createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1708322952416
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee900.00
emd72000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose28-02-2024 16:00:00
tenderQueryClose26-02-2024 11:00:00
technicalBidOpen29-02-2024 16:30:00
publishedDate19-02-2024 14:54:55
publishedByPostPWD_EE_DIV_RCR
publishedByUserKPE15695 - K SHANKAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonChandrashekar TA
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08532225778
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1708322952446
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT8060
titleCONSTRUCTION OF THREE ADDITIONAL CLASS ROOM FOR GOVT MODEL HIGHER PRIMARY SCHOOL AT MATTURU VILLAGE AT MASKI CONSTITUENCY IN LINGASUGUR TALUKA RAICHUR DISTRICT UNDER KKRDB MICRO 2023-24 OF (SAVING) GRANT FOR THE YEAR 2023-24 RCH23S1923122 RCH23S1923423
descriptionCONSTRUCTION OF THREE ADDITIONAL CLASS ROOM FOR GOVT MODEL HIGHER PRIMARY SCHOOL AT MATTURU VILLAGE AT MASKI CONSTITUENCY IN LINGASUGUR TALUKA RAICHUR DISTRICT UNDER KKRDB MICRO 2023-24 OF (SAVING) GRANT FOR THE YEAR 2023-24 RCH23S1923122 RCH23S1923423
categoryWORKS
categoryTextWorks
ecv3599577.24
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1695
locationNamePWD Division Office Raichuru
provisionalAmount4285000.0
groupOverheadTotal0.0
fileNumberAEE/PWD/SDL/MATTURU/SCHOOL/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17083229520001NoneNoneBuildingsCONSTRUCTION OF THREE ADDITIONAL CLASS ROOM FOR GOVT MODEL HIGHER PRIMARY SCHOOL AT MATTURU VILLAGE AT MASKI CONSTITUENCY IN LINGASUGUR TALUKA RAICHUR DISTRICT UNDER KKRDB MICRO 2023-24 OF (SAVING) GRANT FOR THE YEAR 2023-24 RCH23S1923122 RCH23S1923423 GROUND FLOOR3167931.73
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
269102284606NonePWD CSR VOL I year 2023-24. I. No. 1.12 P.No. 08Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.Cum99.7599.7564.8FalseNoneNoneFalseNoneFalse6463.80
269102384606NonePWD CSR VOL I year 2023-24. I. No. 1.14.1 P.No. 08Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum107.1107.183.55FalseNoneNoneFalseNoneFalse8948.2050
269102484606NonePWD CSR VOL I year 2023-24. I. No. 1.4.1 P.No. 05Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 mCum254.1254.131.71FalseNoneNoneFalseNoneFalse8057.5110
269102584606NonePWD CSR VOL I year 2023-24. I. No. 2.1.3 P.No. 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.4531.08FalseNoneNoneFalseNoneFalse195445.0260
269102684606NonePWD CSR VOL I year 2023-24. I. No. 2.1.4 P.No. 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6527.856527.852.69FalseNoneNoneFalseNoneFalse17559.91650
269102784606NonePWD CSR VOL I year 2023-24. Sl. No. 14 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%Cum3916.713916.712.69FalseNoneNoneFalseNoneFalse10535.94990
269102884606NonePWD SR VOL II year 2023-24. I. No. 5.1.1 P.No. 9Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5891.555891.5514.87FalseNoneNoneFalseNoneFalse87607.34850
269102984606NonePWD SRVOL II year 2023-24. I. No. 5.2 P.No. 9Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6948.96948.915.25FalseNoneNoneFalseNoneFalse105970.7250
269103084606NonePWD CSR VOL I year 2023-24. I. No. 1.8 P.No. 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum472.82472.82201.19FalseNoneNoneFalseNoneFalse95126.65580
269103184606NonePWD CSR VOL I year 2023-24. I. No. 2.2.3 P.No. 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.816.08FalseNoneNoneFalseNoneFalse106977.0240
269103284606NonePWD CSR VOL I year 2023-24. Sl. No. 1(a) P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for isolated footings 8%Cum532.22532.2216.08FalseNoneNoneFalseNoneFalse8558.09760
269103384606NonePWD CSR VOL I year 2023-24. I. No. 2.2.3 P.No. 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.81.97FalseNoneNoneFalseNoneFalse13106.0160
269103484606NonePWD CSR VOL I year 2023-24. Sl. No. 9 P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%Cum4656.964656.961.97FalseNoneNoneFalseNoneFalse9174.21120
269103584606NonePWD CSR VOL I year 2023-24. I. No. 2.2.3 P.No. 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.87.5FalseNoneNoneFalseNoneFalse49896.00
269103684606NonePWD CSR VOL I year 2023-24. Sl. No. 2 P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for Plinth Beams of Buildings 50%Cum3326.43326.47.5FalseNoneNoneFalseNoneFalse24948.00
269103784606NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.156.29FalseNoneNoneFalseNoneFalse45194.59350
269103884606NonePWD CSR VOL Iyear 2023-24. Sl. No. 9 P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%Cum5029.65029.66.29FalseNoneNoneFalseNoneFalse31636.1840
269103984606NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.159.71FalseNoneNoneFalseNoneFalse69767.80650
269104084606NonePWD CSR VOL I year 2023-24. Sl. No. 14 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%Cum4311.084311.089.71FalseNoneNoneFalseNoneFalse41860.58680
269104184606NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.152.96FalseNoneNoneFalseNoneFalse21268.0440
269104284606NonePWD CSR VOL I year 2023-24. Sl. No. 16 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for Staircase and other similar structures 50%Cum3592.573592.572.96FalseNoneNoneFalseNoneFalse10634.00720
269104384606NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.1524.48FalseNoneNoneFalseNoneFalse175892.4720
269104484606NonePWD CSR VOL I year 2023-24. Sl. No. 15 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Roof Slabs 50%Cum3592.573592.5724.48FalseNoneNoneFalseNoneFalse87946.11360
269104584606NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.150.57FalseNoneNoneFalseNoneFalse4095.53550
269104684606NonePWD CSR VOL I year 2023-24. Sl. No. 19 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections 45%Cum3233.313233.310.57FalseNoneNoneFalseNoneFalse1842.98670
269104784606NonePWD CSR VOL II year 2023-24. I. No. 6.32 P.No. 17Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.Sqm1375.51375.5186.72FalseNoneNoneFalseNoneFalse256833.360
269104884606NonePWD CSR VOL II year 2023-24. I. No. 8.1.2 P.No. 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm253.05253.05280.63FalseNoneNoneFalseNoneFalse71013.42150
269104984606NonePWD SRVOL II year 2023-24. I. No. 8.8 P.No. 42Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm389.55389.55193.21FalseNoneNoneFalseNoneFalse75264.95550
269105084606NonePWD SR VOL II year 2023-24. I. No. 8.22 P.No. 44Providing lime wash on walls with one coat with lime of approved quality to give an even shade, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm10.510.5464.05FalseNoneNoneFalseNoneFalse4872.5250
269105184606NonePWD SR VOL IIyear 2023-24. I. No. 12.13.1 P.No.100Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.Cum103755.75103755.750.5FalseNoneNoneFalseNoneFalse51877.8750
269105284606NonePWD CSR VOL I year 2023-24. I. No.12.57.6 P.No.105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per specification. 35 mm thick both side commercialSqm3488.13488.113.76FalseNoneNoneFalseNoneFalse47996.2560
269105384606NonePWD SR VOL II year 2023-24. I. No. 12.51 P.No. 104Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Nos1066.81066.86.0FalseNoneNoneFalseNoneFalse6400.80
269105484606NonePWD SR VOL II year 2023-24. I. No. 12.90 P.No.110Providing and fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC Matching to RAL-9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPEThermo Plastic Elastomer and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware and Multi point locking system with touch lock. Wall thickness of frame and sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. The cost is inclusive of all fixtures and separate charges for minor T and P's shall not be madeSqm7070.77070.716.92FalseNoneNoneFalseNoneFalse119636.2440
269105584606NonePWD SR VOL II year 2023-24.I. No. 11.34B P.No. 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.Kg192.15192.15355.32FalseNoneNoneFalseNoneFalse68274.7380
269105684606NonePWD SR VOL II year 2023-24. I. No. 9.17.2 P.No.61Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mmSqm1233.751233.75116.16FalseNoneNoneFalseNoneFalse143312.40
269105784606NonePWD SR VOL II year 2023-24. I. No. 9.31 P.No. 64Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in- harge.Sqm2189.252189.25108.5FalseNoneNoneFalseNoneFalse237533.6250
269105884606NonePWD SR VOL II year 2023-24. I. No. 10.2 P.No. 69Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge.m344.4344.448.0FalseNoneNoneFalseNoneFalse16531.20
269105984606NonePWD SRVOL II year 2023-24. I. No. 8.33.3 P.No. 47Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm145.95145.9538.91FalseNoneNoneFalseNoneFalse5678.91450
269106084606NonePWD SR VOL II year 2023-24. I. No.11.26.1 P.No. 84Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin- Charge.Kg144.9144.9461.91FalseNoneNoneFalseNoneFalse66930.7590
269106184606NonePWD SR VOL II year 2023-24. I. No. 8.33.1 P.No. 46Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm165.9165.9280.61FalseNoneNoneFalseNoneFalse46553.1990
269106284606NonePWD SR VOL II year 2023-24. I. No. 8.33.1 P.No. 46Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm165.9165.9183.44FalseNoneNoneFalseNoneFalse30432.6960
269106384606NonePWD SRVOL II year 2023-24. I. No. 8.30 P.No. 46Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including riming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm182.7182.7193.26FalseNoneNoneFalseNoneFalse35308.6020
269106484606NonePWD CSR VOL II year 2023-24. I. No. 8.84 P.No. 55Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete.Sqm498.75498.7510.8FalseNoneNoneFalseNoneFalse5386.50
269106584606NonePWD CSR VOL IIyear 2023-24. I. No. 8.19.1 P.No. 44Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge.Sqm267.75267.7549.01FalseNoneNoneFalseNoneFalse13122.42750
269106684606NonePWD CSR VOL I year 2023-24. I. No. 2.11.a P.No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a.BuildingsKg93929.8593929.856.58FalseNoneNoneFalseNoneFalse618058.4130
269106784606NonePWD CSR VOL II year 2023-24. I. No. 8.49 P.No. 49Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.cm4.24.22000.0FalseNoneNoneFalseNoneFalse8400.00
17083229520001NoneNoneBuildingsCONSTRUCTION OF THREE ADDITIONAL CLASS ROOM FOR GOVT MODEL HIGHER PRIMARY SCHOOL AT MATTURU VILLAGE AT MASKI CONSTITUENCY IN LINGASUGUR TALUKA RAICHUR DISTRICT HEAD ROOM311882.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
269106884607NonePWD CSR VOL I year 2023-24. I. No. 2.1.4 P.No. 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6593.136593.131.02FalseNoneNoneFalseNoneFalse6724.99260
269106984607NonePWD CSR VOL I year 2023-24. Sl. No. 14 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%Cum3955.873955.871.02FalseNoneNoneFalseNoneFalse4034.98740
269107084607NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7257.07257.02.06FalseNoneNoneFalseNoneFalse14949.420
269107184607NonePWD CSR VOL I year 2023-24. Sl. No. 9 P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%Cum5079.95079.92.06FalseNoneNoneFalseNoneFalse10464.5940
269107284607NonePWD CSR VOL II year 2023-24. I. No. 6.32 P.No. 17Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.Sqm1389.261389.2649.36FalseNoneNoneFalseNoneFalse68573.87360
269107384607NonePWD CSR VOL II year 2023-24. I. No. 8.1.2 P.No. 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm255.57255.5758.29FalseNoneNoneFalseNoneFalse14897.17530
269107484607NonePWD SR VOL II year 2023-24. I. No. 8.8 P.No. 42Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm393.45393.45139.48FalseNoneNoneFalseNoneFalse54878.4060
269107584607NonePWD SR VOL II year 2023-24. I. No. 8.22 P.No. 44Providing lime wash on walls with one coat with lime of approved quality to give an even shade, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm10.6110.6158.29FalseNoneNoneFalseNoneFalse618.45690
269107684607NonePWD CSR VOL I year 2023-24. I. No.12.57.6 P.No.105Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Sqm3522.973522.971.89FalseNoneNoneFalseNoneFalse6658.41330
269107784607NonePWD SRVOL II year 2023-24. I. No. 9.31 P.No. 64Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in- harge.Sqm2211.142211.145.87FalseNoneNoneFalseNoneFalse12979.39180
269107884607NonePWD SR VOL II year 2023-24. I. No. 8.33.1 P.No. 46Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm167.56167.5658.29FalseNoneNoneFalseNoneFalse9767.07240
269107984607NonePWD SR VOL II year 2023-24. I. No. 8.33.1 P.No. 46Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm167.56167.5617.0FalseNoneNoneFalseNoneFalse2848.520
269108084607NonePWD SR VOL II year 2023-24. I. No. 8.30 P.No. 46Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including riming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm184.53184.53139.47FalseNoneNoneFalseNoneFalse25736.39910
269108184607NonePWD SR VOL II year 2023-24. I. No. 7.19 P.No. 23Providing and laying to required line and slope roofing with semicorrugated ( Trafford ) asbestos cement sheet 6mm. thick fixed with galvanised iron J or L hooks, bolts and nuts 8mm. dia C.I plain and bitumen washers, over the existing purlins, rafters and trusses including cost of materials, labour, complete as per specifications.Sqm396.63396.6325.28FalseNoneNoneFalseNoneFalse10026.80640
269108284607NonePWD SR VOL II year 2023-24. I. No.11.25.2 P.No. 84Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kg144.23144.23272.58FalseNoneNoneFalseNoneFalse39314.21340
269108384607NonePWD CSR VOL I year 2023-24. I. No. 2.11.a P.No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a.BuildingsKg94869.1594869.150.31FalseNoneNoneFalseNoneFalse29409.43650
17083229520001NoneNoneBuildingsElectrification Works (3 Class Room)119763.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
269108484608NonePWD Electrical SR 2023-24,Page No-02, It No- 1.2.1Supplying heavy gauge PVC conduit pipe 19/20mm dia 2mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessarym69.369.3230.0FalseNoneNoneFalseNoneFalse15939.00
269108584608NonePWD Electrical SR 2023-24,Page No-02, It No- 1.3.1Supplying heavy gauge PVC Conduit Pipe 19/20mm dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.m71.471.4130.0FalseNoneNoneFalseNoneFalse9282.00
