tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1708165006000 | 0 | None | None | Buildings | Ground Floor | 1683064.49 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2678175 | 83485 | None | 19.3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge PWD CSR For 2023-24 Vol 2 Pag No:187 Item No. 19.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 2547.3 | 2547.3 | 2.09 | False | None | None | False | None | False | 5323.857 | 0 | 2678176 | 83485 | None | 19.7.3 | Demolishing brick work manually/ by mechanical means including stack ing of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.
PWD CSR For 2023-24 Vol 2 pag No:187 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 1080.45 | 1080.45 | 9.03 | False | None | None | False | None | False | 9756.4635 | 0 | 2678177 | 83485 | None | PWD CSR For 2023-24 Vol 2 pag No:188 Item No. 19 | Dismantling doors windows and clerestory windows steel or wood shutters including chowkhats, architrave, holdfasts, etc. complete and stacking to the appropriate disposal area as per direction of the Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 252.0 | 252.0 | 11.1 | False | None | None | False | None | False | 2797.2 | 0 | 2678178 | 83485 | None | PWD CSR For 2023-24 Vol 1 Pag No:8 Item No. 1.14 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumpsand other deleterious matter including dressing of excavated surfaces, posing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 3 m depth
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 107.1 | 107.1 | 96.16 | False | None | None | False | None | False | 10298.736 | 0 | 2678179 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 15 I.No.2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 8.91 | False | None | None | False | None | False | 56030.0895 | 0 | 2678180 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 15 I.No.2.2.1 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all aterials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. ( For footing).
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6601.35 | 6601.35 | 28.18 | False | None | None | False | None | False | 186026.043 | 0 | 2678181 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 15 I.No.2.2.1 | Form, work-for footing
8percent ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 528.11 | 528.11 | 28.18 | False | None | None | False | None | False | 14882.1398 | 0 | 2678182 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications (For coloumn) and shear wall ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6639.15 | 6639.15 | 20.17 | False | None | None | False | None | False | 133911.6555 | 0 | 2678183 | 83485 | None | fromwork1 | Formwork
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4647.41 | 4647.41 | 20.17 | False | None | None | False | None | False | 93738.2597 | 0 | 2678184 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 7 I.No.1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations and other similar works etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming and watering, lead up to 50 m
and lift upto 1.5 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 67.88 | False | None | None | False | None | False | 18958.884 | 0 | 2678185 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical
specifications. (For plinth Beam ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 3.67 | False | None | None | False | None | False | 25548.705 | 0 | 2678186 | 83485 | None | formwork forplinth beam | Formwork
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3480.75 | 3480.75 | 3.67 | False | None | None | False | None | False | 12774.3525 | 0 | 2678187 | 83485 | None | PWD CSR For 2023-24 Vol 1 Pag No:7 Item No.1.11 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 454.65 | 454.65 | 56.87 | False | None | None | False | None | False | 25855.9455 | 0 | 2678188 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (For coloumns ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 4.25 | False | None | None | False | None | False | 29586.375 | 0 | 2678189 | 83485 | None | formwok for column | Formwork
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4873.05 | 4873.05 | 4.25 | False | None | None | False | None | False | 20710.4625 | 0 | 2678190 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (For Beams and lintle of Buildingsl)"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 10.53 | False | None | None | False | None | False | 73304.595 | 0 | 2678191 | 83485 | None | I.No.1 | Form work
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4176.9 | 4176.9 | 10.53 | False | None | None | False | None | False | 43982.757 | 0 | 2678192 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications. (For chejja, staricase of Buildingsl)"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 0.16 | False | None | None | False | None | False | 1113.84 | 0 | 2678193 | 83485 | None | I.No.1 | Form work
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3132.68 | 3132.68 | 0.16 | False | None | None | False | None | False | 501.2288 | 0 | 2678194 | 83485 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications. (For Roof slabs of Buildingsl)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 8.57 | False | None | None | False | None | False | 59660.055 | 0 | 2678195 | 83485 | None | I.No. | Form wrork for roof slab
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3480.75 | 3480.75 | 8.57 | False | None | None | False | None | False | 29830.0275 | 0 | 2678196 | 83485 | None | PWD CSR For 2023-24 Vol 1 Pag No:18 Item No. 2.1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and
technical specification for buildings"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | t | 93929.85 | 93929.85 | 5.57 | False | None | None | False | None | False | 523189.2645 | 0 | 2678197 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:17 Item No. 6.3 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 1375.5 | 1375.5 | 14.55 | False | None | None | False | None | False | 20013.525 | 0 | 2678198 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:42 Item No. 8.5 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 366.45 | 366.45 | 89.81 | False | None | None | False | None | False | 32910.8745 | 0 | 2678199 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:41 Item No. 8.4 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete
as per specifications and as per directions of Engineer-in-charge."
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 327.6 | 327.6 | 99.01 | False | None | None | False | None | False | 32435.676 | 0 | 2678200 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.3 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 133.35 | 133.35 | 99.01 | False | None | None | False | None | False | 13202.9835 | 0 | 2678201 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:46 Item No. 8.3 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per
specifications and as per directions of Engine"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 186.9 | 186.9 | 89.81 | False | None | None | False | None | False | 16785.489 | 0 | 2678202 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:86 Item No. 11. | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 192.15 | 192.15 | 241.92 | False | None | None | False | None | False | 46484.928 | 0 | 2678203 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.4 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of pproved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 175.35 | 175.35 | 18.96 | False | None | None | False | None | False | 3324.636 | 0 | 2678204 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:77 Item No. 11 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 4701.9 | 4701.9 | 6.42 | False | None | None | False | None | False | 30186.198 | 0 | 2678205 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:109 Item No. 1 | Providing fixing of louvered ventilator made out of multi chambered UPVC Matching to RAL 901 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPE Thermo Plastic Elastomer and lead free with gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile throughout the ventilator frame The frame has an overall size of 39mm 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium powder coated in white will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. The wall thickness of the frame shall be 2mm.M maximum possible size is 1000mm 1000mmThe cost is inclusive of all fixtures and separate charges for minor T and Ps shall not be made ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6004.95 | 6004.95 | 1.62 | False | None | None | False | None | False | 9728.019 | 0 | 2678206 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:641Item No.9.17.2 | Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete size tiles 600x600 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1233.75 | 1233.75 | 52.07 | False | None | None | False | None | False | 64241.3625 | 0 | 2678207 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:55 Item No.8.84 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 498.75 | 498.75 | 6.0 | False | None | None | False | None | False | 2992.5 | 0 | 2678208 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:50 Item No.8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 105.0 | 105.0 | 136.07 | False | None | None | False | None | False | 14287.35 | 0 | 2678209 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SSHandles 300 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 577.5 | 577.5 | 4.0 | False | None | None | False | None | False | 2310.0 | 0 | 2678210 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16 mm dia 300 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 393.75 | 393.75 | 4.0 | False | None | None | False | None | False | 1575.0 | 0 | 2678211 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS Tower Bolt 200x 10mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 157.5 | 157.5 | 6.0 | False | None | None | False | None | False | 945.0 | 0 | 2678212 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS hinges 125 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 52.5 | 52.5 | 8.0 | False | None | None | False | None | False | 420.0 | 0 | 2678213 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge S Door Stopper 75 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 105.0 | 105.0 | 8.0 | False | None | None | False | None | False | 840.0 | 0 | 2678214 | 83485 | None | PWD CSR For 2023-24 Vol 2 Pag No:49 Sl No.8.49 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | cm | 4.2 | 4.2 | 3000.0 | False | None | None | False | None | False | 12600.0 | 0 |
| 1708165006000 | 0 | None | None | Buildings | First Floor | 800654.36 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2678215 | 83486 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (For coloumns above plinth Beam )"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 5.92 | False | None | None | False | None | False | 41624.2304 | 0 | 2678216 | 83486 | None | I.No.1 | Form work For coloumns above plinth Beam
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4921.78 | 4921.78 | 5.92 | False | None | None | False | None | False | 29136.9376 | 0 | 2678217 | 83486 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (For Beams and lintle of Buildingsl)"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 5.3 | False | None | None | False | None | False | 37264.936 | 0 | 2678218 | 83486 | None | I.No.1 | Form work For Beams and lintle of Buildingsl
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4218.67 | 4218.67 | 5.3 | False | None | None | False | None | False | 22358.951 | 0 | 2678219 | 83486 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications. (For chejja, staricase of Buildingsl)"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 0.11 | False | None | None | False | None | False | 773.4232 | 0 | 2678220 | 83486 | None | I.No.1 | Form work (For chejja, staricase of Buildingsl)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3164.0 | 3164.0 | 0.11 | False | None | None | False | None | False | 348.04 | 0 | 2678221 | 83486 | None | PWD SR 2021-22 Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications. (For Roof slabs of Buildingsl)"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 8.57 | False | None | None | False | None | False | 60256.6984 | 0 | 2678222 | 83486 | None | I.No.1 | Form work(For Roof slabs of Buildingsl)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3515.56 | 3515.56 | 8.57 | False | None | None | False | None | False | 30128.3492 | 0 | 2678223 | 83486 | None | PWD CSR For 2023-24 Vol 1 Pag No:18 Item No. 2.1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and
technical specification for buildings"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | t | 95808.45 | 95808.45 | 2.32 | False | None | None | False | None | False | 222275.604 | 0 | 2678224 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:17 Item No. 6.3 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum ompressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 1403.01 | 1403.01 | 15.12 | False | None | None | False | None | False | 21213.5112 | 0 | 2678225 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:42 Item No. 8.5 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 373.78 | 373.78 | 112.29 | False | None | None | False | None | False | 41971.7562 | 0 | 2678226 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:41 Item No. 8.4 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 334.15 | 334.15 | 95.62 | False | None | None | False | None | False | 31951.423 | 0 | 2678227 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.3 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 136.02 | 136.02 | 95.62 | False | None | None | False | None | False | 13006.2324 | 0 | 2678228 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:46 Item No. 8.3 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per
specifications and as per directions of Engine"
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 190.64 | 190.64 | 112.29 | False | None | None | False | None | False | 21406.9656 | 0 | 2678229 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:86 Item No. 11. | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 195.99 | 195.99 | 258.72 | False | None | None | False | None | False | 50706.5328 | 0 | 2678230 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.4 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of pproved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 178.86 | 178.86 | 12.32 | False | None | None | False | None | False | 2203.5552 | 0 | 2678231 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:77 Item No. 11 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 4795.94 | 4795.94 | 6.42 | False | None | None | False | None | False | 30789.9348 | 0 | 2678232 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:109 Item No. 1 | providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 5024.32 | 5024.32 | 1.62 | False | None | None | False | None | False | 8139.3984 | 0 | 2678233 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:641Item No.9.17.2 | Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete size tiles 600x600 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1258.43 | 1258.43 | 58.43 | False | None | None | False | None | False | 73530.0649 | 0 | 2678234 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:55 Item No.8.84 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 508.73 | 508.73 | 6.0 | False | None | None | False | None | False | 3052.38 | 0 | 2678235 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:50 Item No.8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 107.1 | 107.1 | 136.07 | False | None | None | False | None | False | 14573.097 | 0 | 2678236 | 83486 | None | PWD CSR For 2023-24 Vol 2 P No:218 Sl No.22.15.2 | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SSHandles 300 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 589.05 | 589.05 | 4.0 | False | None | None | False | None | False | 2356.2 | 0 | 2678237 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16 mm dia 300 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 401.63 | 401.63 | 4.0 | False | None | None | False | None | False | 1606.52 | 0 | 2678238 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS Tower Bolt 200x 10mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 160.65 | 160.65 | 6.0 | False | None | None | False | None | False | 963.9 | 0 | 2678239 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS hinges 125 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 53.55 | 53.55 | 8.0 | False | None | None | False | None | False | 428.4 | 0 | 2678240 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No:218 Sl No.22.15. | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge S Door Stopper 75 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 107.1 | 107.1 | 2.0 | False | None | None | False | None | False | 214.2 | 0 | 2678241 | 83486 | None | Common SR 2023-2024 Vol-2 Item no-13.48 Pg no-125 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 311.66 | 311.66 | 20.0 | False | None | None | False | None | False | 6233.2 | 0 | 2678242 | 83486 | None | PWD CSR For 2023-24 Vol 2 Pag No: 151 Sl No.15.11 | Newly Constructed Roof or Bathroom or Toilet or balcony or utility with Cementatius Waterproof coating Below 500 Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of 5 Liquid 7 Powder to the RCC surface like Roof, bathroom toilet balcony utility area applied 2.2kg per m2 in 2 coats to achieve 1.2mm DFT, having Elongation at break greater 120 as per ASTM D 412, Tensile strength greater 1N per mm2 as per ASTM D 412 Adhesion strength 0.80N per mm2 as per ASTM D 4541 crack bridging upto 2mm as per ASTM C 836 The finished cost to include surface preparation, making coving of 50 mm x 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 562.28 | 562.28 | 57.16 | False | None | None | False | None | False | 32139.9248 | 0 |
| 1708165006000 | 0 | None | None | Buildings | Elecrification work for Ground Floor | 172062.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2678243 | 83487 | None | IC: 1.3.2 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick
with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.Common Sr 2023-24 vol-6,pg no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 82.95 | 82.95 | 13.0 | False | None | None | False | None | False | 1078.35 | 0 | 2678244 | 83487 | None | IC: 1.3.2 | Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase & Neutral)& 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box,the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outl.Short point upto 3Mtr from tapping point to out let via switch box . Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 282.45 | 282.45 | 4.0 | False | None | None | False | None | False | 1129.8 | 0 | 2678245 | 83487 | None | IC: 2.2.1 | Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch. Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 397.95 | 397.95 | 9.0 | False | None | None | False | None | False | 3581.55 | 0 | 2678246 | 83487 | None | IC: 2.2.2 | Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box.Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 582.75 | 582.75 | 9.0 | False | None | None | False | None | False | 5244.75 | 0 | 2678247 | 83487 | None | IC: 2.2.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010.1.5 mm2 Common SR 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 27.3 | 27.3 | 35.0 | False | None | None | False | None | False | 955.5 | 0 | 2678248 | 83487 | None | IC: 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010.2.5 mm2 Common SR 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 44.1 | 44.1 | 70.0 | False | None | None | False | None | False | 3087.0 | 0 | 2678249 | 83487 | None | IC: 2.3.3 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.10-12 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 274.05 | 274.05 | 2.0 | False | None | None | False | None | False | 548.1 | 0 | 2678250 | 83487 | None | IC: 3.3.6 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.16 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 308.7 | 308.7 | 2.0 | False | None | None | False | None | False | 617.4 | 0 | 2678251 | 83487 | None | IC: 3.3.7 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.10-12 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 361.2 | 361.2 | 2.0 | False | None | None | False | None | False | 722.4 | 0 | 2678252 | 83487 | None | IC: 3.5.6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.16 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 416.85 | 416.85 | 2.0 | False | None | None | False | None | False | 833.7 | 0 | 2678253 | 83487 | None | IC: 3.5.7 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A One Way Switch Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 107.1 | 107.1 | 26.0 | False | None | None | False | None | False | 2784.6 | 0 | 2678254 | 83487 | None | IC: 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 179.55 | 179.55 | 4.0 | False | None | None | False | None | False | 718.2 | 0 | 2678255 | 83487 | None | IC: 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293Stepped Fan Regulator Two Module Common SR 2023-24 vol-6,pg no-9 Stepped Fan Regulator Two Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 328.65 | 328.65 | 8.0 | False | None | None | False | None | False | 2629.2 | 0 | 2678256 | 83487 | None | IC: 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 247.8 | 247.8 | 1.0 | False | None | None | False | None | False | 247.8 | 0 | 2678257 | 83487 | None | IC: 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone Socke Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 163.8 | 163.8 | 1.0 | False | None | None | False | None | False | 163.8 | 0 | 2678258 | 83487 | None | IC: 3.6.11 | Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board.6A Bakelite Ceiling Rose.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 81.9 | 81.9 | 8.0 | False | None | None | False | None | False | 655.2 | 0 | 2678259 | 83487 | None | IC: 3.14.5 | Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board.6A Pendant Holder.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 74.55 | 74.55 | 14.0 | False | None | None | False | None | False | 1043.7 | 0 | 2678260 | 83487 | None | IC: 3.14.6 | Supplying and fixing regular 4 Way MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCBs as an incomer for 3 phase Double door with necessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCBs as outgoings confirming to IS/IEC 60898 - 2.Common SR 2023-24 Vol-6 page no-17 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 549.15 | 549.15 | 2.0 | False | None | None | False | None | False | 1098.3 | 0 | 2678261 | 83487 | None | IC: 5.17.1 | Supplying and fixingof 6to32 Amps Double pole miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 10329.0 | 10329.0 | 1.0 | False | None | None | False | None | False | 10329.0 | 0 | 2678262 | 83487 | None | IC: 5.19.1 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter.Common SR 2023-24 Vol-6 page no-19 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1449.0 | 1449.0 | 1.0 | False | None | None | False | None | False | 1449.0 | 0 | 2678263 | 83487 | None | IC: 5.3 | Supplying capacitor type ceiling fan complete with down rod blades,shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system.48 inches Sweep (1200 mm) Regular mode.Common SR 2023-24 Vol-6,Page no-30 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3133.2 | 3133.2 | 8.0 | False | None | None | False | None | False | 25065.6 | 0 | 2678264 | 83487 | None | IC: 6.3.1 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.LED light fitting 1 x 4 - 20/22 W.Common SR 2023-24 Vol-6,Page no-43. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 724.5 | 724.5 | 8.0 | False | None | None | False | None | False | 5796.0 | 0 | 2678265 | 83487 | None | IC: 11.3.2 | Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRIgreater than 70%. efficacy greater than 80 lumen per W, lifegreater than 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF greater than 0.95, power loss should lesser than 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.9W, 6500K.Common SR 2023-24 Vol-6,Page no-47 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 168.0 | 168.0 | 6.0 | False | None | None | False | None | False | 1008.0 | 0 | 2678266 | 83487 | None | IC: 11.11.4 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 161.7 | 161.7 | 8.0 | False | None | None | False | None | False | 1293.6 | 0 | 2678267 | 83487 | None | IC: 13.7.1 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and S hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired.Common SR 2023-24,Vol-6 page no-57 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 330.75 | 330.75 | 8.0 | False | None | None | False | None | False | 2646.0 | 0 | 2678268 | 83487 | None | IC: 13.11 | GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg.Common SR 2023-24,Vol-6 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 780.15 | 780.15 | 1.0 | False | None | None | False | None | False | 780.15 | 0 | 2678269 | 83487 | None | IC: 51.01 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 709.8 | 709.8 | 1.0 | False | None | None | False | None | False | 709.8 | 0 | 2678270 | 83487 | None | IC: 54.02 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 325.5 | 325.5 | 1.0 | False | None | None | False | None | False | 325.5 | 0 | 2678271 | 83487 | None | IC: 54.03 | Digging of Pit for providing GI Pipe type Earthing for Haed Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Bag | 3139.5 | 3139.5 | 1.0 | False | None | None | False | None | False | 3139.5 | 0 | 2678272 | 83487 | None | IC: 1.6.2 | 1.1 kV, XLPE or Heat resistant PVC
insulated, PVC exutruted Inner Seath
Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip
thickness and resistivity as per IS-3975 10 Sqmm, 2 Core, (9 GI Strips - 4x0.8mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 83193.6 | 83193.6 | 0.03 | False | None | None | False | None | False | 2495.808 | 0 | 2678273 | 83487 | None | IC: 32.01 | Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed.In Ordinary Soil. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 273.0 | 273.0 | 11.25 | False | None | None | False | None | False | 3071.25 | 0 | 2678274 | 83487 | None | IC: 29.02 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. 2.5 to 25 Sqmm (Single/3.5/4 Core) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | cm | 21930.3 | 21930.3 | 0.03 | False | None | None | False | None | False | 657.909 | 0 | 2678275 | 83487 | None | IC: 21.05 | Supplying heavy gauge PVC conduit pipe 25mm dia 2 mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws.25 mm dia 2 mm thick.Common Sr 2023-24 page no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 85.05 | 85.05 | 25.0 | False | None | None | False | None | False | 2126.25 | 0 | 2678276 | 83487 | None | IC 1 | Green board (writing)-gem rates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 17665.0 | 17665.0 | 2.0 | False | None | None | False | None | False | 35330.0 | 0 | 2678277 | 83487 | None | IC2 | Providing and supplying of 2 seater reversable desk (1.5 ft height)-CEO approved rates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 4870.0 | 4870.0 | 10.0 | False | None | None | False | None | False | 48700.0 | 0 |
| 1708165006000 | 0 | None | None | Buildings | TOILET -Construction of Two class rooms Building for Government Lower Primary school Harishchandra Nagara in Ballari city. | 125420.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2678278 | 83488 | None | Common Schedule rate 2023-24Volume-I Item Code-1.4 | Earth work excavation by manual means for drains, canals, waste weir, draft,
approach channels, key trenches, foundation of Buildings & bridges and such
simillar works in all kinds of soils, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, removal
of stumps and other deleterious matter, excavated surface leveled and sides
neatly dressed disposing off the excavated stuff or sorting & stacking the
selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of
labour, tools & other appurtenaces required to complete the work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 254.1 | 254.1 | 0.79 | False | None | None | False | None | False | 200.739 | 0 | 2678279 | 83488 | None | Common Schedule rate 2023-24Volume-I Iteam Code-2 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 0.32 | False | None | None | False | None | False | 2012.304 | 0 | 2678280 | 83488 | None | Common Schedule rate 2023-24 Volume-II Iteam Code- | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1159.24 | 1159.24 | 19.42 | False | None | None | False | None | False | 22512.4408 | 0 | 2678281 | 83488 | None | Common Schedule rate 2023-24 Volume-I Iteam Code- | Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 0.05 | False | None | None | False | None | False | 348.075 | 0 | 2678282 | 83488 | None | Common Schedule rate 2023-24 Volume-I Iteam Code- | Formwork, for Beam,Lintel
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4176.9 | 4176.9 | 0.53 | False | None | None | False | None | False | 2213.757 | 0 | 2678283 | 83488 | None | PWD CSR For 2023-24 Vol 1 Pag No:18 Item No. 2.1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 93.93 | 93.93 | 42.0 | False | None | None | False | None | False | 3945.06 | 0 | 2678284 | 83488 | None | Building Schedule rate 2023-24 Volume-II Iteam Co | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers
specification & direction of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 333.9 | 333.9 | 1.58 | False | None | None | False | None | False | 527.562 | 0 | 2678285 | 83488 | None | Building Schedule rate 2023-24 Volume-II Iteam Cod | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 2484.3 | 2484.3 | 1.58 | False | None | None | False | None | False | 3925.194 | 0 | 2678286 | 83488 | None | PWD CSR For 2023-24 Vol 2 Pag No:41 Item No. 8.4 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 327.6 | 327.6 | 23.4 | False | None | None | False | None | False | 7665.84 | 0 | 2678287 | 83488 | None | Building Schedule rate 2023-24 Volume-II Iteam Co | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 133.35 | 133.35 | 21.0 | False | None | None | False | None | False | 2800.35 | 0 | 2678288 | 83488 | None | Common Schedule rate 2023-24 Volume-II Iteam Code- | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1129.8 | 1129.8 | 3.0 | False | None | None | False | None | False | 3389.4 | 0 | 2678289 | 83488 | None | Common Schedule rate 2023-24 Volume-II Iteam Code- | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1461.1 | 1461.1 | 7.35 | False | None | None | False | None | False | 10739.085 | 0 | 2678290 | 83488 | None | Common Schedule rate PWD SR. 2023-24Pg-131I | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 6275.85 | 6275.85 | 1.0 | False | None | None | False | None | False | 6275.85 | 0 | 2678291 | 83488 | None | PWD SR. 2023-24 Pg- 123 I No.13.34 | Providing and placing on terrace (at all floor levels) polyethylenewater storage tank, IS : 12701 marked, with cover and suitable lockingarrangement and making necessary holes for inlet, outlet and overflowpipes but without fittings and the base support for tank. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Ltr | 9.45 | 9.45 | 1000.0 | False | None | None | False | None | False | 9450.0 | 0 | 2678292 | 83488 | None | PWD SR. 2023-24Pg- 122 I No.13.32.3 | Providing and fixing chlorinated polyvinyl chloride ( CPVC) pipes having thermal stability for Hot and cold water supply including all CPVC palin and brass threated fittings i/c fixing the pipe with clamps at 1.0 mt. spacing, This includes jointing of pipes and fittings with one step CPVC solvent cement and cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer inchare concealed work work including cutting chases and making good the walls etc., PWD SR. 2023-24/ Pg- 122 I No.13.32.3 Rs. 477.00/mtr
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 500.85 | 500.85 | 30.0 | False | None | None | False | None | False | 15025.5 | 0 | 2678293 | 83488 | None | IC1 | Supplying & delivery of pump. 0.50HP As per market rate.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 10500.0 | 10500.0 | 1.0 | False | None | None | False | None | False | 10500.0 | 0 | 2678294 | 83488 | None | Common Schedule rate 2023-24 Volume-II Iteam Code- | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc PWD SR. 2023-24/ Pg- 85 I No.7.3 Rs. 2140.00/mtr
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1461.6 | 1461.6 | 1.0 | False | None | None | False | None | False | 1461.6 | 0 | 2678295 | 83488 | None | Common Schedule rate 2023-24 Volume-5 Iteam Code-1 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) PVC pipes 160mm .6kg/cm&class3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 648.9 | 648.9 | 20.0 | False | None | None | False | None | False | 12978.0 | 0 | 2678296 | 83488 | None | ic2 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling,transportation, and labour etc complete. Spec. No.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 |
|
|
---|