noticeInvitingTenderDTO
createdTs1708098482152
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd656720.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose04-03-2024 17:00:00
tenderQueryClose02-03-2024 16:00:00
technicalBidOpen05-03-2024 17:30:00
publishedDate16-02-2024 21:32:33
publishedByPostZAK_ED_CPMZ_KLB
publishedByUserKPE13701 - SUMIT KUMAR PATIL
bidValidityPeriod180
noOfCalls1
preBidMeetingDate28-02-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonRamesh V G
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9480302656
tenderSupplierListNone
tenderSchedule
createdTs1708098482177
version4
createdDateNone
modifiedDateNone
tenderNumberZAK/2023-24/WS/WORK_INDENT49
titleConstruction of UGD line at New Zoological Park at Madbool Village in Chittapur Taluka
descriptionConstruction of UGD line at New Zoological Park at Madbool Village in Chittapur Taluka
categoryWORKS
categoryTextWorks
ecv33705587.81
deptNameZoo Authority of Karnataka
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location4996
locationNameZAK Children Park-Mini Zoo Kalaburagi
provisionalAmount40500000.0
groupOverheadTotalNone
fileNumberKkrdb270
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17080984820000NoneNoneWater supply/sewage linesConstruction of UGD line at New Zoological Park at Madbool Village in Chittapur Taluka33705587.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
266548682922NoneCode1Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights,bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.Hard rock (requiring blasting) Depth upto 1.50 m (Common SR Volume-I 2023-24 ,item No. 1.21.1, P. No.10 )." Cum702.45702.453568.5FalseNoneNoneFalseNoneFalse2506692.8250
266548782922NoneCode2Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights,bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strataDepth exceeding 1.5 m, but not exceeding 3 m (Common SR Volume-I 2023-24 ,item No. 1.21.2, P. No.10 )." Cum789.6789.62141.1FalseNoneNoneFalseNoneFalse1690612.560
266548882922NoneCode3Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights,bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strataDepth exceeding 3 m, but not exceeding 4.50 m (Common SR Volume-I 2023-24 ,item No. 1.21.3, P. No.10 )." Cum871.5871.51546.35FalseNoneNoneFalseNoneFalse1347644.0250
266548982922NoneCode4Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights,bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata Depth exceeding 3 m, but not exceeding 4.50 m Add 5% per mt for evey additional 1.50 m depth or part thereoff beyond 4.50 m depth (Common SR Volume-I 2023-24 ,item No. 1.21.3, P. No.10 )." Cum915.08915.08920.7FalseNoneNoneFalseNoneFalse842514.1560
266549082922NoneCode5Earth work excavation for Foundation by Mechanical means depth upto 1.50m,as per drawing and technical specifications, including setting out, shoring,strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work.In Hard Rock ( requiring blasting) Depth upto 1.50m (Common SR Volume-I 2023-24 ,item No. 1.16.1, P. No.9 )." Cum581.7581.7778.13FalseNoneNoneFalseNoneFalse452638.2210
266549182922NoneCode6Earth work excavation for Foundation by Mechanical means depth upto 1.50m,as per drawing and technical specifications, including setting out, shoring,strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work.Depth exceeding 1.5 m, but not exceeding 3 m (Common SR Volume-I 2023-24 ,item No. 1.16.2, P. No.9 )Cum654.15654.15918.75FalseNoneNoneFalseNoneFalse601000.31250
266549282922NoneCode7Earth work excavation for Foundation by Mechanical means depth upto 1.50m,as per drawing and technical specifications, including setting out, shoring,strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work.Depth exceeding 3m, but not exceeding 4.5m(Common SR Volume-I 2023-24 ,item No. 1.16.3, P. No.9 )Cum746.55746.55972.0FalseNoneNoneFalseNoneFalse725646.60
266549382922NoneCode8Earth work excavation for Foundation by Mechanical means depth upto 1.50m,as per drawing and technical specifications, including setting out, shoring,strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work.Depth exceeding 3m, but not exceeding 4.5m Add 5% per m3 for every additional 1.50m depth or part thereoff beyond initial 1.50 m depth if shoring and strutting is provided.(Common SR Volume-I 2023-24 ,item No. 1.16.1 (2), P. No.9 ).Cum783.88783.8854.0FalseNoneNoneFalseNoneFalse42329.520
266549482922NoneCode9Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, horing, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. , 1.0 M depth & Heavy duty SFRC cover & frame (Common SR Volume-V 2023-24 ,item No. 16.46.1, P. No.204 ).Each26248.9526248.9563.0FalseNoneNoneFalseNoneFalse1653683.850
266549582922NoneCode10Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, horing, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. , 2.0 M depth & Heavy duty SFRC cover & frame (Common SR Volume-V 2023-24 ,item No. 16.46.2, P. No.204 ).Each49461.349461.399.0FalseNoneNoneFalseNoneFalse4896668.70
266549682922Nonecode11Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Precast RCC Machinehole chambers,constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting herever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes,including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia.Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart as detailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.For 1.2m dia Machinehole: Constructing Pre-cast RCC Machinehole 1.5 m internal dia. , 4.0 M depth &SFRC cover & frame (Common SR Volume-V 2023-24 ,item No.16.19.4, P. No.195Each119165.55119165.5521.0FalseNoneNoneFalseNoneFalse2502476.550
266549782922Nonecode12Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Precast RCC Machinehole chambers,constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting herever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes,including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia.Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart as detailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.For 1.2m dia Machinehole: Constructing Pre-cast RCC Machinehole 1.5 m internal dia. , 5.0 M depth & SFRC cover & frame (Common SR Volume-V 2023-24 ,item No. 16.19.5, P. No.195 )Each145678.05145678.053.0FalseNoneNoneFalseNoneFalse437034.150
266549882922Nonecode13Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Precast RCC Machinehole chambers,constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting herever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes,including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia.Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart as detailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.For 1.2m dia Machinehole: Constructing Pre-cast RCC Machinehole 1.5 m internal dia. , 6.0 M depth & SFRC cover & frame (Common SR Volume-V 2023-24 ,item No. 16.19.6, P. No.195 ).Each166944.75166944.751.0FalseNoneNoneFalseNoneFalse166944.750
266549982922Nonecode14Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for: Pipes of SN 8, 160mm diaMtr731.85731.853000.0FalseNoneNoneFalseNoneFalse2195550.00
266550082922Nonecode15Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for: Pipes of SN 8, 200mm dia.Mtr1085.71085.7220.0FalseNoneNoneFalseNoneFalse238854.00
266550182922Nonecode16Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (Common SR Volume-V 2023-24 ,item No. 1.10, P. No.07 ).Cum168.0168.012370.8FalseNoneNoneFalseNoneFalse2078294.40
266550282922Nonecode17Providing PVC-U INDIVIDUAL U.G.D House service connection (which shall be laid from inside the customer property ) which includes: a) Supply of PVC-U pipe (b) providing and fixing of 315 mm dia the PE Inspection chambres with lid consisting of inlet & outlet arrangements with base, riser of min. 0.42 m depth which includes earth work, fixing in CC-1:2:4 with appurtenances., complete. (c) civil works like Earthwork excavation for the pipeline trenches for laying of PVC-U pipes for the house connections in all types of soils , disintegrated rock,soft rock, hard rock, including cutting of any road using , crossing drains, compound, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, c.c. wood work, steel work, including T & P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable and stacking the serviceable material with all lifts and lead , restoring the damaged portions inside or outside the property premises, refilling the portions of trenches that are dug open including linking to existing sewer network with appurtenances. complete. 110 mm dia (Common SR Volume-V 2023-24 ,item No. 16.60.1, P. No.208 ).Each8540.78540.740.0FalseNoneNoneFalseNoneFalse341628.00
266550382922Nonecode18Design, Engineering, Supply, Installation and commissioning of 80 KLD Pre Fabricated based STP including Coarse Screen, Fine screen, Pumping machinery, DAF Unit, Lamella Plate settler, Active Media Filter, Active Carbon Filter, Dosing system. Disinfection system with associated piping, civil Foundation work & Control system 80KLD Sewage Treatment PlantEach8500000.08500000.01.0FalseNoneNoneFalseNoneFalse8500000.00
266550482922Nonecode19Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, horing, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. , 3.0 M depth & Heavy duty SFRC cover & frame (Common SR Volume-V 2023-24 ,item No. 16.46.3, P. No.204 )Each75314.475314.433.0FalseNoneNoneFalseNoneFalse2485375.20
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17080984830000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17080984830000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17080984830000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17080984880000NoneNoneELIGIBILITYas per tender documentNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneas per tender documentOthersas per tender document
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- as per tender document
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1708098756000
version0
createdDateNone
modifiedDateNone
blockNumberDeputy Conservator of Forests and executive director children park cum mini zoo kalaburgi
streetNone
citykalaburagi
stateKarnataka
pin585102
tenderRecallDTONone