269108684608NonePWD Electrical SR 2023-24,Page No-05,It No-2.2.1Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase&Neutral) &1x1.0sqmm(Earthwire) FRLSmultistrand PVC insulated copperwire (confirming to IS-694:and latest amendments) without control switch shall be fixed on the existing plastic sheet/gangbox, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.. Short point upto 3Mtr from tapping point to out let via switch boxPoint282.45282.4518.0FalseNoneNoneFalseNoneFalse5084.10
269108784608NonePWD Electrical SR 2023-24,Page No-05,It No-2.2.2Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch boxPoint397.95397.9521.0FalseNoneNoneFalseNoneFalse8356.950
269108884608NonePWD Electrical SR 2023-24,Page No-05,It No- 2.2.3Long point above 6Mtr upto 10Mtr from tapping point to out let via switch boxPoint582.75582.7510.0FalseNoneNoneFalseNoneFalse5827.50
269108984608NonePWD Electrical SR 2023-24,Page No-05,It No-2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 1.5sqmm.m27.0227.02250.0FalseNoneNoneFalseNoneFalse6755.00
269109084608NonePWD Electrical SR 2023-24,Page No-05,It No-2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 2.5sqmm.m44.144.1280.0FalseNoneNoneFalseNoneFalse12348.00
269109184608NonePWD Electrical SR 2023-24,Page No-10,It No-3.14.7Supplying And fixing/replacing of 6/16/32A electricalaccessories on existing switch board.6A Batten HolderNo77.777.718.0FalseNoneNoneFalseNoneFalse1398.60
269109284608NonePWD Electrical SR 2023-24,Page No-8,It No-3.1.1Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 - 6Amps 2 WayEach134.4134.432.0FalseNoneNoneFalseNoneFalse4300.80
269109384608NonePWD Electrical SR 2023-24,Page No-9,It No-3.6.4Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 Stepped fan regulator. Two ModuleEach374.85374.856.0FalseNoneNoneFalseNoneFalse2249.10
269109484608NonePWD Electrical SR 2023-24,Page No-9,It No-3.6.716Amps one way switch.Each189.0189.012.0FalseNoneNoneFalseNoneFalse2268.00
269109584608NonePWD Electrical SR 2023-24,Page No-8,It No-3.4.3Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall . 4-5WayEach185.85185.856.0FalseNoneNoneFalseNoneFalse1115.10
269109684608NonePWD Electrical SR 2023-24,Page No-8,It No-3.4.5Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall . 8WayEach274.05274.056.0FalseNoneNoneFalseNoneFalse1644.30
269109784608NonePWD Electrical SR 2023-24,Page No-8,It No-3.5.3Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. - 4 ModuleEach183.75183.756.0FalseNoneNoneFalseNoneFalse1102.50
269109884608NonePWD Electrical SR 2023-24,Page No-8,It No-3.5.5Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. - 8 ModuleEach298.2298.26.0FalseNoneNoneFalseNoneFalse1789.20
269109984608NonePWD Electrical SR 2023-24,Page No-47,It No-11.13.2Supplying and fixing of slim patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired. Excluding Ballast & Fluorescent Tube. 1 x 4' Tube light fitting.Each282.45282.4520.0FalseNoneNoneFalseNoneFalse5649.00
269110084608NonePWD Electrical SR 2023-24,Page No-48,It No-12.12.1Supplying and fixing/replacing of fluorescent tube. 18 to 40WEach99.7599.7520.0FalseNoneNoneFalseNoneFalse1995.00
269110184608NonePWD Electrical SR 2023-24,Page No-30,It No-6.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular modelEach3133.23133.26.0FalseNoneNoneFalseNoneFalse18799.20
269110284608NonePWD Electrical SR 2023-24,Page No-57, It No-13.10Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. Ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring.Each179.55179.556.0FalseNoneNoneFalseNoneFalse1077.30
269110384608NonePWD Electrical SR 2023-24,Page No-17,It No-5.18.1Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32Amps SPEach435.75435.7512.0FalseNoneNoneFalseNoneFalse5229.00
269110484608NonePWD Electrical SR 2023-24,Page No-17,It No-5.18.4Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32Amps DPEach775.95775.956.0FalseNoneNoneFalseNoneFalse4655.70
269110584608NonePWD Electrical SR 2023-24,Page No-19,It No-5.30Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter.Each1449.01449.02.0FalseNoneNoneFalseNoneFalse2898.00
17083245270000NoneNoneBuildingsCONSTRUCTION OF THREE ADDITIONAL CLASS ROOM FOR GOVT MODEL HIGHER PRIMARY SCHOOL AT MATTURU VILLAGE AT MASKI CONSTITUENCY IN LINGASUGUR TALUKA RAICHUR DISTRICT UNDER KKRDB MICRO 2023-24 OF (SAVING) GRANT FOR THE YEAR 2023-24 RCH23S1923122 RCH23S19234233599577.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
269128584624NonePWD CSR VOL I year 2023-24. I. No. 1.12 P.No. 08Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.Cum99.7599.7564.8FalseNoneNoneFalseNoneFalse6463.80
269133184624NonePWD CSR VOL I year 2023-24. I. No. 2.1.4 P.No. 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6593.136593.131.02FalseNoneNoneFalseNoneFalse6724.99260
269134784624NonePWD Electrical SR 2023-24,Page No-02, It No- 1.2.1Supplying heavy gauge PVC conduit pipe 19/20mm dia 2mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessarym69.369.3230.0FalseNoneNoneFalseNoneFalse15939.00
269128684624NonePWD CSR VOL I year 2023-24. I. No. 1.14.1 P.No. 08Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum107.1107.183.55FalseNoneNoneFalseNoneFalse8948.2050
269134884624NonePWD Electrical SR 2023-24,Page No-02, It No- 1.3.1Supplying heavy gauge PVC Conduit Pipe 19/20mm dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.m71.471.4130.0FalseNoneNoneFalseNoneFalse9282.00
269133284624NonePWD CSR VOL I year 2023-24. Sl. No. 14 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%Cum3955.873955.871.02FalseNoneNoneFalseNoneFalse4034.98740
269128784624NonePWD CSR VOL I year 2023-24. I. No. 1.4.1 P.No. 05Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 mCum254.1254.131.71FalseNoneNoneFalseNoneFalse8057.5110
269134984624NonePWD Electrical SR 2023-24,Page No-05,It No-2.2.1Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase&Neutral) &1x1.0sqmm(Earthwire) FRLSmultistrand PVC insulated copperwire (confirming to IS-694:and latest amendments) without control switch shall be fixed on the existing plastic sheet/gangbox, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.. Short point upto 3Mtr from tapping point to out let via switch boxPoint282.45282.4518.0FalseNoneNoneFalseNoneFalse5084.10
269133384624NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7257.07257.02.06FalseNoneNoneFalseNoneFalse14949.420
269135084624NonePWD Electrical SR 2023-24,Page No-05,It No-2.2.2Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch boxPoint397.95397.9521.0FalseNoneNoneFalseNoneFalse8356.950
269133484624NonePWD CSR VOL I year 2023-24. Sl. No. 9 P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%Cum5079.95079.92.06FalseNoneNoneFalseNoneFalse10464.5940
269128884624NonePWD CSR VOL I year 2023-24. I. No. 2.1.3 P.No. 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.4531.08FalseNoneNoneFalseNoneFalse195445.0260
269128984624NonePWD CSR VOL I year 2023-24. I. No. 2.1.4 P.No. 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6527.856527.852.69FalseNoneNoneFalseNoneFalse17559.91650
269135184624NonePWD Electrical SR 2023-24,Page No-05,It No- 2.2.3Long point above 6Mtr upto 10Mtr from tapping point to out let via switch boxPoint582.75582.7510.0FalseNoneNoneFalseNoneFalse5827.50
269133584624NonePWD CSR VOL II year 2023-24. I. No. 6.32 P.No. 17Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.Sqm1389.261389.2649.36FalseNoneNoneFalseNoneFalse68573.87360
269133684624NonePWD CSR VOL II year 2023-24. I. No. 8.1.2 P.No. 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm255.57255.5758.29FalseNoneNoneFalseNoneFalse14897.17530
269135284624NonePWD Electrical SR 2023-24,Page No-05,It No-2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 1.5sqmm.m27.0227.02250.0FalseNoneNoneFalseNoneFalse6755.00
269129084624NonePWD CSR VOL I year 2023-24. Sl. No. 14 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%Cum3916.713916.712.69FalseNoneNoneFalseNoneFalse10535.94990
269135384624NonePWD Electrical SR 2023-24,Page No-05,It No-2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 2.5sqmm.m44.144.1280.0FalseNoneNoneFalseNoneFalse12348.00
269133784624NonePWD SR VOL II year 2023-24. I. No. 8.8 P.No. 42Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm393.45393.45139.48FalseNoneNoneFalseNoneFalse54878.4060
269129184624NonePWD SR VOL II year 2023-24. I. No. 5.1.1 P.No. 9Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5891.555891.5514.87FalseNoneNoneFalseNoneFalse87607.34850
269133884624NonePWD SR VOL II year 2023-24. I. No. 8.22 P.No. 44Providing lime wash on walls with one coat with lime of approved quality to give an even shade, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm10.6110.6158.29FalseNoneNoneFalseNoneFalse618.45690
269135484624NonePWD Electrical SR 2023-24,Page No-10,It No-3.14.7Supplying And fixing/replacing of 6/16/32A electricalaccessories on existing switch board.6A Batten HolderNo77.777.718.0FalseNoneNoneFalseNoneFalse1398.60
269129284624NonePWD SRVOL II year 2023-24. I. No. 5.2 P.No. 9Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6948.96948.915.25FalseNoneNoneFalseNoneFalse105970.7250
269135584624NonePWD Electrical SR 2023-24,Page No-8,It No-3.1.1Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 - 6Amps 2 WayEach134.4134.432.0FalseNoneNoneFalseNoneFalse4300.80
269129384624NonePWD CSR VOL I year 2023-24. I. No. 1.8 P.No. 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum472.82472.82201.19FalseNoneNoneFalseNoneFalse95126.65580
269133984624NonePWD CSR VOL I year 2023-24. I. No.12.57.6 P.No.105Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Sqm3522.973522.971.89FalseNoneNoneFalseNoneFalse6658.41330
269129484624NonePWD CSR VOL I year 2023-24. I. No. 2.2.3 P.No. 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.816.08FalseNoneNoneFalseNoneFalse106977.0240
269134084624NonePWD SRVOL II year 2023-24. I. No. 9.31 P.No. 64Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in- harge.Sqm2211.142211.145.87FalseNoneNoneFalseNoneFalse12979.39180
269135684624NonePWD Electrical SR 2023-24,Page No-9,It No-3.6.4Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 Stepped fan regulator. Two ModuleEach374.85374.856.0FalseNoneNoneFalseNoneFalse2249.10
269135784624NonePWD Electrical SR 2023-24,Page No-9,It No-3.6.716Amps one way switch.Each189.0189.012.0FalseNoneNoneFalseNoneFalse2268.00
269129584624NonePWD CSR VOL I year 2023-24. Sl. No. 1(a) P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for isolated footings 8%Cum532.22532.2216.08FalseNoneNoneFalseNoneFalse8558.09760
269134184624NonePWD SR VOL II year 2023-24. I. No. 8.33.1 P.No. 46Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm167.56167.5658.29FalseNoneNoneFalseNoneFalse9767.07240
269134284624NonePWD SR VOL II year 2023-24. I. No. 8.33.1 P.No. 46Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm167.56167.5617.0FalseNoneNoneFalseNoneFalse2848.520
269129684624NonePWD CSR VOL I year 2023-24. I. No. 2.2.3 P.No. 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.81.97FalseNoneNoneFalseNoneFalse13106.0160
269135884624NonePWD Electrical SR 2023-24,Page No-8,It No-3.4.3Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall . 4-5WayEach185.85185.856.0FalseNoneNoneFalseNoneFalse1115.10
269129784624NonePWD CSR VOL I year 2023-24. Sl. No. 9 P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%Cum4656.964656.961.97FalseNoneNoneFalseNoneFalse9174.21120
269135984624NonePWD Electrical SR 2023-24,Page No-8,It No-3.4.5Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall . 8WayEach274.05274.056.0FalseNoneNoneFalseNoneFalse1644.30
269134384624NonePWD SR VOL II year 2023-24. I. No. 8.30 P.No. 46Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including riming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm184.53184.53139.47FalseNoneNoneFalseNoneFalse25736.39910
269129884624NonePWD CSR VOL I year 2023-24. I. No. 2.2.3 P.No. 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.87.5FalseNoneNoneFalseNoneFalse49896.00
269136084624NonePWD Electrical SR 2023-24,Page No-8,It No-3.5.3Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. - 4 ModuleEach183.75183.756.0FalseNoneNoneFalseNoneFalse1102.50
269134484624NonePWD SR VOL II year 2023-24. I. No. 7.19 P.No. 23Providing and laying to required line and slope roofing with semicorrugated ( Trafford ) asbestos cement sheet 6mm. thick fixed with galvanised iron J or L hooks, bolts and nuts 8mm. dia C.I plain and bitumen washers, over the existing purlins, rafters and trusses including cost of materials, labour, complete as per specifications.Sqm396.63396.6325.28FalseNoneNoneFalseNoneFalse10026.80640
269136184624NonePWD Electrical SR 2023-24,Page No-8,It No-3.5.5Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. - 8 ModuleEach298.2298.26.0FalseNoneNoneFalseNoneFalse1789.20
269129984624NonePWD CSR VOL I year 2023-24. Sl. No. 2 P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for Plinth Beams of Buildings 50%Cum3326.43326.47.5FalseNoneNoneFalseNoneFalse24948.00
269134584624NonePWD SR VOL II year 2023-24. I. No.11.25.2 P.No. 84Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kg144.23144.23272.58FalseNoneNoneFalseNoneFalse39314.21340
269130084624NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.156.29FalseNoneNoneFalseNoneFalse45194.59350
269136284624NonePWD Electrical SR 2023-24,Page No-47,It No-11.13.2Supplying and fixing of slim patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired. Excluding Ballast & Fluorescent Tube. 1 x 4' Tube light fitting.Each282.45282.4520.0FalseNoneNoneFalseNoneFalse5649.00
269134684624NonePWD CSR VOL I year 2023-24. I. No. 2.11.a P.No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a.BuildingsKg94869.1594869.150.31FalseNoneNoneFalseNoneFalse29409.43650
269136384624NonePWD Electrical SR 2023-24,Page No-48,It No-12.12.1Supplying and fixing/replacing of fluorescent tube. 18 to 40WEach99.7599.7520.0FalseNoneNoneFalseNoneFalse1995.00
269130184624NonePWD CSR VOL Iyear 2023-24. Sl. No. 9 P.No. 111Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%Cum5029.65029.66.29FalseNoneNoneFalseNoneFalse31636.1840
269136484624NonePWD Electrical SR 2023-24,Page No-30,It No-6.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular modelEach3133.23133.26.0FalseNoneNoneFalseNoneFalse18799.20
269130284624NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.159.71FalseNoneNoneFalseNoneFalse69767.80650
269136584624NonePWD Electrical SR 2023-24,Page No-57, It No-13.10Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. Ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring.Each179.55179.556.0FalseNoneNoneFalseNoneFalse1077.30
269130384624NonePWD CSR VOL I year 2023-24. Sl. No. 14 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%Cum4311.084311.089.71FalseNoneNoneFalseNoneFalse41860.58680
269136684624NonePWD Electrical SR 2023-24,Page No-17,It No-5.18.1Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32Amps SPEach435.75435.7512.0FalseNoneNoneFalseNoneFalse5229.00
269130484624NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.152.96FalseNoneNoneFalseNoneFalse21268.0440
269136784624NonePWD Electrical SR 2023-24,Page No-17,It No-5.18.4Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32Amps DPEach775.95775.956.0FalseNoneNoneFalseNoneFalse4655.70
269130584624NonePWD CSR VOL I year 2023-24. Sl. No. 16 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for Staircase and other similar structures 50%Cum3592.573592.572.96FalseNoneNoneFalseNoneFalse10634.00720
269136884624NonePWD Electrical SR 2023-24,Page No-19,It No-5.30Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter.Each1449.01449.02.0FalseNoneNoneFalseNoneFalse2898.00
269130684624NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.1524.48FalseNoneNoneFalseNoneFalse175892.4720
269130784624NonePWD CSR VOL I year 2023-24. Sl. No. 15 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Roof Slabs 50%Cum3592.573592.5724.48FalseNoneNoneFalseNoneFalse87946.11360
269130884624NonePWD CSR VOL I year 2023-24. I. No. 2.5.2 P.No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.150.57FalseNoneNoneFalseNoneFalse4095.53550
269130984624NonePWD CSR VOL I year 2023-24. Sl. No. 19 P.No. 112Percentage Additionalities for Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections 45%Cum3233.313233.310.57FalseNoneNoneFalseNoneFalse1842.98670
269131084624NonePWD CSR VOL II year 2023-24. I. No. 6.32 P.No. 17Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.Sqm1375.51375.5186.72FalseNoneNoneFalseNoneFalse256833.360
269131184624NonePWD CSR VOL II year 2023-24. I. No. 8.1.2 P.No. 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm253.05253.05280.63FalseNoneNoneFalseNoneFalse71013.42150
269131284624NonePWD SRVOL II year 2023-24. I. No. 8.8 P.No. 42Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm389.55389.55193.21FalseNoneNoneFalseNoneFalse75264.95550
269131384624NonePWD SR VOL II year 2023-24. I. No. 8.22 P.No. 44Providing lime wash on walls with one coat with lime of approved quality to give an even shade, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm10.510.5464.05FalseNoneNoneFalseNoneFalse4872.5250
269131484624NonePWD SR VOL IIyear 2023-24. I. No. 12.13.1 P.No.100Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.Cum103755.75103755.750.5FalseNoneNoneFalseNoneFalse51877.8750
269131584624NonePWD CSR VOL I year 2023-24. I. No.12.57.6 P.No.105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per specification. 35 mm thick both side commercialSqm3488.13488.113.76FalseNoneNoneFalseNoneFalse47996.2560
269131684624NonePWD SR VOL II year 2023-24. I. No. 12.51 P.No. 104Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Nos1066.81066.86.0FalseNoneNoneFalseNoneFalse6400.80
269131784624NonePWD SR VOL II year 2023-24. I. No. 12.90 P.No.110Providing and fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC Matching to RAL-9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPEThermo Plastic Elastomer and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware and Multi point locking system with touch lock. Wall thickness of frame and sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. The cost is inclusive of all fixtures and separate charges for minor T and P's shall not be madeSqm7070.77070.716.92FalseNoneNoneFalseNoneFalse119636.2440
269131884624NonePWD SR VOL II year 2023-24.I. No. 11.34B P.No. 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.Kg192.15192.15355.32FalseNoneNoneFalseNoneFalse68274.7380
269131984624NonePWD SR VOL II year 2023-24. I. No. 9.17.2 P.No.61Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mmSqm1233.751233.75116.16FalseNoneNoneFalseNoneFalse143312.40
269132084624NonePWD SR VOL II year 2023-24. I. No. 9.31 P.No. 64Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in- harge.Sqm2189.252189.25108.5FalseNoneNoneFalseNoneFalse237533.6250
269132184624NonePWD SR VOL II year 2023-24. I. No. 10.2 P.No. 69Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge.m344.4344.448.0FalseNoneNoneFalseNoneFalse16531.20
269132284624NonePWD SRVOL II year 2023-24. I. No. 8.33.3 P.No. 47Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm145.95145.9538.91FalseNoneNoneFalseNoneFalse5678.91450
269132384624NonePWD SR VOL II year 2023-24. I. No.11.26.1 P.No. 84Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin- Charge.Kg144.9144.9461.91FalseNoneNoneFalseNoneFalse66930.7590
269132484624NonePWD SR VOL II year 2023-24. I. No. 8.33.1 P.No. 46Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm165.9165.9280.61FalseNoneNoneFalseNoneFalse46553.1990
269132584624NonePWD SR VOL II year 2023-24. I. No. 8.33.1 P.No. 46Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm165.9165.9183.44FalseNoneNoneFalseNoneFalse30432.6960
269132684624NonePWD SRVOL II year 2023-24. I. No. 8.30 P.No. 46Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including riming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm182.7182.7193.26FalseNoneNoneFalseNoneFalse35308.6020
269132784624NonePWD CSR VOL II year 2023-24. I. No. 8.84 P.No. 55Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete.Sqm498.75498.7510.8FalseNoneNoneFalseNoneFalse5386.50
269132884624NonePWD CSR VOL IIyear 2023-24. I. No. 8.19.1 P.No. 44Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge.Sqm267.75267.7549.01FalseNoneNoneFalseNoneFalse13122.42750
269132984624NonePWD CSR VOL I year 2023-24. I. No. 2.11.a P.No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a.BuildingsKg93929.8593929.856.58FalseNoneNoneFalseNoneFalse618058.4130
269133084624NonePWD CSR VOL II year 2023-24. I. No. 8.49 P.No. 49Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.cm4.24.22000.0FalseNoneNoneFalseNoneFalse8400.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17083229670000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17083229670000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17083229670001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of kppp portal due to internet connectivity issues and technical glitches at bidders end.None
17083233190000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17083233320000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17083233480000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17083233580000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the Bid. The Original Certificate/Certificates shall be produced at the time of opening of technical Bids for physical verification.None
17083233720000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reason.None
17083233840000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17083233950000NoneNoneELIGIBILITYBidders are advised to note that, 18% GST will be added to the contract amount.None
17083234080000NoneNoneELIGIBILITYThe Increse in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17083234170000NoneNoneELIGIBILITYThe bidder should mention the UDIN No on the turnover certificate, failing which bid is rejected.None
17083234440000NoneNoneELIGIBILITYIf the bidder uploaded the false document while participating in the tender, the bidder will be responsible and action will be initiated as per the tender clause.None
17083234540000NoneNoneELIGIBILITYThe work should be completed in 06 (Six) Months ( including monsoon).None
17083234730000NoneNoneELIGIBILITYThe KPWD Code, KTTP Act/Rules ,Delegation of Powers and other Government Orders issued by the Government from time to time will apply.None
17083234980000NoneNoneELIGIBILITYAll the specifications in the commercial bid format please be read as with all leads and lifts etc., complete as per specification and as directed by the engineer-in-charge.None
17083235410000NoneNoneELIGIBILITYThe Bidder will be qualified only if their available tender capacity is more than the total tender value of this work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNone3.2. To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e. (between 2018-19 to 2022-23) , (b) Satisfactory completion as a prime contractor for at least one similar nature of work to an extent of 50% of the cost of the work. Rs. 18.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2 (a) To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e. (between 2018-19 to 2022-23) (a) Achieved in at least two financial years a minimum financial turnover (In all classes of Civil Engineering Construction works only) (not less than 2 times the estimated annual payment under this contract) of Rs 36.00 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneBanker Details for referenceFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Banker Details
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersexisting commitments and ongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- existing commitments and ongoing works
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
Similar Nature of work done CertificateTrueTechnical Bid
Existing commitments or Ongoing worksTrueTechnical Bid
Any other relevant documentsTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone