noticeInvitingTenderDTO
createdTs1707830860625
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1500.00
emd141165.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose22-02-2024 16:30:00
tenderQueryClose21-02-2024 16:30:00
technicalBidOpen23-02-2024 17:00:00
publishedDate14-02-2024 17:15:56
publishedByPostPWD_EE_DIV_CKM
publishedByUserKPE11164 - D N SRIDHAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonD N Sridhar
splitEmdRequiredYnTrue
emdBankGuarantee41165.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08262234028
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1707830860653
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT8831
titleCONSTRUCTION OF GOVT PU COLLEGE AT LINGADAHALLI ,TARIKERE TALUK, CHIKMAGALUR DISTRICT.
descriptionCONSTRUCTION OF GOVT PU COLLEGE AT LINGADAHALLI ,TARIKERE TALUK, CHIKMAGALUR DISTRICT.
categoryWORKS
categoryTextWorks
ecv5981273.96
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1699
locationNamePWD Division Office Chikkamagaluru
provisionalAmount8000000.0
groupOverheadTotalNone
fileNumberAEE/pwd/trk/puc/lingadahalli
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17078308610000NoneNoneBuildingsCONSTRUCTION OF GOVT PU COLLEGE AT LINGADAHALLI ,TARIKERE TALUK, CHIKMAGALUR DISTRICT.5981273.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
258040679821NoneIt no. 1.12, pg no.8, Vol1 PWD SR 2023-24GROUND FLOOR Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth. (It no. 1.12, pg no.8, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum95.095.072.43FalseNoneNoneFalseNoneFalse6880.850
258040779821NoneIt no. 1.14.1, pg no.8, Vol-1 PWD SR 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m. (It no. 1.14.1, pg no.8, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum102.0102.0183.71FalseNoneNoneFalseNoneFalse18738.420
258040879821NoneIt no. 1.15.2, pg no.9, Vol-1 PWD SR 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 1.5m, but not exceeding 3 m. (It no. 1.15.2, pg no.9, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum425.0425.020.41FalseNoneNoneFalseNoneFalse8674.250
258040979821NoneIt no. 4.1, pg no.5, Vol-2 PWD SR 2023-24Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 ltr/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. (It no. 4.1, pg no.5, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm118.0118.0234.24FalseNoneNoneFalseNoneFalse27640.320
258041079821NoneIt no. 1.9, pg no.7, Vol-1 PWD SR 2023-24Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (It no. 1.9, pg no.7, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum266.0266.0174.56FalseNoneNoneFalseNoneFalse46432.960
258041179821NoneIt no. 2.1.3, pg no.15, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. (It no. 2.1.3, pg no.15, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum5989.05989.037.0FalseNoneNoneFalseNoneFalse221593.00
258041279821NoneIt no. 2.2.3, pg no. 15, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Isolated Footing. (It no. 2.2.3, pg no. 15, Vol-1) PWD SR 2023-24. Including Formwork, Centering & Scaffloding 8% For Isolated Footing. ( It no. 1a, pg no 111, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum6842.886842.8842.9FalseNoneNoneFalseNoneFalse293559.5520
258041379821NoneIt no. 2.4.3, pg no.17, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns up to plinth. (It no. 2.4.3, pg no.17, Vol-1) PWD SR 2023-24. Including Formwork, Centering & Scaffloding 70% For Columns up to plinth. ( It no. 9, pg no 111, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum10771.210771.23.39FalseNoneNoneFalseNoneFalse36514.3680
258041479821NoneIt no. 2.5.2, pg no. 17, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns. (It no. 2.5.2, pg no. 17, Vol-1) PWD SR 2023-24. Including Formwork, Centering & Scaffloding 70% For Columns. (It no. 9, pg no. 111, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum11633.111633.17.85FalseNoneNoneFalseNoneFalse91319.8350
258041579821NoneIt no. 2.4.3, pg no 17, vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Plinth beams & Curtain wall. ( It no. 2.4.3, pg no 17, vol-1) PWD SR 2023-24. Including Formwork, Centering & Scaffloding 50% For Plinth Beams & Curtain wall. (It no. 2, pg no. 111, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum9504.09504.018.7FalseNoneNoneFalseNoneFalse177724.80
258041679821NoneIt no. 2.5.2, pg no.17, Vol-1 PWD SR 2023-2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams & Lintel. (It no. 2.5.2, pg no.17, Vol-1) PWD SR 2023-24, Including Formwork, Centering & Scaffloding 60% For Beams & Lintel. ( It no. 14, pg no 112, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum10948.810948.813.27FalseNoneNoneFalseNoneFalse145290.5760
258041779821NoneIt no. 2.5.2, pg no.17, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Roof Slab & Staircase. (It no. 2.5.2, pg no.17, Vol-1) PWD SR 2023-24, Including Formwork, Centering & Scaffloding 50% For Roof Slab & Staircase. ( It no. 15, pg no 112, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum10264.510264.532.86FalseNoneNoneFalseNoneFalse337291.470
258041879821NoneIt no. 2.5.2, pg no. 17, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill. (It no. 2.5.2, pg no. 17, Vol-1) PWD SR 2023-24, Including Formwork, Centering & Scaffloding 3% For Sill. ( It no. 14, pg no 112, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum7048.297048.291.35FalseNoneNoneFalseNoneFalse9515.19150
258041979821NoneIt no. 2.5.2, pg no. 17, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Chejja. (It no. 2.5.2, pg no. 17, Vol-1) PWD SR 2023-24, Including Formwork, Centering & Scaffloding 45% For Chejja. ( It no. 19, pg no 112, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum9922.359922.350.43FalseNoneNoneFalseNoneFalse4266.61050
258042079821NoneIt no. 2.11(a), pg no. 18, Vol-1 PWD SR 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (It no. 2.11(a), pg no. 18, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Tonne89457.089457.011.19FalseNoneNoneFalseNoneFalse1001023.830
258042179821NoneIt no. 5.4, pg no. 9, Vol-2 PWD SR 2023-24Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (It no. 5.4, pg no. 9, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum6389.06389.05.9FalseNoneNoneFalseNoneFalse37695.10
258042279821NoneIt no. 6.32, pg no.17, Vol-2 PWD SR 2023-24Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (It no. 6.32, pg no.17, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm1310.01310.0182.34FalseNoneNoneFalseNoneFalse238865.40
258042379821NoneIt no. 12.13.1, pg no.100, Vol-2 PWD SR 2023-24Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (It no. 12.13.1, pg no.100, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum98815.098815.00.29FalseNoneNoneFalseNoneFalse28656.350
258042479821NoneIt no. 12.51, pg no. 105, Vol-2 PWD SR 2023-24Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (It no. 12.51, pg no. 105, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Nos1016.01016.04.0FalseNoneNoneFalseNoneFalse4064.00
258042579821NoneIt no. 10.6.3, pg no.69, Vol-2 PWD SR 2023-24Providing and fixing expansion hold fasteners on C.C./R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.Fastener with threaded dia 12 mm. (It no. 10.6.3, pg no.69, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Each60.060.024.0FalseNoneNoneFalseNoneFalse1440.00
258042679821NoneIt no. 12.57.3, pg no.105, Vol-2 PWD SR 2023-24Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial. (It no. 12.57.3, pg no.105, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm3005.03005.010.08FalseNoneNoneFalseNoneFalse30290.40
258042779821NoneIt no. 12.86, pg no. 109, Vol-2 PWD SR 2023-24Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) .(It no. 12.86, pg no. 109, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm5390.05390.018.0FalseNoneNoneFalseNoneFalse97020.00
258042879821NoneIt no. 11.34B, pg no.86, Vol-2 PWD SR 2023-24Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings wooden frames with rawl plugs screws etc. (It no. 11.34 B, pg no.86, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Kg183.0183.0378.0FalseNoneNoneFalseNoneFalse69174.00
258042979821NoneIt no. 8.1.2, pg no. 41, Vol-2 PWD SR 2023-24Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.1.2, pg no. 41, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm241.0241.0229.25FalseNoneNoneFalseNoneFalse55249.250
258043079821NoneIt no. 8.51, pg no. 50, Vol-2 PWD SR 2023-24Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (It no. 8.51, pg no. 50, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm100.0100.0522.67FalseNoneNoneFalseNoneFalse52267.00
258043179821NoneIt no. 8.2.2, pg no. 41, Vol-2 PWD SR 2023-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side). (It no. 8.2.2, pg no. 41, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm279.0279.0292.81FalseNoneNoneFalseNoneFalse81693.990
258043279821NoneIt no. 9.2, pg no. 59, Vol-2 PWD SR 2023-24Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge. (It no. 9.2, pg no. 59, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm800.0800.030.78FalseNoneNoneFalseNoneFalse24624.00
258043379821NoneIt no. 9.17.2, pg no.61, Vol-2 PWD SR 2023-24Providing and laying Vitrified tiles in different sizes (with thickness 9-10 mm), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/m2 including grouting the joint with white cement & matching pigments etc. complete.(It no. 9.17.2, pg no.61, Vol-2) PWD SR 2023-24. (Size of tile 600 x 600 mm) ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm1175.01175.0161.62FalseNoneNoneFalseNoneFalse189903.50
258043479821NoneIt no. 9.34, pg no. 64, Vol-2 PWD SR 2023-24Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (It no. 9.34, pg no. 64, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm1545.01545.0104.54FalseNoneNoneFalseNoneFalse161514.30
258043579821NoneIt no. 11.25.2, pg no. 84, Vol-2 PWD SR 2023-24Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (It no. 11.25.2, pg no. 84, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Kg136.0136.0182.79FalseNoneNoneFalseNoneFalse24859.440
258043679821NoneIt no. 8.33.1, pg no. 46, Vol-2 PWD SR 2023-24Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.33.1, pg no. 46, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm158.0158.0522.67FalseNoneNoneFalseNoneFalse82581.860
258043779821NoneIt no. 8.30, pg no. 46, Vol-2 PWD SR 2023-24Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.30, pg no. 46, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm174.0174.0292.81FalseNoneNoneFalseNoneFalse50948.940
258043879821NoneIt no. 8.33.3, pg no. 47, Vol-2 PWD SR 2023-24Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(It no. 8.33.3, pg no. 47, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm139.0139.018.0FalseNoneNoneFalseNoneFalse2502.00
258043979821NoneIt no. 8.34.1, pg no. 47, Vol-2 PWD SR 2023-24Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.34.1, pg no. 47, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm53.053.024.19FalseNoneNoneFalseNoneFalse1282.070
258044079821NoneIt no. 8.40, pg no. 48, Vol-2 PWD SR 2023-24Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(It no. 8.40, pg no. 48, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm115.0115.024.19FalseNoneNoneFalseNoneFalse2781.850
258044179821NoneIt no. 8.84, pg no. 55, Vol-2 PWD SR 2023-24Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. (It no. 8.84, pg no. 55, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm475.0475.08.64FalseNoneNoneFalseNoneFalse4104.00
258044279821NoneIt no. 10.1.7, pg no. 113, Vol-5 PWD SR 2023-24Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and erfect linking at joints, testing and commissioning, including oading unloading at both destinations and cuts of pipes herever ecessary including jointing of PVC pipes and pecials excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For PVC pipes 110mm dia., 6 kg/sqcm & class 3. (It no. 10.1.7, pg no. 113, Vol-5) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.m411.0411.040.0FalseNoneNoneFalseNoneFalse16440.00
258044379821NoneIt no. 22.9A, pg no.218, Vol-2 PWD SR 2023-24Providing and fixing stainless steel 304 grade fancy handle of approved make fixed with SS screws etc. complete as per direction of Engineer-in charge.-200mm length-(It no. 22.9A, pg no.218, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Nos1500.01500.08.0FalseNoneNoneFalseNoneFalse12000.00
258044479821NoneIt no. 12.58, pg no. 218, Vol-2 PWD SR 2023-24Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete-(It no. 12.58, pg no. 218, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Nos120.0120.04.0FalseNoneNoneFalseNoneFalse480.00
258044579821NoneIt no. 12.80.1, pg no. 108, Vol-2 PWD SR 2023-24Providing and fixing door latch with necessary screws etc complete-Bright finished brass latch-(It no. 12.80.1, pg no. 108, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Each285.0285.04.0FalseNoneNoneFalseNoneFalse1140.00
258044679821NoneIt no. 12.60, pg no. 105, Vol-2 PWD SR 2023-24Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete.-(It no. 12.60, pg no. 105, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Nos1052.01052.04.0FalseNoneNoneFalseNoneFalse4208.00
258044779821NoneIt no. 2.5.2, pg no. 17, Vol-1 PWD SR 2023-24FIRST FLOOR Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns. (It no. 2.5.2, pg no. 17, Vol-1) PWD SR 2023-24, Including Formwork, Centering & Scaffloding 70% For Columns ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum11749.4311749.436.45FalseNoneNoneFalseNoneFalse75783.82350
