| 1707981154000 | 0 | None | None | Buildings | PROPOSED CONSTRUCTION OF COMMERCIAL BUILDING AT SY.NO 674, BELONGING TO TAPCMS, GADAG ROAD, KOPPAL. | 5057992.69 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2599455 | 81068 | None | code01 | Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. (Page No 10-Item No 1.19.2) DSR 2023-2024-Vol-1 | Cum | 584.85 | 584.85 | 272.12 | False | None | None | False | None | False | 159149.382 | 0 | | 2599456 | 81068 | None | code02 | Providing and laying in position cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (INo.2.1.2-Pag no 15 DSR 2023-24-Vol-1 | Cum | 5947.2 | 5947.2 | 23.67 | False | None | None | False | None | False | 140770.224 | 0 | | 2599457 | 81068 | None | code03 | Foundation upto Plinth a. Isolated APENDIX-1 [Volume-1-Pg- 111, Sl No- 1a) | Cum | 475.78 | 475.78 | 23.67 | False | None | None | False | None | False | 11261.7126 | 0 | | 2599458 | 81068 | None | code04 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand (I.No. 5.1 - P.No - 9 SSR 2023-24)-Vol-2 | Cum | 5891.55 | 5891.55 | 68.7384 | False | None | None | False | None | False | 404975.72052 | 0 | | 2599459 | 81068 | None | code05 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (I.No. 5.4 - P.No - 9 SSR 23-2024)-Vol-2 | Cum | 6708.45 | 6708.45 | 61.83 | False | None | None | False | None | False | 414783.4635 | 0 | | 2599460 | 81068 | None | code06 | Providing and laying in position cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (I.No. 2.2.1 P.No - 15 DSR 2023-24- Volume-1) | Cum | 6601.35 | 6601.35 | 62.9984 | False | None | None | False | None | False | 415874.48784 | 0 | | 2599461 | 81068 | None | code07 | Foundation upto Plinth a. Isolated APENDIX-1 [Volume-1-Pg- 111, Sl No- 1a) | Cum | 528.11 | 528.11 | 62.9984 | False | None | None | False | None | False | 33270.085024 | 0 | | 2599462 | 81068 | None | code08 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (I.No. 1.11, P.No - 7 DSR 2023-24- Volume-1) | Cum | 454.65 | 454.65 | 41.61 | False | None | None | False | None | False | 18917.9865 | 0 | | 2599463 | 81068 | None | code09 | Providing and laying in position cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (I.No. 2.2.1 P.No - 15 DSR 2023-24- Volume-1) | Cum | 6287.0 | 6287.0 | 12.42 | False | None | None | False | None | False | 78084.54 | 0 | | 2599464 | 81068 | None | code10 | Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Columns, (Sl.No. 9, P.No - 111 DSR 2023-24-Vol-1 Appendix I Percentage on finished rate of concrete per m3 | Cum | 4620.95 | 4620.95 | 12.42 | False | None | None | False | None | False | 57392.199 | 0 | | 2599465 | 81068 | None | code11 | Providing and laying in position cement concrete for all Super structures of building, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (I.No. 2.5.1 P.No - 16 DSR 2023-24-Vol-1 | Cum | 6961.5 | 6961.5 | 16.61 | False | None | None | False | None | False | 115630.515 | 0 | | 2599466 | 81068 | None | code12 | Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Plinth Beams & Staircase (Sl.No. 2 & 16, P.No - 111 DSR 2023-24-Vol-1 Appendix I Percentage on finished rate of concrete per m3 | Cum | 3480.75 | 3480.75 | 16.61 | False | None | None | False | None | False | 57815.2575 | 0 | | 2599467 | 81068 | None | code13 | Providing and laying in position cement concrete for all Super structures of building, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (I.No. 2.5.1 P.No - 16 DSR 2023-24-Vol-1 | Cum | 6961.5 | 6961.5 | 15.68 | False | None | None | False | None | False | 109156.32 | 0 | | 2599468 | 81068 | None | code14 | Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Roof Beams Building, (Sl.No. 14 P.No - 111 DSR 2023-24-Vol-1 Appendix I Percentage on finished rate of concrete per m3 | Cum | 4176.9 | 4176.9 | 15.68 | False | None | None | False | None | False | 65493.792 | 0 | | 2599469 | 81068 | None | code15 | Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (I.No. 2.5.1 P.No - 16 DSR 2023-24-Vol-1 | Cum | 6961.5 | 6961.5 | 40.35 | False | None | None | False | None | False | 280896.525 | 0 | | 2599470 | 81068 | None | code16 | Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Roof (Sl.No. 15 P.No - 112 DSR 2023-24-Vol-1 Appendix I Percentage on finished rate of concrete per m3 | Cum | 3480.75 | 3480.75 | 40.35 | False | None | None | False | None | False | 140448.2625 | 0 | | 2599471 | 81068 | None | code17 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (The laps and wastages shall not be measured separately) (P.No.18 I.No.2.11.a.DSR 2023-24)-Vol-1 | t | 93929.85 | 93929.85 | 10.914 | False | None | None | False | None | False | 1025150.3829 | 0 | | 2599472 | 81068 | None | code18 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (INo.2.1.4-Pag no 15 DSR 2023-24-Vol-1) | Cum | 6527.85 | 6527.85 | 2.46 | False | None | None | False | None | False | 16058.511 | 0 | | 2599473 | 81068 | None | code19 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (P.No.17 I.No.6.33.DSR 2023-24)-Vol-2 | Sqm | 1292.55 | 1292.55 | 365.38 | False | None | None | False | None | False | 472271.919 | 0 | | 2599474 | 81068 | None | code20 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. ( Size of Tile 600x600 mm) (I.No 9.12.2, P.no 60, Vol 2 SR 2023-24) | Sqm | 1202.25 | 1202.25 | 189.72 | False | None | None | False | None | False | 228090.87 | 0 | | 2599475 | 81068 | None | code21 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. (I.No 9.11, P.no 60, Vol 2 SR 2023-24) | Sqm | 933.45 | 933.45 | 22.4406 | False | None | None | False | None | False | 20947.17807 | 0 | | 2599476 | 81068 | None | code22 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. (INo.9.38-Pag no 65 DSR 2023-24-Vol-2 | Sqm | 1461.6 | 1461.6 | 87.04 | False | None | None | False | None | False | 127217.664 | 0 | | 2599477 | 81068 | None | code23 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Item No 11.26.1 page No-84) DSR-2023-24-Vol-2 | Kgs | 144.9 | 144.9 | 137.25 | False | None | None | False | None | False | 19887.525 | 0 | | 2599478 | 81068 | None | code24 | Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for
inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness
for rolling shutters. 80x0.90 mm M.S. laths with 0.90 mm thick top cover including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Item No 11.6.3 page No-78) DSR-2023-24-Vol-2 | Sqm | 2388.75 | 2388.75 | 20.16 | False | None | None | False | None | False | 48157.2 | 0 | | 2599479 | 81068 | None | code25 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (Item No 12.13.1 page No-99) DSR-2023-24-Vol-2 | Sqm | 103755.75 | 103755.75 | 0.24 | False | None | None | False | None | False | 24901.38 | 0 | | 2599480 | 81068 | None | code26 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures)( excluding cost of fixtures ) (Item No 12.21 page No-100, DSR-2023-24) | Cum | 6029.1 | 6029.1 | 5.67 | False | None | None | False | None | False | 34184.997 | 0 | | 2599481 | 81068 | None | code27 | Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges. (Item No 12.53 page No-104) DSR-2023-24-Vol-2 | Sqm | 1667.4 | 1667.4 | 17.33 | False | None | None | False | None | False | 28896.042 | 0 | | 2599482 | 81068 | None | code28 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (item no11.34A page no 86 SR 2021-22 Vol-2) | Kgs | 176.4 | 176.4 | 94.5 | False | None | None | False | None | False | 16669.8 | 0 | | 2599483 | 81068 | None | code29 | Providing 15 mm cement plaster with coarse sand) finished with a floating coat of neat cement on the roughcement mortar 1:3 (1 cement: 3 side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(P.No.42 I.No.8.7.DSR 2023-24)-Vol-2 | Sqm | 384.3 | 384.3 | 620.98 | False | None | None | False | None | False | 238642.614 | 0 | | 2599484 | 81068 | None | code30 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P.No.42 I.No.8.8.DSR 2023-24-Vol-2 | Sqm | 389.55 | 389.55 | 284.553 | False | None | None | False | None | False | 110847.62115 | 0 | | 2599485 | 81068 | None | code31 | Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 g/L and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives, New work (Two coats applied @ 1.43 L/ 10 m². Over and including priming coat of exterior primer applied @ 0.90 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Item No 8.32 page No-46) DSR-2023-24-Vol-2 | Sqm | 163.8 | 163.8 | 284.553 | False | None | None | False | None | False | 46609.7814 | 0 | | 2599486 | 81068 | None | code32 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign
matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Item No 8.25 page No-45) DSR-2023-24-Vol-2 | Sqm | 143.85 | 143.85 | 620.98 | False | None | None | False | None | False | 89327.973 | 0 | | 2599487 | 81068 | None | code33 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in charge. (Item No 8.40 page No-48) DSR-2023-24-Vol-2 | Sqm | 120.75 | 120.75 | 51.435 | False | None | None | False | None | False | 6210.77625 | 0 |
|