noticeInvitingTenderDTO
createdTs1707910376358
version9
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee4170.00
emd250000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose26-02-2024 16:00:00
tenderQueryClose24-02-2024 12:00:00
technicalBidOpen27-02-2024 16:30:00
publishedDate19-02-2024 11:17:17
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate17-02-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee150000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1707910376388
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT7988
titleImprovement to State Highway (SH-29) Mudugal-Kudathini Road from Km 92.00 to 93.00 (Working Chainage Km 91.90 to 93.00) in Kampli taluk of Kampli constituency, Ballari district under 2515 KKRDB (Macro projects) for the year 2023-24
descriptionImprovement to State Highway (SH-29) Mudugal-Kudathini Road from Km 92.00 to 93.00 (Working Chainage Km 91.90 to 93.00) in Kampli taluk of Kampli constituency, Ballari district under 2515 KKRDB (Macro projects) for the year 2023-24
categoryWORKS
categoryTextWorks
ecv16661972.83
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1693
locationNamePWD Division Office Ballari
provisionalAmount20000000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/SDN/BLR/2515/KKRDB/MACRO/2/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17079103760000NoneNoneRoadsRoads15542137.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
259031880557NoneCOMMON SR 2023-24, Vol-3 Sl.No. 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) By Mechanical Means using Dozer (A) In area of light jungle ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm412.65412.6530.24FalseNoneNoneFalseNoneFalse12478.5360
259031980557NoneVol-3 Sl.No. 2.2 B (i), P.No - 9Removal of stumps and roots including backfilling with suitable material to required compaction . (i) Girth from 300 mm to 600 mm (COMMON SR 2023-24, Vol-3 Sl.No. 2.2 B (i), P.No - 9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No373.8373.84.0FalseNoneNoneFalseNoneFalse1495.20
259032080557NoneVol-1, P.NO -17, SL. No -3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (COMMON SR 2023-24, Vol-1, P.NO -17, SL. No -3.5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm6.36.34778.4FalseNoneNoneFalseNoneFalse30103.920
259032180557NoneVol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.11020.81FalseNoneNoneFalseNoneFalse109328.7510
259032280557NoneVol-3, Sl.No.3.7 ,P.No - 17Compacting original ground supporting embankment : Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction (COMMON SR 2023-24, Vol-3, Sl.No.3.7 ,P.No - 17) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum110.25110.251888.13FalseNoneNoneFalseNoneFalse208166.33250
259032380557NoneVol-1, SI.No.1.8, P.No - 7Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.71719.39FalseNoneNoneFalseNoneFalse855740.4030
259032480557NoneVol-1, SI..No. 1.7, P.No - 7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (COMMON SR 2021-22, Vol-1, SI.No. 1.7, P.No - 7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum124.95124.95510.41FalseNoneNoneFalseNoneFalse63775.72950
259032580557NoneVol-3, Sl.No. 3.6 ,P.No -17Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 305 (COMMON SR 2023-24,Vol-3, Sl.No. 3.6 ,P.No -17) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum517.65517.652133.78FalseNoneNoneFalseNoneFalse1104551.2170
259032680557NoneVol-3 Sl.No.4.1.A.(v) ,P.No - 23Granular Sub-Base A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (v) For Grading -V Material (COMMON SR 2023-24, Vol-3 Sl.No.4.1.A.(v) ,P.No - 23 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2611.42611.4715.5FalseNoneNoneFalseNoneFalse1868456.70
259032780557NoneVol-3 Sl.No.4.17 ,P.No - 26.Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in (COMMON SR 2023-24, Vol-3 Sl.No.4.17 ,P.No - 26. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2687.02687.01895.5FalseNoneNoneFalseNoneFalse5093208.50
259032880557NoneVol-3 Sl.No.5.1.A.(i), P.No - 31Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on Prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg per m2 using mechanical means. 502 (COMMON SR 2023-24, Vol-3 Sl.No.5.1.A.(i), P.No - 31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm43.143.17560.0FalseNoneNoneFalseNoneFalse325836.00
259032980557NoneVol-3, Sl.No.5.3.(i), P.No - 31Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (COMMON SR 2023-24, Vol-3, Sl.No.5.3.(i), P.No - 31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm12.612.67420.0FalseNoneNoneFalseNoneFalse93492.00
259033080557NoneVol-3 Sl.No.5.6(i) P.No.32 Providing and laying Bituminous Macadam with 40/60 tph capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7835.17835.1378.0FalseNoneNoneFalseNoneFalse2961667.80
259033180557NoneVol-3 Sl.No. 5.31, P.No - 43Semi Dense Bituminous Concrete Providing and laying Semi Dense Bituminous Concrete with40/60 TPH capacity hot mix plant batch type using crushedaggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. IRC-37: 2018 (COMMON SR 2023-24, Vol-3 Sl.No. 5.31, P.No - 43) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum10659.610659.6189.72FalseNoneNoneFalseNoneFalse2022339.3120
259033280557NoneVol-3 Sl.No. 8.15 ,P.No - 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.803 (COMMON SR 2023-24, Vol-3 Sl.No. 8.15 ,P.No - 67) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm556.5556.5488.7FalseNoneNoneFalseNoneFalse271961.550
259033380557NoneVol-3 Sl.No. 8.43 ,P.No - 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (COMMON SR 2023-24, Vol-3 Sl.No. 8.43 ,P.No - 74) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No383.3383.3822.0FalseNoneNoneFalseNoneFalse315072.60
259033480557NoneVol-3 Sl.No. 8.6 (A), P.No - 64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.801 (COMMON SR 2023-24, Vol-3 Sl.No. 8.6 (A)(1), P.No - 64 )" ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each6667.56667.55.0FalseNoneNoneFalseNoneFalse33337.50
259033580557NoneVol-3, SL.NO. 8.18, P.NO.67Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (COMMON SR 2023-24, Vol-3, SL.NO. 8.18, P.NO.67) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.420.0FalseNoneNoneFalseNoneFalse15708.00
259033680557NoneVol-3 Page No.67 Item No.8.16 (iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) Ordinary kilometer stone (precast) (COMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16 (ii) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3073.353073.352.0FalseNoneNoneFalseNoneFalse6146.70
259033780557NoneVol-3 Page No.67 Item No.8.16 (iii)Reinforced cement concrete M15grade 200m stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (iii)200m stone (precast) (COMMON SR 2021-22, Vol-3 Page No.67 Item No.8.16 (iii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No884.1884.14.0FalseNoneNoneFalseNoneFalse3536.40
259033880557NoneVol-3 Sl.No. 8.7 ,P.No - 65Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60cm, 60 cm below ground level as per approved drawing (COMMON SR 2023-24, Vol-3 Sl.No. 8.7 ,P.No - 65) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm9460.59460.51.8FalseNoneNoneFalseNoneFalse17028.90
259033980557NoneVol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.157.6FalseNoneNoneFalseNoneFalse6168.960
259034080557NoneVol-5, P.NO -120, SL. No -10.14Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. (COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m375.9375.950.0FalseNoneNoneFalseNoneFalse18795.00
259034180557NoneVol-5, P.NO -120, SL. No -10.14Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. (COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m678.3678.350.0FalseNoneNoneFalseNoneFalse33915.00
259034280557NoneVol-3 Page No.80 Item No.8.58aProviding and laying Reinforced Cement Concrete pipe light duty NP2 for culverts, roadway utilities& crossingsas per IS 458:2003 in Single row including pointing ends and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing completeas per specifications. a. 300mm dia (COMMON SR 2023-24, Vol-3 Page No.80 Item No.8.58a) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m895.65895.6560.0FalseNoneNoneFalseNoneFalse53739.00
259034380557NoneItem No : 1.9 , Page No : 7 , Vol 1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ( SR 2023-24 , Item No : 1.9 , Page No : 7 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm279.3279.357.6FalseNoneNoneFalseNoneFalse16087.680
17079103760000NoneNoneRoadsConstruction of One vent pipe culvert298282.61
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
259034480558NoneCOMMON SR 2023-24, Vol-3, SL.No -2.17(ix).A, P.NORemoving all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Upto 600 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1004.851004.8510.0FalseNoneNoneFalseNoneFalse10048.50
259034580558NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.115.84FalseNoneNoneFalseNoneFalse1696.4640
259034680558NoneCOMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3)Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.452.4FalseNoneNoneFalseNoneFalse15092.280
259034780558NoneCOMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.1)Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6724.06724.014.01FalseNoneNoneFalseNoneFalse94203.240
259034880558NoneCOMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.t90754.6590754.650.7FalseNoneNoneFalseNoneFalse63528.2550
259034980558NoneCOMMON SR 2023-24, Vol-3 Sl.No. 16.15.C, P.No - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6.1000mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m8355.98355.912.5FalseNoneNoneFalseNoneFalse104448.750
259035080558NoneCOMMON SR 2023-24 Vol-3 Page No.123 SI.No.13.14)Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. 800 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm88.288.219.6FalseNoneNoneFalseNoneFalse1728.720
259035180558NoneSI.No -2.4.2)Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.2)-formwork ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum537.93537.9314.01FalseNoneNoneFalseNoneFalse7536.39930
17079103760000NoneNoneRoadsField culvert243993.75
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
259035280559NoneVol 1, P.No.8 Sl.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.114.7FalseNoneNoneFalseNoneFalse1574.370
259035380559NoneVol 1 P.No.15, Sl No.2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.454.9FalseNoneNoneFalseNoneFalse30813.4050
259035480559NoneVol 3 Sl.No.16.15C P.No.146Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 (COMMON SR 2023-24, Vol-3 Sl.No. 16.15.c, P.No - 146) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m3501.753501.7546.5FalseNoneNoneFalseNoneFalse162831.3750
259035580559NoneVol 1 Sl.No.1.8 P.No.7Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm497.7497.798.0FalseNoneNoneFalseNoneFalse48774.60
17079103760000NoneNoneRoadsPART -A(Running 11 KV HT -Line)Electrical pole shifting for SH 29506123.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
259035680560NoneELE SR 1.01 RCC Pole-9 Mtr Long 145 Kg WL ELE SR 2023-24, (Page No-1PART - II Distribution (ESCOMs))inclding labour charges of rs.1742 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos.9171.89171.830.0FalseNoneNoneFalseNoneFalse275154.00
259035780560NoneELE SR2.01Horizontal X-arms with HTSTS ELE SR 2023-24, (Page No- 1, PART- II Distribution (ESCOMs)including labour charges of rs 272 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set662.6662.633.0FalseNoneNoneFalseNoneFalse21865.80
259035880560NoneELE SR 59Mtr Long Rcc Pole DP Set Complete with Poles ELE SR 2023-24, (Page No- 1, BESCOM V Cost Data Sheet-1,)including labour charges of rs 5392 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set27366.427366.42.0FalseNoneNoneFalseNoneFalse54732.80
259035980560NoneELE SR 6.04 11 kV, 5 kN Composite/Polymeric Pin Insulator ELE SR 2023-24, (Page No- 2, PART II Distribution (ESCOMs) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No215.25215.2590.0FalseNoneNoneFalseNoneFalse19372.50
259036080560NoneELE SR 2.06LT 4 Pin Cross Arm with clamps, bolts, nuts and washers ELE SR 2023-24, (Page No- 5, BESCOM V Cost Data Sheet-1,)INCLUDING LABOUR CHARGES OF RS 160 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set557.95557.954.0FalseNoneNoneFalseNoneFalse2231.80
259036180560None6.031.1 kV Ceramic Pin Insulator (Shell only) ELE SR 2023-24, (Page No- 2, PART- II Distribution (ESCOMs) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No32.5532.5514.0FalseNoneNoneFalseNoneFalse455.70
259036280560None6.041.1 kV GI Pin for 1.1 kV Ceramic Shell Insulator ELE SR 2023-24, (Page No- 2, PART- II Distribution (ESCOMs) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos36.7536.758.0FalseNoneNoneFalseNoneFalse294.00
259036380560NoneELE SR 6.06No.8 Strain Insulator ELE SR 2023-24, (Page No- 2, PART II Distribution (ESCOMs),)- ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos28.3528.358.0FalseNoneNoneFalseNoneFalse226.80
259036480560NoneELE SR 6.07No.15 Strain Insulator ELE SR 2023-24, (Page No- 2, PART II Distribution (ESCOMs),)INCLUDING LABOUR CHARGES OF RS 309 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos370.95370.958.0FalseNoneNoneFalseNoneFalse2967.60
259036580560NoneELE SR 6.0845 KN Disk Insulators ELE SR 2023-24, (Page No- 2, PART II Distribution (ESCOMs),) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos535.5535.524.0FalseNoneNoneFalseNoneFalse12852.00
259036680560NoneELE SR 7.02Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ELE SR 2023-24, (Page No- 46, PART II Distribution (ESCOMs),) INCUDINHG LABOUR CHARGES OF RS 4361 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km50595.050595.01.25FalseNoneNoneFalseNoneFalse63243.750
259036780560NoneELE SR 2.16Spiral Earth Electrode ELE SR 2021-22, (Page No- 2, PART II Distribution (ESCOMs),) INCLUDING LABOUR CHARGES OF RS 90 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos320.95320.9529.0FalseNoneNoneFalseNoneFalse9307.550
259036880560NoneELE SR 5.14Fish Plate-MS ELE SR 2021-22, (Page No- 2, PART II Distribution (ESCOMs),)INCLUDING LABOUR CHARGES OF RS 763 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos844.9844.929.0FalseNoneNoneFalseNoneFalse24502.10
259036980560NoneELE SR 5.12Anchor Rod using 12 mm rounds/Guy Rod - MS( ELE SR 2021-22 (Page No- 2, PART II Distribution (ESCOMs),)INCLUDING LABOUR CHARGES RS 448 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos.716.8716.810.0FalseNoneNoneFalseNoneFalse7168.00
259037080560NoneELE SR 5.11Turn buckle (GI) ELE SR 2021-22, (Page No- 2, PART II Distribution (ESCOMs),)including labour charges of Rs 242 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos495.05495.0510.0FalseNoneNoneFalseNoneFalse4950.50
259037180560Noneele sr 54.01G.I Grounding pipe,B-Class, 4 ELE SR 2021-22, (Page No- 17, PART II Distribution (ESCOMs),)iNCLUDING LABOUR CHARGES OF Rs 1486 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos2266.152266.153.0FalseNoneNoneFalseNoneFalse6798.450
17079103760000NoneNoneRoadsPART-B DISTRIBUTION TRANSFORMER to State Highway (SH-29) Mudugal-Kudathini Road from Km 92.00 to 93.00 (Working Chainage Km 91.90 to 93.00) in Kampli Taluk, Kampli Contituency, Under 2515 KRDB (Macro) for the year 2023-24.71435.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
259037280561NoneELE SR 13.01Releasing & Fixing of DOLO ELE SR 2023-24, (Page No- 5, BESCOM IV,) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos237.0237.02.0FalseNoneNoneFalseNoneFalse474.00
259037380561NoneELE SR 15.03Releasing & Fixing of LT Kit ELE SR 2023-24, (Page No- 5, BESCOM IV ,) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos356.0356.02.0FalseNoneNoneFalseNoneFalse712.00
259037480561NoneELE SRSpecial Locality allowance at 15% if Labor charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Percentage18010.018010.01.0FalseNoneNoneFalseNoneFalse18010.00
259037580561NoneELE SRESI 4.75% on Labour ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.LS5703.05703.01.0FalseNoneNoneFalseNoneFalse5703.00
259037680561NoneELE SRContribution Towards Employee provident fund charge & 13.16% ESI on Total Labour Charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.LS16341.016341.01.0FalseNoneNoneFalseNoneFalse16341.00
259037780561NoneELE SR Transportation cost from store tio site 2% on material coat ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.LS7866.07866.01.0FalseNoneNoneFalseNoneFalse7866.00
259037880561NoneELE SRContigency @ 2% on Material and labuor ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.LS10267.010267.01.0FalseNoneNoneFalseNoneFalse10267.00
259037980561NoneELE SREmployees cost @ 20% on LC+MC ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.LS3602.03602.01.0FalseNoneNoneFalseNoneFalse3602.00
259038080561NoneELE SRStautory charges as per actuals (Inspectorate charges, civic body charges etc,) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.LS867.0867.01.0FalseNoneNoneFalseNoneFalse867.00
259038180561NoneELE SRGovernment Electrical Inspectorate Charges as per Actuals ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.LS5593.435593.431.0FalseNoneNoneFalseNoneFalse5593.430
259038280561NoneELE SRCompensation cost fro free cutting ect, as per approved norms ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.LS2000.02000.01.0FalseNoneNoneFalseNoneFalse2000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17079103770000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17079103770000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17079103770000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17079138710000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of kp-Procurement on or before the last date and time of bid submission.None
17079138810000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17079138890000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17079138940000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17079139000000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17079139070000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17079139170000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17079139240000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17079139300000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17079139360000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17079139430000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17079139490000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17079139550000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building during the defect liability period.None
17079139610000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing e-procurement portal.None
17079139670000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24. And Value at 2023-24 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24) in the Technical Qualification Criteria mentioned in the next section.None
17079139750000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17079139810000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17079139860000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the e-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17079139940000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17079140000000NoneNoneELIGIBILITYThe time stipulated for completion of work is 8 (Eight) calendar months including rainy season.None
17079140070000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17079140140000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17079140200000NoneNoneELIGIBILITYThe defect liability period for the work is 12 (Twelve) calendar months.None
17079140260000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work.None
17079140310000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17079140380000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests for the materials and work being used in the project for satisfactory completion.None
17079140440000NoneNoneELIGIBILITYThe Bidder shall ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date of bid submission.None
17079140500000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches.None
17079140560000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17079140640000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17079140710000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17079140840000NoneNoneELIGIBILITYThe Successful Tenderer has to execute the work as per approved designs and drawings provided by the Department.None
17079140880000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17079140940000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17079141000000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17079141120000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17079141180000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17079141240000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17079141300000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
17079141440000NoneNoneELIGIBILITYThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing electrification worksNone
17079141520000NoneNoneELIGIBILITYSuccessful tender should have to obtain all mandatory clearances from Fire Services, Electrical Inspectorate, GESCOM Power Supply etc., before commencement of the work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 - satisfactorily completed as prime contractor, at least one similar work such as -IMPROVEMENTS OF ASPHALT ROAD WORKS of value not less than Rs.84.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of of value not less than Rs.334.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23, (c)executed in any one year, the following minimum quantities of work: (a) Earthwork Excavation- 4457.00 Cum, (b) steel - 0.56 Metric Tonne, (c) GSB - 572.40 cum and (d) WMM/WBM - 1516.40 Cum (e) BM/SDBC - 454.12 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of not less than Rs.62.50 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneConstitutional or Legal Status of the Tenderer.OthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD under Class-I category
NoneNoneNoneNonePrincipal Place of Business.OthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation on Existing commitments and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involvedOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Contractor Registration CertificateTrueTechnical Bid
Existing CommitmentsTrueTechnical Bid
Annual Turnover Certificate with UDIN for the last five years duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Similar Nature i.e IMPROVEMENTS OF ASPHALT ROAD WORKS, work Done Certificate as Prime Certificate from competent authority not below the rank of Executive Engineer or equivalent that as to be duly attested by the Notary or Government Gazetted Officer and should Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Workdone Quantitywise statementTrueTechnical Bid
Physical and financial implementation calendarTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1708090108000
version0
createdDateNone
modifiedDateNone
blockNumberoffice of the Executive engineer PWD Division Ballari
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone