tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1707995893000 | 1 | None | None | Buildings | Construction of one classroom for GHPS Medarvadi(kan urdu telugu) Ballri. | 1350105.38 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2605060 | 81351 | None | Common SR 2023-2024 Vol-2,Item no-19.7.3 Pg no-187 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the
appropriate disposal area as per direction of Engineer-in-charge.In cement morta
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 1091.25 | 1091.25 | 4.81 | False | None | None | False | None | False | 5248.9125 | 0 | 2605061 | 81351 | None | Common SR 2023-2024 Vol-2,Item no-19.2.1 Pg no-187 | Demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of
Engineer-in-charge
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 1763.61 | 1763.61 | 0.52 | False | None | None | False | None | False | 917.0772 | 0 | 2605062 | 81351 | None | Common SR 2023-2024 Vol-1,Item no-2.5.1 Pg no-16 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.-for columns
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 11952.9 | 11952.9 | 2.3 | False | None | None | False | None | False | 27491.67 | 0 | 2605063 | 81351 | None | Common SR 2023-2024 Vol-1,Item no-2.5.1 Pg no-16 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.-For cill
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 0.43 | False | None | None | False | None | False | 3023.3816 | 0 | 2605064 | 81351 | None | Common SR 2023-2024 Vol-1,Item no-2.5.1 Pg no-16 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.-for lintel & beam
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 11249.78 | 11249.78 | 0.92 | False | None | None | False | None | False | 10349.7976 | 0 | 2605065 | 81351 | None | Common SR 2023-2024 Vol-1,Item no-2.5.1 Pg no-16 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.-Chejja
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 11249.78 | 11249.78 | 0.38 | False | None | None | False | None | False | 4274.9164 | 0 | 2605066 | 81351 | None | Common SR 2023-2024 Vol-1,Item no-2.5.1 Pg no-16 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.- Roof Beam
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 15066.68 | 15066.68 | 3.5 | False | None | None | False | None | False | 52733.38 | 0 | 2605067 | 81351 | None | Common SR 2023-2024 Vol-1,Item no-2.5.1 Pg no-16 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.-Roof Slab
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6863.71 | 6863.71 | 6.99 | False | None | None | False | None | False | 47977.3329 | 0 | 2605068 | 81351 | None | Common SR 2023-2024 Vol-1,Item no-2.11 Pg no-18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specificaion-Buildings
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | t | 94.86 | 94.86 | 1585.6 | False | None | None | False | None | False | 150410.016 | 0 | 2605069 | 81351 | None | Common SR 2023-2024 Vol-2,Item no-6.10 Pg no-13 | Providing Brick work with common burnt clay Non Modular bricks of
class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1
cement : 4 coarse sand) including cost of all materials, labour, scaffolding
and usage charges of machinery & other incidental charges complete as
per the direction of engineer incharge of work.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 8717.31 | 8717.31 | 25.29 | False | None | None | False | None | False | 220460.7699 | 0 | 2605070 | 81351 | None | Common SR 2023-2024 Vo2-1,Item no-8.1.1 Pg no-41 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement:
4 fine sand) to brick masonry including rounding off corners wherever
required smooth rendering, providing and removing scaffolding, including
cost of materials, labour, curing complete as per specifications and as per
directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 270.43 | 270.43 | 92.11 | False | None | None | False | None | False | 24909.3073 | 0 | 2605071 | 81351 | None | Common SR 2023-2024 Vo2-1,Item no-8.51 Pg no-50 | Providing and applying white cement based putty of average thickness
1 mm, of approved brand and manufacturer, over the plastered
wall surface to prepare the surface even and smooth complete as per
specifications and as per directions of Engineer in charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 106.05 | 106.05 | 91.71 | False | None | None | False | None | False | 9725.8455 | 0 | 2605072 | 81351 | None | Common SR 2023-2024 Vo2-1,Item no-8.55.20 Pg no-5 | Applying priming coats with primer of approved brand and
manufacture, having low VOC (Volatile Organic Compound) content.
With water thinnable cement primer on wall surface having VOC content
less than 50 g/L as per specifications and as per directions of Engineer
in charge
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 56.21 | 56.21 | 91.8 | False | None | None | False | None | False | 5160.078 | 0 | 2605073 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-8.28 Pg no-45 | Finishing walls with water proofing cement paint of required shade :New
work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after
thoroughly brooming the surface to remove all dirt, dust, mortar drops
and foreign matter including preparing the surface even and sand paper
smooth, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 94.38 | 94.38 | 91.8 | False | None | None | False | None | False | 8664.084 | 0 | 2605074 | 81351 | None | Common SR 2023-2024 Vo2-1,Item no-8.2.1 Pg no-41 | Providing 15 mm cement plaster on the rough side of single or half brick
wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners
wherever required smooth rendering, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications
and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 312.85 | 312.85 | 135.06 | False | None | None | False | None | False | 42253.521 | 0 | 2605075 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-8.32 Pg no-46 | Finishing walls with 100% Premium acrylic emulsion paint having VOC
less than 50 g/L and UV resistance as per IS 15489:2004, Alkali
& fungal resistance, dirt resistance exterior paint of required shade
(Company Depot Tinted) with silicon additives, New work (Two coats
applied @ 1.43 L/ 10 m². Over and including priming coat of exterior
primer applied @ 0.90 L/10 m² with paint of approved quality to give an
even shade, after thoroughly brooming the surface to remove all dirt, dust,
mortar drops and foreign matter including preparing the surface even and
sand paper smooth, cost of materials, labour complete as per specifications
and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 165.44 | 165.44 | 135.06 | False | None | None | False | None | False | 22344.3264 | 0 | 2605076 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-12.13.1 Pg no-1 | Providing Salwood frames of doors, windows, clerestory windows,
ventilators and other frames, wrought, framed or assembled including
making plaster groves (excluding cost of cement concrete and side clamps),
but including cost of materials, labour, usage charges complete as per
specifications.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 104793.31 | 104793.31 | 0.1 | False | None | None | False | None | False | 10479.331 | 0 | 2605077 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-12.15 Pg no-100 | Providing and fixing in position fully panelled Mathi/Nandi wood shutters
for doors with stiles and rails of 40mm. thick with bottom and lock rails
180mm wide top rail and stiles 100mm wide as per drawing and panels of
25mm thick including cost of materials, labour, usage charges complete
as per specifications. (excluding cost of Fixture)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 7314.27 | 7314.27 | 2.52 | False | None | None | False | None | False | 18431.9604 | 0 | 2605078 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-8.33.1 Pg no-46 | Finishing with Deluxe Multi surface paint system for interiors and exteriors
using Primer as per manufacturers specifications: Two coats applied on
walls @ 1.25 L/10 m² over and including one coat of Special primer applied
@ 0.75 L/10 m² with paint of approved quality to give an even shade, after
thoroughly brooming the surface to remove all dirt, dust, mortar drops
and foreign matter including preparing the surface even and sand paper
smooth, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree
angle with 10 years life)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 167.56 | 167.56 | 8.71 | False | None | None | False | None | False | 1459.4476 | 0 | 2605079 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-12.51 Pg no-104 | Fixing of door frame in an existing opening including embedding frame in
floor and walls after cutting masonry for holdfasts for embedding holdfast
in cement concrete 1:3:6 of 20mm and down size granite metal painting
two coats of coal tar to sides of frame, making good the damages to walls
and floor as required and disposal of the debris with lead upto 50 m.
including cost of materials, labour charges, complete as per specifications.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1077.47 | 1077.47 | 1.0 | False | None | None | False | None | False | 1077.47 | 0 | 2605080 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-12.52 Pg no-104 | Fixing of window frame in an existing opening including embedding frame
in floor and walls after cutting masonry for holdfasts for embedding
holdfast in cement concrete 1:3:6 of 20mm and down size granite metal
painting two coats of coal tar to sides of frame, making good the damages
to walls and floor as required and disposal of the debries with lead
upto 50 m. including cost of materials, labour charges, complete as per
specifications
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 819.77 | 819.77 | 3.0 | False | None | None | False | None | False | 2459.31 | 0 | 2605081 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-11.34B Pg no-86 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 194.07 | 194.07 | 189.0 | False | None | None | False | None | False | 36679.23 | 0 | 2605082 | 81351 | None | Common SR 2023-2024 Vol-2,Item no-8.40 Pg no-48 | Painting with synthetic enamel paint of approved brand and
manufacture to give an even shade :Two coats on new work after
thoroughly brooming the surface to remove all dirt, dust, mortar drops
and foreign matter including preparing the surface even and sand paper
smooth, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge."
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 121.96 | 121.96 | 9.0 | False | None | None | False | None | False | 1097.64 | 0 | 2605083 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-12.90 Pg no-110 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi
chambered UPVC(Matching to RAL-9016) sections and with minimum
TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and
lead free, gaskets -grey colour having isolated drainage and reinforced with
Galvanized Iron profile through-out the window frame. The outer frame
having an overall size of 108mm width x 45mmheight with reinforcement
of 1mm thickness and Sash with overall size of 39mm x 75mm with GI
reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded
Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows
shall be provided with 6mm plain float glass, standard hardware& Multi
point locking system with touch lock. Wall thickness of frame & sash shall
be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The
cost is inclusive of all fixtures and separate charges for minor T&P's shall
not be made ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6759.63 | 6759.63 | 5.76 | False | None | None | False | None | False | 38935.4688 | 0 | 2605084 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-12.85 Pg no-109 | providing & fixing of louvered ventilator made out of multi chambered
UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium
Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free
with gaskets -grey colour having isolated drainage and reinforced with
Galvanized Iron profile through-out the ventilator frame. The frame having
overall size of 39mm x 39mm with GI reinforcement of 1mm thickness.
Louver clip in Aluminium (powder coated in white) will be used on the
frame along with plastic parts for fixing the 4 mm pin head glass. Wall
thickness of frame shall be 2mm.Maximum possible size 1000mm x
1000mm.(The cost is inclusive of all fixtures and separate charges for minor
T&P's shall not be made
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6065.0 | 6065.0 | 3.24 | False | None | None | False | None | False | 19650.6 | 0 | 2605085 | 81351 | None | Common SR 2023-2024 Vol-2,Item no-9.12.2 Pg no-60 | Providing and laying vitrified floor tiles with thickness 9-10 mm in
different sizes with water absorption less than 0.08% and conforming to
IS: 15622, of approved make, in all colours and shades, laid on 20mm thick
cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement
slurry @ 3.3 kg/ m2 including grouting the joints with white cement and
matching pigments etc., complete.Size of Tile 600x600 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1214.27 | 1214.27 | 33.6 | False | None | None | False | None | False | 40799.472 | 0 | 2605086 | 81351 | None | Common SR 2023-2024 Vol-2,Item no-9.30 Pg no-64 | Providing and laying flooring and steps fine machine polished granite stone
slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints finished with cement mortar 1:3 over existing cement concrete bed , including
cost of materials, mortar, labour, curing complete as per specifications.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 5650.34 | 5650.34 | 9.6 | False | None | None | False | None | False | 54243.264 | 0 | 2605087 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-22.15.2 Pg no-21 | Providing and fixing Stainless Steel Fixtures conforming to 304
graded steel as per direction of engineer in charge.SS Handles 300mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 583.28 | 583.28 | 1.0 | False | None | None | False | None | False | 583.28 | 0 | 2605088 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-22.15.4 Pg no-21 | Providing and fixing Stainless Steel Fixtures conforming to 304
graded steel as per direction of engineer in charge.SS Aldrop 16mm dia, 300mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 397.69 | 397.69 | 1.0 | False | None | None | False | None | False | 397.69 | 0 | 2605089 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-22.15.7 Pg no-21 | Providing and fixing Stainless Steel Fixtures conforming to 304
graded steel as per direction of engineer in charge SS Tower Bolts 250x10mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 212.1 | 212.1 | 1.0 | False | None | None | False | None | False | 212.1 | 0 | 2605090 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-22.15.8 Pg no-21 | roviding and fixing Stainless Steel Fixtures conforming to 304
graded steel as per direction of engineer in charge. SS hinges 125 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 53.03 | 53.03 | 4.0 | False | None | None | False | None | False | 212.12 | 0 | 2605091 | 81351 | None | Common SR 2023-2024 Vo2-2,Item no-22.15.10 Pg no- | Providing and fixing Stainless Steel Fixtures conforming to 304
graded steel as per direction of engineer in charge. SS Door stopper 75mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 106.05 | 106.05 | 1.0 | False | None | None | False | None | False | 106.05 | 0 | 2605092 | 81351 | None | Common SR 2023-2024 Vol-2,Item no-15.1 Pg no-149 | Providing and laying water proofing treatment to the Roof with PU based
single component elastomeric pure polyurethane based coating on New
terrace/Chajjas/Sunken portion of WC: Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than
400% and tensile strength greater than 2MPa as per ASTM D412. The
waterproofing membrane to be applied in 2coats @ 1.6 kg/m2
to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 gm2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation,
making coving at Junction, Bore Packing, treatment of construction joints
completely as per specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 866.43 | 866.43 | 51.04 | False | None | None | False | None | False | 44222.5872 | 0 | 2605093 | 81351 | None | Common SR 2023-2024 Vol-2,Item no-13.48 Pg no-125 | Providing and fixing on wall face unplasticised Rigid PVC rain water
pipes conforming to IS : 13592 Type A, including jointing with seal ring
conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i)
Single socketed pipes 100 mm diameter"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Rmtr | 308.61 | 308.61 | 50.0 | False | None | None | False | None | False | 15430.5 | 0 | 2605094 | 81351 | None | I.No.1 | Supplying of 2 seater reversible desk (1.5ft Height)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 5164.64 | 5164.64 | 46.0 | False | None | None | False | None | False | 237573.44 | 0 | 2605095 | 81351 | None | Common SR 2023-2024 Vol-3,Item no-8.54 Pg no-78 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling,transportation, and labour etc complete. Spec. No.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2605096 | 81351 | None | I.No. | Supplying of office tables for staff
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 8500.0 | 8500.0 | 10.0 | False | None | None | False | None | False | 85000.0 | 0 | 2605097 | 81351 | None | I.No.1 | Supplying of officeChairs for staff
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 2500.0 | 2500.0 | 10.0 | False | None | None | False | None | False | 25000.0 | 0 | 2605098 | 81351 | None | I.No.1 | Supplying of office Green board for classrooms
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 17665.0 | 17665.0 | 4.0 | False | None | None | False | None | False | 70660.0 | 0 |
| 1707995893000 | 0 | None | None | Buildings | Electrification | 64861.32 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2605099 | 81352 | None | IC: 1.2.1 | Concealed Conduit SystemSupplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 69.3 | 69.3 | 24.0 | False | None | None | False | None | False | 1663.2 | 0 | 2605100 | 81352 | None | IC: 1.3.2 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick
with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.Common Sr 2023-24 vol-6,pg no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 82.95 | 82.95 | 7.0 | False | None | None | False | None | False | 580.65 | 0 | 2605101 | 81352 | None | IC: 1.3.2 | Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase & Neutral)& 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box,the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outl.Short point upto 3Mtr from tapping point to out let via switch box . Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 282.45 | 282.45 | 2.0 | False | None | None | False | None | False | 564.9 | 0 | 2605102 | 81352 | None | IC: 2.2.1 | Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch. Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 397.95 | 397.95 | 5.0 | False | None | None | False | None | False | 1989.75 | 0 | 2605103 | 81352 | None | IC: 2.2.2 | Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box.Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 582.75 | 582.75 | 5.0 | False | None | None | False | None | False | 2913.75 | 0 | 2605104 | 81352 | None | IC: 2.2.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010.1.5 mm2 Common SR 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 27.3 | 27.3 | 18.0 | False | None | None | False | None | False | 491.4 | 0 | 2605105 | 81352 | None | IC: 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010.2.5 mm2 Common SR 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 44.1 | 44.1 | 35.0 | False | None | None | False | None | False | 1543.5 | 0 | 2605106 | 81352 | None | IC: 2.3.3 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.10-12 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 274.05 | 274.05 | 1.0 | False | None | None | False | None | False | 274.05 | 0 | 2605107 | 81352 | None | IC: 3.3.6 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.16 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 308.7 | 308.7 | 1.0 | False | None | None | False | None | False | 308.7 | 0 | 2605108 | 81352 | None | IC: 3.3.7 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.10-12 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 361.2 | 361.2 | 1.0 | False | None | None | False | None | False | 361.2 | 0 | 2605109 | 81352 | None | IC: 3.5.6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.16 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 416.85 | 416.85 | 12.0 | False | None | None | False | None | False | 5002.2 | 0 | 2605110 | 81352 | None | IC: 3.5.7 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A One Way Switch Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 107.1 | 107.1 | 13.0 | False | None | None | False | None | False | 1392.3 | 0 | 2605111 | 81352 | None | IC: 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 179.55 | 179.55 | 2.0 | False | None | None | False | None | False | 359.1 | 0 | 2605112 | 81352 | None | IC: 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293Stepped Fan Regulator Two Module Common SR 2023-24 vol-6,pg no-9 Stepped Fan Regulator Two Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 328.65 | 328.65 | 4.0 | False | None | None | False | None | False | 1314.6 | 0 | 2605113 | 81352 | None | IC: 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 247.8 | 247.8 | 1.0 | False | None | None | False | None | False | 247.8 | 0 | 2605114 | 81352 | None | IC: 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone Socke Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 163.8 | 163.8 | 1.0 | False | None | None | False | None | False | 163.8 | 0 | 2605115 | 81352 | None | IC: 3.6.11 | Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board.6A Bakelite Ceiling Rose.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 81.9 | 81.9 | 4.0 | False | None | None | False | None | False | 327.6 | 0 | 2605116 | 81352 | None | IC: 3.14.5 | Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board.6A Pendant Holder.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 74.55 | 74.55 | 7.0 | False | None | None | False | None | False | 521.85 | 0 | 2605117 | 81352 | None | IC: 3.14.6 | Supplying and fixing regular 4 Way MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCBs as an incomer for 3 phase Double door with necessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCBs as outgoings confirming to IS/IEC 60898 - 2.Common SR 2023-24 Vol-6 page no-17 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 549.15 | 549.15 | 1.0 | False | None | None | False | None | False | 549.15 | 0 | 2605118 | 81352 | None | IC: 5.17.1 | Supplying and fixingof 6to32 Amps Double pole miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 10329.0 | 10329.0 | 1.0 | False | None | None | False | None | False | 10329.0 | 0 | 2605119 | 81352 | None | IC: 5.17.4 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBs single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure.4 Way SP & N .Common SR 2023-24 Vol-6 page no-18 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1303.05 | 1303.05 | 1.0 | False | None | None | False | None | False | 1303.05 | 0 | 2605120 | 81352 | None | IC: 5.19.1 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter.Common SR 2023-24 Vol-6 page no-19 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1449.0 | 1449.0 | 1.0 | False | None | None | False | None | False | 1449.0 | 0 | 2605121 | 81352 | None | IC: 5.3 | Supplying capacitor type ceiling fan complete with down rod blades,shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system.48 inches Sweep (1200 mm) Regular mode.Common SR 2023-24 Vol-6,Page no-30 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3133.2 | 3133.2 | 4.0 | False | None | None | False | None | False | 12532.8 | 0 | 2605122 | 81352 | None | IC: 6.3.1 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.LED light fitting 1 x 4 - 20/22 W.Common SR 2023-24 Vol-6,Page no-43. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 724.5 | 724.5 | 4.0 | False | None | None | False | None | False | 2898.0 | 0 | 2605123 | 81352 | None | IC: 11.3.2 | Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRIgreater than 70%. efficacy greater than 80 lumen per W, lifegreater than 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF greater than 0.95, power loss should lesser than 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.9W, 6500K.Common SR 2023-24 Vol-6,Page no-47 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 168.0 | 168.0 | 3.0 | False | None | None | False | None | False | 504.0 | 0 | 2605124 | 81352 | None | IC: 11.11.4 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 161.7 | 161.7 | 4.0 | False | None | None | False | None | False | 646.8 | 0 | 2605125 | 81352 | None | IC: 13.7.1 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and S hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired.Common SR 2023-24,Vol-6 page no-57 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 330.75 | 330.75 | 4.0 | False | None | None | False | None | False | 1323.0 | 0 | 2605126 | 81352 | None | IC: 13.11 | GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg.Common SR 2023-24,Vol-6 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 780.15 | 780.15 | 1.0 | False | None | None | False | None | False | 780.15 | 0 | 2605127 | 81352 | None | IC: 51.01 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 709.8 | 709.8 | 1.0 | False | None | None | False | None | False | 709.8 | 0 | 2605128 | 81352 | None | IC: 54.02 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 325.5 | 325.5 | 1.0 | False | None | None | False | None | False | 325.5 | 0 | 2605129 | 81352 | None | IC: 54.03 | Digging of Pit for providing GI Pipe type Earthing for Haed Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Bag | 3139.5 | 3139.5 | 1.0 | False | None | None | False | None | False | 3139.5 | 0 | 2605130 | 81352 | None | IC: 1.6.2 | 1.1 kV, XLPE or Heat resistant PVC
insulated, PVC exutruted Inner Seath
Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip
thickness and resistivity as per IS-3975 10 Sqmm, 2 Core, (9 GI Strips - 4x0.8mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 83193.6 | 83193.6 | 0.03 | False | None | None | False | None | False | 2495.808 | 0 | 2605131 | 81352 | None | IC: 32.01 | Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed.In Ordinary Soil. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 273.0 | 273.0 | 11.25 | False | None | None | False | None | False | 3071.25 | 0 | 2605132 | 81352 | None | IC: 29.02 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. 2.5 to 25 Sqmm (Single/3.5/4 Core) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | cm | 21930.3 | 21930.3 | 0.03 | False | None | None | False | None | False | 657.909 | 0 | 2605133 | 81352 | None | IC: 21.05 | Supplying heavy gauge PVC conduit pipe 25mm dia 2 mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws.25 mm dia 2 mm thick.Common Sr 2023-24 page no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 85.05 | 85.05 | 25.0 | False | None | None | False | None | False | 2126.25 | 0 |
|
|
---|