tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1708062396000 | 1 | None | None | Roads | Construction of CC drain | 14571412.71 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2642085 | 82272 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m(Item No: 1.14.1 Page No: 8 Vol 1 PWD UNI SR 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 102.0 | 102.0 | 2715.2 | False | None | None | False | None | False | 276950.4 | 0 | 2642086 | 82272 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( I No. 2.1.3 P No 15 of PWD S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 5989.0 | 5989.0 | 274.4 | False | None | None | False | None | False | 1643381.6 | 0 | 2642087 | 82272 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates( I No. 2.4.3 P No 16 of PWD S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 6323.0 | 6323.0 | 734.75 | False | None | None | False | None | False | 4645824.25 | 0 | 2642088 | 82272 | None | 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates( I No. 2.5.1 P No 16 of PWD S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 6630.0 | 6630.0 | 504.0 | False | None | None | False | None | False | 3341520.0 | 0 | 2642089 | 82272 | None | 2.11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.( I No. 2.11 h P No 18 of PWD S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | MT | 79011.0 | 79011.0 | 57.86 | False | None | None | False | None | False | 4571576.46 | 0 | 2642090 | 82272 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour
complete as per specifications.( I No. 1.10 P No 7 of PWD UNI S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 160.0 | 160.0 | 576.0 | False | None | None | False | None | False | 92160.0 | 0 |
| 1708062396000 | 1 | None | None | Roads | Road | 23187694.5 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2642091 | 82273 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m(Item No: 1.14.1 Page No: 8 Vol 1 PWD UNI SR 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 102.0 | 102.0 | 3498.0 | False | None | None | False | None | False | 356796.0 | 0 | 2642092 | 82273 | None | 3.7 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ( Item No: 3.7 Page No: 17 Vol 3 PWD SR for Roads) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 105.0 | 105.0 | 180.0 | False | None | None | False | None | False | 18900.0 | 0 | 2642093 | 82273 | None | 4.20(i) | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -iv Material( Item No: 4.20(i) Page No: 23 Vol 3 PWD SR for Roads ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 2432.0 | 2432.0 | 1581.75 | False | None | None | False | None | False | 3846816.0 | 0 | 2642094 | 82273 | None | 6.1 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing.( I No. 6.1 P No 49 of PWD S.R 2023-24 Vol 31) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 4920.0 | 4920.0 | 1054.5 | False | None | None | False | None | False | 5188140.0 | 0 | 2642095 | 82273 | None | 6.5 | Pavement Quality M30 Grade Concrete (RMC) with OPC &GGPS laid using paver : Construction of un-reinforced,Dowel jointed M30 Grade pavement quality concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 31.5mm mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation. membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing( I No. 6.5 P No 50 of PWD S.R 2023-24 Vol 3 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 7839.0 | 7839.0 | 1757.5 | False | None | None | False | None | False | 13777042.5 | 0 |
| 1708062396000 | 1 | None | None | Roads | Water supply | 1200453.6 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2642096 | 82274 | None | 1.19.1 | Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Ordinary/soft rock (without requiring blasting) Depth upto 1.50 m Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.19.1 Page No.10) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 454.0 | 454.0 | 122.4 | False | None | None | False | None | False | 55569.6 | 0 | 2642097 | 82274 | None | 16.3.2 | Laying,Lowering and jointing of S&S RCC SPUN / VIBRATED CAST PIPES REINFORCED) pipes NP-3 Class ,rolling and lowering into trenches, laying true to line and level at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). RCC NP3 Class pipe of 300 mm dia. (Item No. VOL-5-16.3.2 Page No.188) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Rmtr | 1332.0 | 1332.0 | 240.0 | False | None | None | False | None | False | 319680.0 | 0 | 2642098 | 82274 | None | 10.20.5 | Supplying HDPE pipes conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete (Contractor will make his own
arrangement for procuring water for testing)Upto 110mm dia,Coils shall be used. (RWS SR Item no. 10.20.5 d Page No.87) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Rmtr | 463.0 | 463.0 | 1740.0 | False | None | None | False | None | False | 805620.0 | 0 | 2642099 | 82274 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications.( I No. 1.10 P No 7 of PWD UNI S.R 2023-24 Vol 1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 160.0 | 160.0 | 122.4 | False | None | None | False | None | False | 19584.0 | 0 |
| 1708062396000 | 1 | None | None | Roads | Electrical Estimate | 1857641.54 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2642100 | 82275 | None | code01 | RCC Pole - 9 Mtr Long, 145 Kg WL (V-6 ESCOM P.No 3/ 1/1.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 7288.28 | 7288.28 | 62.0 | False | None | None | False | None | False | 451873.36 | 0 | 2642101 | 82275 | None | code02 | Labour For RCC Pole(V-6 ESCOM P.No 44/ 30/2.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1146.39 | 1146.39 | 62.0 | False | None | None | False | None | False | 71076.18 | 0 | 2642102 | 82275 | None | code03 | RCC Pole - 8 Mtr Long, 115 Kg WL (Dwg No. BESCOM/GM/QS&S/05 Dtd 24.11.2018) as per IS-785 (V-6 ESCOM P.No 3/1/ 1.03) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 5282.87 | 5282.87 | 10.0 | False | None | None | False | None | False | 52828.7 | 0 | 2642103 | 82275 | None | code04 | Labour For 8 mtr RCC Pole(V-6 ESCOM P.No 44/ 29/2.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 949.66 | 949.66 | 10.0 | False | None | None | False | None | False | 9496.6 | 0 | 2642104 | 82275 | None | code05 | Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 (V-6 ESCOM P.No 9/144/21.05) For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300 Kg WL - MS ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 23202.81 | 23202.81 | 2.0 | False | None | None | False | None | False | 46405.62 | 0 | 2642105 | 82275 | None | code06 | Labour For DP TC Set (V-6 ESCOM P.No 44/39/3.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 6141.89 | 6141.89 | 2.0 | False | None | None | False | None | False | 12283.78 | 0 | 2642106 | 82275 | None | code07 | Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500 Kg WL (V-6 ESCOM P.No 3/7/1.07) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 18233.06 | 18233.06 | 5.0 | False | None | None | False | None | False | 91165.3 | 0 | 2642107 | 82275 | None | code08 | Labour for Spun Pole (V-6 ESCOM P.No 44/ 33/2.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 2620.32 | 2620.32 | 5.0 | False | None | None | False | None | False | 13101.6 | 0 | 2642108 | 82275 | None | code09 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia( Elec SR Vol-6 P.No.59/12.56) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 3615.3 | 3615.3 | 3.0 | False | None | None | False | None | False | 10845.9 | 0 | 2642109 | 82275 | None | code10 | GI/Copper strips for grounding connections, using necessary fixing materials as required.25 x 6 mm GI strip( Elec SR Vol-6 P.No.59/12.58.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 131.84 | 131.84 | 30.0 | False | None | None | False | None | False | 3955.2 | 0 | 2642110 | 82275 | None | code011 | GOS Set 200 Amps Single break (V-6 ESCOM P.No 11/166/24.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 9733.5 | 9733.5 | 4.0 | False | None | None | False | None | False | 38934.0 | 0 | 2642111 | 82275 | None | code012 | Labour for GOS Set(V-6 ESCOM P.No 48/97/13.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1137.12 | 1137.12 | 4.0 | False | None | None | False | None | False | 4548.48 | 0 | 2642112 | 82275 | None | code013 | H-Frame for mounting GOS (CDS-15) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 4461.96 | 4461.96 | 4.0 | False | None | None | False | None | False | 17847.84 | 0 | 2642113 | 82275 | None | code014 | Labour for H-Frame (CDS-15) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 332.69 | 332.69 | 4.0 | False | None | None | False | None | False | 1330.76 | 0 | 2642114 | 82275 | None | code015 | Spiral Earth Electrode (V-6 ESCOM P.No 26/2.16) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 246.17 | 246.17 | 18.0 | False | None | None | False | None | False | 4431.06 | 0 | 2642115 | 82275 | None | code016 | Labour for Spiral Earth (V-6 ESCOM P.No 44/36/2.08) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 95.79 | 95.79 | 18.0 | False | None | None | False | None | False | 1724.22 | 0 | 2642116 | 82275 | None | code017 | 11 kV, Special 3 Pin Cross Arm - GI (V-6 ESCOM P.No 3/14/2.04) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1185.53 | 1185.53 | 8.0 | False | None | None | False | None | False | 9484.24 | 0 | 2642117 | 82275 | None | code018 | 11 kV, Horizontal Cross Arm (V-6 ESCOM P.No 3/12.2.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 501.61 | 501.61 | 180.0 | False | None | None | False | None | False | 90289.8 | 0 | 2642118 | 82275 | None | code019 | Labour for Horizontal Cross Arm (V-6 ESCOM P.No 45/52/5.04) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 164.8 | 164.8 | 180.0 | False | None | None | False | None | False | 29664.0 | 0 | 2642119 | 82275 | None | code020 | LT 4 Pin Cross Arm GI (V-6 ESCOM P.No 4 I.No 16/2.06) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 390.37 | 390.37 | 144.0 | False | None | None | False | None | False | 56213.28 | 0 | 2642120 | 82275 | None | code021 | Labour for 4 Pin Cross Arm (V-6 ESCOM P.No 45 I.No 50/5.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 164.8 | 164.8 | 144.0 | False | None | None | False | None | False | 23731.2 | 0 | 2642121 | 82275 | None | code022 | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (V-6 ESCOM P.No 5/52.6.06) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 211.15 | 211.15 | 160.0 | False | None | None | False | None | False | 33784.0 | 0 | 2642122 | 82275 | None | code023 | 1.1 kV Polymeric Pin Insulator (V-6 ESCOM P.No 5/51/6.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 89.61 | 89.61 | 110.0 | False | None | None | False | None | False | 9857.1 | 0 | 2642123 | 82275 | None | code024 | No. 8 Strain Insulator (V-6 ESCOM P.No 5/53/6.07) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 27.81 | 27.81 | 45.0 | False | None | None | False | None | False | 1251.45 | 0 | 2642124 | 82275 | None | code025 | Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (V-6 ESCOM P.No 5, I.No59/7.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 47621.02 | 47621.02 | 7.54 | False | None | None | False | None | False | 359062.4908 | 0 | 2642125 | 82275 | None | code026 | Labour ACSR (V-6 ESCOM P.No 46, I.No 67/7.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 5389.99 | 5389.99 | 7.54 | False | None | None | False | None | False | 40640.5246 | 0 | 2642126 | 82275 | None | code027 | Guy Set Complete with No. 15 Strain Insulator ((CDS-1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 1205.1 | 1205.1 | 9.0 | False | None | None | False | None | False | 10845.9 | 0 | 2642127 | 82275 | None | code028 | Labour for Guy Set (CDS-1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 610.79 | 610.79 | 9.0 | False | None | None | False | None | False | 5497.11 | 0 | 2642128 | 82275 | None | code029 | PG Clamp Rabbit to Rabbit (V-6 ESCOM P.No 6/65/9.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 105.06 | 105.06 | 28.0 | False | None | None | False | None | False | 2941.68 | 0 | 2642129 | 82275 | None | code030 | Transparent Alkathine tube 19 mm dia, 2 mm thick in coils of 30 Mtr (V-6 ESCOM P.No 23/394/52.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 532.51 | 532.51 | 2.0 | False | None | None | False | None | False | 1065.02 | 0 | 2642130 | 82275 | None | code031 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications (V-1 P. No 15/2.2.1) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 6475.61 | 6475.61 | 15.0 | False | None | None | False | None | False | 97134.15 | 0 | 2642131 | 82275 | None | code032 | DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - GI (V-6 ESCOM P.No 12/179/26.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 9128.89 | 9128.89 | 3.0 | False | None | None | False | None | False | 27386.67 | 0 | 2642132 | 82275 | None | code033 | Releasing of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth (V-6 ESCOM P.No 44/ 30/2.02)(1113*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1031.75 | 1031.75 | 49.0 | False | None | None | False | None | False | 50555.75 | 0 | 2642133 | 82275 | None | code034 | Releasing of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth V-6 ESCOM P.No 44/ 29/2.01) (922*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 854.69 | 854.69 | 13.0 | False | None | None | False | None | False | 11110.97 | 0 | 2642134 | 82275 | None | code035 | Releasing of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechnised Labour) (2544*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 2358.28 | 2358.28 | 6.0 | False | None | None | False | None | False | 14149.68 | 0 | 2642135 | 82275 | None | code036 | Releasing of V-Shape/Horizontal cross arm for DC Line including Brace and Insulator fixing. (Without Single Top Support (V-6 ESCOM P.No 45/52/5.04) (160*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 148.32 | 148.32 | 98.0 | False | None | None | False | None | False | 14535.36 | 0 | 2642136 | 82275 | None | code037 | Releasing of 4 Pin cross arm with Insulator and Braces fixing (V-6 ESCOM P.No 45/50/5.02) (160*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 148.32 | 148.32 | 65.0 | False | None | None | False | None | False | 9640.8 | 0 | 2642137 | 82275 | None | code038 | Releasing and Re- erection of V-Shape/Horizontal cross arm for DC Line including Brace and Insulator fixing. (Without Single Top Support (V-6 ESCOM P.No 45/52/5.04) (160*1.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 313.12 | 313.12 | 12.0 | False | None | None | False | None | False | 3757.44 | 0 | 2642138 | 82275 | None | code039 | Releasing and Re- erection of 4 Pin cross arm with Insulator and Braces fixing (V-6 ESCOM P.No 45/50/5.02) (160*1.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 313.12 | 313.12 | 7.0 | False | None | None | False | None | False | 2191.84 | 0 | 2642139 | 82275 | None | code040 | Releasing of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing(V-6 ESCOM P.No 44/39/3.02) (5963*0.9) For 100 to 250 kVA ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Per Structure | 5527.7 | 5527.7 | 2.0 | False | None | None | False | None | False | 11055.4 | 0 | 2642140 | 82275 | None | code041 | Releasing and Restringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Rabbit (Escom Pg 46, I.No 67/7.02)(5233*1.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 10240.98 | 10240.98 | 7.73 | False | None | None | False | None | False | 79162.7754 | 0 | 2642141 | 82275 | None | code042 | Releasing and Restringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Weasel (Escom Pg 46, I.No 66/7.01)(3975*1.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 7779.07 | 7779.07 | 3.0 | False | None | None | False | None | False | 23337.21 | 0 | 2642142 | 82275 | None | code043 | Releasing & Refixing of Over Head Service Mains (Single Phase/3 Phase) Per connection/Installation (While executing reconductoring works only) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 62.83 | 62.83 | 38.0 | False | None | None | False | None | False | 2387.54 | 0 | 2642143 | 82275 | None | code044 | Releasing of 100 kVA Transformer on Transformer Structure (Escom Pg 46, /72/8.01) (1193*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1473.93 | 1473.93 | 2.0 | False | None | None | False | None | False | 2947.86 | 0 | 2642144 | 82275 | None | code045 | Releasing of 200 - 250 kVA Transformer (Escom Pg 46, /74/8.03) (2278*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 2111.7 | 2111.7 | 1.0 | False | None | None | False | None | False | 2111.7 | 0 |
| 1708062396000 | 1 | None | None | Roads | Sub Estimate for Providing LED Lights from Police Station to Vyadyanatheswara Temple at Old Talakadu Villge in T.Narasipuar Taluk Mysuru Dist | 246948.41 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2642145 | 82276 | None | code01 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70percent, maximum light intensity should be between 60 degrees to 70 degrees. CCT greater than 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire greater than IK08. Power Factor greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiencygreater than 1301m/w, nominal CRI greater than75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. (46/11.8.4) LED Streetlight 90 W ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 9125.8 | 9125.8 | 22.0 | False | None | None | False | None | False | 200767.6 | 0 | 2642146 | 82276 | None | code02 | Supplying and fixing telescopic M.S. bracket fabricated by using 0.5m length 4" dia telescopic M. S. pipe, with 2" dia1.5m long M.S.Bracket and are welded with suitable angle, using 6mm thick M. S. sheet, grip bolts & nuts, as required, suitable for 9 to 12 ms. M. S. tubular pole, with necessary two coats of painting, with all other accessories.(56/13.4.1)Single bracket 1.5 m. Length ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 1504.83 | 1504.83 | 22.0 | False | None | None | False | None | False | 33106.26 | 0 | 2642147 | 82276 | None | code03 | Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with suitable approved colour powder coated paint. (Vol-6 Ele SR P.No. 20/5.42.2) 16SWG ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sq CM | 0.44 | 0.44 | 4000.0 | False | None | None | False | None | False | 1760.0 | 0 | 2642148 | 82276 | None | code04 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 Amps three phase 4 wire whole current class-1 Accuracy Energy Meter..(Vol-6 P.No 19 SL No 5.35) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 5876.15 | 5876.15 | 1.0 | False | None | None | False | None | False | 5876.15 | 0 | 2642149 | 82276 | None | code05 | Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts.(Vol-6 Ele SR P.No. 60/12.57) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 4383.68 | 4383.68 | 1.0 | False | None | None | False | None | False | 4383.68 | 0 | 2642150 | 82276 | None | code06 | GI/Copper strips for grounding connections, using necessary fixing materials as required. (Vol-6 Ele SR P.No. 60/25 x 6 mm GI strip) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 131.84 | 131.84 | 8.0 | False | None | None | False | None | False | 1054.72 | 0 |
| 1708064233000 | 0 | None | None | Roads | Improvements to 0.80 km road from Ganapathi temple to vaidhyanathershwara temple at Talakadu village in T Narasipura taluk | 41064150.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2643002 | 82312 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m(Item No: 1.14.1 Page No: 8 Vol 1 PWD UNI SR 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 102.0 | 102.0 | 2715.2 | False | None | None | False | None | False | 276950.4 | 0 | 2643008 | 82312 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m(Item No: 1.14.1 Page No: 8 Vol 1 PWD UNI SR 2023-24) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 102.0 | 102.0 | 3498.0 | False | None | None | False | None | False | 356796.0 | 0 | 2643013 | 82312 | None | 1.19.1 | Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Ordinary/soft rock (without requiring blasting) Depth upto 1.50 m Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.19.1 Page No.10) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 454.0 | 454.0 | 122.4 | False | None | None | False | None | False | 55569.6 | 0 | 2643062 | 82312 | None | code01 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70percent, maximum light intensity should be between 60 degrees to 70 degrees. CCT greater than 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire greater than IK08. Power Factor greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiencygreater than 1301m/w, nominal CRI greater than75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. (46/11.8.4) LED Streetlight 90 W ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 9125.8 | 9125.8 | 22.0 | False | None | None | False | None | False | 200767.6 | 0 | 2643017 | 82312 | None | code01 | RCC Pole - 9 Mtr Long, 145 Kg WL (V-6 ESCOM P.No 3/ 1/1.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 7288.28 | 7288.28 | 62.0 | False | None | None | False | None | False | 451873.36 | 0 | 2643063 | 82312 | None | code02 | Supplying and fixing telescopic M.S. bracket fabricated by using 0.5m length 4" dia telescopic M. S. pipe, with 2" dia1.5m long M.S.Bracket and are welded with suitable angle, using 6mm thick M. S. sheet, grip bolts & nuts, as required, suitable for 9 to 12 ms. M. S. tubular pole, with necessary two coats of painting, with all other accessories.(56/13.4.1)Single bracket 1.5 m. Length ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 1504.83 | 1504.83 | 22.0 | False | None | None | False | None | False | 33106.26 | 0 | 2643014 | 82312 | None | 16.3.2 | Laying,Lowering and jointing of S&S RCC SPUN / VIBRATED CAST PIPES REINFORCED) pipes NP-3 Class ,rolling and lowering into trenches, laying true to line and level at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). RCC NP3 Class pipe of 300 mm dia. (Item No. VOL-5-16.3.2 Page No.188) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Rmtr | 1332.0 | 1332.0 | 240.0 | False | None | None | False | None | False | 319680.0 | 0 | 2643003 | 82312 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( I No. 2.1.3 P No 15 of PWD S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 5989.0 | 5989.0 | 274.4 | False | None | None | False | None | False | 1643381.6 | 0 | 2643018 | 82312 | None | code02 | Labour For RCC Pole(V-6 ESCOM P.No 44/ 30/2.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1146.39 | 1146.39 | 62.0 | False | None | None | False | None | False | 71076.18 | 0 | 2643009 | 82312 | None | 3.7 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ( Item No: 3.7 Page No: 17 Vol 3 PWD SR for Roads) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 105.0 | 105.0 | 180.0 | False | None | None | False | None | False | 18900.0 | 0 | 2643019 | 82312 | None | code03 | RCC Pole - 8 Mtr Long, 115 Kg WL (Dwg No. BESCOM/GM/QS&S/05 Dtd 24.11.2018) as per IS-785 (V-6 ESCOM P.No 3/1/ 1.03) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 5282.87 | 5282.87 | 10.0 | False | None | None | False | None | False | 52828.7 | 0 | 2643064 | 82312 | None | code03 | Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with suitable approved colour powder coated paint. (Vol-6 Ele SR P.No. 20/5.42.2) 16SWG ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sq CM | 0.44 | 0.44 | 4000.0 | False | None | None | False | None | False | 1760.0 | 0 | 2643004 | 82312 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates( I No. 2.4.3 P No 16 of PWD S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 6323.0 | 6323.0 | 734.75 | False | None | None | False | None | False | 4645824.25 | 0 | 2643015 | 82312 | None | 10.20.5 | Supplying HDPE pipes conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete (Contractor will make his own
arrangement for procuring water for testing)Upto 110mm dia,Coils shall be used. (RWS SR Item no. 10.20.5 d Page No.87) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Rmtr | 463.0 | 463.0 | 1740.0 | False | None | None | False | None | False | 805620.0 | 0 | 2643010 | 82312 | None | 4.20(i) | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -iv Material( Item No: 4.20(i) Page No: 23 Vol 3 PWD SR for Roads ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 2432.0 | 2432.0 | 1581.75 | False | None | None | False | None | False | 3846816.0 | 0 | 2643011 | 82312 | None | 6.1 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing.( I No. 6.1 P No 49 of PWD S.R 2023-24 Vol 31) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 4920.0 | 4920.0 | 1054.5 | False | None | None | False | None | False | 5188140.0 | 0 | 2643005 | 82312 | None | 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates( I No. 2.5.1 P No 16 of PWD S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 6630.0 | 6630.0 | 504.0 | False | None | None | False | None | False | 3341520.0 | 0 | 2643016 | 82312 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications.( I No. 1.10 P No 7 of PWD UNI S.R 2023-24 Vol 1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 160.0 | 160.0 | 122.4 | False | None | None | False | None | False | 19584.0 | 0 | 2643020 | 82312 | None | code04 | Labour For 8 mtr RCC Pole(V-6 ESCOM P.No 44/ 29/2.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 949.66 | 949.66 | 10.0 | False | None | None | False | None | False | 9496.6 | 0 | 2643065 | 82312 | None | code04 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 Amps three phase 4 wire whole current class-1 Accuracy Energy Meter..(Vol-6 P.No 19 SL No 5.35) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 5876.15 | 5876.15 | 1.0 | False | None | None | False | None | False | 5876.15 | 0 | 2643012 | 82312 | None | 6.5 | Pavement Quality M30 Grade Concrete (RMC) with OPC &GGPS laid using paver : Construction of un-reinforced,Dowel jointed M30 Grade pavement quality concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 31.5mm mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation. membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing( I No. 6.5 P No 50 of PWD S.R 2023-24 Vol 3 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 7839.0 | 7839.0 | 1757.5 | False | None | None | False | None | False | 13777042.5 | 0 | 2643006 | 82312 | None | 2.11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.( I No. 2.11 h P No 18 of PWD S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | MT | 79011.0 | 79011.0 | 57.86 | False | None | None | False | None | False | 4571576.46 | 0 | 2643066 | 82312 | None | code05 | Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts.(Vol-6 Ele SR P.No. 60/12.57) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 4383.68 | 4383.68 | 1.0 | False | None | None | False | None | False | 4383.68 | 0 | 2643021 | 82312 | None | code05 | Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 (V-6 ESCOM P.No 9/144/21.05) For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300 Kg WL - MS ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 23202.81 | 23202.81 | 2.0 | False | None | None | False | None | False | 46405.62 | 0 | 2643067 | 82312 | None | code06 | GI/Copper strips for grounding connections, using necessary fixing materials as required. (Vol-6 Ele SR P.No. 60/25 x 6 mm GI strip) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 131.84 | 131.84 | 8.0 | False | None | None | False | None | False | 1054.72 | 0 | 2643022 | 82312 | None | code06 | Labour For DP TC Set (V-6 ESCOM P.No 44/39/3.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 6141.89 | 6141.89 | 2.0 | False | None | None | False | None | False | 12283.78 | 0 | 2643007 | 82312 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour
complete as per specifications.( I No. 1.10 P No 7 of PWD UNI S.R 2023-24 Vol 1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 160.0 | 160.0 | 576.0 | False | None | None | False | None | False | 92160.0 | 0 | 2643023 | 82312 | None | code07 | Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500 Kg WL (V-6 ESCOM P.No 3/7/1.07) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 18233.06 | 18233.06 | 5.0 | False | None | None | False | None | False | 91165.3 | 0 | 2643024 | 82312 | None | code08 | Labour for Spun Pole (V-6 ESCOM P.No 44/ 33/2.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 2620.32 | 2620.32 | 5.0 | False | None | None | False | None | False | 13101.6 | 0 | 2643025 | 82312 | None | code09 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia( Elec SR Vol-6 P.No.59/12.56) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 3615.3 | 3615.3 | 3.0 | False | None | None | False | None | False | 10845.9 | 0 | 2643026 | 82312 | None | code10 | GI/Copper strips for grounding connections, using necessary fixing materials as required.25 x 6 mm GI strip( Elec SR Vol-6 P.No.59/12.58.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 131.84 | 131.84 | 30.0 | False | None | None | False | None | False | 3955.2 | 0 | 2643027 | 82312 | None | code011 | GOS Set 200 Amps Single break (V-6 ESCOM P.No 11/166/24.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 9733.5 | 9733.5 | 4.0 | False | None | None | False | None | False | 38934.0 | 0 | 2643028 | 82312 | None | code012 | Labour for GOS Set(V-6 ESCOM P.No 48/97/13.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1137.12 | 1137.12 | 4.0 | False | None | None | False | None | False | 4548.48 | 0 | 2643029 | 82312 | None | code013 | H-Frame for mounting GOS (CDS-15) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 4461.96 | 4461.96 | 4.0 | False | None | None | False | None | False | 17847.84 | 0 | 2643030 | 82312 | None | code014 | Labour for H-Frame (CDS-15) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 332.69 | 332.69 | 4.0 | False | None | None | False | None | False | 1330.76 | 0 | 2643031 | 82312 | None | code015 | Spiral Earth Electrode (V-6 ESCOM P.No 26/2.16) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 246.17 | 246.17 | 18.0 | False | None | None | False | None | False | 4431.06 | 0 | 2643032 | 82312 | None | code016 | Labour for Spiral Earth (V-6 ESCOM P.No 44/36/2.08) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 95.79 | 95.79 | 18.0 | False | None | None | False | None | False | 1724.22 | 0 | 2643033 | 82312 | None | code017 | 11 kV, Special 3 Pin Cross Arm - GI (V-6 ESCOM P.No 3/14/2.04) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1185.53 | 1185.53 | 8.0 | False | None | None | False | None | False | 9484.24 | 0 | 2643034 | 82312 | None | code018 | 11 kV, Horizontal Cross Arm (V-6 ESCOM P.No 3/12.2.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 501.61 | 501.61 | 180.0 | False | None | None | False | None | False | 90289.8 | 0 | 2643035 | 82312 | None | code019 | Labour for Horizontal Cross Arm (V-6 ESCOM P.No 45/52/5.04) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 164.8 | 164.8 | 180.0 | False | None | None | False | None | False | 29664.0 | 0 | 2643036 | 82312 | None | code020 | LT 4 Pin Cross Arm GI (V-6 ESCOM P.No 4 I.No 16/2.06) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 390.37 | 390.37 | 144.0 | False | None | None | False | None | False | 56213.28 | 0 | 2643037 | 82312 | None | code021 | Labour for 4 Pin Cross Arm (V-6 ESCOM P.No 45 I.No 50/5.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 164.8 | 164.8 | 144.0 | False | None | None | False | None | False | 23731.2 | 0 | 2643038 | 82312 | None | code022 | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (V-6 ESCOM P.No 5/52.6.06) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 211.15 | 211.15 | 160.0 | False | None | None | False | None | False | 33784.0 | 0 | 2643039 | 82312 | None | code023 | 1.1 kV Polymeric Pin Insulator (V-6 ESCOM P.No 5/51/6.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 89.61 | 89.61 | 110.0 | False | None | None | False | None | False | 9857.1 | 0 | 2643040 | 82312 | None | code024 | No. 8 Strain Insulator (V-6 ESCOM P.No 5/53/6.07) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 27.81 | 27.81 | 45.0 | False | None | None | False | None | False | 1251.45 | 0 | 2643041 | 82312 | None | code025 | Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (V-6 ESCOM P.No 5, I.No59/7.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 47621.02 | 47621.02 | 7.54 | False | None | None | False | None | False | 359062.4908 | 0 | 2643042 | 82312 | None | code026 | Labour ACSR (V-6 ESCOM P.No 46, I.No 67/7.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 5389.99 | 5389.99 | 7.54 | False | None | None | False | None | False | 40640.5246 | 0 | 2643043 | 82312 | None | code027 | Guy Set Complete with No. 15 Strain Insulator ((CDS-1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 1205.1 | 1205.1 | 9.0 | False | None | None | False | None | False | 10845.9 | 0 | 2643044 | 82312 | None | code028 | Labour for Guy Set (CDS-1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 610.79 | 610.79 | 9.0 | False | None | None | False | None | False | 5497.11 | 0 | 2643045 | 82312 | None | code029 | PG Clamp Rabbit to Rabbit (V-6 ESCOM P.No 6/65/9.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 105.06 | 105.06 | 28.0 | False | None | None | False | None | False | 2941.68 | 0 | 2643046 | 82312 | None | code030 | Transparent Alkathine tube 19 mm dia, 2 mm thick in coils of 30 Mtr (V-6 ESCOM P.No 23/394/52.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 532.51 | 532.51 | 2.0 | False | None | None | False | None | False | 1065.02 | 0 | 2643047 | 82312 | None | code031 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications (V-1 P. No 15/2.2.1) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Cum | 6475.61 | 6475.61 | 15.0 | False | None | None | False | None | False | 97134.15 | 0 | 2643048 | 82312 | None | code032 | DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - GI (V-6 ESCOM P.No 12/179/26.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 9128.89 | 9128.89 | 3.0 | False | None | None | False | None | False | 27386.67 | 0 | 2643049 | 82312 | None | code033 | Releasing of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth (V-6 ESCOM P.No 44/ 30/2.02)(1113*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1031.75 | 1031.75 | 49.0 | False | None | None | False | None | False | 50555.75 | 0 | 2643050 | 82312 | None | code034 | Releasing of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth V-6 ESCOM P.No 44/ 29/2.01) (922*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 854.69 | 854.69 | 13.0 | False | None | None | False | None | False | 11110.97 | 0 | 2643051 | 82312 | None | code035 | Releasing of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechnised Labour) (2544*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 2358.28 | 2358.28 | 6.0 | False | None | None | False | None | False | 14149.68 | 0 | 2643052 | 82312 | None | code036 | Releasing of V-Shape/Horizontal cross arm for DC Line including Brace and Insulator fixing. (Without Single Top Support (V-6 ESCOM P.No 45/52/5.04) (160*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 148.32 | 148.32 | 98.0 | False | None | None | False | None | False | 14535.36 | 0 | 2643053 | 82312 | None | code037 | Releasing of 4 Pin cross arm with Insulator and Braces fixing (V-6 ESCOM P.No 45/50/5.02) (160*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 148.32 | 148.32 | 65.0 | False | None | None | False | None | False | 9640.8 | 0 | 2643054 | 82312 | None | code038 | Releasing and Re- erection of V-Shape/Horizontal cross arm for DC Line including Brace and Insulator fixing. (Without Single Top Support (V-6 ESCOM P.No 45/52/5.04) (160*1.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 313.12 | 313.12 | 12.0 | False | None | None | False | None | False | 3757.44 | 0 | 2643055 | 82312 | None | code039 | Releasing and Re- erection of 4 Pin cross arm with Insulator and Braces fixing (V-6 ESCOM P.No 45/50/5.02) (160*1.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 313.12 | 313.12 | 7.0 | False | None | None | False | None | False | 2191.84 | 0 | 2643056 | 82312 | None | code040 | Releasing of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing(V-6 ESCOM P.No 44/39/3.02) (5963*0.9) For 100 to 250 kVA ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Per Structure | 5527.7 | 5527.7 | 2.0 | False | None | None | False | None | False | 11055.4 | 0 | 2643057 | 82312 | None | code041 | Releasing and Restringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Rabbit (Escom Pg 46, I.No 67/7.02)(5233*1.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 10240.98 | 10240.98 | 7.73 | False | None | None | False | None | False | 79162.7754 | 0 | 2643058 | 82312 | None | code042 | Releasing and Restringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Weasel (Escom Pg 46, I.No 66/7.01)(3975*1.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 7779.07 | 7779.07 | 3.0 | False | None | None | False | None | False | 23337.21 | 0 | 2643059 | 82312 | None | code043 | Releasing & Refixing of Over Head Service Mains (Single Phase/3 Phase) Per connection/Installation (While executing reconductoring works only) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Km | 62.83 | 62.83 | 38.0 | False | None | None | False | None | False | 2387.54 | 0 | 2643060 | 82312 | None | code044 | Releasing of 100 kVA Transformer on Transformer Structure (Escom Pg 46, /72/8.01) (1193*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1473.93 | 1473.93 | 2.0 | False | None | None | False | None | False | 2947.86 | 0 | 2643061 | 82312 | None | code045 | Releasing of 200 - 250 kVA Transformer (Escom Pg 46, /74/8.03) (2278*0.9) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 2111.7 | 2111.7 | 1.0 | False | None | None | False | None | False | 2111.7 | 0 |
|
|
---|