNoneLiquid Assets and or availability of credit facilities of no less than Rs.43.75 Lakhs (Credit Lines or letter of credit or certificates from the banks for meeting the fund requirement etc.,Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneMaximum of Civil Engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. (Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on the Letter Head of the tenderer
NoneNoneNoneNoneLatest Income Tax Clearance CertificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Scanned Copy of ITC Certificate
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity (AxNx1.5-B)Where A is Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress.N -Number of years prescribed for completion of the works for which tenders are invited-0.75 Year.B-Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 0.75 year (Period of completion of the works for which tenders are invited)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Calculation sheet on lettar head
NoneNoneNoneNoneValue at 2023-24 price level, of existing commitments and on-going works to be executed during the next 12 months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24), (Monthwise commitment shall be furnished).Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Statement on the Letter head of the tenderer
NoneNoneNoneNonePrincipal Place of BusinessOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation on works which are yet to be completed.OthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 5 and Certificates in Format 3
NoneNoneNoneNoneAssessed Tender Capacity shall be more than the Tendered AmountOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Assessed Tender Capacity shall be more than the Tendered Amount
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involved:OthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 10
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 6 and Letter of Acceptance
NoneNoneNoneNoneConstitutional or Legal Status of the TendererOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneThe EMD of Rs. 2,00,000.00 shall be paid in full through e payment or in two parts i.e. part (1) Rs, 1,00,000.00 br e payment Part (2) Rs. 1,00,000.00 EMD shall be in the form Bank Guarantee in the prescribed format obtained from any Nationalised / Scheduled Bank in favour of Executive Engineer, PWD Division, Chikodi payable at ChikodiOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Epayment Challan and Part-II Scanned copy of EMD
NoneNoneNoneNoneName, Address, telephone No., Fax No., and email ID of the Tenderers BankersOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on the Letter Head of the tenderer
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 7
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors KPWD Civil Registration CertificateTrueTechnical Bid
Annual Turn Over Certificate from 2018-19 to 2022-23TrueTechnical Bid
Financial work done certificateTrueTechnical Bid
Qtywise work done certificate.TrueTechnical Bid
Machineries documents.TrueTechnical Bid
Line of credit in prescribed formatTrueTechnical Bid
GST RegistratationTrueTechnical Bid
Ongoing work detailsTrueTechnical Bid
Any other related documentsTrueTechnical Bid
UDIN form practicing Chartered Account is preferredTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1707805978000
version0
createdDateNone
modifiedDateNone
blockNumberOffice Of the Executive Engineer PWD Division Chikkodi. Opp Court Office
streetNone
citychikodi
stateKarnataka
pin591201
tenderRecallDTONone