tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1707371786000 | 1 | None | None | Bridges/Culverts | Construction of Road Bridge across Vrushabavathi Valley at ch 2.25 km from Mudavadi Gopalli road to Byramangala road viaChowkahalli Bidadi Hobli, Ramanagara Taluk, Ramanagara District. | 68370702.59 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2504421 | 76123 | None | 10, 2.7 I (ii), a | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead, I. Lime /Cement Concrete, ii) By Mechanical Means, a) Cement Concrete Grade M-15 & M-20, V.3, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead, I. Lime /Cement Concrete, ii) By Mechanical Means, a) Cement Concrete Grade M-15 & M-20, V.3, 10, 2.7 I (ii), a ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 747.76 | 747.76 | 412.65 | False | None | None | False | None | False | 308563.164 | 0 | 2504422 | 76123 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m, V.1, P.8, Item no.1.14.1 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 121.48 | 121.48 | 6335.31 | False | None | None | False | None | False | 769613.4588 | 0 | 2504423 | 76123 | None | 1.14.2 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth 3 m to 6 m, V.1, P.8, Item no.1.14.2 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 142.08 | 142.08 | 1444.11 | False | None | None | False | None | False | 205179.1488 | 0 | 2504424 | 76123 | None | 1.15.2 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In ordinary/soft rock without blastingDepth exceeding 1.5 m, but not exceeding 3 m, V.1, P.9, Item no.1.15.2 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 517.64 | 517.64 | 1398.15 | False | None | None | False | None | False | 723738.366 | 0 | 2504425 | 76123 | None | 1.21.5 | Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.Hard rock (blasting prohibited) Depth upto 1.50 m, V.1, P.11, Item no.1.21.5 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 1235.51 | 1235.51 | 66.56 | False | None | None | False | None | False | 82235.5456 | 0 | 2504426 | 76123 | None | 2.1.5 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, formwork and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement shall be paid separately) Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregates, V-1, 15, 2.1.5 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 6984.81 | 6984.81 | 261.03 | False | None | None | False | None | False | 1823244.9543 | 0 | 2504427 | 76123 | None | 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour,Usage charges of machinery, curing, formwork and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement to be paid separately),M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, V-1,15,2.2.1 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 7489.22 | 7489.22 | 216.8 | False | None | None | False | None | False | 1623662.896 | 0 | 2504428 | 76123 | None | 2.2.5 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour,Usage charges of machinery, curing, formwork and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement to be paid separately),M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, V-1,15,2.2.5 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 7742.36 | 7742.36 | 1007.58 | False | None | None | False | None | False | 7801047.0888 | 0 | 2504429 | 76123 | None | 11.39 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm, V-3,113,11.39 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 12622.48 | 12622.48 | 310.0 | False | None | None | False | None | False | 3912968.8 | 0 | 2504430 | 76123 | None | 11.43 | Driven cast-in-place vertical M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and & Technical Specification. Pile diameter-1000 mm, Including 6mm thick steel liner 1 additional pile for intial load test V-3,113,11.43 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 11696.88 | 11696.88 | 155.0 | False | None | None | False | None | False | 1813016.4 | 0 | 2504431 | 76123 | None | 2.4.4 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, formwork and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement to be paid separately) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, V-1,16,2.4.4 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 8413.45 | 8413.45 | 643.14 | False | None | None | False | None | False | 5411026.233 | 0 | 2504432 | 76123 | None | 2.5.3 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing, formwork and all other appurtenances required to complete the work as per technical specifications.(The cost of steel reinforcement, dowel bars to be paid separately) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates , V-1,16,2.5.3 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 10214.87 | 10214.87 | 655.7 | False | None | None | False | None | False | 6697890.259 | 0 | 2504433 | 76123 | None | 2.11 b | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, Foundations of Bridges V-1, 18, 2.11 b ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Tonne | 89654.24 | 89654.24 | 103.23 | False | None | None | False | None | False | 9255007.1952 | 0 | 2504434 | 76123 | None | 2.11 c | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, Sub structure of Bridges.V-1, 18, 2.11 c ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Tonne | 89890.32 | 89890.32 | 50.19 | False | None | None | False | None | False | 4511595.1608 | 0 | 2504435 | 76123 | None | 2.11 c | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, Super structure of Bridges, V-1, P-18, 2.11 c ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Tonne | 91778.96 | 91778.96 | 106.25 | False | None | None | False | None | False | 9751514.5 | 0 | 2504436 | 76123 | None | 12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification (A) Granular material, V-3, 117, 12.3 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 1214.72 | 1214.72 | 2113.9 | False | None | None | False | None | False | 2567796.608 | 0 | 2504437 | 76123 | None | 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the equirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.V-3, 117, 12.4 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 2784.08 | 2784.08 | 713.12 | False | None | None | False | None | False | 1985383.1296 | 0 | 2504438 | 76123 | None | 12.8 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.V-3, 118, 12.8 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | cc | 0.7 | 0.7 | 691200.0 | False | None | None | False | None | False | 483840.0 | 0 | 2504439 | 76123 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant), V-3, 121, 13.2 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 14529.84 | 14529.84 | 60.75 | False | None | None | False | None | False | 882687.78 | 0 | 2504440 | 76123 | None | 13.4 | Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, c/c spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. , V-3, 121, 13.4 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | m | 2422.16 | 2422.16 | 180.0 | False | None | None | False | None | False | 435988.8 | 0 | 2504441 | 76123 | None | 13.7 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification, V-3, 121, 13.7 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | No | 3401.84 | 3401.84 | 30.0 | False | None | None | False | None | False | 102055.2 | 0 | 2504442 | 76123 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification, V-3, 121, 13.8 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 7083.44 | 7083.44 | 15.26 | False | None | None | False | None | False | 108093.2944 | 0 | 2504443 | 76123 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant), V-3, 122, 13.9 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 12308.4 | 12308.4 | 22.89 | False | None | None | False | None | False | 281739.276 | 0 | 2504444 | 76123 | None | 13.14 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.V-3, 123, 13.14 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Sqm | 87.36 | 87.36 | 504.0 | False | None | None | False | None | False | 44029.44 | 0 | 2504445 | 76123 | None | 13.15 (iii) | Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.V-3, 123, 13.15 (iii) ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 240.24 | 240.24 | 21.8 | False | None | None | False | None | False | 5237.232 | 0 | 2504446 | 76123 | None | 13.19 | Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.V-3, 124, 13.19 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 14862.64 | 14862.64 | 72.0 | False | None | None | False | None | False | 1070110.08 | 0 | 2504447 | 76123 | None | 14.4 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification, (A)stone/Boulder, V-3, 129, 14.4 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 1988.48 | 1988.48 | 467.4 | False | None | None | False | None | False | 929415.552 | 0 | 2504448 | 76123 | None | 14.6 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification, V-3, 129, 14.6 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 3157.44 | 3157.44 | 118.0 | False | None | None | False | None | False | 372577.92 | 0 | 2504449 | 76123 | None | 44. | Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia over burden ( by diamond drilling machine ) such as soil of all sorts, soft murum, hard murum and boulders and in soft rock including all materials such as casing pipes and accessories oil, grease, steel, rods, and such other materials as required (including conveying the material to site of work). Preserving the loose sample in glass jar and core sample serially on site of work and conveying the same to HQ of concerning office as directed. a)over burden 0 to 50 m, V-1, 130, 44 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 2168.4 | 2168.4 | 36.0 | False | None | None | False | None | False | 78062.4 | 0 | 2504450 | 76123 | None | 47. | Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia in rocks as specified below including all necessary materials such as oil, grease, steel boostan and such other materials as required (including conveying the material to site of work) and Preserving the core sample serially on site of work and conveying the same to HQ of concernring officeas directed. Other Rock with diamond drill. 0 to 50 m. V-1, 131, 47 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 4035.2 | 4035.2 | 84.0 | False | None | None | False | None | False | 338956.8 | 0 | 2504451 | 76123 | None | 45. | Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia in rocks as specified below including all necessary materials such as oil, grease, steel boostan and such other materials as required (including conveying the material to site of work) and Preserving the core sample serially on site of work and conveying the same to HQ of concernring office as directed. Quartzite with diamond drill with Nx Bit 0 to 50 m. V-1, 130, 45 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 7051.2 | 7051.2 | 12.0 | False | None | None | False | None | False | 84614.4 | 0 | 2504452 | 76123 | None | 28. | Survey of major bridge including taking L-section of existing road two defined cross-sections (one at U/S and one at D/s) and one vergin cross section on alternate proposed cross sections and bed slope of stream upto sufficient long distance as required with chain and compass.Taking 5 trial pits, three in bed, two on banks of size 2.00x2.00x3.00 m for collecting samples of materials at site for ascertaining the silt factor, unit weight test, specific gravity from Govt. approved laboratories (testing charges to be borne by the agency) and preparation of detailed survey data, submission of the project duly typed and colouring of ammonia prints, site plan and other drawings etc.complete and all types of compliance if required from Department. (Excluding taking trial bores and contouring), V-1, 128, 28 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 1872.0 | 1872.0 | 125.0 | False | None | None | False | None | False | 234000.0 | 0 | 2504453 | 76123 | None | 31. | Initial Vertical Pile Load Test, For 1000mm dia. Pile,having pile capacity of 550 t Reaction load -1719 t, V-1, 122, 31 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | No | 780000.0 | 780000.0 | 1.0 | False | None | None | False | None | False | 780000.0 | 0 | 2504454 | 76123 | None | 11.37 | Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as perDetailed Drawing. ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | t | 130441.96 | 130441.96 | 22.2 | False | None | None | False | None | False | 2895811.512 | 0 |
| 1707371786000 | 0 | None | None | Bridges/Culverts | Construction of bridge at chainage 1.20 km from B.M. road to ketohalli, Kenjigarahalli, Uragahalli, Seebakatte, Bennehalli, Huchamanadoddi joining MDR of kasaba hobli Ramanagara Taluk. | 11148701.18 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2504455 | 76124 | None | 2.5 ii b | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii)By Mechanical Means using Dozer, b)In area of thorny jungle, V-3, 9, 2.5 ii b ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | 100 Sqm | 503.36 | 503.36 | 34.8 | False | None | None | False | None | False | 17516.928 | 0 | 2504456 | 76124 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. V-1, P-7, 1.8 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 492.96 | 492.96 | 6117.5 | False | None | None | False | None | False | 3015682.8 | 0 | 2504457 | 76124 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2, V-3, P-17, 3.6 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 512.72 | 512.72 | 1935.0 | False | None | None | False | None | False | 992113.2 | 0 | 2504458 | 76124 | None | 4.1 A iii | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (A) Plant Mix Method, (iii) For Grading -III Material, V-3, P-19, 4.1 A iii ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 2611.44 | 2611.44 | 390.0 | False | None | None | False | None | False | 1018461.6 | 0 | 2504459 | 76124 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. V-3, 26, 4.17 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 2661.36 | 2661.36 | 750.75 | False | None | None | False | None | False | 1998016.02 | 0 | 2504460 | 76124 | None | 4.13 B (i)(b) | Water Bound Macadam, Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density, B.Mechanical means.Grading-I (63 mm to 45 mm) Using Screening Type A (13.2mm agg) V-3, 26, 4.13 B (i)(b) ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 2447.12 | 2447.12 | 136.5 | False | None | None | False | None | False | 334031.88 | 0 | 2504461 | 76124 | None | 4.13 B (ii)(b) | Water Bound Macadam, Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density, B.Mechanical means.Grading-II (53 mm to 22.4 mm) Using Screening Type B (11.2mm agg) V-3, 26, 4.13 B (ii)(b) ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 2502.24 | 2502.24 | 102.38 | False | None | None | False | None | False | 256179.3312 | 0 | 2504462 | 76124 | None | 5.1 | Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. V-3, P-31, 5.1 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Sqm | 42.64 | 42.64 | 2925.0 | False | None | None | False | None | False | 124722.0 | 0 | 2504463 | 76124 | None | 5.4(ii) | Tack coat on Granular surface treated with primer, Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. V-3, P-31,5.4(ii) ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Sqm | 14.56 | 14.56 | 2925.0 | False | None | None | False | None | False | 42588.0 | 0 | 2504464 | 76124 | None | 5.12- C | Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. V-3, P-35, 5.12- C ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 9826.96 | 9826.96 | 146.25 | False | None | None | False | None | False | 1437192.9 | 0 | 2504465 | 76124 | None | 5.31 | Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision., V-3, P-43, 5.31 ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Cum | 10558.08 | 10558.08 | 87.75 | False | None | None | False | None | False | 926471.52 | 0 | 2504466 | 76124 | None | 16.15(a)mtr | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material insingle row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6,(A)1200mm dia V-3, P-146, 16.15(a) ---- including cost and conveyance of all materials, all labour, all lead and lifts, loading | Mtr | 8762.0 | 8762.0 | 112.5 | False | None | None | False | None | False | 985725.0 | 0 |
|
|
---|