createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1708182544682
version8
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd12005000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-03-2024 16:00:00
tenderQueryClose28-02-2024 16:00:00
technicalBidOpen07-03-2024 16:30:00
publishedDate22-02-2024 12:49:01
publishedByPostPWD_EE_DIV_KPL
publishedByUserKPE15981 - P HEMANTHARAJ
bidValidityPeriod90
noOfCalls1
preBidMeetingDate26-02-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonP Hemantharaj
splitEmdRequiredYnTrue
emdBankGuarantee11905000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08539222318
mobileNumber9448021564
tenderSupplierListNone
tenderSchedule
createdTs1708182544711
version8
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT8868
titleImprovement to Sompura-Sidnekoppa M.D.R from Km 0.00 to Km 6.00 in Yalburga constituency, Kuknur Taluk, Koppal District (Working chainage from Km 0.34 to Km 5.44)
descriptionImprovement to Sompura-Sidnekoppa M.D.R from Km 0.00 to Km 6.00 in Yalburga constituency, Kuknur Taluk, Koppal District (Working chainage from Km 0.34 to Km 5.44)
categoryWORKS
categoryTextWorks
ecv80302127.31
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1696
locationNamePWD Division Office Koppala
provisionalAmount99000000.0
groupOverheadTotal0.0
fileNumberaeepwdyel5054-01-2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17081825450001NoneNoneRoadsImprovement to Sompura-Sidnekoppa M.D.R from Km 0.00 to Km 6.00 in Yalburga constituency, Kuknur Taluk, Koppal District (Working chainage from Km 0.34 to Km 5.44) (Road work))63071902.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268444983916NoneVol-3 Pg.no 9 It No. 2.5.ii b of 2023-24Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer a In area of thorny jungle ---- including cost of all materials, labour, HOM, I 100 Sqm508.2508.2155.89FalseNoneNoneFalseNoneFalse79223.2980
268445083916NoneVol-1 Pg.no 8 It No. 1.14.1 of 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete Common SOR For Engineering Departments ---- including cost of all materials, labour, HOM, I Cum107.1107.1744.19FalseNoneNoneFalseNoneFalse79702.7490
268445183916NoneVol-1 Pg.no 144 It No. 16.8.b of 2023-24Construction of unlined surface drains of average cross sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. Mechanical Mean ---- including cost of all materials, labour, HOM, I m26.2526.257869.0FalseNoneNoneFalseNoneFalse206561.250
268445283916NoneVol-3 Pg.no 17 It No. 3.5 of 2023-24Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- including cost of all materials, labour, HOM, I Sqm6.36.39562.5FalseNoneNoneFalseNoneFalse60243.750
268445383916NoneVol-3 Pg.no 17 It No. 3.7 of 2023-24Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- including cost of all materials, labour, HOM, I Cum110.25110.254016.25FalseNoneNoneFalseNoneFalse442791.56250
268445483916NoneVol-1 Pg.no 7 It No. 1.7 of 2023-24Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) Common SOR For Engineering Departments ---- including cost of all materials, labour, HOM, I Cum124.95124.95360.96FalseNoneNoneFalseNoneFalse45101.9520
268445583916NoneVol-1 Pg.no 7 It No. 1.8 of 2023-24Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- including cost of all materials, labour, HOM, I Cum497.7497.73622.47FalseNoneNoneFalseNoneFalse1802903.3190
268445683916NoneVol-3 Pg.no 17 It No. 3.6 of 2023-24Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- including cost of all materials, labour, HOM, I Cum517.65517.654993.92FalseNoneNoneFalseNoneFalse2585102.6880
268445783916NoneVol-3 Pg.no 23 It No. 4.2.v of 2023-24Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material ---- including cost of all materials, labour, HOM, I Cum2476.952476.956213.95FalseNoneNoneFalseNoneFalse15391643.45250
268445883916NoneVol-3 Pg.no 26 It No. 4.17 of 2023-24Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- including cost of all materials, labour, HOM, I Cum2686.952686.957058.01FalseNoneNoneFalseNoneFalse18964519.96950
268445983916NoneVol-3 Pg.no 31 It No. 5.1 of 2023-24Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- including cost of all materials, labour, HOM, I Sqm43.0543.0528232.01FalseNoneNoneFalseNoneFalse1215388.03050
268446083916NoneVol-3 Pg.no 31 It No. 5.4 of 2023-24Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. ---- including cost of all materials, labour, HOM, I Sqm14.714.728232.01FalseNoneNoneFalseNoneFalse415010.5470
