| 1708072062000 | 0 | None | None | Buildings | a)Construction of Kitchen room and Others at Anganavadi Building in manchandahalli village b) Reapir of works at Anganavadi Building in Annenahalli village, c) Reapir of works at Anganavadi Building in Kenchapura village d) Reapir of Child Painding at Anganavadi Building in Dimba village e)Reapir of Roof, Tiels, Painting and Child Painding at Anganavadi Building in Patna village f)Repair of works at Anganavadi Building in Janapanahalli village in kolar taluk | 567370.67 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2645303 | 82417 | None | CSR_V2_IN 19.2.1 | Demolishing cement concrete manually by mechanical means including disposal of material to the appropriate disposal area as per direction of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 1663.0 | 1663.0 | 16.56 | False | None | None | False | None | False | 27539.28 | 0 | | 2645304 | 82417 | None | CSR_V1_IN 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 20 mm nominal size hraded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 6217.0 | 6217.0 | 14.69 | False | None | None | False | None | False | 91327.73 | 0 | | 2645305 | 82417 | None | CSR_V2_IN 8.3.1 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 354.0 | 354.0 | 72.31 | False | None | None | False | None | False | 25597.74 | 0 | | 2645306 | 82417 | None | CSR_V2_IN 9.22.2 | Providing and laying Polished Glazed Vitrified tiles with thickness 10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1326.0 | 1326.0 | 159.84 | False | None | None | False | None | False | 211947.84 | 0 | | 2645307 | 82417 | None | CSR_V2_IN 9.36 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1650.0 | 1650.0 | 4.5 | False | None | None | False | None | False | 7425.0 | 0 | | 2645308 | 82417 | None | CSR_V2_IN 8.74.1 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two coat applied @ 1.67 l/ 10 m²) on existing cement paint surface including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 105.0 | 105.0 | 763.33 | False | None | None | False | None | False | 80149.65 | 0 | | 2645309 | 82417 | None | CSR_V2_IN 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 127.0 | 127.0 | 355.96 | False | None | None | False | None | False | 45206.92 | 0 | | 2645310 | 82417 | None | CSR_V2_IN 8.40 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 115.0 | 115.0 | 122.41 | False | None | None | False | None | False | 14077.15 | 0 | | 2645311 | 82417 | None | CSR_V2_IN 7.38 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 568.0 | 568.0 | 39.34 | False | None | None | False | None | False | 22345.12 | 0 | | 2645312 | 82417 | None | CSR_V2_IN 11.16.1 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. omplete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Kg | 136.0 | 136.0 | 229.04 | False | None | None | False | None | False | 31149.44 | 0 | | 2645313 | 82417 | None | CSR_V2_IN 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1310.0 | 1310.0 | 4.83 | False | None | None | False | None | False | 6327.3 | 0 | | 2645314 | 82417 | None | CSR_V2_IN 8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 295.0 | 295.0 | 14.5 | False | None | None | False | None | False | 4277.5 | 0 |
|