258044879821NoneIt no. 2.5.2, pg no. 17, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Roof Slab & Staircase. (It no. 2.5.2, pg no. 17, Vol-1) PWD SR 2023-24, Including Formwork, Centering & Scaffloding 50% For Roof Slab & Staircase. ( It no. 15, pg no 112, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum10367.1510367.1518.35FalseNoneNoneFalseNoneFalse190237.20250
258044979821Nonet no. 2.5.2, pg no. 17, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill. (It no. 2.5.2, pg no. 17, Vol-1) PWD SR 2023-24,Including Formwork, Centering & Scaffloding 3% For Sill. ( It no. 14, pg no 112, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum7118.777118.770.8FalseNoneNoneFalseNoneFalse5695.0160
258045079821NoneIt no. 2.5.2, pg no. 17, Vol-1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Chejja. (It no. 2.5.2, pg no. 17, Vol-1) PWD SR 2023-24,Including Formwork, Centering & Scaffloding 45% For Chejja. ( It no. 19, pg no 112, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum10021.5710021.570.22FalseNoneNoneFalseNoneFalse2204.74540
258045179821NoneIt no. 2.11(a), pg no. 18, Vol-1 PWD SR 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (It no. 2.11(a), pg no. 18, Vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Tonne90351.5790351.573.47FalseNoneNoneFalseNoneFalse313519.94790
258045279821NoneIt no. 6.32, pg no.17, Vol-2 PWD SR 2023-24Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (It no. 6.32, pg no.17, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm1323.11323.1155.03FalseNoneNoneFalseNoneFalse205120.1930
258045379821NoneIt no. 6.34, pg no.17, Vol-2 PWD SR 2023-24Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (It no. 6.34, pg no.17, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm1115.041115.0422.29FalseNoneNoneFalseNoneFalse24854.24160
258045479821NoneIt no. 12.13.1, pg no.100, Vol-2 PWD SR 2023-24Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (It no. 12.13.1, pg no.100, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum99803.1599803.150.14FalseNoneNoneFalseNoneFalse13972.4410
258045579821NoneIt no. 12.51, pg no.105, Vol-2 PWD SR 2023-24Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (It no. 12.51, pg no.105, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Nos1026.161026.162.0FalseNoneNoneFalseNoneFalse2052.320
258045679821NoneIt no. 10.6.3, pg no.69, Vol-2 PWD SR 2023-24Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.Fastener with threaded dia 12 mm. (It no. 10.6.3, pg no.69, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Nos60.660.612.0FalseNoneNoneFalseNoneFalse727.20
258045779821NoneIt no. 12.57.3, pg no.105, Vol-2 PWD SR 2023-24Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial. (It no. 12.57.3, pg no.105, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm3035.053035.055.04FalseNoneNoneFalseNoneFalse15296.6520
258045879821NoneIt no. 12.86, pg no.109, Vol-2 PWD SR 2023-24Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (It no. 12.86, pg no.109, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm5443.95443.99.0FalseNoneNoneFalseNoneFalse48995.10
258045979821NoneIt no. 11.34B, pg no.86, Vol-2 PWD SR 2023-24Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (It no. 11.34B, pg no.86, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Kg184.83184.83189.0FalseNoneNoneFalseNoneFalse34932.870
258046079821NoneIt no. 8.1.2, pg no.41, Vol-2 PWD SR 2023-24Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.1.2, pg no.41, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm243.41243.41114.63FalseNoneNoneFalseNoneFalse27902.08830
258046179821NoneIt no. 8.51, pg no.50, Vol-2 PWD SR 2023-24Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (It no. 8.51, pg no.50, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm101.0101.0274.39FalseNoneNoneFalseNoneFalse27713.390
258046279821NoneIt no. 8.2.2, pg no.41, Vol-2 PWD SR 2023-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side). (It no. 8.2.2, pg no.41, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm281.79281.79328.76FalseNoneNoneFalseNoneFalse92641.28040
258046379821NoneIt no. 9.17.2, pg no.61, Vol-2 PWD SR 2023-24Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. (It no. 9.17.2, pg no.61, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm1186.751186.7578.5FalseNoneNoneFalseNoneFalse93159.8750
258046479821NoneIt no. 9.34, pg no.64, Vol-2 PWD SR 2023-24Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (It no. 9.34, pg no.64, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm1560.451560.4549.13FalseNoneNoneFalseNoneFalse76664.90850
258046579821NoneIt no. 11.25.2, pg no.84, Vol-2 PWD SR 2023-24Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (It no. 11.25.2, pg no.84, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Kg137.36137.36115.29FalseNoneNoneFalseNoneFalse15836.23440
258046679821NoneIt no. 8.33.1, pg no.46, Vol-2 PWD SR 2023-24Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.33.1, pg no.46, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm159.58159.58274.28FalseNoneNoneFalseNoneFalse43769.60240
258046779821NoneIt no. 8.30, pg no.46, Vol-2 PWD SR 2023-24Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.30, pg no.46, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm175.74175.74328.75FalseNoneNoneFalseNoneFalse57774.5250
258046879821NoneIt no. 8.33.3, pg no.47, Vol-2 PWD SR 2023-24Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.33.3, pg no.47, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm140.39140.399.0FalseNoneNoneFalseNoneFalse1263.510
258046979821NoneIt no. 15.1, pg no. 149, Vol-2 PWD SR 2023-24Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. Thewaterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (It no. 15.1, pg no. 149, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm825.17825.17115.04FalseNoneNoneFalseNoneFalse94927.55680
258047079821NoneIt no. 11.16.1, pg no.82, Vol-2 PWD SR 2023-24Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (It no. 11.16.1, pg no.82, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Kg137.36137.364557.7FalseNoneNoneFalseNoneFalse626045.6720
258047179821NoneIt no. 7.38, pg no. 26, Vol-2 PWD SR 2023-24Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineerin-charge. The sheet shall be fixed using self drilling / self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (It no. 7.38, pg no. 26, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm573.68573.68113.94FalseNoneNoneFalseNoneFalse65365.09920
258047279821NoneIt no. 7.39.6, pg no. 26, Vol-2 PWD SR 2023-24Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete : Gutter (600 mm over all girth). (It no. 7.39.6, pg no. 26, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.m1084.741084.7419.92FalseNoneNoneFalseNoneFalse21608.02080
258047379821NoneIt no. 8.34.1, pg no. 47, Vol-2 PWD SR 2023-24Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.34.1, pg no. 47, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm53.5353.5312.1FalseNoneNoneFalseNoneFalse647.7130
258047479821NoneIt no. 8.40, pg no. 48, Vol-2 PWD SR 2023-24Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (It no. 8.40, pg no. 48, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm116.15116.1512.1FalseNoneNoneFalseNoneFalse1405.4150
258047579821NoneIt no. 8.84, pg no. 55, Vol-2 PWD SR 2023-24Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. (It no. 8.84, pg no. 55, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm479.75479.755.76FalseNoneNoneFalseNoneFalse2763.360
258047679821NoneIt no. 22.9A, pg no. 218, Vol-2 PWD SR 2023-24Providing and fixing stainless steel 304 grade fancy handle of approved make fixed with SS screws etc. complete as per direction of Engineer-in charge.-200mm length-(It no. 22.9A, pg no. 218, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.No1515.01515.04.0FalseNoneNoneFalseNoneFalse6060.00
258047779821NoneIt no. 12.58, pg no. 105, Vol-2 PWD SR 2023-24Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete-(It no. 12.58, pg no. 105, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.No121.2121.22.0FalseNoneNoneFalseNoneFalse242.40
258047879821NoneIt no. 12.80.1, pg no. 108, Vol-2 PWD SR 2023-24Providing and fixing door latch with necessary screws etc complete-Bright finished brass latch-(It no. 12.80.1, pg no. 108, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Each287.85287.852.0FalseNoneNoneFalseNoneFalse575.70
258047979821NoneIt no. 12.60, pg no. 105, Vol-2 PWD SR 2023-24Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete.-(It no. 12.60, pg no. 105, Vol-2) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.No1062.521062.522.0FalseNoneNoneFalseNoneFalse2125.040
258048079821NoneIt no. 2.5.2, pg no 17, vol-1) PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams & Lintel. ( It no. 2.5.2, pg no 17, vol-1) PWD SR 2023-24.Including Formwork, Centering & Scaffloding 60% For Beams & Lintel .( It no. 14, pg no 112, vol-1) PWD SR 2023-24 ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum11058.2911058.297.88FalseNoneNoneFalseNoneFalse87139.32520
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17078308610000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17078308610000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17078308610000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17078308840000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP Portal on or before the last date and time of bid submission.None
17078308920000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPP Portal due to internet connectivity issues and technical glitches at bidders end.None
17078309000000NoneNoneELIGIBILITYContractors should follow strictly prevailing rules of labour actNone
17078309090000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundableNone
17078309170000NoneNoneELIGIBILITYThe employer reserves the rights to Reject one or all Tender without assigning any reasonsNone
17078309260000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing KPP PortalNone
17078309330000NoneNoneELIGIBILITYContractors Should be registered with KPWD RegistrationNone
17078309420000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17078309510000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should give all details and documents as per Technical and Financial bid attached to this tenderNone
17078309600000NoneNoneELIGIBILITYMaterials like bitumen steel cement etc required for the work shell be procured by the tenderer themselves and should got tested by the quality control authority before use on the workNone
17078309670000NoneNoneELIGIBILITYAs per Karnataka state Government order LD.300.LET.2006 Bangalore dated 01.01.2007 and Government letter no PW.134.BMS.2007 dated 27.07.2007 a sum amounting to 1Percent of the bill amount will be deducted towards constructions labour welfare fundNone
17078309740000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete mannerNone
17078309820000NoneNoneELIGIBILITYoriginal documents shall be scanned. and same has to be uploaded in KPP PortalNone
17078309900000NoneNoneELIGIBILITYThe contractors assessed tender capacity will be calculated asper the clauses of STD document attachedNone
17078309990000NoneNoneELIGIBILITYThe tender validity period is 90Days from the date of opening of TenderNone
17078310090000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Bid documentNone
17078310190000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17078310270000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17078310350000NoneNoneELIGIBILITYContractor shall bound to comply the prevailing rules and regulations with regard to the EPF Contribution rules and any modifications thereof before and after execution of agreementNone
17078310410000NoneNoneELIGIBILITYContractors has to submit their labour EPF details with every Running BillNone
17078310470000NoneNoneELIGIBILITYBidder Should Establish a field LaboratoryNone
17078310540000NoneNoneELIGIBILITYsubmit Affidavit duly signed by notary should be furnished for the statements showing the value of existing commitments and on-going works (for B Value) to calculate Bid Capacity.None
17078310610000NoneNoneELIGIBILITYIncrease in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of timeNone
17078310850000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Bid document KW 3None
17078310960000NoneNoneELIGIBILITYThe rates are exclusive of GST. The contractor has to quote the rates without GST. As per Govt. order FD:447:Exependiture:12/2022 Bangalore dt. 30-7-2022 GST 18% will be added to the contract amount separately.None
17078311060000NoneNoneELIGIBILITYValue, at 2023-24 price level, of existing commitments and on-going works Documents to be submittedNone
17078311130000NoneNoneELIGIBILITYThe contractor shall submit the details of Technical staff employed by him.None
17078311210000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit in any of the forms given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 of ITT and Clause 44 of the Conditions of Contract.None
17078311290000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer in his name should have in the last five years period financial turnover Certificate (Balance Sheets) issued by the competent accountant/authority with UDIN number.None
17078311380001NoneNoneELIGIBILITYTHE EMD SHALL BE PAID THROUGH PUBLIC PROCUREMENT PORTAL IN FULL AMOUNT OR EMD FOR RS. 1,00,000.00 SHALL BE PAID THROUGH KARNATAKA PUBLIC PROCUREMENT PORTAL (KPPP) AND THE BALANCE OF RS 41,165.00 BY BANK GUARANTEE ISSUED BY NATIONALISED/SCHEDULED BANK. CONTRACTOR SHOULD UPLOAD THE SCANNED COPY OF BANK GUARANTEE ISSUED BY NATIONALISED/SCHEDULED BANK IN KARNATAKA PUBLIC PROCUREMENT PORTAL (KPPP), BEFORE ENTERING THE AGREEMENT, IF AWARDED.None
17078311570000NoneNoneELIGIBILITYThe Work completion period is 9 months (including monsoon)None
17078311650000NoneNoneELIGIBILITYThe Defects Liability Period for this project shall be upto ONE YEARNone
17078311710000NoneNoneELIGIBILITYContractors has to upload the EPF Registration with JANUARY 2024 ChallanNone
17078311780000NoneNoneELIGIBILITYEstimate rates are excluding GST as per Common SR 2023-24 and prevailing GST (18% of Amount Put to tender) amount is kept in form of Lump sum in sanctioned estimate according to guidelines in Common SR Therefore, amount put to Tender and ECV amount are excluding GST. KPPP-PORTAL format has No Options to add GST Separately at stage of Draft Tender Schedule Process for Over All amount put to Tender, tender has been inviting through an Option with INCLUSIVE. But the item wise rates do not include GST. Hence, Contractor has to quote the rates excluding GST and the GST will be paid separately for the quoted amount accordingly. Declaration Certificate must be attached mandatorily.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneSatisfactoriy completed atleast 50 PERCENT as prime contractor at-least one such similar work i.e BUILDING Work of value not less than Rs. 29.91LAKHSPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work 1. Earth work: 222.00 CUM 2. PCC & RCC: 154.00CUM 3. TMT STEEL: 12.00 TONNE4. Solid Concrete blocks/BBM: 288 .00Sqm 5. Plastering : 773.00 Sqm 6. Flooring: 340.00 Sqm) (80% of peak rate of construction)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2 (a) To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., (2018-19 to 2022-23) a) achieved in at least two financial years an average annual financial turnover (in all classes civil engineering works) equal to estimated cost i.e lakhs59.82Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- financial turnoverCertificate (Balance Sheets) issued by the competent accountant/authority with UDIN number.
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. 17.95 LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized Banks
NoneNoneNoneNoneTo qualify for award of this contract, each tenderer in his name should have in the last five years period (year-wise) i.e. 2018-19, 2019-20, 2020-21, 2021-22,2022-23 financial turnover Certificate (Balance Sheets) issued by the competent accountant/authority with UDIN numberFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- profit and loss statement, Balance sheets issued by the competent accountant/authority with UDIN number.
NoneNoneNoneNoneA copy of Valid KPWD registration certificate (Class III & Above )Certificate issued by the competent authorityOthersA copy of Valid KPWD registration certificate (Class III & Above )Certificate issued by the competent authority
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneContractors has to upload the EPF Registration with january 2024Challan CopyOthersContractors has to upload the EPF Registration with january 2024Challan Copy
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid EPF Certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
Satisfactoriy completed atleast 50 PERCENT as prime contractor at-least one such similar work i.e BUILDING Work of value not less than Rs. 29.91LAKHSTrueTechnical Bid
Executed in any one year the following minimum quantities of work 1.Earth work 222.00cum 2. PCC & RCC 154.00cum 3. TMT STEEL 12.00 TONNE 4. Solid Concrete blocks/BBM 288 .00Sqm 5. Plastering 773.00 Sqm 6. Flooring 340.00 SqmTrueTechnical Bid
Liquid assets and /or availability of credit facilities of no less than Rs. 17.95 LakhsTrueTechnical Bid
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19 to 2022-23 achieved in at least two financial years an average annual financial turnover in all classes civil engineering works equal to estimated cost i.e 59.82 lakhsTrueTechnical Bid
A copy of Valid KPWD registration certificate Class III & Above Certificate issued by the competent authorityTrueTechnical Bid
Contractors has to upload the EPF Registration with January 2024Challan CopyTrueTechnical Bid
GST DECLARATION CERTIFICATETrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsChikkmagaluruTarikereChikmagalurTARIKEREGOVT PU COLLEGE AT LINGADAHALLI ,TARIKERE TALUK, CHIKMAGALUR DISTRICTNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone