tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1708004123000 | 0 | None | None | Roads | RECONSTRUCTION OF KAVALOOR -BANNIKOPPA MDR FROM CHAINAGE KM 0.00 TO KM 6.80 IN KOPPAL TALUK, KOPPAL DISTRICT | 51358705.93 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2609138 | 81544 | None | 2.5(ii)A | Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.By Mechanical Means using Dozer, In area of light jungle. (100 m2) | 100 Sqm | 412.65 | 412.65 | 61.92 | False | None | None | False | None | False | 25551.288 | 0 | 2609139 | 81544 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work | Cum | 107.1 | 107.1 | 2187.0 | False | None | None | False | None | False | 234227.7 | 0 | 2609140 | 81544 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet equirement of table No. 300-2 | Cum | 517.65 | 517.65 | 8855.6 | False | None | None | False | None | False | 4584101.34 | 0 | 2609141 | 81544 | None | 4.2(V)b | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material | Cum | 2476.95 | 2476.95 | 4982.6 | False | None | None | False | None | False | 12341651.07 | 0 | 2609142 | 81544 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead | Sqm | 6.3 | 6.3 | 23650.0 | False | None | None | False | None | False | 148995.0 | 0 | 2609143 | 81544 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | Cum | 2686.95 | 2686.95 | 5912.5 | False | None | None | False | None | False | 15886591.875 | 0 | 2609144 | 81544 | None | 5.1a(I) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means | Sqm | 43.05 | 43.05 | 23650.0 | False | None | None | False | None | False | 1018132.5 | 0 | 2609145 | 81544 | None | 5.4(II) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg /m2 on Granular Surface | Sqm | 14.7 | 14.7 | 23650.0 | False | None | None | False | None | False | 347655.0 | 0 | 2609146 | 81544 | None | 5.6 i (c) | Providing and laying Bituminous Macadam with 40/60 tph capacity hot mix plant using crushed aggregates of specifiedgrading premixed with bituminous binder VG-30 @ 3.3%by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction | Cum | 7835.1 | 7835.1 | 1182.5 | False | None | None | False | None | False | 9265005.75 | 0 | 2609147 | 81544 | None | 5.31 | Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. | Cum | 10659.6 | 10659.6 | 591.25 | False | None | None | False | None | False | 6302488.5 | 0 | 2609148 | 81544 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. | Sqm | 556.5 | 556.5 | 1075.0 | False | None | None | False | None | False | 598237.5 | 0 | 2609149 | 81544 | None | 8.16(II) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc ii. Ordinary kilometer stone (precast) | Each | 3073.35 | 3073.35 | 4.0 | False | None | None | False | None | False | 12293.4 | 0 | 2609150 | 81544 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. | Each | 383.25 | 383.25 | 1500.0 | False | None | None | False | None | False | 574875.0 | 0 | 2609151 | 81544 | None | 8.54 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two
M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 | No | 9450.0 | 9450.0 | 2.0 | False | None | None | False | None | False | 18900.0 | 0 |
| 1708004123000 | 0 | None | None | Roads | Routine Maintainanace for 3rd year | 220690.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2609152 | 81545 | None | 5.3 (ii) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.By Mechanical Means using Dozer, In area of light jungle. (100 m2) | 100 Sqm | 412.65 | 412.65 | 61.92 | False | None | None | False | None | False | 25551.288 | 0 | 2609153 | 81545 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work | Cum | 107.1 | 107.1 | 1458.0 | False | None | None | False | None | False | 156151.8 | 0 | 2609154 | 81545 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface,painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 | Sqm | 164.85 | 164.85 | 236.5 | False | None | None | False | None | False | 38987.025 | 0 |
| 1708004123000 | 0 | None | None | Roads | Routine Maintainanace for 4th year | 234125.85 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2609155 | 81546 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work | Cum | 107.1 | 107.1 | 1458.0 | False | None | None | False | None | False | 156151.8 | 0 | 2609156 | 81546 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface,painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 | Sqm | 164.85 | 164.85 | 473.0 | False | None | None | False | None | False | 77974.05 | 0 |
| 1708004123000 | 0 | None | None | Roads | Routine Maintainanace for 5th year | 273112.88 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2609157 | 81547 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work | Cum | 107.1 | 107.1 | 1458.0 | False | None | None | False | None | False | 156151.8 | 0 | 2609158 | 81547 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface,painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 | Sqm | 164.85 | 164.85 | 709.5 | False | None | None | False | None | False | 116961.075 | 0 |
| 1708004123000 | 0 | None | None | Roads | Resurfacing for the 6th year | 6926209.57 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2609159 | 81548 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.By Mechanical Means using Dozer, In area of light jungle. (100 m2) | 100 Sqm | 412.65 | 412.65 | 61.92 | False | None | None | False | 23.0 | False | 25551.288 | 0 | 2609160 | 81548 | None | 5.3(ii) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on the prepared bituminous surface cleaned with mechanical broom | Sqm | 14.7 | 14.7 | 23650.0 | False | None | None | False | None | False | 347655.0 | 0 | 2609161 | 81548 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface,painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 | Sqm | 164.85 | 164.85 | 709.5 | False | None | None | False | 3.0 | False | 116961.075 | 0 | 2609162 | 81548 | None | 5.31 | Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. | Cum | 10659.6 | 10659.6 | 591.25 | False | None | None | False | None | False | 6302488.5 | 0 | 2609163 | 81548 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet equirement of table No. 300-2 | Cum | 517.65 | 517.65 | 258.0 | False | None | None | False | None | False | 133553.7 | 0 |
|
|
---|
generalCriterionList | createdTs | version | createdDate | modifiedDate | criterionType | description | tenderEligibilityCriterionDocumentList |
---|
1708004124000 | 0 | None | None | ELIGIBILITY | Tenders from Joint ventures are not acceptable. | None | 1708004124000 | 0 | None | None | ELIGIBILITY | Bidders shall not be under a declaration of ineligibility for
corrupt and fraudulent practices issued by Government of Karnataka
| None | 1708004124000 | 0 | None | None | ELIGIBILITY | Bidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document. | None | 1708004169000 | 0 | None | None | ELIGIBILITY | EMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection. | None | 1708004184000 | 0 | None | None | ELIGIBILITY | Bidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder. | None | 1708004210000 | 0 | None | None | ELIGIBILITY | The agency shall furnish affidavit stating that existing commitments furnished by him are true. If found falls action shall be taken as per rules. | None | 1708004219000 | 0 | None | None | ELIGIBILITY | The bidder shall bear all costs associated with the preparation and submission of each tender and the employer will in no case be responsible and liable for those costs. The department is not responsible for any delay in accessing KPP portal. | None | 1708004239000 | 0 | None | None | ELIGIBILITY | As per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund. | None | 1708004255000 | 0 | None | None | ELIGIBILITY | The Employer reserves the right to reject any or all Tenders without assigning any reason. | None | 1708004273000 | 0 | None | None | ELIGIBILITY | Conditional tenders will not be accepted. | None | 1708004312000 | 0 | None | None | ELIGIBILITY | Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year. (both days inclusive) | None | 1708004325000 | 0 | None | None | ELIGIBILITY | The Item Rates quoted shall include cost of Royalty charges on constructive materials & other taxes as per the prevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loading and unloading, with all leads & lifts, labour, hire charges of all machineries & equipments and all incidental charges etc., complete necessary for completion of work. All the Items shall be executed as directed by the Engineer-in-charge of the work. | None | 1708004350000 | 0 | None | None | ELIGIBILITY | The Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent. And scan the original certificates and attach the scanned file to the bid. The Original Certificate/certificates shall be produced at the time of opening of technical bids for physical verification | None | 1708004372000 | 0 | None | None | ELIGIBILITY | Tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 -Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation | None | 1708004393000 | 0 | None | None | ELIGIBILITY | The bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end. | None | 1708004411000 | 0 | None | None | ELIGIBILITY | The tenderer shall furnish required information in all prescribed formats. Scan & upload all the original documents/Formats required for this bid to the KPPP portal. The Original documents/ Formats shall be produced at the time of opening of technical bid for physical verification | None | 1708004428000 | 0 | None | None | ELIGIBILITY | The tenderer shall note that the scanned Documents shall also be up loaded in the tasks created under Document/ Evidence required from the bidder | None | 1708004446000 | 0 | None | None | ELIGIBILITY | All materials required for this work shall be procured by the bidder himself and should got tested by the quality control authorities at his own cost before use on the work. | None | 1708004464000 | 0 | None | None | ELIGIBILITY | The intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the standard bid document KW4 KPWD and further orders theron | None | 1708004481000 | 0 | None | None | ELIGIBILITY | The KPWD Code, KTTP Act/ Rules, Delegation of powers and other Government orders issued by Government from time to time will apply. | None | 1708004499000 | 0 | None | None | ELIGIBILITY | If the office happens to be closed on the dates notified, next working day will holds good. | None | 1708004516000 | 0 | None | None | ELIGIBILITY | The field laboratory shall preferably locate, adjacent to the site with the required amenity as per the clause. Failing which 1% of the amount of work done will be penalized | None | 1708004534000 | 0 | None | None | ELIGIBILITY | If undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damage occurred during the undue delay period in accordance with the Karnataka Highway act 1964. | None | 1708004555000 | 0 | None | None | ELIGIBILITY | All safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent. | None | 1708004577000 | 0 | None | None | ELIGIBILITY | Contractor should follow strictly the prevailing rules of labour act and applicable any law as concerned. | None | 1708004603000 | 0 | None | None | ELIGIBILITY | 18%GST shall be paid to the tendered amount separately. | None | 1708004623000 | 0 | None | None | ELIGIBILITY | The increase in GST shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time. | None | 1708004640000 | 0 | None | None | ELIGIBILITY | Any dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rules | None | 1708004659000 | 0 | None | None | ELIGIBILITY | The tenderers shall note that as per the Government Order No.FD/850/ EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015 & GO no 850-12/15 Dated 15-12-2016 the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for purchases, but not for works | None | 1708004689000 | 0 | None | None | ELIGIBILITY | Contractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work. In case of any mishap, accidents are cause of death it is the duty of the contractor to settle the dispute at is own cost. In no way department is held responsible | None | 1708004715000 | 0 | None | None | ELIGIBILITY | construction materials (Minerals Metal, Sand and Murum, etc.,) shall be bought from the authorized quarries along with the mineral dispatch permit or else 5 times the royalty will be deducted as penalty as per the Directions on the Director, Mines and Geology Department Bangalore Proceedings Dated 25-03-2013 | None | 1708004738000 | 0 | None | None | ELIGIBILITY | The defect liability period is two (2) years from the date of actual completion of work | None | 1708004757000 | 0 | None | None | ELIGIBILITY | Financial turn over and Financial commitments of previous years shall be given weight age of 10% per year to bring them to the price level of 2023-24 in the technical qualification criteria | None | 1708004777000 | 0 | None | None | ELIGIBILITY | As per Govt circular no GO-FD/AE 263/EXP12-2022 dt-11-05-2022, this clause for owning key equipments for works costing up to Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the required machineries for various activities involved in construction as per MORTH specification. | None | 1708004811000 | 1 | None | None | ELIGIBILITY | The tender period for completion of work is eleven (11) Calendar months. (Including monsoon period) | None | 1708004904000 | 0 | None | None | ELIGIBILITY | The tenderer has to quote the rates are exclusive of GST and As per Government CIRCULAR NO:FD/447/EXPENDITURE | None | 1708004928000 | 0 | None | None | ELIGIBILITY | Estimate rates are excluding GST and the prevailing GST 18 percent of APT is added in the form of Lumpsum in santioned estimate as per the guidelines in common SR 2021-22 GO PWD51 RDF 2019 Bengaluru dt 18-03-2022. Therefore, APT or ECV is excluding GST. In kppp portal there is no option to add GST separately over and above APT during DTSprocess. Hence even through the tender has been invited by opting for the INCLUSIVE option, the item wise rates do not include GST. Hence GST will be paid separately for the quoted amount as per the Govt. circular no FD/447/expenditur /12/2022/dt -30-07-2022. Therefore GST declaration certificate must be uploaded mandatorily by the prospective bidders. | None | 1708004979000 | 0 | None | None | ELIGIBILITY | All necessary arrangements shall be made and precaution taken to prevent completely or partially, damage to the structure or labours / employees during construction period. (As per recent Labour Act) Contractor shall be fully responsible for any damage to the structure during the construction and maintainance period.Any damage caused due to any reasons shall be rectified / replaced at his own cost as per the direction of Engineer in charge. Nothing shall be payable by the Department on account of inclusive of all such arrangements/ precautions work needed. | None | 1708005009000 | 1 | None | None | ELIGIBILITY | The Earnest Money Deposit Rs.8,86,000.00 through KPPP portal OR it shall be in two parts. Part (1) Rs. 1,00,000.00 through KPPP portal under any one of the option(CC/DD/NEFT/OTC) and Part (2) Balance EMD of Rs. 7,86,000.00 shall be in favour of the Executive Engineer, PWD Division Koppal, in the form of Bank Guarantee in the prescribed format obtained from any Nationalized/Scheduled Bank. The scanned copy of the original Part(2) EMD should be uploaded along with the Technical bid. The part (2) of the EMD shall be delivered to the Executive Engineer before the prescribed Date and time of opening of the Technical Bids | None | 1708005039000 | 0 | None | None | ELIGIBILITY | The contractor shall bound to comply the prevailing rules and regulations with regard to the EPF rules | None |
|
---|