createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1707994895456
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2530.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose23-02-2024 16:02:38
tenderQueryClose22-02-2024 16:41:35
technicalBidOpen24-02-2024 16:03:41
publishedDate16-02-2024 19:34:15
publishedByPostPWD_EE_DIV_BID
publishedByUserKPE14569 - SHIVSHANKER V KAMSHETTY
bidValidityPeriod90
noOfCalls1
preBidMeetingDate22-02-2024 16:40:55
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShivshanker kamshetty
splitEmdRequiredYnTrue
emdBankGuarantee100000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08482226440
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1707994895485
version4
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT8453
titleConstruction of Bus Shelter at Halsi (T), Khatakchincholi Village and Providing Basic amenities to Mehkar Bus stand at Mehkar Village in Bhalki Taluka.
descriptionConstruction of Bus Shelter at Halsi (T), Khatakchincholi Village and Providing Basic amenities to Mehkar Bus stand at Mehkar Village in Bhalki Taluka.
categoryWORKS
categoryTextWorks
ecv10114503.64
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1692
locationNamePWD Division Office Bidar
provisionalAmount12000000.0
groupOverheadTotal0.0
fileNumberPWD/Bhalki/KKRDB/2023-24/AM/BusShelter
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17079948950000NoneNoneBuildingsDetailed Estimate of Halsi (T) - Bus Shelter1109578.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
260455581315NoneCSR 23-24 Volume-1, Pg No. 8 SI. No.1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth (CSR 23-24 Volume-1, Pg No. 8/ SI. No.1.12)Cum99.7599.7511.55FalseNoneNoneFalseNoneFalse1152.11250
260455681315NoneCSR 23-24 Volume-1, Pg No. 8 SI. No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (CSR 23-24 Volume-1, Pg No. 8/ SI. No.1.14.1)Cum107.1107.127.98FalseNoneNoneFalseNoneFalse2996.6580
260455781315NoneCSR 23-24 Volume-1, Pg No. 15 SI. No.2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 15/ SI. No.2.1.3)Cum6288.456288.454.1FalseNoneNoneFalseNoneFalse25782.6450
260455881315NoneCSR 23-24 Volume-2, Pg No. 9 SI. No.5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (CSR 23-24 Volume-2, Pg No. 9/ SI. No.5.3)Cum6515.256515.2511.67FalseNoneNoneFalseNoneFalse76032.96750
260455981315NoneCSR 23-24 Volume-1, Pg No. 15 SI. No.2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 15/ SI. No.2.2.1)Cum6601.356601.353.89FalseNoneNoneFalseNoneFalse25679.25150
260456081315NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.1aFormwark for Footings Isolated @ 8% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.1a)Cum528.11528.113.89FalseNoneNoneFalseNoneFalse2054.34790
260456181315NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 DesignMix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.4.2)Cum6639.156639.152.84FalseNoneNoneFalseNoneFalse18855.1860
260456281315NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.7Formwark for Columns @ 70% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.7)Cum4647.414647.410.97FalseNoneNoneFalseNoneFalse4507.98770
260456381315NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.1aFormwark for Plinth beams of Buildings @ 50% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.1a)Cum2323.72323.71.87FalseNoneNoneFalseNoneFalse4345.3190
260456481315NoneCSR 23-24 Volume-1, Pg No. 7 SI. No.1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (CSR 23-24 Volume-1, Pg No. 7/ SI. No.1.9)Cum279.3279.342.32FalseNoneNoneFalseNoneFalse11819.9760
260456581315NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.5.1)Cum6961.56961.515.92FalseNoneNoneFalseNoneFalse110827.080
260456681315NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.7Formwark for Columns @ 70% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.7)Cum4873.054873.052.2FalseNoneNoneFalseNoneFalse10720.710
260456781315NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.12Formwark for Beams & Lintels of Building @ 60% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.12)Cum4176.94176.94.23FalseNoneNoneFalseNoneFalse17668.2870
260456881315NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.13Formwark for Roof Slab of Building @ 50% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.13)Cum3480.753480.759.3FalseNoneNoneFalseNoneFalse32370.9750
260456981315NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.17Formwark for Chejjas, Canopy & Other Architectural projections of minor sections @ 45% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.17)Cum3132.683132.680.19FalseNoneNoneFalseNoneFalse595.20920
260457081315NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.4.1)Cum6724.26724.26.79FalseNoneNoneFalseNoneFalse45657.3180
260457181315NoneCSR 23-24 Volume-1, Pg No. 18 SI. No.2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (CSR 23-24 Volume-1, Pg No. 18/ SI. No.2.11a)Tonne93929.8593929.852.49FalseNoneNoneFalseNoneFalse233885.32650
260457281315NoneCSR 23-24 Volume-2, Pg No. 14 SI. No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(CSR 23-24 Volume-2, Pg No. 14/ SI. No.6.8)Cum8367.458367.4514.96FalseNoneNoneFalseNoneFalse125177.0520
260457381315NoneCSR 23-24 Volume-2, Pg No. 86 SI. No.11.31Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge including cost of materials, labour, usage charges of machinery complete as per specifications. (CSR 23-24 Volume-2, Pg No. 86/ SI. No.11.31)Kg120.75120.75150.0FalseNoneNoneFalseNoneFalse18112.50
260457481315NoneCSR 23-24 Volume-2, Pg No. 108-109 SI. No.12.84Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight withreinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. CSR 23-24 Volume-2, Pg No. 108-109/ SI. No.12.84)Sqm5274.155274.156.0FalseNoneNoneFalseNoneFalse31644.90
260457581315NoneCSR 23-24 Volume-2, Pg No. 64 SI. No.9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (CSR 23-24 Volume-2, Pg No. 64/ SI. No.9.34)Sqm1622.251622.2542.24FalseNoneNoneFalseNoneFalse68523.840
260457681315NoneCSR 23-24 Volume-2, Pg No. 63 SI. No.9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. (CSR 23-24 Volume-2, Pg No. 63/ SI. No.9.24)Sqm2994.62994.621.16FalseNoneNoneFalseNoneFalse63365.7360
260457781315NoneCSR 23-24 Volume-2, Pg No. 41 SI. No.8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 41/ SI. No.8.1.2)Sqm253.05253.05124.27FalseNoneNoneFalseNoneFalse31446.52350
260457881315NoneCSR 23-24 Volume-2, Pg No. 50 SI. No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (CSR 23-24 Volume-2, Pg No. 50/ SI. No.8.51)Sqm105.0105.0124.27FalseNoneNoneFalseNoneFalse13048.350
260457981315None2023-24 CSR, Volume-2, Pg No. 42 SI. No.8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge (2023-24 CSR, Volume-2, Pg No. 42/ SI. No.8.2.2)Sqm292.95292.95132.02FalseNoneNoneFalseNoneFalse38675.2590
260458081315NoneCSR 23-24 Volume-2, Pg No. 44 SI. No.8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. (CSR 23-24 Volume-2, Pg No. 44/ SI. No.8.16a)Sqm1299.91299.910.08FalseNoneNoneFalseNoneFalse13102.9920
260458181315NoneCSR 23-24 Volume-2, Pg No. 26 SI. No.7.35Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete. (CSR 23-24 Volume-2, Pg No. 26/ SI. No.7.35)Sqm308.7308.710.08FalseNoneNoneFalseNoneFalse3111.6960
260458281315NoneCSR 23-24 Volume-2, Pg No. 47 SI. No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 47/ SI. No.8.33.3)Sqm145.95145.956.0FalseNoneNoneFalseNoneFalse875.70
260458381315NoneCSR 23-24 Volume-2, Pg No. 46 SI. No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 46/ SI. No.8.30)Sqm182.7182.7132.02FalseNoneNoneFalseNoneFalse24120.0540
260458481315NoneCSR 23-24 Volume-2, Pg No. 46 SI. No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (CSR 23-24 Volume-2, Pg No. 46/ SI. No.8.33.1)Sqm165.9165.9124.27FalseNoneNoneFalseNoneFalse20616.3930
260458581315NoneCSR 23-24 Volume-2, Pg No. 84 SI. No.11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge. (CSR 23-24 Volume-2, Pg No. 84/ SI. No.11.26.1)Sqm144.9144.9185.0FalseNoneNoneFalseNoneFalse26806.50
260458681315Noneitem 1KKRDB Name BoardEach6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
17079948960000NoneNoneBuildingsDetailed Estimate of Khatakchincholi - Bus Shelter1109578.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
260458781316NoneCSR 23-24 Volume-1, Pg No. 8 SI. No.1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth (CSR 23-24 Volume-1, Pg No. 8/ SI. No.1.12)Cum99.7599.7511.55FalseNoneNoneFalseNoneFalse1152.11250
260458881316NoneCSR 23-24 Volume-1, Pg No. 8 SI. No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (CSR 23-24 Volume-1, Pg No. 8/ SI. No.1.14.1)Cum107.1107.127.98FalseNoneNoneFalseNoneFalse2996.6580
260458981316NoneCSR 23-24 Volume-1, Pg No. 15 SI. No.2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 15/ SI. No.2.1.3)Cum6288.456288.454.1FalseNoneNoneFalseNoneFalse25782.6450
260459081316NoneCSR 23-24 Volume-2, Pg No. 9 SI. No.5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (CSR 23-24 Volume-2, Pg No. 9/ SI. No.5.3)Cum6515.256515.2511.67FalseNoneNoneFalseNoneFalse76032.96750
260459181316NoneCSR 23-24 Volume-1, Pg No. 15 SI. No.2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 15/ SI. No.2.2.1)Cum6601.356601.353.89FalseNoneNoneFalseNoneFalse25679.25150
260459281316NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.1aFormwark for Footings Isolated @ 8% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.1a)Cum528.11528.113.89FalseNoneNoneFalseNoneFalse2054.34790
260459381316NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 DesignMix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.4.2)Cum6639.156639.152.84FalseNoneNoneFalseNoneFalse18855.1860
260459481316NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.7Formwark for Columns @ 70% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.7)Cum4647.414647.410.97FalseNoneNoneFalseNoneFalse4507.98770
260459581316NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.1aFormwark for Plinth beams of Buildings @ 50% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.1a)Cum2323.72323.71.87FalseNoneNoneFalseNoneFalse4345.3190
260459681316NoneCSR 23-24 Volume-1, Pg No. 7 SI. No.1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (CSR 23-24 Volume-1, Pg No. 7/ SI. No.1.9)Cum279.3279.342.32FalseNoneNoneFalseNoneFalse11819.9760
260459781316NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.5.1)Cum6961.56961.515.92FalseNoneNoneFalseNoneFalse110827.080
260459881316NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.7Formwark for Columns @ 70% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.7)Cum4873.054873.052.2FalseNoneNoneFalseNoneFalse10720.710
260459981316NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.12Formwark for Beams & Lintels of Building @ 60% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.12)Cum4176.94176.94.23FalseNoneNoneFalseNoneFalse17668.2870
260460081316NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.13Formwark for Roof Slab of Building @ 50% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.13)Cum3480.753480.759.3FalseNoneNoneFalseNoneFalse32370.9750
260460181316NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.17Formwark for Chejjas, Canopy & Other Architectural projections of minor sections @ 45% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.17)Cum3132.683132.680.19FalseNoneNoneFalseNoneFalse595.20920
260460281316NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.4.1)Cum6724.26724.26.79FalseNoneNoneFalseNoneFalse45657.3180
260460381316NoneCSR 23-24 Volume-1, Pg No. 18 SI. No.2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (CSR 23-24 Volume-1, Pg No. 18/ SI. No.2.11a)Tonne93929.8593929.852.49FalseNoneNoneFalseNoneFalse233885.32650
260460481316NoneCSR 23-24 Volume-2, Pg No. 14 SI. No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(CSR 23-24 Volume-2, Pg No. 14/ SI. No.6.8)Cum8367.458367.4514.96FalseNoneNoneFalseNoneFalse125177.0520
260460581316NoneCSR 23-24 Volume-2, Pg No. 86 SI. No.11.31Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge including cost of materials, labour, usage charges of machinery complete as per specifications. (CSR 23-24 Volume-2, Pg No. 86/ SI. No.11.31)Kg120.75120.75150.0FalseNoneNoneFalseNoneFalse18112.50
260460681316NoneCSR 23-24 Volume-2, Pg No. 108-109 SI. No.12.84Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight withreinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. CSR 23-24 Volume-2, Pg No. 108-109/ SI. No.12.84)Sqm5274.155274.156.0FalseNoneNoneFalseNoneFalse31644.90
260460781316NoneCSR 23-24 Volume-2, Pg No. 64 SI. No.9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (CSR 23-24 Volume-2, Pg No. 64/ SI. No.9.34)Sqm1622.251622.2542.24FalseNoneNoneFalseNoneFalse68523.840
260460881316NoneCSR 23-24 Volume-2, Pg No. 63 SI. No.9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. (CSR 23-24 Volume-2, Pg No. 63/ SI. No.9.24)Sqm2994.62994.621.16FalseNoneNoneFalseNoneFalse63365.7360
260460981316NoneCSR 23-24 Volume-2, Pg No. 41 SI. No.8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 41/ SI. No.8.1.2)Sqm253.05253.05124.27FalseNoneNoneFalseNoneFalse31446.52350
260461081316NoneCSR 23-24 Volume-2, Pg No. 50 SI. No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (CSR 23-24 Volume-2, Pg No. 50/ SI. No.8.51)Sqm105.0105.0124.27FalseNoneNoneFalseNoneFalse13048.350
260461181316None2023-24 CSR, Volume-2, Pg No. 42 SI. No.8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge (2023-24 CSR, Volume-2, Pg No. 42/ SI. No.8.2.2)Sqm292.95292.95132.02FalseNoneNoneFalseNoneFalse38675.2590
260461281316NoneCSR 23-24 Volume-2, Pg No. 44 SI. No.8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. (CSR 23-24 Volume-2, Pg No. 44/ SI. No.8.16a)Sqm1299.91299.910.08FalseNoneNoneFalseNoneFalse13102.9920
260461381316NoneCSR 23-24 Volume-2, Pg No. 26 SI. No.7.35Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete. (CSR 23-24 Volume-2, Pg No. 26/ SI. No.7.35)Sqm308.7308.710.08FalseNoneNoneFalseNoneFalse3111.6960
260461481316NoneCSR 23-24 Volume-2, Pg No. 47 SI. No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 47/ SI. No.8.33.3)Sqm145.95145.956.0FalseNoneNoneFalseNoneFalse875.70
260461581316NoneCSR 23-24 Volume-2, Pg No. 46 SI. No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 46/ SI. No.8.30)Sqm182.7182.7132.02FalseNoneNoneFalseNoneFalse24120.0540
260461681316NoneCSR 23-24 Volume-2, Pg No. 46 SI. No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (CSR 23-24 Volume-2, Pg No. 46/ SI. No.8.33.1)Sqm165.9165.9124.27FalseNoneNoneFalseNoneFalse20616.3930
260461781316NoneCSR 23-24 Volume-2, Pg No. 84 SI. No.11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge. (CSR 23-24 Volume-2, Pg No. 84/ SI. No.11.26.1)Sqm144.9144.9185.0FalseNoneNoneFalseNoneFalse26806.50
260461881316Noneitem 1KKRDB Name BoardEach6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
17079948960000NoneNoneBuildingsDetailed Estimate of Mehkar Bus Shelter- GF - Bal Work3314010.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
260461981317NoneCSR 23-24 Volume-1, Pg No. 8 SI. No.1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth (CSR 23-24 Volume-1, Pg No. 8/ SI. No.1.12)Cum99.7599.7535.7FalseNoneNoneFalseNoneFalse3561.0750
260462081317NoneCSR 23-24 Volume-1, Pg No. 8 SI. No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (CSR 23-24 Volume-1, Pg No. 8/ SI. No.1.14.1)Cum107.1107.188.72FalseNoneNoneFalseNoneFalse9501.9120
260462181317NoneCSR 23-24 Volume-1, Pg No. 15 SI. No.2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 15/ SI. No.2.1.3)Cum6288.456288.458.56FalseNoneNoneFalseNoneFalse53829.1320
260462281317NoneCSR 23-24 Volume-2, Pg No. 9 SI. No.5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (CSR 23-24 Volume-2, Pg No. 9/ SI. No.5.3)Cum6515.256515.2522.79FalseNoneNoneFalseNoneFalse148482.54750
260462381317NoneCSR 23-24 Volume-1, Pg No. 15 SI. No.2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 15/ SI. No.2.2.1)Cum6601.356601.3510.86FalseNoneNoneFalseNoneFalse71690.6610
260462481317NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.1aFormwark for Footings Isolated @ 8% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.1a)Cum528.11528.1110.86FalseNoneNoneFalseNoneFalse5735.27460
260462581317NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 DesignMix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.4.2)Cum6639.156639.156.75FalseNoneNoneFalseNoneFalse44814.26250
260462681317NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.7Formwark for Columns @ 70% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.7)Cum4647.414647.412.72FalseNoneNoneFalseNoneFalse12640.95520
260462781317NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.1aFormwark for Plinth beams of Buildings @ 50% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.1a)Cum2323.72323.74.03FalseNoneNoneFalseNoneFalse9364.5110
260462881317NoneCSR 23-24 Volume-1, Pg No. 7 SI. No.1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (CSR 23-24 Volume-1, Pg No. 7/ SI. No.1.9)Cum279.3279.3113.6FalseNoneNoneFalseNoneFalse31728.480
260462981317NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.5.1)Cum6961.56961.542.92FalseNoneNoneFalseNoneFalse298787.580
260463081317NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.7Formwark for Columns @ 70% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.7)Cum4873.054873.055.29FalseNoneNoneFalseNoneFalse25778.43450
260463181317NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.12Formwark for Beams & Lintels of Building @ 60% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.12)Cum4176.94176.99.97FalseNoneNoneFalseNoneFalse41643.6930
260463281317NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.13Formwark for Roof Slab of Building @ 50% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.13)Cum3480.753480.7527.33FalseNoneNoneFalseNoneFalse95128.89750
260463381317NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.17Formwark for Chejjas, Canopy & Other Architectural projections of minor sections @ 45% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.17)Cum3132.683132.680.33FalseNoneNoneFalseNoneFalse1033.78440
260463481317NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.4.1)Cum6724.26724.215.87FalseNoneNoneFalseNoneFalse106713.0540
260463581317NoneCSR 23-24 Volume-1, Pg No. 18 SI. No.2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (CSR 23-24 Volume-1, Pg No. 18/ SI. No.2.11a)Tonne93929.8593929.854.97FalseNoneNoneFalseNoneFalse466831.35450
260463681317NoneCSR 23-24 Volume-2, Pg No. 14 SI. No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(CSR 23-24 Volume-2, Pg No. 14/ SI. No.6.8)Cum8367.458367.4552.65FalseNoneNoneFalseNoneFalse440546.24250
260463781317NoneCSR 23-24 Volume-2, Pg No. 86 SI. No.11.31Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge including cost of materials, labour, usage charges of machinery complete as per specifications. (CSR 23-24 Volume-2, Pg No. 86/ SI. No.11.31)Kg120.75120.75224.64FalseNoneNoneFalseNoneFalse27125.280
260463881317NoneCSR 23-24 Volume-2, Pg No. 108-109 SI. No.12.84Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight withreinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. CSR 23-24 Volume-2, Pg No. 108-109/ SI. No.12.84)Sqm5274.155274.1510.32FalseNoneNoneFalseNoneFalse54429.2280
260463981317NoneCSR 23-24 Volume-2, Pg No. 64 SI. No.9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (CSR 23-24 Volume-2, Pg No. 64/ SI. No.9.34)Sqm1622.251622.25194.96FalseNoneNoneFalseNoneFalse316273.860
260464081317NoneCSR 23-24 Volume-2, Pg No. 41 SI. No.8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 41/ SI. No.8.1.2)Sqm253.05253.05436.58FalseNoneNoneFalseNoneFalse110476.5690
260464181317NoneCSR 23-24 Volume-2, Pg No. 50 SI. No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (CSR 23-24 Volume-2, Pg No. 50/ SI. No.8.51)Sqm105.0105.0424.06FalseNoneNoneFalseNoneFalse44526.30
260464281317None2023-24 CSR, Volume-2, Pg No. 42 SI. No.8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge (2023-24 CSR, Volume-2, Pg No. 42/ SI. No.8.2.2)Sqm292.95292.95179.22FalseNoneNoneFalseNoneFalse52502.4990
260464381317NoneCSR 23-24 Volume-2, Pg No. 44 SI. No.8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. (CSR 23-24 Volume-2, Pg No. 44/ SI. No.8.16a)Sqm1299.91299.912.9FalseNoneNoneFalseNoneFalse16768.710
260464481317NoneCSR 23-24 Volume-2, Pg No. 26 SI. No.7.35Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete. (CSR 23-24 Volume-2, Pg No. 26/ SI. No.7.35)Sqm308.7308.710.08FalseNoneNoneFalseNoneFalse3111.6960
260464581317NoneCSR 23-24 Volume-2, Pg No. 47 SI. No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 47/ SI. No.8.33.3)Sqm145.95145.9512.48FalseNoneNoneFalseNoneFalse1821.4560
260464681317NoneCSR 23-24 Volume-2, Pg No. 46 SI. No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 46/ SI. No.8.30)Sqm182.7182.7179.22FalseNoneNoneFalseNoneFalse32743.4940
260464781317NoneCSR 23-24 Volume-2, Pg No. 46 SI. No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (CSR 23-24 Volume-2, Pg No. 46/ SI. No.8.33.1)Sqm165.9165.9424.06FalseNoneNoneFalseNoneFalse70351.5540
260464881317NoneCSR 23-24 Volume-2, Pg No. 84 SI. No.8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Comman SR, Volume-2, Pg No. 46/ SI. No.8.33.2) Sqm144.9144.924.19FalseNoneNoneFalseNoneFalse3505.1310
260464981317NoneComman SR, Volume 2 Pg No. 99 SI. No.12.12Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications. (Comman SR, Volume-2, Pg No. 99/ SI. No.12.12)Cum130412.1130412.10.19FalseNoneNoneFalseNoneFalse24778.2990
260465081317NoneComman SR, Volume-2, Pg No. 104 SI. No.12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (Comman SR, Volume-2, Pg No. 104/ SI. No.12.51) No1066.81066.83.0FalseNoneNoneFalseNoneFalse3200.40
260465181317NoneComman SR, Volume-2, Pg No. 100 SI. No.12.16Providing and fixing in position fully panelled Mathi/Nandi wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) (Comman SR, Volume-2, Pg No. 100/ SI. No.12.16) Sqm7241.857241.857.56FalseNoneNoneFalseNoneFalse54748.3860
260465281317NoneComm SR Vol-2 Material Component Pg No A-24 sl 394Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm(Comman SR, Volume-2, Material Component Pg No. A-24/ SI. No.394) Sqm294.0294.012.48FalseNoneNoneFalseNoneFalse3669.120
260465381317NoneComman SR, Volume-2, Pg No. 85 SI. No.11.30.1Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 4.0 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.(Comman SR, Volume-2, Pg No. 85/ SI. No.11.30.1) Sqm957.6957.62.16FalseNoneNoneFalseNoneFalse2068.4160
260465481317NoneComman SR, Volume-2, Pg No. 77 SI. No.11.5.1Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.(Comman SR, Volume-2, Pg No. 77/ SI. No.11.5.1) Sqm4701.94701.911.02FalseNoneNoneFalseNoneFalse51814.9380
260465581317NoneComman SR, Volume-2, Pg No. 60 SI. No.9.9Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete (Comman SR, Volume-2, Pg No. 60/ SI. No.9.9) Sqm1129.81129.835.1FalseNoneNoneFalseNoneFalse39655.980
260465681317NoneComman SR, Volume-2, Pg No. 65 SI. No.9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications(Comman SR, Volume-2, Pg No. 65/ SI. No.9.39)Sqm1521.451521.45120.83FalseNoneNoneFalseNoneFalse183836.80350
260465781317NoneComman SR, Volume-2, Pg No. 125 SI. No.13.47Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 75 mm diameter (Comman SR, Volume-2, Pg No. 125/ SI. No.13.47) m206.85206.856.0FalseNoneNoneFalseNoneFalse1241.10
260465881317NoneComman SR, Volume-2, Pg No. 69 SI. No.10.1.2Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar loca tions of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Area of slab over 0.50 m2 (Comman SR, Volume-2, Pg No. 69/ SI. No.10.1.2) Sqm4133.854133.854.5FalseNoneNoneFalseNoneFalse18602.3250
260465981317NoneComman SR, Volume-2, Pg No. 131 SI. No.14.4.1Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : One urinal basin with 5 litre white P.V.C. automatic flushing cistern (Comman SR, Volume-2, Pg No. 131/ SI. No.14.4.1) Each4676.74676.75.0FalseNoneNoneFalseNoneFalse23383.50
260466081317NoneComman SR, Volume-2, Pg No. 131 SI. No.14.3.1Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid (Comman SR, Volume-2, Pg No. 131/ SI. No.14.3.1) Each6275.856275.852.0FalseNoneNoneFalseNoneFalse12551.70
260466181317NoneComman SR, Volume-2, Pg No. 131 SI. No.14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests (Comman SR, Volume-2, Pg No. 131/ SI. No.14.1.1) Each5128.25128.25.0FalseNoneNoneFalseNoneFalse25641.00
260466281317NoneComman SR, Volume-2, Pg No. 123 SI. No.13.34Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. (Comman SR, Volume-2, Pg No. 123/ SI. No.13.34) Ltr9.459.451000.0FalseNoneNoneFalseNoneFalse9450.00
260466381317NoneComman SR, Volume-2, Pg No. 117 SI. No.13.4.2Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 32 mm nominal bore (Comman SR, Volume-2, Pg No. 117/ SI. No.13.4.2) No627.9627.91.0FalseNoneNoneFalseNoneFalse627.90
260466481317NoneComman SR, Volume-2, Pg No. 122 SI. No.13.33.4Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 32 mm nominal dia Pipes (Comman SR, Volume-2, Pg No. 122/ SI. No.13.33.4) m390.6390.630.0FalseNoneNoneFalseNoneFalse11718.00
260466581317NoneComman SR, Volume-2, Pg No. 122 SI. No.13.33.3Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes (Comman SR, Volume-2, Pg No. 122/ SI. No.13.33.3) m310.8310.820.0FalseNoneNoneFalseNoneFalse6216.00
260466681317NoneComman SR, Volume-2, Pg No. 122 SI. No.13.33.2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes (Comman SR, Volume-2, Pg No. 122/ SI. No.13.33.2) m227.85227.8520.0FalseNoneNoneFalseNoneFalse4557.00
260466781317NoneComman SR, Volume-2, Pg No. 139 SI. No.14.55aProviding and fixing Bib cock with wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class Economy (Comman SR, Volume-2, Pg No. 139/ SI. No.14.55a) No1172.851172.857.0FalseNoneNoneFalseNoneFalse8209.950
260466881317NoneComman SR, Volume-2, Pg No. 133 SI. No.14.7AProviding and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer (Comman SR, Volume-2, Pg No. 133/ SI. No.14.7A) No4327.054327.052.0FalseNoneNoneFalseNoneFalse8654.10
260466981317NoneComman SR, Volume-1, Pg No. 6 SI. No.1.5.1Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth (Comman SR, Volume-1, Pg No. 6/ SI. No.1.5.1) Cum313.95313.9521.6FalseNoneNoneFalseNoneFalse6781.320
260467081317NoneComman SR, Volume-2, Pg No. 125 SI. No.13.50.9Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 100 mm nominal dia Pipes (Comman SR, Volume-2, Pg No. 125/ SI. No.13.50.9) m976.5976.530.0FalseNoneNoneFalseNoneFalse29295.00
260467181317NoneComman SR, Volume-2, Pg No. 122-123 SI. No.13.33.Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 50 mm nominal dia Pipes (Comman SR, Volume-2, Pg No. 122-123/ SI. No.13.33.6) m757.05757.0550.0FalseNoneNoneFalseNoneFalse37852.50
260467281317NoneComman SR, Volume-2, Pg No. 126 SI. No.13.53Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: Inside dimensions 455x610 mm and 45 cm deep for single pipe line : With common burnt clay (non modular) bricks of class designation 3. (Comman SR, Volume-2, Pg No. 126/ SI. No.13.53) Each5924.15924.11.0FalseNoneNoneFalseNoneFalse5924.10
260467381317NoneComman SR, Volume-1, Pg No. 6 SI. No.1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (Comman SR, Volume-1, Pg No. 6/ SI. No.1.10) Cum168.0168.021.6FalseNoneNoneFalseNoneFalse3628.80
260467481317NoneComman SR, Volume-2, Pg No. 84 SI. No.11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge. (Comman SR, Volume-2, Pg No. 84/ SI. No.11.26.1) Kgs144.9144.9300.0FalseNoneNoneFalseNoneFalse43470.00
260467581317NoneComman SR, Volume-2, Pg No. 77 SI. No.11.30Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Comman SR, Volume-2, Pg No. 77/ SI. No.11.30) Sqm8689.88689.89.78FalseNoneNoneFalseNoneFalse84986.2440
260467681317Noneitem1KKRDB LOGO BOARDEach6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
17079948960000NoneNoneBuildingsMehkar Bus Shelter- GF - Electrical work71877.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
260467781318NonePWD Ele. SR 2023-24, It No. 1.3.2Supplying heavy gauge PVC conduit pipe.mm dia. mm thick with suitable size bends, metal/PVC junction boxes adhesive paste etc.,by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. 25mm dia 2mm thick (PWD Ele. SR 2023-24, It No. 1.3.2)Mtr80.080.0100.0FalseNoneNoneFalseNoneFalse8000.00
260467881318NonePWD Ele. SR 2023-24, It No. 2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper conductor resistance single core wire in open or consealed system of wiring with specified IS- 694:1990 & confirming to GTP of Group -A.2.5sqmm. (PWD Ele. SR 2023-24, It No. 2.3.3) A.2.5sqmm MtrMtr40.040.0150.0FalseNoneNoneFalseNoneFalse6000.00
260467981318NonePWD Ele. SR 2023-24, It No. 2.3.4Wiring for lighting/power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper conductor resistance single core wire in open or consealed system of wiring with specified IS- 694:1990 & confirming to GTP of Group -A.4.0sqmm. (PWD Ele. SR 2023-24, It No. 2.3.4) A.4.0sqmm MtrMtr87.087.0100.0FalseNoneNoneFalseNoneFalse8700.00
260468081318NonePWD Ele. SR 2023-24, It No. 3.4.2Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.4-5Way (PWD Ele. SR 2023-24, It No. 3.4.2) 4-5 way EachEach138.0138.03.0FalseNoneNoneFalseNoneFalse414.00
260468181318NonePWD Ele. SR 2023-24, It No. 3.6.2Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.2) 4 ModuleEach175.0175.03.0FalseNoneNoneFalseNoneFalse525.00
260468281318NonePWD Ele. SR 2023-24, It No. 3.6.1Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.1) 6Amps one way SwitchEach88.088.036.0FalseNoneNoneFalseNoneFalse3168.00
260468381318NonePWD Ele. SR 2023-24, It No. 3.6.3Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.3) 6Amps 3way socketEach162.0162.06.0FalseNoneNoneFalseNoneFalse972.00
260468481318NonePWD Ele. SR 2023-24, It No. 3.6.4Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.4) Stepped Fan Regulator.Each313.0313.06.0FalseNoneNoneFalseNoneFalse1878.00
260468581318NonePWD Ele. SR 2023-24, Pg. No. 10, It No. 3.6.11Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.11) 6/16Amps universal socketEach249.0249.04.0FalseNoneNoneFalseNoneFalse996.00
260468681318NonePWD Ele. SR 2023-24, It No. 5.17.1Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring asrequired confirming to IEC 60898. (PWD Ele. SR 2023-24, It No. 5.17.1) 6-32Amps SPEach523.0523.01.0FalseNoneNoneFalseNoneFalse523.00
260468781318NonePWD Ele. SR 2023-24, It No. 5.18.7Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. (PWD Ele. SR 2023-24, It No. 5.18.7) 6 Way SP & NEach1552.01552.01.0FalseNoneNoneFalseNoneFalse1552.00
260468881318NonePWD Ele. SR 2023-24, It No. 5.42.2Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with (PWD Ele. SR 2023-24, It No. 5.42.2) 16SWGSqm0.380.3822500.0FalseNoneNoneFalseNoneFalse8550.00
260468981318NonePWD Ele. SR 2023-24, It No. 6.1Earthing : Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia (PWD Ele. SR 2023-24, It No. 6.1) Earthing No2999.72999.71.0FalseNoneNoneFalseNoneFalse2999.70
260469081318NonePWD Ele. SR 2023-24, It No. 29.02Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits,depositing on bank upto a lead of 50 In soil (ordinary) (PWD Ele. SR 2023-24, It No. 29.02)Mtr260.0260.05.0FalseNoneNoneFalseNoneFalse1300.00
260469181318NonePWD Ele. SR 2023-24, It No. 6.4.4Supplying of 1.1 Kv LT UG cable XLPE or heat resistance PVC Insulated PVC Extruded inner sheath armoured UG LT csble as per IS-1554( part-1) (PWD Ele. SR 2023-24, It No. 6.4.4) 4 core 16SqmmMtr150.0150.010.0FalseNoneNoneFalseNoneFalse1500.00
260469281318NonePWD Ele. SR 2023-24, It No. 6.5.1Labour Charges for laying 1.1 Kv class UG cable when supplied agency in existing trench GI pipe / Stoneware pipe/on wall/ on pole as required (PWD Ele. SR 2023-24, It No. 6.5.1) Existing Trench / ductMtr11.8811.885.0FalseNoneNoneFalseNoneFalse59.40
260469381318NonePWD Ele. SR 2023-24, It No. 7.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system.48" Sweep (1200 mm) Regular model (PWD Ele. SR 2023-24, It No. 7.3.1)No2949.02949.05.0FalseNoneNoneFalseNoneFalse14745.00
260469481318NonePWD Ele. SR 2023-24, It No. 14.9Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. (PWD Ele. SR 2023-24, It No. 14.9)No281.0281.05.0FalseNoneNoneFalseNoneFalse1405.00
260469581318NonePWD Ele. SR 2023-24, It No. 11.3.2Supplying of feet - PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. LED light fighting 1 x4'- 20/22 w (PWD Ele. SR 2023-24, It No. 11.3.2)No740.0740.010.0FalseNoneNoneFalseNoneFalse7400.00
260469681318NonePWD Ele. SR 2023-24, It No. 12.3.2Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA.On wall/ ceiling / Rafter / Girders (PWD Ele. SR 2023-24, It No. 12.3.2) On wall/ ceiling / Rafter / GirdersNo119.0119.010.0FalseNoneNoneFalseNoneFalse1190.00
17079948960000NoneNoneBuildingsDetailed Estimate of Mehkar Bus Shelter- FF - Bal Work1447680.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
260469781319NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.5.1)Cum7031.127031.1221.68FalseNoneNoneFalseNoneFalse152434.68160
260469881319NoneCSR 23-24 Volume-1, Pg No. 29 SI. No.7Formwark for Columns @ 70% (CSR 23-24 Volume-1, Pg No. 29/ SI. No.7)Cum4921.784921.783.21FalseNoneNoneFalseNoneFalse15798.91380
260469981319NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.12Formwark for Beams & Lintels of Building @ 60% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.12)Cum4218.674218.676.68FalseNoneNoneFalseNoneFalse28180.71560
260470081319NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.13Formwark for Roof Slab of Building @ 50% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.13)Cum3515.563515.5611.34FalseNoneNoneFalseNoneFalse39866.45040
260470181319NoneCSR 23-24 Volume-1, Pg No. 30 SI. No.17Formwark for Chejjas, Canopy & Other Architectural projections of minor sections @ 45% (CSR 23-24 Volume-1, Pg No. 30/ SI. No.17)Cum3164.03164.00.46FalseNoneNoneFalseNoneFalse1455.440
260470281319NoneCSR 23-24 Volume-1, Pg No. 16 SI. No.2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (CSR 23-24 Volume-1, Pg No. 16/ SI. No.2.4.1)Cum6791.446791.440.83FalseNoneNoneFalseNoneFalse5636.89520
260470381319NoneCSR 23-24 Volume-1, Pg No. 18 SI. No.2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (CSR 23-24 Volume-1, Pg No. 18/ SI. No.2.11a)Tonne94869.1594869.152.39FalseNoneNoneFalseNoneFalse226737.26850
260470481319NoneCSR 23-24 Volume-2, Pg No. 14 SI. No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(CSR 23-24 Volume-2, Pg No. 14/ SI. No.6.8)Cum8451.128451.1245.32FalseNoneNoneFalseNoneFalse383004.75840
260470581319NoneCSR 23-24 Volume-2, Pg No. 86 SI. No.11.31Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge including cost of materials, labour, usage charges of machinery complete as per specifications. (CSR 23-24 Volume-2, Pg No. 86/ SI. No.11.31)Kg121.96121.96139.32FalseNoneNoneFalseNoneFalse16991.46720
260470681319NoneCSR 23-24 Volume-2, Pg No. 108-109 SI. No.12.84Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight withreinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. CSR 23-24 Volume-2, Pg No. 108-109/ SI. No.12.84)Sqm5326.895326.897.2FalseNoneNoneFalseNoneFalse38353.6080
260470781319NoneCSR 23-24 Volume-2, Pg No. 64 SI. No.9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (CSR 23-24 Volume-2, Pg No. 64/ SI. No.9.34)Sqm1638.471638.4736.2FalseNoneNoneFalseNoneFalse59312.6140
260470881319NoneCSR 23-24 Volume-2, Pg No. 41 SI. No.8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 41/ SI. No.8.1.2)Sqm255.58255.58224.69FalseNoneNoneFalseNoneFalse57426.27020
260470981319NoneCSR 23-24 Volume-2, Pg No. 50 SI. No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (CSR 23-24 Volume-2, Pg No. 50/ SI. No.8.51)Sqm106.05106.05252.95FalseNoneNoneFalseNoneFalse26825.34750
260471081319None2023-24 CSR, Volume-2, Pg No. 42 SI. No.8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge (2023-24 CSR, Volume-2, Pg No. 42/ SI. No.8.2.2)Sqm295.88295.88291.34FalseNoneNoneFalseNoneFalse86201.67920
260471181319NoneCSR 23-24 Volume-2, Pg No. 44 SI. No.8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. (CSR 23-24 Volume-2, Pg No. 44/ SI. No.8.16a)Sqm1312.91312.91.35FalseNoneNoneFalseNoneFalse1772.4150
260471281319NoneCSR 23-24 Volume-2, Pg No. 47 SI. No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 47/ SI. No.8.33.3)Sqm147.41147.4111.34FalseNoneNoneFalseNoneFalse1671.62940
260471381319NoneCSR 23-24 Volume-2, Pg No. 46 SI. No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 23-24 Volume-2, Pg No. 46/ SI. No.8.30)Sqm184.53184.53291.34FalseNoneNoneFalseNoneFalse53760.97020
260471481319NoneCSR 23-24 Volume-2, Pg No. 46 SI. No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (CSR 23-24 Volume-2, Pg No. 46/ SI. No.8.33.1)Sqm167.56167.56252.95FalseNoneNoneFalseNoneFalse42384.3020
260471581319NoneCSR 23-24 Volume-2, Pg No. 84 SI. No.8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Comman SR, Volume-2, Pg No. 46/ SI. No.8.33.2) Sqm146.35146.3524.19FalseNoneNoneFalseNoneFalse3540.20650
260471681319NoneComman SR, Volume 2 Pg No. 99 SI. No.12.12Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications. (Comman SR, Volume-2, Pg No. 99/ SI. No.12.12)Cum131716.22131716.220.19FalseNoneNoneFalseNoneFalse25026.08180
260471781319NoneComman SR, Volume-2, Pg No. 104 SI. No.12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (Comman SR, Volume-2, Pg No. 104/ SI. No.12.51) No1077.471077.473.0FalseNoneNoneFalseNoneFalse3232.410
260471881319NoneComman SR, Volume-2, Pg No. 100 SI. No.12.16Providing and fixing in position fully panelled Mathi/Nandi wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) (Comman SR, Volume-2, Pg No. 100/ SI. No.12.16) Sqm7314.277314.277.56FalseNoneNoneFalseNoneFalse55295.88120
260471981319NoneComm SR Vol-2 Material Component Pg No A-24 sl 394Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm(Comman SR, Volume-2, Material Component Pg No. A-24/ SI. No.394) Sqm296.94296.947.74FalseNoneNoneFalseNoneFalse2298.31560
260472081319NoneComman SR, Volume-2, Pg No. 85 SI. No.11.30.1Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 4.0 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.(Comman SR, Volume-2, Pg No. 85/ SI. No.11.30.1) Sqm967.18967.180.54FalseNoneNoneFalseNoneFalse522.27720
260472181319NoneComman SR, Volume-2, Pg No. 77 SI. No.11.5.1Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.(Comman SR, Volume-2, Pg No. 77/ SI. No.11.5.1) Sqm4748.924748.923.15FalseNoneNoneFalseNoneFalse14959.0980
260472281319NoneComman SR, Volume-2, Pg No. 60 SI. No.9.9Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete (Comman SR, Volume-2, Pg No. 60/ SI. No.9.9) Sqm1141.11141.17.48FalseNoneNoneFalseNoneFalse8535.4280
260472381319NoneComman SR, Volume-2, Pg No. 65 SI. No.9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications(Comman SR, Volume-2, Pg No. 65/ SI. No.9.39)Sqm1536.661536.6633.1FalseNoneNoneFalseNoneFalse50863.4460
260472481319NoneComman SR, Volume-2, Pg No. 125 SI. No.13.47Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 75 mm diameter (Comman SR, Volume-2, Pg No. 125/ SI. No.13.47) m208.92208.926.0FalseNoneNoneFalseNoneFalse1253.520
260472581319NoneComman SR, Volume-2, Pg No. 131 SI. No.14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests (Comman SR, Volume-2, Pg No. 131/ SI. No.14.1.1) Each5179.485179.482.0FalseNoneNoneFalseNoneFalse10358.960
260472681319NoneComman SR, Volume-2, Pg No. 123 SI. No.13.34Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. (Comman SR, Volume-2, Pg No. 123/ SI. No.13.34) Ltr9.549.541000.0FalseNoneNoneFalseNoneFalse9540.00
260472781319NoneComman SR, Volume-2, Pg No. 117 SI. No.13.4.2Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 32 mm nominal bore (Comman SR, Volume-2, Pg No. 117/ SI. No.13.4.2) No664.38664.381.0FalseNoneNoneFalseNoneFalse664.380
260472881319NoneComman SR, Volume-2, Pg No. 122 SI. No.13.33.4Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 32 mm nominal dia Pipes (Comman SR, Volume-2, Pg No. 122/ SI. No.13.33.4) m394.51394.5110.0FalseNoneNoneFalseNoneFalse3945.10
260472981319NoneComman SR, Volume-2, Pg No. 122 SI. No.13.33.3Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes (Comman SR, Volume-2, Pg No. 122/ SI. No.13.33.3) m313.91313.915.0FalseNoneNoneFalseNoneFalse1569.550
260473081319NoneComman SR, Volume-2, Pg No. 122 SI. No.13.33.2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes (Comman SR, Volume-2, Pg No. 122/ SI. No.13.33.2) m230.13230.135.0FalseNoneNoneFalseNoneFalse1150.650
260473181319NoneComman SR, Volume-2, Pg No. 139 SI. No.14.55aProviding and fixing Bib cock with wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class Economy (Comman SR, Volume-2, Pg No. 139/ SI. No.14.55a) No1184.581184.582.0FalseNoneNoneFalseNoneFalse2369.160
260473281319NoneComman SR, Volume-2, Pg No. 133 SI. No.14.7AProviding and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer (Comman SR, Volume-2, Pg No. 133/ SI. No.14.7A) No4370.324370.322.0FalseNoneNoneFalseNoneFalse8740.640
260473381319Noneitem1KKRDB LOGO BOARDEach6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
17079948960000NoneNoneBuildingsMehkar Bus Shelter- FF - Electrical Work44704.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
260473481320NonePWD Ele. SR 2023-24, It No. 1.3.2Supplying heavy gauge PVC conduit pipe.mm dia. mm thick with suitable size bends, metal/PVC junction boxes adhesive paste etc.,by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. 25mm dia 2mm thick (PWD Ele. SR 2023-24, It No. 1.3.2)Mtr80.080.080.0FalseNoneNoneFalseNoneFalse6400.00
260473581320NonePWD Ele. SR 2023-24, It No. 2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper conductor resistance single core wire in open or consealed system of wiring with specified IS- 694:1990 & confirming to GTP of Group -A.2.5sqmm. (PWD Ele. SR 2023-24, It No. 2.3.3) A.2.5sqmm MtrMtr40.040.0125.0FalseNoneNoneFalseNoneFalse5000.00
260473681320NonePWD Ele. SR 2023-24, It No. 2.3.4Wiring for lighting/power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper conductor resistance single core wire in open or consealed system of wiring with specified IS- 694:1990 & confirming to GTP of Group -A.4.0sqmm. (PWD Ele. SR 2023-24, It No. 2.3.4) A.4.0sqmm MtrMtr87.087.080.0FalseNoneNoneFalseNoneFalse6960.00
260473781320NonePWD Ele. SR 2023-24, It No. 3.4.2Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.4-5Way (PWD Ele. SR 2023-24, It No. 3.4.2) 4-5 way EachEach138.0138.03.0FalseNoneNoneFalseNoneFalse414.00
260473881320NonePWD Ele. SR 2023-24, It No. 3.6.2Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.2) 4 ModuleEach175.0175.03.0FalseNoneNoneFalseNoneFalse525.00
260473981320NonePWD Ele. SR 2023-24, It No. 3.6.1Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.1) 6Amps one way SwitchEach88.088.024.0FalseNoneNoneFalseNoneFalse2112.00
260474081320NonePWD Ele. SR 2023-24, It No. 3.6.3Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.3) 6Amps 3way socketEach162.0162.06.0FalseNoneNoneFalseNoneFalse972.00
260474181320NonePWD Ele. SR 2023-24, It No. 3.6.4Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.4) Stepped Fan Regulator.Each313.0313.02.0FalseNoneNoneFalseNoneFalse626.00
260474281320NonePWD Ele. SR 2023-24, Pg. No. 10, It No. 3.6.11Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts (PWD Ele. SR 2023-24, It No. 3.6.11) 6/16Amps universal socketEach249.0249.03.0FalseNoneNoneFalseNoneFalse747.00
260474381320NonePWD Ele. SR 2023-24, It No. 5.17.1Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring asrequired confirming to IEC 60898. (PWD Ele. SR 2023-24, It No. 5.17.1) 6-32Amps SPEach523.0523.01.0FalseNoneNoneFalseNoneFalse523.00
260474481320NonePWD Ele. SR 2023-24, It No. 5.18.7Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. (PWD Ele. SR 2023-24, It No. 5.18.7) 6 Way SP & NEach1552.01552.01.0FalseNoneNoneFalseNoneFalse1552.00
260474581320NonePWD Ele. SR 2023-24, It No. 5.42.2Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with (PWD Ele. SR 2023-24, It No. 5.42.2) 16SWGSqm0.380.3815000.0FalseNoneNoneFalseNoneFalse5700.00
260474681320NonePWD Ele. SR 2023-24, It No. 6.4.4Supplying of 1.1 Kv LT UG cable XLPE or heat resistance PVC Insulated PVC Extruded inner sheath armoured UG LT csble as per IS-1554( part-1) (PWD Ele. SR 2023-24, It No. 6.4.4) 4 core 16SqmmMtr150.0150.010.0FalseNoneNoneFalseNoneFalse1500.00
260474781320NonePWD Ele. SR 2023-24, It No. 6.5.1Labour Charges for laying 1.1 Kv class UG cable when supplied agency in existing trench GI pipe / Stoneware pipe/on wall/ on pole as required (PWD Ele. SR 2023-24, It No. 6.5.1) Existing Trench / ductMtr11.8811.885.0FalseNoneNoneFalseNoneFalse59.40
260474881320NonePWD Ele. SR 2023-24, It No. 7.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system.48" Sweep (1200 mm) Regular model (PWD Ele. SR 2023-24, It No. 7.3.1)No2949.02949.02.0FalseNoneNoneFalseNoneFalse5898.00
260474981320NonePWD Ele. SR 2023-24, It No. 14.9Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. (PWD Ele. SR 2023-24, It No. 14.9)No281.0281.02.0FalseNoneNoneFalseNoneFalse562.00
260475081320NonePWD Ele. SR 2023-24, It No. 11.3.2Supplying of feet - PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. LED light fighting 1 x4'- 20/22 w (PWD Ele. SR 2023-24, It No. 11.3.2)No740.0740.06.0FalseNoneNoneFalseNoneFalse4440.00
260475181320NonePWD Ele. SR 2023-24, It No. 12.3.2Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA.On wall/ ceiling / Rafter / Girders (PWD Ele. SR 2023-24, It No. 12.3.2) On wall/ ceiling / Rafter / GirdersNo119.0119.06.0FalseNoneNoneFalseNoneFalse714.00
17079948960000NoneNoneBuildingsDetailed Estimate of Mehkar Bus Shelter- Compound wall1153332.67
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
260475281321NoneComman SR, Volume-1, Pg No. 8 SI. No.1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth (Comman SR, Volume-1, Pg No. 8/ SI. No.1.12)Cum99.7599.7527.22FalseNoneNoneFalseNoneFalse2715.1950
260475381321NoneComman SR, Volume-1, Pg No. 8 SI. No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Comman SR, Volume-1, Pg No. 8/ SI. No.1.14.1) Cum107.1107.139.93FalseNoneNoneFalseNoneFalse4276.5030
260475481321NoneComman SR, Volume-1, Pg No. 15 SI. No.2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Comman SR, Volume-1, Pg No. 15/ SI. No.2.1.3) Cum6288.456288.457.26FalseNoneNoneFalseNoneFalse45654.1470
260475581321NoneComman SR, Volume-2, Pg No. 9 SI. No.5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (Comman SR, Volume-2, Pg No. 9/ SI. No.5.3) Cum6515.256515.2547.49FalseNoneNoneFalseNoneFalse309409.22250
260475681321NoneComman SR, Volume-1, Pg No. 16 SI. No.2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Comman SR, Volume-1, Pg No. 16/ SI. No.2.4.1) Cum6724.26724.27.47FalseNoneNoneFalseNoneFalse50229.7740
260475781321NoneComman SR, Volume-2, Pg No. 14 SI. No.6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(Comman SR, Volume-2, Pg No. 14/ SI. No.6.8) Cum8367.458367.4531.56FalseNoneNoneFalseNoneFalse264076.7220
260475881321None2023-24 CSR, Volume-2, Pg No. 42 SI. No.8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge (2023-24 CSR, Volume-2, Pg No. 42/ SI. No.8.2.2)Sqm292.95292.95435.6FalseNoneNoneFalseNoneFalse127609.020
260475981321NoneComman SR, Volume-2, Pg No. 46 SI. No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Comman SR, Volume-2, Pg No. 46/ SI. No.8.30) Sqm182.7182.7435.6FalseNoneNoneFalseNoneFalse79584.120
260476081321NoneComman SR, Volume-2, Pg No. 84 SI. No.11.25.2Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge (Comman SR, Volume-2, Pg No. 84/ SI. No.11.25.2) Kg142.8142.81815.0FalseNoneNoneFalseNoneFalse259182.00
260476181321NoneComman SR, Volume-2, Pg No. 47 SI. No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Comman SR, Volume-2, Pg No. 47/ SI. No.8.33.3) Sqm145.95145.9572.6FalseNoneNoneFalseNoneFalse10595.970
17079948960000NoneNoneBuildingsMehkar Bus Shelter- CC Pavement1863740.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
260476281322NoneComman SR, Volume-3, Pg No. 17 SI. No.3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. (Comman SR, Volume-3, Pg No. 17/ SI. No.3.7 ) Cum110.25110.25150.0FalseNoneNoneFalseNoneFalse16537.50
260476381322NoneComman SR, Volume-3, Pg No. 17 SI. No.3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Comman SR, Volume-3, Pg No. 17/ SI. No.3.6 ) Cum517.65517.65114.84FalseNoneNoneFalseNoneFalse59446.9260
260476481322NoneComman SR, Volume-3, Pg No. 23 SI. No.4.2 (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401, For Grading -V Materia (Comman SR, Volume-3, Pg No. 23/ SI. No.4.2 (v) ) Cum2476.952476.95100.0FalseNoneNoneFalseNoneFalse247695.00
260476581322NoneComman SR, Volume-3, Pg No. 26 SI. No.4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density (Comman SR, Volume-3, Pg No. 26/ SI. No.4.17 ) Cum2686.952686.9575.0FalseNoneNoneFalseNoneFalse201521.250
260476681322NoneComman SR, Volume-3, Pg No. 148-149 SI. No.16.27Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. (Comman SR, Volume-3, Pg No. 148-149/ SI. No.16.27 ) Cum6692.76692.7200.0FalseNoneNoneFalseNoneFalse1338540.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17079948970000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17079948970000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17079948970000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17079949130000NoneNoneELIGIBILITYG.S.T. at the prevailing rates will be given separately.None
17079949230000NoneNoneELIGIBILITYThe Tenderer shall furnish, as part of his tender, earnest money deposit in the amount as shown in column 4 of the Table of IFT for this particular work. Tenderer can pay the full EMD amount of Rs. 2,00,000/- through e-payment or the Earnest Money Deposit shall be in two parts. Part(1): Rs. 1,00,000/- by e-payment, Part-(2): Rs 1,00,000/- EMD shall be in favour of Executive Engineer, PWD, Bidar Division, Bidar, and may be in the form of Bankers Cheque/Demand Draft/Pay order in favour of Executive Engineer, PWD, Bidar Division, Bidar, payable at Bidar or cash or specified Small Savings Instruments pledged to the Executive Engineer, PWD, Bidar DivisionNone
17079949410000NoneNoneELIGIBILITYPeriod for completion of this work is 09(Nine) months including Monsoon.None
17079949540000NoneNoneELIGIBILITYPart (2) Rs. 1,00,000/- EMD shall be in favour of Executive Engineer, PWD , Bidar Division, Bidar and may be in the form of Bankers Cheque/Demand Draft/Pay order in favour of Executive Engineer, PWD Divn. Bidar, payable at Bidar or cash or specified Small Savings Instruments pledged to the Executive Engineer, PWD.Division, Bidar or Bank Guarantee in the prescribed format obtained form any Nationaled / Scheduled Banks.None
17079950780000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19 ,2019-20 ,2020-21 2021-22 and 2022-23 (a) achieved in at least two financial years a minimum financial turn over (in all cases of civil engineering construction works only) Rs. 202.28 Lakhs/- Turnover certificate must have UDI number , otherwise it will not be considered for further bid evaluation.None
17079951160000NoneNoneELIGIBILITYLiquid Assets and/or availability of credit facilities of not less than Rs. 33.72 LakhsNone
17079951290000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19 ,2019-20 ,2020-21 2021-22 and 2022-23 (b) satisfactorily completed as prime contractor, at least one similar work such as Construction of Building such as of value not less than Rs 50.58 Lakhs/-None
17079951410001NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19 ,2019-20 ,2020-21 2021-22 and 2022-23 (c) executed in any one year, the following minimum quantities of work (1)RCC/PCC: 302.77cum (2)BBM/SSM/Solid Blocks : 190.49Cum (3) Plastering:1682.54Sqm (4)Steel: 5.90.MT (5)Flooring :318.07 Sqm (7)Earth Work Excavation:586.97CumNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19 ,2019-20 ,2020-21 2021-22 and 2022-23 (a) achieved in at least two financial years a minimum financial turn over (in all cases of civil engineering construction works only) Rs. 202.28 Lakhs/- Turnover certificate must have UDI number , otherwise it will not be considered for further bid evaluation.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19 ,2019-20 ,2020-21 2021-22 and 2022-23 (b) satisfactorily completed as prime contractor, at least one similar work such as Construction of Building such as of value not less than Rs 50.58 Lakhs/-Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19 ,2019-20 ,2020-21 2021-22 and 2022-23 (c) executed in any one year, the following minimum quantities of work (1)RCC/PCC: 302.77cum (2)BBM/SSM/Solid Blocks : 190.49Cum (3) Plastering:1682.54Sqm (4)Steel: 5.90.MT (5)Flooring :318.07 Sqm (7)Earth Work Excavation:586.97CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneList of existing commitments and ongoing worksPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
NoneNoneNoneNoneList of works for which tenders already submittedPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneLiquid Assets and/or availability of credit facilities of not less than Rs. 33.72 Lakhs etc.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
Line of CreditTrueTechnical Bid
Work done CertificateTrueTechnical Bid
Other DocumentsFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1708082655000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer PWD division Bidar
streetNone
cityBidar
stateKarnataka
pin585401
tenderRecallDTONone