noticeInvitingTenderDTO
createdTs1707913139251
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee690.00
emd34253.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose22-02-2024 17:00:00
tenderQueryClose16-02-2024 17:00:00
technicalBidOpenNone
publishedDate14-02-2024 23:11:26
publishedByPostCMC_MCOM_GOK
publishedByUserKPE16857 - SIDDAPPA ANNAPPA MAHAJAN
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonVinod Y Patil
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8277110126
tenderSupplierListNone
tenderSchedule
createdTs1707913139279
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/BD/WORK_INDENT14802
titleConstruction of parking shed for SWM vehicles at W.No 26 Gokak CMC.
descriptionConstruction of parking shed for SWM vehicles at W.No 26 Gokak CMC.
categoryWORKS
categoryTextWorks
ecv2740225.99
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2483
locationNameDMA City Municipal Council Gokak
provisionalAmount3300000.0
groupOverheadTotalNone
fileNumberCMC/PWD/15F/MPC/2021-22/6
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17079131390000NoneNoneBuildingsConstruction of parking shed for SWM vehicles at W.No 26 Gokak CMC.2740225.99
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
259196180648Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. (PWD SR Vol-1 2023-24; P.No. 8; Serial NO. 1.14)Cum107.1107.134.03FalseNoneNoneFalseNoneFalse3644.6130
259196280648Nonecode02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR Vol-1 2023-24; P.No. 15; Serial NO. 2.1.4)Cum5947.25947.22.0FalseNoneNoneFalseNoneFalse11894.40
259196380648Nonecode03Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (PWD SR Vol-1 2023-24; P.No. 15; Serial NO. 2.2.1) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates - Footings & RaftCum6799.396799.3955.77FalseNoneNoneFalseNoneFalse379201.98030
259196480648Nonecode04Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (PWD SR Vol-1 2023-24; P.No. 16; Serial NO. 2.4.2) Add. Percentage on finished rate of concrete per m3 for Foundation Works as per Addendum 1 ColumnCum6838.326838.320.8FalseNoneNoneFalseNoneFalse5470.6560
259196580648Nonecode05Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (PWD SR Vol-1 2023-24; P.No. 16; Serial NO. 2.4.2) Add. Percentage on finished rate of concrete per m3 for Plinth Beam as per Addendum 1 BeamCum9958.739958.7310.77FalseNoneNoneFalseNoneFalse107255.52210
259196680648Nonecode06Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications (PWD SR Vol-1 2023-24; P.No. 16; Serial NO. 2.5.2)Cum11834.5511834.551.32FalseNoneNoneFalseNoneFalse15621.6060
259196780648Nonecode07Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (PWD SR Vol-1 2023-24; P.No. 18; Serial NO. 2.11 h)MT82961.5582961.553.94FalseNoneNoneFalseNoneFalse326868.5070
259196880648Nonecode08Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD SR Vol-2 2023-24; P.No. 13; Serial NO. 6.7)Cum8621.558621.5513.38FalseNoneNoneFalseNoneFalse115356.3390
259196980648Nonecode09Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR Vol-02, 2023-24, Item no. 8.4.1, Page No.41)Sqm339.15339.15126.0FalseNoneNoneFalseNoneFalse42732.90
259197080648Nonecode10Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (PWD SR Vol-02, 2023-24, Item no. 8.33.1, Page No.46)Sqm165.9165.9126.0FalseNoneNoneFalseNoneFalse20903.40
259197180648Nonecode11Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (PWD SR Vol-1 2023-24; P.No. 16; Serial NO 2.5.1 ) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates - Coping for WallCum6961.56961.50.75FalseNoneNoneFalseNoneFalse5221.1250
259197280648Nonecode12Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.(PWD SR Vol-02, 2023-24, Item no. 11.57, Page No.95)Mtr18.018.0180.0FalseNoneNoneFalseNoneFalse3240.00
259197380648Nonecode13Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.(PWD SR Vol-02, 2023-24, Item no. 11.57.2, Page No.95) 65mmx65mmx6mm (5.8 Kg/m)Kg118.65118.6597.44FalseNoneNoneFalseNoneFalse11561.2560
259197480648Nonecode14Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(PWD SR Vol-02, 2023-24, Item no. 8.33.3, Page No.47)Sqm145.95145.950.66FalseNoneNoneFalseNoneFalse96.3270
259197580648Nonecode15Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kg154.35154.355388.12FalseNoneNoneFalseNoneFalse831656.3220
259197680648Nonecode16Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer-in- charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (PWD SR Vol-02, 2023-24, Item no. 7.38, Page No.26)Sqm596.4596.4312.75FalseNoneNoneFalseNoneFalse186524.10
259197780648Nonecode17Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : Ridges plain (500 - 600mm) (PWD SR Vol-02, 2023-24, Item no. 7.39.1, Page No.26)Mtr473.55473.5545.0FalseNoneNoneFalseNoneFalse21309.750
259197880648Nonecode18Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. (PWD SR Vol-02, 2023-24, Item no. 8.36.1, Page No.47)Sqm184.8184.8508.34FalseNoneNoneFalseNoneFalse93941.2320
259197980648Nonecode19Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipment’s etc., complete. as per the directions of the Engineer-in-charge of the work. [SR 2023-24 Vol-3 P.No:149 Sl.No:16.27]Cum6692.76692.734.13FalseNoneNoneFalseNoneFalse228421.8510
259198080648Nonecode2011kV Class 3CX95 Sq.mm XLPE UG Cable 2RunsKms889666.0889666.00.04FalseNoneNoneFalseNoneFalse35586.640
259198180648Nonecode21Cable termination kit Out door HS Type for 95 Sq.mmPer Kit4077.04077.02.0FalseNoneNoneFalseNoneFalse8154.00
259198280648Nonecode22Cable termination kit In door HS Type for 95 Sq.mmPer Kit3744.03744.02.0FalseNoneNoneFalseNoneFalse7488.00
259198380648Nonecode23Straight through Jointing Kit suitable for 95sqmm XLPE UG CablePer Kit10246.010246.02.0FalseNoneNoneFalseNoneFalse20492.00
259198480648Nonecode24Cable covering tiles 250X125X40 mmNo10.2510.25160.0FalseNoneNoneFalseNoneFalse1640.00
259198580648Nonecode25SandCum1965.01965.02.4FalseNoneNoneFalseNoneFalse4716.00
259198680648Nonecode26GI Pipe, 100 mm diaMtr1350.01350.040.0FalseNoneNoneFalseNoneFalse54000.00
259198780648Nonecode27Route and joint indicating stonesNo133.0133.02.0FalseNoneNoneFalseNoneFalse266.00
259198880648Nonecode28Cable trench excavation, Ordinary soilCum536.0536.015.0FalseNoneNoneFalseNoneFalse8040.00
259198980648Nonecode29Laying of cable in trenchKm61322.061322.00.04FalseNoneNoneFalseNoneFalse2452.880
259199080648Nonecode30Refilling and consolidationCum160.0160.015.0FalseNoneNoneFalseNoneFalse2400.00
259199180648Nonecode31Making of cable terminationsNo2658.02658.04.0FalseNoneNoneFalseNoneFalse10632.00
259199280648Nonecode32Making of straight through joints - 95Sqmm XLPE UG CableNo2848.02848.02.0FalseNoneNoneFalseNoneFalse5696.00
259199380648Nonecode33Covering the cable with tilesKm4367.04367.00.04FalseNoneNoneFalseNoneFalse174.680
259199480648Nonecode34Spreading and forming with Sand round the cableKm14810.014810.00.04FalseNoneNoneFalseNoneFalse592.40
259199580648Nonecode35Laying of GI PipeMtr93.093.040.0FalseNoneNoneFalseNoneFalse3720.00
259199680648Nonecode36Laying of Route and Joint stonesNo116.0116.02.0FalseNoneNoneFalseNoneFalse232.00
259199780648Nonecode37Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158:1991Set20246.020246.01.0FalseNoneNoneFalseNoneFalse20246.00
259199880648Nonecode38Single Pole Mounted Transformer Kit for erection of Transformers on 11 Mtr Spun Poles as per IS-1977Single H Frame without Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 100KVA/63KVA (UG Line) - MSNo31899.031899.01.0FalseNoneNoneFalseNoneFalse31899.00
259199980648Nonecode3911KV Horizontal 'X' arm with HTS, clamps B&N, completeSet532.0532.01.0FalseNoneNoneFalseNoneFalse532.00
259200080648Nonecode40HT Single Top Support with bolts nuts & WashersNo203.0203.01.0FalseNoneNoneFalseNoneFalse203.00
259200180648Nonecode41Rabbit ACSR Conductor with 1.5% sagKm50595.050595.00.3FalseNoneNoneFalseNoneFalse15178.50
259200280648Nonecode4211KV Polymer Pin InsulatorNo205.0205.03.0FalseNoneNoneFalseNoneFalse615.00
259200380648Nonecode43Earthing MaterialsNo2678.02678.05.0FalseNoneNoneFalseNoneFalse13390.00
259200480648Nonecode44AntiClimbing DevicesKg131.0131.01.0FalseNoneNoneFalseNoneFalse131.00
259200580648Nonecode45Lightening ArrestorSet1039.01039.01.0FalseNoneNoneFalseNoneFalse1039.00
259200680648Nonecode46LT Distribution Box with MCCBSet23199.023199.01.0FalseNoneNoneFalseNoneFalse23199.00
259200780648Nonecode47LT Wiring KIT for 100/63KVA DTCSet4995.54995.52.0FalseNoneNoneFalseNoneFalse9991.00
259200880648Nonecode48HG Fuse for 63/100KVA DTCSet1306.01306.01.0FalseNoneNoneFalseNoneFalse1306.00
259200980648Nonecode49GOS 200Amps Single breakSet10554.010554.03.0FalseNoneNoneFalseNoneFalse31662.00
259201080648Nonecode50LT Metering box with CTs and necessary wiring for housing ETV MeterNo7727.07727.01.0FalseNoneNoneFalseNoneFalse7727.00
259201180648Nonecode51LT Electronic Tri-Vector Meter 5A, Class- 0.5/1.0 accuracyNo5903.05903.01.0FalseNoneNoneFalseNoneFalse5903.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17079131400000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17079131400000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17079131400000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual Turn over certificateTrueTechnical Bid
Qty wise Work done certificateTrueTechnical Bid
Work done certificateTrueTechnical Bid
Liquid assets or availability of credit facilities Credit lines-letter of credit certificatesTrueTechnical Bid
Reserved Category CertificateTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsBelagaviGokakBelgaumGOKAK (ST)Gokak CMCNoneNoneNoneNoneNoneNone
tenderAddressNone