| 1707906204000 | 0 | None | None | Roads | Construction of Concrete road from sangama main road to Venkatesh house in Aralalu Village Shivanahalli G.P, Kanakapura Taluk. | 508187.01 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2588616 | 80453 | None | code01 | Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary soil/Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including Cost of labour, tools, usage of machinery & other appurtenances required to complete the work ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 372.86 | 372.86 | 91.26 | False | None | None | False | None | False | 34027.2036 | 0 | | 2588617 | 80453 | None | code02 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 2635.77 | 2635.77 | 36.51 | False | None | None | False | None | False | 96231.9627 | 0 | | 2588618 | 80453 | None | code03 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 m3 capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 6565.22 | 6565.22 | 54.76 | False | None | None | False | None | False | 359511.4472 | 0 | | 2588619 | 80453 | None | code04 | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 824.0 | 824.0 | 22.35 | False | None | None | False | None | False | 18416.4 | 0 |
|