268446183916NoneVol-3 Pg.no 33 It No. 5.8.C of 2023-24Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction ---- including cost of all materials, labour, HOM, I Cum8044.058044.051411.6FalseNoneNoneFalseNoneFalse11354980.980
268446283916NoneVol-3 Pg.no 43 It No. 5.31 of 2023-24Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. ---- including cost of all materials, labour, HOM, I Cum10659.610659.6846.96FalseNoneNoneFalseNoneFalse9028254.8160
268446383916NoneVol-3 Pg.no 67 It No. 8.15 of 2023-24Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- including cost of all materials, labour, HOM, I Sqm556.5556.51789.75FalseNoneNoneFalseNoneFalse995995.8750
268446483916NoneVol-3 Pg.no 64 It No. 8.6.ii of 2023-24Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle ---- including cost of all materials, labour, HOM, I Each4985.44985.429.0FalseNoneNoneFalseNoneFalse144576.60
268446583916NoneVol-3 Pg.no 65 It No. 8.7 of 2023-24Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- including cost of all materials, labour, HOM, I Sqm9460.59460.52.7FalseNoneNoneFalseNoneFalse25543.350
268446683916NoneVol-3 Pg.no 63-64 It No. 8.5.xvi of 2023-24Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 75 cm high octagon ---- including cost of all materials, labour, HOM, I Each5603.855603.853.0FalseNoneNoneFalseNoneFalse16811.550
268446783916NoneVol-3 Pg.no 74 It No. 8.43 of 2023-24Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer ---- including cost of all materials, labour, HOM, I Each383.25383.25444.0FalseNoneNoneFalseNoneFalse170163.00
268446883916NoneVol-3 Pg.no 67 It No. 8.18 of 2023-24Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- including cost of all materials, labour, HOM, I Each785.4785.416.0FalseNoneNoneFalseNoneFalse12566.40
268446983916NoneVol-3 Pg.no 67 It No. 8.16.ii of 2023-24Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc ---- including cost of all materials, labour, HOM, I Each3073.353073.355.0FalseNoneNoneFalseNoneFalse15366.750
268447083916NoneVol-3 Pg.no 67 It No. 8.16.iii of 2023-24Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- For 200 m stone (precast) ---- including cost of all materials, labour, HOM, I Each884.1884.122.0FalseNoneNoneFalseNoneFalse19450.20
17081825450000NoneNoneRoadsConstruction of Hume Pipe Culvert 3 Nos958933.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268447183917NoneVol-1 Pg.no 8 It No. 1.14.1 of 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) ---- including cost of all materials, labour, HOM, I Cum107.1107.1112.2FalseNoneNoneFalseNoneFalse12016.620
268447283917NoneVol-1 Pg.no 15 It No. 2.1.3 of 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) ---- including cost of all materials, labour, HOM, I Cum6288.456288.457.55FalseNoneNoneFalseNoneFalse47477.79750
268447383917NoneVol-1 Pg.no 18 It No. 2.11.h of 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18) ---- including cost of all materials, labour, HOM, I Tonne82961.5582961.551.89FalseNoneNoneFalseNoneFalse156797.32950
268447483917NoneVol-1 Pg.no 16 It No. 2.4.2 of 2023-24Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 (8% for Centring) Page No.16) ---- including cost of all materials, labour, HOM, I Cum6639.156639.1567.63FalseNoneNoneFalseNoneFalse449005.71450
268447583917NoneVol-1 Formwork Pg No 111 SI No. 8 of 2023-24Additionalities for Formwork, Centering & Scaffolding- For Foundation, Culverts (Head walls) ---- including cost of all materials, labour, HOM, I Cum531.13531.1367.63FalseNoneNoneFalseNoneFalse35920.32190
268447683917NoneVol-3 Pg.no 146 It No. 16.15.ii of 2023-24Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 1000mm dia PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.15-ii Page No.146) ---- including cost of all materials, labour, HOM, I m8355.98355.930.0FalseNoneNoneFalseNoneFalse250677.00
268447783917NoneVol-1 Pg.no 7 It No. 1.9 of 2023-24Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering,lead up to 50 m and lift upto 1.5 m Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.9 Page No.7) ---- including cost of all materials, labour, HOM, I Cum279.3279.325.2FalseNoneNoneFalseNoneFalse7038.360
17081825450000NoneNoneRoadsConstruction of RCC Drain work2670791.74
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268447883918NoneVol-1 Pg.no 8 It No. 1.14.1 of 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete ---- including cost of all materials, labour, HOM, I Cum107.1107.1459.0FalseNoneNoneFalseNoneFalse49158.90
268447983918NoneVol-1 Pg.no 15 It No. 2.1.3 of 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I Cum6288.456288.4545.0FalseNoneNoneFalseNoneFalse282980.250
268448083918NoneVol-1 Pg.no 18 It No. 2.11.h of 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures ---- including cost of all materials, labour, HOM, I Tonne82961.5582961.558.5FalseNoneNoneFalseNoneFalse705173.1750
268448183918None122-AAProviding and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I Cum6639.156639.15182.25FalseNoneNoneFalseNoneFalse1209985.08750
268448283918NoneVol-1 Formwork Pg No 111 SI No. 4 of 2023-24Additionalities for Formwork, Centering & Scaffolding For Cement Concrete Drain Walls ---- including cost of all materials, labour, HOM, I Cum2323.72323.7182.25FalseNoneNoneFalseNoneFalse423494.3250
17081825450000NoneNoneRoadsMaintenance of Road Work for 3rd Year167129.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268448383919NoneRate as per PWD notification SBC-AE-1-2023-24 regaRoad Maintenance for 3rd yearfor road with BM+SDBC as wearing coat: Maintenanceof Road for 3rd yearby Clearing & Uprooting Vegetation on either sides of road, Maintenance of surface drains by cleaning, reshaping, deepening of side drains, Stripping excess soil from the shoulder surface and making up loss of material/irregulaties on shoulder whatever necessary, Maintenance & painting of 200 metre and km stones, White washing of parapet walls of CD work and tree trunks, Patching of shallow and deep potholesusing premixed bitumenmixes corresponding to the layersof the road and repairs to CDs including Vent clearance. ---- including cost of all materials, labour, HOM, I Per Km32770.532770.55.1FalseNoneNoneFalseNoneFalse167129.550
17081825450000NoneNoneRoadsMaintenance of Road Work for 4th Year293079.15
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268448483920NoneRate as per PWD notification SBC-AE-1-2023-24 regaRoad Maintenance for 4th yearfor road with BM+SDBC as wearing coat: Maintenanceof Road for 4th yearby Clearing & Uprooting Vegetation on either sides of road, Maintenance of surface drains by cleaning, reshaping, deepening of side drains, Stripping excess soil from the shoulder surface and making up loss of material/irregulaties on shoulder whatever necessary, Maintenance & painting of 200 metre and km stones, White washing of parapet walls of CD work and tree trunks, Patching of shallow and deep potholesusing premixed bitumenmixes corresponding to the layersof the road and repairs to CDs including Vent clearance. ---- including cost of all materials, labour, HOM, I Per Km57466.557466.55.1FalseNoneNoneFalseNoneFalse293079.150
17081825450000NoneNoneRoadsMaintenance of Road Work for 5th year369869.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268448583921NoneRate as per PWD notification SBC-AE-1-2023-24 regaRoad Maintenance for 5th yearfor road with BM+SDBC as wearing coat: Maintenanceof Road for 5th yearby Clearing & Uprooting Vegetation on either sides of road, Maintenance of surface drains by cleaning, reshaping, deepening of side drains, Stripping excess soil from the shoulder surface and making up loss of material/irregulaties on shoulder whatever necessary, Maintenance & painting of 200 metre and km stones, White washing of parapet walls of CD work and tree trunks, Patching of shallow and deep potholesusing premixed bitumenmixes corresponding to the layersof the road and repairs to CDs including Vent clearance. ---- including cost of all materials, labour, HOM, I Per Km72523.572523.55.1FalseNoneNoneFalseNoneFalse369869.850
17081825450000NoneNoneRoads6th Year Renewal Work11202625.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268448683922NoneVol-3 Pg.no 9 It No. 2.5.ii b of 2023-24Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer a In area of thorny jungle ---- including cost of all materials, labour, HOM, I 100 Sqm508.2508.2248.88FalseNoneNoneFalseNoneFalse126480.8160
268448783922NoneVol-3 Pg.no 147 It No. 16.22 of 2023-24Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification. ---- including cost of all materials, labour, HOM, I Per Km2083.22083.25.1FalseNoneNoneFalseNoneFalse10624.320
268448883922NoneVol-3 Pg.no 147 It No. 16.19 of 2023-24The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. ---- including cost of all materials, labour, HOM, I m6.36.3450.0FalseNoneNoneFalseNoneFalse2835.00
268448983922NoneVol-3 Pg.no 91 It No. 10.3 of 2023-24Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor ---- including cost of all materials, labour, HOM, I Sqm40.9540.954590.0FalseNoneNoneFalseNoneFalse187960.50
268449083922NoneVol-3 Pg.no 91 It No. 10.2 of 2023-24Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment ---- including cost of all materials, labour, HOM, I Sqm101.85101.854590.0FalseNoneNoneFalseNoneFalse467491.50
268449183922NoneVol-3 Pg.no 148 It No. 16.24.i of 2023-24Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification. (i) Painting two coats with synthetic enamel paint ---- including cost of all materials, labour, HOM, I Per Km216.3216.35.1FalseNoneNoneFalseNoneFalse1103.130
268449283922NoneVol-3 Pg.no 91 It No. 10.4 of 2023-24Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- including cost of all materials, labour, HOM, I Sqm164.85164.851402.5FalseNoneNoneFalseNoneFalse231202.1250
268449383922NoneVol-3 Pg.no 31 It No. 5.3 of 2023-24Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- including cost of all materials, labour, HOM, I Sqm12.612.628050.0FalseNoneNoneFalseNoneFalse353430.00
268449483922NoneVol-3 Pg.no 43 It No. 5.31 of 2023-24Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. ---- including cost of all materials, labour, HOM, I Cum10659.610659.6841.5FalseNoneNoneFalseNoneFalse8970053.40
268449583922NoneVol-3 Pg.no 67 It No. 8.15 of 2023-24Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- including cost of all materials, labour, HOM, I Sqm556.5556.51530.0FalseNoneNoneFalseNoneFalse851445.00
17081825450000NoneNoneRoadsEstimate for Electrical Pole Shifting471794.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268449683923NoneP No-3, I no-1.02, Material code-200106RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ---- including cost of all materials, labour, HOM, I Nos8242.08242.02.0FalseNoneNoneFalseNoneFalse16484.00
268449783923NoneP No-3, I no-1.06, Material code-200006PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I Nos5365.05365.02.0FalseNoneNoneFalseNoneFalse10730.00
268449883923NoneP No-3, I no-1.05, Material code-200004PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I Nos4631.04631.02.0FalseNoneNoneFalseNoneFalse9262.00
268449983923NoneP No-3, I no-2.01, Material code-27902011 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I Nos478.0478.06.0FalseNoneNoneFalseNoneFalse2868.00
268450083923NoneP No-3, I no-2.11, Material code-279092HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I Nos197.0197.06.0FalseNoneNoneFalseNoneFalse1182.00
268450183923NoneP No-3, I no-2.07, Material code-279012LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I Nos238.0238.06.0FalseNoneNoneFalseNoneFalse1428.00
268450283923NoneP No-5, I no-6.10, Material code-28332011 kV, 45 kN Polymeric Insulator . ---- including cost of all materials, labour, HOM, I Nos186.0186.06.0FalseNoneNoneFalseNoneFalse1116.00
268450383923NoneP No-5, I no-6.06, Material code-28300811 kV, 5 kN Composite/Polymeric Pin Insulator. ---- including cost of all materials, labour, HOM, I Nos205.0205.06.0FalseNoneNoneFalseNoneFalse1230.00
268450483923NoneSetGuy Set ---- including cost of all materials, labour, HOM, I Set1220.01220.06.0FalseNoneNoneFalseNoneFalse7320.00
268450583923NoneP No-5, I no-7.02, Material code-284108)Rabbit ACSR conductor ---- including cost of all materials, labour, HOM, I Km49103.049103.06.0FalseNoneNoneFalseNoneFalse294618.00
268450683923NoneP No-218, I no-26.02)Loading & Unloading of 9mt pole. ---- including cost of all materials, labour, HOM, I Nos92.092.06.0FalseNoneNoneFalseNoneFalse552.00
268450783923NoneP No-218, I no-26.01)Loading & Unloading of 8mt pole. ---- including cost of all materials, labour, HOM, I Nos69.069.06.0FalseNoneNoneFalseNoneFalse414.00
268450883923NoneNosR&R of 9mt pole ---- including cost of all materials, labour, HOM, I Nos1166.01166.06.0FalseNoneNoneFalseNoneFalse6996.00
268450983923NoneNosR&R of X-Arm ---- including cost of all materials, labour, HOM, I Nos106.0106.06.0FalseNoneNoneFalseNoneFalse636.00
268451083923NoneNosR&R of HTST ---- including cost of all materials, labour, HOM, I Nos106.0106.06.0FalseNoneNoneFalseNoneFalse636.00
268451183923NoneNosR&R of Rabbit ---- including cost of all materials, labour, HOM, I Nos2869.02869.06.0FalseNoneNoneFalseNoneFalse17214.00
268451283923NoneP No-3, I no-1.02, Material code-200106RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ---- including cost of all materials, labour, HOM, I Nos1166.01166.06.0FalseNoneNoneFalseNoneFalse6996.00
268451383923NoneP No-3, I no-1.06, Material code-200006PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I Nos1166.01166.04.0FalseNoneNoneFalseNoneFalse4664.00
268451483923NoneP No-3, I no-1.05, Material code-200004PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I Nos932.0932.06.0FalseNoneNoneFalseNoneFalse5592.00
268451583923NoneP No-3, I no-2.01, Material code-27902011 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I Nos106.0106.016.0FalseNoneNoneFalseNoneFalse1696.00
268451683923NoneP No-3, I no-2.11, Material code-279092HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I Nos106.0106.016.0FalseNoneNoneFalseNoneFalse1696.00
268451783923NoneP No-3, I no-2.07, Material code-279012LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I Nos106.0106.016.0FalseNoneNoneFalseNoneFalse1696.00
268451883923NoneSetGuy Set ---- including cost of all materials, labour, HOM, I Set390.0390.016.0FalseNoneNoneFalseNoneFalse6240.00
268451983923NoneP No-218, I no-26.02)Loading & Unloading of 9mt pole. ---- including cost of all materials, labour, HOM, I Nos92.092.016.0FalseNoneNoneFalseNoneFalse1472.00
268452083923NoneP No-218, I no-26.01)Loading & Unloading of 8mt pole. ---- including cost of all materials, labour, HOM, I Nos69.069.016.0FalseNoneNoneFalseNoneFalse1104.00
268452183923NoneNosR&R of 9mt pole ---- including cost of all materials, labour, HOM, I Nos1166.01166.016.0FalseNoneNoneFalseNoneFalse18656.00
268452283923NoneNosR&R of X-Arm ---- including cost of all materials, labour, HOM, I Nos106.0106.016.0FalseNoneNoneFalseNoneFalse1696.00
268452383923NoneNosR&R of HTST ---- including cost of all materials, labour, HOM, I Nos106.0106.016.0FalseNoneNoneFalseNoneFalse1696.00
268452483923NoneNosR&R of Rabbit ---- including cost of all materials, labour, HOM, I Nos2869.02869.016.0FalseNoneNoneFalseNoneFalse45904.00
17081825450000NoneNoneRoadsSupplying of Vehicle to PWD Sub-Division Yelburga1096002.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
268452583924NoneGeM Product ID: 5116877-4210875374Mahindra Bolero Neo N10 (O) BS-VI ---- including cost of all materials, labour, HOM, I Each1096002.01096002.01.0FalseNoneNoneFalseNoneFalse1096002.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17081825460000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17081825460000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17081825460001NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17082619590000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17082620330000NoneNoneELIGIBILITYThe agency shall furnish affidavit stating that existing commitments furnished by him are true. If found falls action shall be taken as per rules.None
17082620520000NoneNoneELIGIBILITYThe bidder shall bear all costs associated with the preparation and submission of each tender and the employer will in no case be responsible and liable for those costs. The department is not responsible for any delay in accessing KPP portal.None
17082620670000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17082621250000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17082621400000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17082621550000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year. (both days inclusive)None
17082622050000NoneNoneELIGIBILITYThe Item Rates quoted shall include cost of Royalty charges on constructive materials & other taxes as per the prevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loading and unloading, with all leads & lifts, labour, hire charges of all machineries & equipments and all incidental charges etc., complete necessary for completion of work. All the Items shall beexecuted as directed by the Engineer-in-charge of the work.None
17082622290000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent. And scan the original certificates and attach the scanned file to the bid. The Original Certificate/certificates shall be produced at the time of opening of technical bids for physical verification.None
17082622540000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 -Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17082622720000NoneNoneELIGIBILITYThe bidder required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17082623580000NoneNoneELIGIBILITYThe Tenderer shall furnish required information in all prescribed formats. Scan & upload all the original documents/Formats required for this bid to the KPPP portal. The Original documents/ Formats shall be produced at the time of opening of technical bid for physical verification.None
17083049010000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents shall also be up loaded in the tasks created under Document/ Evidence required from the bidder.None
17083049960000NoneNoneELIGIBILITYAll materials required for this work shall be procured by the bidder himself and should got tested by the quality control authorities at his own cost before use on the workNone
17083050110000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the standard bid document KW4 KPWD and further orders theron.None
17083050460000NoneNoneELIGIBILITYThe KPWD Code, KTTP Act/ Rules, Delegation of powers and other Government orders issued by Government from time to time will apply.None
17083050560000NoneNoneELIGIBILITYIf the office happens to be closed on the dates notified, next working day will holds good.None
17083050680000NoneNoneELIGIBILITYThe field laboratory shall preferably locate, adjacent to the site with the required amenity as per the clause. Failing which 1% of the amount of work done will be penalized.None
17083050830000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damage occurred during the undue delay period in accordance with the Karnataka Highway act 1964.None
17083050970000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17083051090000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any law as concerned.None
17083051190001NoneNoneELIGIBILITYAll items are excluding 18%GST shall be paid to the tendered amount separately. except Mahindra Bolero Neo N10 (O) BS-VINone
17083051310000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17083051480000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17083051670000NoneNoneELIGIBILITYThe tenderers shall note that as per the Government Order No.FD/850/ EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015 & GO no 850-12/15 Dated 15-12-2016 the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for purchases, but not for works.None
17083052000000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work. In case of any mishap, accidents are cause of death it is the duty of the contractor to settle the dispute at is own cost. In no way department is held responsible.None
17083052300000NoneNoneELIGIBILITYconstruction materials (Minerals Metal, Sand and Murum, etc.,) shall be bought from the authorized quarries along with the mineral dispatch permit or else 5 times the royalty will be deducted as penalty as per the Directions on the Director, Mines and Geology Department Bangalore Proceedings Dated 25-03-2013.None
17083052450000NoneNoneELIGIBILITYThe defect liability period is two (2) years from the date of actual completion of work.None
17083052570000NoneNoneELIGIBILITYFinancial turn over and Financial commitments of previous years shall be given weight age of 10% per year to bring them to the price level of 2023-24 in the technical qualification criteria.None
17083052720000NoneNoneELIGIBILITYThe tender period for completion of work is nine (9) Calendar months. (Including monsoon period)None
17083052930000NoneNoneELIGIBILITYThe tenderer has to quote the rates are exclusive of GST and As per Government CIRCULAR NO:FD/447/EXPENDITURENone
17083053140000NoneNoneELIGIBILITYGST declaration certificate must be uploaded mandatory by the prospective bidders.None
17083053360000NoneNoneELIGIBILITYAll necessary arrangements shall be made and precaution taken to prevent completely or partially, damage to the structure or labours / employees during construction period. (As per recent Labour Act) Contractor shall be fully responsible for any damage to the structure during the construction and maintainance period.Any damage caused due to any reasons shall be rectified / replaced at his own cost as per the direction of Engineer in charge. Nothing shall be payable by the Department on account of inclusive of all such arrangements/ precautions work needed.None
17083053640001NoneNoneELIGIBILITYThe Earnest Money Deposit Rs.12,05,000.00 through KPPP portal OR it shall be in two parts. Part (1) Rs. 1,00,000.00 through KPPP portal under any one of the option (CC/DD/NEFT/OTC) and Part (2) Balance EMD of Rs. 11,05,000.00 shall be in favour of the Executive Engineer, PWD Division Koppal, in the form of Bank Guarantee in the prescribed format obtained from any Nationalized/Scheduled Bank. The scanned copy of the original Part(2) EMD should be uploaded along with the Technical bid. The part (2) of the EMD shall be delivered to the Executive Engineer before the prescribed Date and time of opening of the Technical Bids.None
17083053810000NoneNoneELIGIBILITYThe contractor shall bound to comply the prevailing rules and regulations with regard to the EPF rules.None
17083054050000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17084233990000NoneNoneELIGIBILITYThe Tenderer or his identified sub contractor should possess required valid electrical license for executing electrification worksNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneAs per Clause 3.2(b) : To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) satisfactorily completed (at least 50% of the contract value) as prime contractor, at least one similar work such as Asphalt Road Work of value not less than Rs. 401.52 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAs per Clause 3.2(c) :To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (c) executed in any one year, the following minimum quantities of work :a) Earthwork, Embankment,Sugrade &Earthen shoulders: 7945.00 Cum. b)GSB: 4972.00 Cumc)WMM/ WBM: 5647.00 Cum.d)BM/ SDBC: 2480.00Cum. e)RCC/ PCC:242.00Cum.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNonePWD Registration copyCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneAs per Clause 3.3(a)&(b) : To qualify for award of this contract, Each Tenderer should demonstrate the availability of the machineries/equipment as mentioned below1)Pug mill 1 No.Own/Hire/ Lease 2) Mechanical concrete mixer - 2 Nos. i.e.,1 No. Own, 1 No.Own/Lease/Hire 3) Tippers - 4 Nos : 2 Own, 2 Own/Hire/ Lease 4) Excavators - 2 Nos :1Own, 1 Own/Hire/Lease 5) Water Tankers : 2 Nos - 1 Own, 1 Own/Hire/LeaseCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneAs per Clause 3.2(a): To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (a) achieved in at least two financial years a minimum financial turn over (in all classes of civil engineering construction works only) of Rs.1606.05 Lakhs. (usually not less than two times the estimated annual payments under this contract)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Profit and loss statements and auditors reports
NoneNoneNoneNoneAs per Clause 3.3(c) : To qualify for award of this contract, Each Tenderer should further demonstrate: Liquid assets and /or availability of credit facilities of not less than Rs. 267.70 Lakhs. (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in the peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNonePrincipal Place of BusinessOthersPrincipal Place of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Principal Place of Business
NoneNoneNoneNoneLitigation in which the Tenderer is involved.OthersLitigation in which the Tenderer is involved.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Litigation in which the Tenderer is involved.
NoneNoneNoneNoneList of existing commitments and ongoing works.OthersList of existing commitments and ongoing works.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works.
NoneNoneNoneNoneList of works for which tenders already submitted.OthersList of works for which tenders already submitted.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted.
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN issued by CATrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
Principal place of businessTrueTechnical Bid
Cost of work for which Tenders submitted.TrueTechnical Bid
Cost of work for which Tender acceptance letters received.TrueTechnical Bid
Cost of existing commitments and on going works.TrueTechnical Bid
Litigation in which the Tenderer is involved.TrueTechnical Bid
Work Done Certificate Not Below the rank of Executive EngineerTrueTechnical Bid
Line CreditTrueTechnical Bid
MachineriesTrueTechnical Bid
Bankers addressTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1708424060000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer, PWD Division Koppal
streetNone
cityKoppal
stateKarnataka
pin583231
tenderRecallDTONone