createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1707834834644
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee1380.00
emd55000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose27-02-2024 17:30:00
tenderQueryClose26-02-2024 15:30:11
technicalBidOpen29-02-2024 10:30:54
publishedDate16-02-2024 13:24:24
publishedByPostMI_EE_DIV_MDY
publishedByUserKPE18040 - C SHANKARA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08232224435
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1707834834665
version4
createdDateNone
modifiedDateNone
tenderNumberMI/2023-24/IW/WORK_INDENT1446
titleRepairs to Nagaragatta tank feeder canal damaged due to heavy rain fall in KR Pete taluk Mandya district
descriptionRepairs to Feeder canal and construction of box drain
categoryWORKS
categoryTextWorks
ecv5496932.38
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location112
locationNameMinor Irrigation Division Mandya
provisionalAmount5500000.0
groupOverheadTotal838515.11
fileNumbermisd/krp/RD/Nagaragatta
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17078348350000NoneNoneIrrigation and Other WorksRepairs to Nagaragatta tank feeder canal damaged to due to heavy rain fall in KR Pete taluk Mandya district.4658417.27
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
258094779873Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work inA all kinds of soil depth upto 3 m.Complete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of workCum102.0102.0783.0FalseNoneNoneFalseNoneFalse79866.00
258094879873Nonecode03Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. Complete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of workCum6067.06067.0121.8FalseNoneNoneFalseNoneFalse738960.60
258094979873Nonecode04Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification. Complete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of workCum6955.06955.0290.0FalseNoneNoneFalseNoneFalse2016950.00
258095079873Nonecode05Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specificationComplete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of workt79011.079011.011.97FalseNoneNoneFalseNoneFalse945761.670
258095179873Nonecode06Providing new embankment abutting to existing bund to strength theexisting bund using soil from approved borrow area in layers of 200to 250 mm and compacting each layer to density control of not lessthan 95 percent by vibrating plate compactor or pnuematic tamperincluding cost of all materials, machinery, labour, picking previous layer,spreading soil in layer, breaking clods, watering & all necessary worksas directed and complete as per specification.Complete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of workCum454.0454.0714.0FalseNoneNoneFalseNoneFalse324156.00
258095279873Nonecode07Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of light jungle.Complete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of work100 Sqm393.0393.086.0FalseNoneNoneFalseNoneFalse33798.00
258095379873Nonecode08Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.Complete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of workEach25.525.52750.0FalseNoneNoneFalseNoneFalse70125.00
258095479873Nonecode09De-silting of tank bed/Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour & all necessary works as directed and complete as per specification.Complete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of workCum54.054.04000.0FalseNoneNoneFalseNoneFalse216000.00
258095579873Nonecode02Providing and constructing dry size stone pitching using 200 to 250mm size stones with pin headers at 2 per m2 using stones and stonechips from approved source including cost of all materials, labour,hand packing / wedging stone chips into joints, finishing and all otherancillary operations complete a.300mm.Complete with all lead and lift ,loading and unloading charges and as directed by engineer incharge of workSqm388.0388.0600.0FalseNoneNoneFalseNoneFalse232800.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17078348360000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17078348360000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17078348360001NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste as prescribed in the tender document.None
17079074350000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders endNone
17079074450000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17079080500000NoneNoneELIGIBILITYThe intending Bidder/ firm/ company are advised to visit the work site before submission of the tendersNone
17079080610000NoneNoneELIGIBILITYThe necessary certificates / documents in support of eligibility criteria Fullfilled as stipulated shall be scanned and attached to e- tender document. The original certifcate / documents shall be produced prior to the opening of bid for verification. Scanned signature of the Bidder/ firm/ company authorized representative of the Bidder/ firm/ company shall be attached while uploading bid documentNone
17079080710000NoneNoneELIGIBILITYIf any of the dates mentioned above happens to be a general holiday, the next working day holds goodNone
17079080790000NoneNoneELIGIBILITYconditional tenders are liable to be rejected. The officer competent to accept the tender shall have the right to reject any or all the tenders without assigning any reason whatsoever.None
17079080900000NoneNoneELIGIBILITYCorrigendum will be published in the website for all modifcations or corrections if anyNone
17079081020000NoneNoneELIGIBILITYThe contractor should mention their recent correct postal address & mail address in declaration formsNone
17079081130000NoneNoneELIGIBILITYAll materials like steel, cement etc., required for the above work should be procured by the contractor only. No departmental supply of any materials shall be made by DeptNone
17079081240000NoneNoneELIGIBILITYThe contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work & also Land acquisition problems if anyNone
17079081340000NoneNoneELIGIBILITYRoyalty charges will be deducted from contractors running bill as the per prevailing G.O.at the time of payment. Commerce and Industries Secretariat Notifcation No.CI 81 MMN 2014 18th February 2018 see sub rule i of rule 36 Royalty, and Mines and Geology, rules and regulations amendment Act, para 36 &para 92 of 1994 and as per the and Circular issued from Director Mines and Geology Department, Bengaluru letter no 2019 20 4493 Dtd 03.12.2019 are to be followedNone
17079081450000NoneNoneELIGIBILITYTypographical errors, if any, will not be the ground for any claims by the Contractor.None
17079081550000NoneNoneELIGIBILITYThe necessary certificates / documents in support of eligibility criteria Fullfilled as stipulated shall be scanned and attached to e- tender document. The original certifcate / documents shall be produced for verification when demanded, otherwise the tender will be treated as non responsive bid and rejectedNone
17079081660000NoneNoneELIGIBILITYScanned signature of the Bidder/ firm/ company authorized representative of the Bidder/ firm/ company shall be attached while uploading bid documentNone
17079081790000NoneNoneELIGIBILITYIncomplete tender documents will be rejectedNone
17079081900000NoneNoneELIGIBILITYAs per the Karnataka Building and other Constructions Workers Welfare Cess Act 1996, 1% of the bill amount will be deducted from the billsNone
17079082230000NoneNoneELIGIBILITYThe contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work.None
17079082500000NoneNoneELIGIBILITYThe contractor should furnish the name of the individual / firm / company with address & telephone No with place of registration, year of incorporation etcNone
17079082650000NoneNoneELIGIBILITYOriginal documents should be produced for verification at any stage of the tender process, as and when sought for. Failure to produce original documents will lead to disqualifcation. work done certifcate should have all the details CR no, work order issuing date, work completion date and year as asked in bid documentNone
17079082760000NoneNoneELIGIBILITYThe Applicant shall be registered in KPWD/CPWD/KNNL /CNNL/ KBJNL/VJNL and Other Public sector Organizations and shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by GOK/GOINone
17079082840000NoneNoneELIGIBILITYRestrictions on Public Procurement from Bidders of certain countries as per Government order No.FD 455 Exp-12 2020 Bengaluru dated:25-08-2020None
17079083010000NoneNoneELIGIBILITYDuring the execution of works, if any minor minerals are required, contractors have to abide by the prevailing rules and Acts applicable to Minor Minerals. As per the prevailing rules, for any use of Minor Minerals, the contractor has to submit the mineral Dispatch Permit (MDP) obtained from Mines and Geology Department. If mineral Dispatch permit (MDP) is not submitted by the contractor along with the bill, the prevailing penalty DMF contribution as per karnantaka Minor Mineral Concession Rules 1994 (as amended from time to time) will be deducted from the contractors billNone
17079083230000NoneNoneELIGIBILITYThe agencies participating in the tender shall be registered in the Construction Labour Board as per the G.O.No.LD 300 LET 2006 Dated:18-1-2007 and Addendum No.LD 95 LET 2013 Bengaluru Dt:1-4-2013. Also the contractors entrusted with the work shall employ the labours only who have registered in the Karnataka Building and Construction Workers Welfare Board failing which the contractor shall be liable for any further action as deem by the authorityNone
17079083400000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit in any of the forms as mentioned in bid document for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 of ITT and Clause 44 of the Conditions of Contract for all worksNone
17079083590000NoneNoneELIGIBILITYThe Bidder shall quote Rates BY adding GST OF 18% for either materials or works Contract (Service).All other duties (Including recovered from the contractor bill), taxes, and other levies payable by the contractor under the contract or for any other cause shall be included in the Total Tender Price submitted by the Tenderer.None
17079083730000NoneNoneELIGIBILITYThe contractor has to make his own arrangements for procurement of all the required materials and the materials so procured shall confirm to the relevant IS Specifications and obtain necessary quality certificate from authorized quality control.None
17079083890000NoneNoneELIGIBILITYThe Contractor is fully responsible for the Equipment / Material until the same is handed over to the EXECUTIVE ENGINEER in an operating condition after commissioning. The Contractor is responsible for the proper maintenance of equipment / material as well as protection of the same against theft, elements of nature, damages etc., while in his custody as well as after erection until the same is taken over by the EXECUTIVE ENGINEER under due acknowledgment in writingNone
17079084090000NoneNoneELIGIBILITYThe tenderer shall also disclose if there are any bankruptcy proceedings against him.None
17079084340000NoneNoneELIGIBILITYThe Work Done certificates shall be issued by the Executive Engineer with indent number mentioned (if work done in Karnataka State), otherwise it shall be issued/counter signed by Superintending Engineer (if the work is done in other states)None
17079084530000NoneNoneELIGIBILITYSub-Leasing/G.P.A of Work is Prohibited.None
17079084660000NoneNoneELIGIBILITYEach Item Of BOQ To be read as with all lead and lifts as per the direction of Engineer in charge.None
17079084750000NoneNoneELIGIBILITYUploaded drawings are for TENDER PURPOSE ONLYNone
17079084850000NoneNoneELIGIBILITYThe tender processing charges paid by the bidder/ firm/ company are not refundable even if the tenders are cancelledNone
17079084940000NoneNoneELIGIBILITYThe statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the work listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalentNone
17079085060000NoneNoneELIGIBILITYIncome Tax : Latest copy of the Income Tax Clearance Certificate and Sale Tax Clearance PAN and TAN Nos. to be uploadedNone
17079085160000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee into the respective receiving bank accounts of KPPP Portal on or before the last date and time of bid submission.None
17079085260000NoneNoneELIGIBILITYAll other terms and conditions as per KW3 tender documents ARE APPLICABLENone
17079085360001NoneNoneELIGIBILITYBIDDER INSTRUCTED TO UPLOAD concerned caste certificateNone
17079085490000NoneNoneELIGIBILITYRATES QUOTED BY THE CONTRACTOR SHALL BE DEEMED TO BE INCLUSIVE OF THE SALES AND OTHER TAXES THAT THE CONTRACTOR WILL HAVE TO PAY FOR THE PERFORMANCE OF THE CONTRACT.THE EMPLOYER SHALL PERFORM SUCH DUTIES IN REGARDS TO THE DEDUCTION OF SUCH TAXES AT SOURCE AS PER APPLICABLE LAWNone
17079085640000NoneNoneELIGIBILITYTHE BIDDER SHALL QUOTE Rates BY adding GST OF 18% for either materials or works Contract (Service).All other duties (Including EXCISE DUTYWHERE THERE IS A EXEMPTION FOR GOVERNMENT PROJECTS THE SAME SHALL BE recovered from the contractor bill), taxes, and other levies payable by the contractor under the contract or for any other cause SHALL BE INCLUDED IN THE TOTAL TENDER PRICE SUBMITTED BY THE TENDERERNone
17079085830000NoneNoneELIGIBILITYLABOUR RATES ARE INCLUSIVE EPF PPF ESI ETC.CONTRACTOR SHOULD BARE ALL LABOUR EXPENSES IN HIS QUOTED RATES WRT LABOUR WAGES.None
17079085950001NoneNoneELIGIBILITYAMOUNT PUT TO TENDER ARE INCLUSIVE OF 18 PERCENT GSTNone
17079086070000NoneNoneELIGIBILITYThe Work is Reserved For Scheduled Caste Contractor Only For Which Necessary caste Certificate is to be uplodedNone
17079086200000NoneNoneELIGIBILITYbidder shall ensure upload of relevant document certifying his / her status as scheduled caste as prescribed in the tender documentNone
17079086320000NoneNoneELIGIBILITYthe contractor belonging to scheduled caste shall be domicle of karnataka state for more than 10 years and should fournish necessary document issued by the competant authorityNone
17079132380000NoneNoneELIGIBILITYAS PER GO ORDER NOFD611 EXP-12/2023 DATED 03-02-2024 in order to ensure higher tendercapacity and better selection of eligible contractors and also to ensure more competition the existingmultiplyingfactor of 2.50 for assessing the available tendercapacitymay be modified to 5.00 for works costing ptoRs.100lakhsNone
17079132780000NoneNoneELIGIBILITYAS PER GO ORDER NO :FD611 EXP-12/2023 DATED 03-02-2024 Earnest Money Deposit: The tenderer all furnish, as part of his tender, Earnest money Deposit EMD at the following rates. EMD amount as of the estimated cost of the work put to tenderaUp to 20 lakh-1.25percent bRs.20 lakh and above up to Rs.1 crore-percent subject to a minimum s.25,000None
17079133220000NoneNoneELIGIBILITYAS PER GO ORDER NO FD611 EXP-12/2023 DATED 03-02-2024)Security deposit for an amount quivalent to 5percent of the contract price payable shall be deducted in every running bill. However, in case of first and final bill the entire security deposit will be deducted from the final billNone
17079134290000NoneNoneELIGIBILITYAS PER GO ORDER NO FD611 EXP-12/2023 DATED3-02-2024) all other conditions and modifications are applicableNone
17079134520000NoneNoneELIGIBILITYAll specifications includes with all lead and lift, loading and unloading charges and as per direction of Engineer incharge of workNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMandating satisfactory completion as a prime contractor for at least any construction work to an extent i.e RS13.74 lakhs of 25% of the cost of the work, for all works costing up to Rs.100lakhPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecutedinanyoneyear(foracontinuousperiodof12months)theminimumquantitiesofwork(usually80PERCENof annual requirement) for workscostinguptoRs.100.00 lakhs1.Earth work Excavation,Desilting,Embankment& Filling (Combined qty):8795.20cum2.CementConcrete (both PCC & RCC):658.88 cum3.steel:19.15tonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe work is reserved for schedule caste contractors only for which necessary caste certificate is to be uploaded. failing which the tenderer will be rejectedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- SCHEDULE CASTE CERTIFICATE
NoneNoneNoneNoneVALID CIVIL WORK REGISTRATION CERTIFICATE-SC REGISTRATION CONTRACTORS ONLYCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneGST REGISTRATION CERTIFICATECapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneLATEST ADDRESS AND CONTACT NUMBER OF THE BIDDER FOR CONTACT PURPOSECapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- SELF ATTESTATION BY CONTRACTOR
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2018-19 to 2022-23Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneachieved in at least one financial year a minimum financial turnover (in all classes of civil engineering constructions works only) of Rs 54.96 lakhs (usually not less than the estimated annual payments under this contract for works costing up to Rs.100 lakh)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneliquid assets and /or availability of credit facilities of not less than Rs.16.49Lakhs(Creditlines/letterofcredit/ certificates from banks formeetingthefundrequirement etc. (usually 30% of the amount of contract) for works costing up to Rs.100.00 lakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneCLAUSE 36A IN SECTION 5 OF CONDITIONS OF CONTRACT OF KW3 AS PER GO AS PER GO ORDER NO :FD611 EXP-12/2023 DATED 03-02-2024OthersSECTION 5
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- SECTION 5
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate WITH UDIN CERTIFIED BY CATrueTechnical Bid
VALID CIVIL WORK Registration CertificateTrueTechnical Bid
SCHEDULED CASTE Reservation Category CertificateTrueTechnical Bid
WORK DONE CERTIFICATETrueTechnical Bid
LINE OF CREDIT-Credit lines /letter of credit/ certificates from banks for meeting the fund requirement etcTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Irrigation and Other WorksMandyaKrishnarajapeteMandyaKRISHNARAJPETKr pete mandyaNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone